gillette south boston manufacturing center chapter 91

19
Gillette South Boston Manufacturing Center Chapter 91 License Application FORT POINT NEIGHBORHOOD ASSOCIATION MARCH 31, 2020

Upload: others

Post on 06-Feb-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gillette South Boston Manufacturing Center Chapter 91

Gillette South Boston Manufacturing CenterChapter 91 License Application

FORT POINT N E I G H B O R H O O D

ASSOCIATION

MARCH 31, 2020

Page 2: Gillette South Boston Manufacturing Center Chapter 91

LICENSE HISTORY

4/20/2020 2

Page 3: Gillette South Boston Manufacturing Center Chapter 91

PURPOSE OF LICENSE

Single License to Maintain:

➢ Existing structures and uses

➢ Water-dependent industrial uses

➢ Water-dependent accessory uses

34/20/2020

Page 4: Gillette South Boston Manufacturing Center Chapter 91

P ROJ E C T S I T E

• 8 Parcels

• 25.6 acres— most of which is historically filled tidelands

• Includes 46,364 sf of water-sheet

Page 5: Gillette South Boston Manufacturing Center Chapter 91

P ROJ E C T S I T E

• 8 Parcels

• 25.6 acres— most of which is historically filled tidelands

• Includes 46,364 sf of water-sheet

Page 6: Gillette South Boston Manufacturing Center Chapter 91

EXTENDED TERM LICENSE REQUEST

4/20/2020 6

Page 7: Gillette South Boston Manufacturing Center Chapter 91

MUNICIPAL HARBOR PLAN

74/20/2020

Page 8: Gillette South Boston Manufacturing Center Chapter 91

CHAPTER 91

Water-Dependent

vs.

Nonwater-Dependent

84/20/2020

Page 9: Gillette South Boston Manufacturing Center Chapter 91

4/20/2020 9

1. Seawater intake building is located here.

Page 10: Gillette South Boston Manufacturing Center Chapter 91

2. Three pipes run below the parking lots and above the I-90 highway tunnel.

4/20/2020 10

Page 11: Gillette South Boston Manufacturing Center Chapter 91

3. Cooling water from the manufacturing building is returned to the Channel through the outfall at Location 3.

4/20/2020 11

Page 12: Gillette South Boston Manufacturing Center Chapter 91

4. Water used to cool manufacturing machinery discharges at Location 6.

4/20/2020 12

Page 13: Gillette South Boston Manufacturing Center Chapter 91

5. Water taken from the Channel cools power-generating machinery at the Power House (and at the Chiller Building for warm-weather cooling of the buildings). Water is discharged at locations 6 and 7.

4/20/2020 13

Page 14: Gillette South Boston Manufacturing Center Chapter 91

MA DEP CHAPTER 91PUBLIC PROCESS

File Number Reference:W20-5696

4/20/2020 14

Page 15: Gillette South Boston Manufacturing Center Chapter 91

COMMENTS TO:

Susan YouWaterways Regulation ProgramMass DEPOne Winter Street, 5th FloorBoston, MA 02108

[email protected]

Page 16: Gillette South Boston Manufacturing Center Chapter 91

LANDLOCKED TIDELANDS

• Any filled tidelands which on January 1, 1984 were entirely separated by a public way or interconnected public ways from any flowed tidelands;

• Except for that portion of such filled tidelands which are presently located within 250 feet of the high-water mark, 310 CMR 9.02

Page 17: Gillette South Boston Manufacturing Center Chapter 91

4/20/2020 17

Page 18: Gillette South Boston Manufacturing Center Chapter 91
Page 19: Gillette South Boston Manufacturing Center Chapter 91