gillian gillett 01-10-12 spur

10
Grade Separa)on and Rail Alignments

Upload: adina-levin

Post on 12-Nov-2014

7.391 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Gillian Gillett 01-10-12 SPUR

Grade  Separa)on  and  Rail  Alignments  

Page 2: Gillian Gillett 01-10-12 SPUR

Benefits  of  Grade  Separa0on  

•  Improve  safety  •  Enable  higher  train  speeds  •  Minimize  delay  to  16th  Street  Bus  Rapid  Transit  •  Incompa0ble  train  and  bus  overhead  wire  systems  •  Minimize  traffic  delay  and  queuing  •  Prevent  neighborhood  traffic  diversion  •  Eliminate  train  horn  noise  

To  create  grade  separa0on,  either  the  streets  or  the  tracks  need  to  be  depressed  

Page 3: Gillian Gillett 01-10-12 SPUR

Mission  Bay  Street  Under  Tracks  

Source:  CaHSRA  

Page 4: Gillian Gillett 01-10-12 SPUR

16th  Street  Under  Tracks  

Source:  CaHSRA  

Kaiser  MOB  site  

DaggeQ  Place  Development  (400  residen0al  units,  46K  office)  

Page 5: Gillian Gillett 01-10-12 SPUR

16th  Street  Under  Tracks  

Source:  CaHSRA  

Kaiser  MOB  site  

DaggeQ  Place  

Page 6: Gillian Gillett 01-10-12 SPUR

7th  Street  Underpass,  Oakland  

•  Inhospitable  pedestrian  realm  •  Exacerbates  barrier  between  neighborhoods  •  Inhibits  access  to  adjacent  land  uses  

Page 7: Gillian Gillett 01-10-12 SPUR

•  Reconnect  neighborhoods  •  Improve  aesthe0cs  •  Reduce  noise  •  Enable  access  to  adjacent  land  uses  

Preferred  design  would  depress  tracks  under  street    –  like  a  subway  

Underground  tracks  enable  poten0ally  straighter  or  shorter  route  than  exis0ng  alignment  

Page 8: Gillian Gillett 01-10-12 SPUR

Alterna0ve  Rail    Alignments  Considered  

Source:    SFCTA  

West  Route  •  Conflicts  with  Moscone  &  SFMOMA  •  No  Mission  Bay  sta0on  (except  spur)  

East  Route  •  Poten0al  conflicts  with  Mission  Bay  

building  pilings  •  Relocated  Mission  Bay  sta0on  to  east  

DTX  Route  •  Retain  0ght  curve  at  7th/Townsend  •  Mission  Bay  sta0on  remains  

Page 9: Gillian Gillett 01-10-12 SPUR

1.  Connect  to  DTX  at  4th/Townsend  Sta0on?  2.  Avoid  major  sewer  infrastructure  3.  Avoid  structures  on  pilings  4.  During  construc0on:  •  Maintain  Caltrain  opera0on  •  Minimize  disrup0on  to  local  land  uses  •  Accommodate  local  circula0on  and  regional  traffic  

Constraints  on  Poten0al  Rail  Alignments  

Page 10: Gillian Gillett 01-10-12 SPUR

•  Simplest  op0on  •  May  not  be  physically  or  structurally  

feasible  

Op0on  1:    Trench  in  between  freeway  pilings