gie 2008 bucharest lessons from denmark1 lessons from denmark - development in the last ten years...
TRANSCRIPT
Lessons from Denmark 1GIE 2008 Bucharest
Lessons from Denmark - Development in the last ten years
Energinet.dk
Torben BraboVice President, Gas
2Lessons from Denmark GIE 2008 Bucharest
EU Gas Directive
1998
From domestic
production to import
From closed book
to open processDanish wish
for full opening and unbundling
From national to European initiatives
From manual to online to real-time
From few bilateral contracts to
auctionsFrom fossil
fuel to climate friendly energies
Agenda GIE Conference Bucharest
3Lessons from Denmark GIE 2008 Bucharest
• One political deal
• One gas company
• Planning introduced gas
• Domestic reserves
• Simple infrastructure
• One year lead time for implementation of Gas Directive
• One political deal
• One gas company
• Planning introduced gas
• Domestic reserves
• Simple infrastructure
• One year lead time for implementation of Gas Directive
• 23 shippers
• 10 storage customers
• Export for more than 25 years
• Declining reserves change the supply picture
• Open process with customers and authorities on developing the Network Code
• 23 shippers
• 10 storage customers
• Export for more than 25 years
• Declining reserves change the supply picture
• Open process with customers and authorities on developing the Network Code
1999-2003 2004-2008 2009-2012
From closed book to open process
• Energinet.dk Online - one hour lead time
• More DMS
• Central data hub
• Open Season coordinated with Norway, Poland, Sweden, Germany
• Third Directive and ENTSOG - What can we do for the customers?
• Energinet.dk Online - one hour lead time
• More DMS
• Central data hub
• Open Season coordinated with Norway, Poland, Sweden, Germany
• Third Directive and ENTSOG - What can we do for the customers?
4Lessons from Denmark GIE 2008 Bucharest
• Few contracts between Danish Underground Consortium and DONG
• Few contracts between DONG and regional DSOs
• No TSO contracts
• Few contracts between Danish Underground Consortium and DONG
• Few contracts between DONG and regional DSOs
• No TSO contracts
• New entrants
• Old agreements partitioned
• GTF reaches 50% of demand
• Nord Pool Gas
• TSO acts on market based mechanisms
• IT is the key
• New entrants
• Old agreements partitioned
• GTF reaches 50% of demand
• Nord Pool Gas
• TSO acts on market based mechanisms
• IT is the key
1999-2003 2004-2008 2009-2012
From bilateral contracts to auctions
• Balance system tightened
• Exchange provides real price signals
• Intra-day balancing market
• Regulating gas market
• Daily auctions
• What products are required in a liberalised market?
• Balance system tightened
• Exchange provides real price signals
• Intra-day balancing market
• Regulating gas market
• Daily auctions
• What products are required in a liberalised market?
5Lessons from Denmark GIE 2008 Bucharest
• Danish climate goals include 20% renewables by 2011 and ”no fossil fuels” by 2050
• Can gas play the role as intermediate fuel bringing us from the fossil era to a greener future?
• Gas competes with biofuels and looses!
• Danish climate goals include 20% renewables by 2011 and ”no fossil fuels” by 2050
• Can gas play the role as intermediate fuel bringing us from the fossil era to a greener future?
• Gas competes with biofuels and looses!
• Biogas are one option
• Gas in the transport sector another
• CO2 goal is key
• Energinet.dk has EUR 20m R&D programme
• Biogas are one option
• Gas in the transport sector another
• CO2 goal is key
• Energinet.dk has EUR 20m R&D programme
2008 2009 2020
Climate is the future
• Carbon Capture and Storage (CSS)
• 2 Danish projects
• Hydrogen?
• TSO role for CSS or hydrogen?
• Gas as flexible fuel in the power sector
• Carbon Capture and Storage (CSS)
• 2 Danish projects
• Hydrogen?
• TSO role for CSS or hydrogen?
• Gas as flexible fuel in the power sector
6Lessons from Denmark GIE 2008 Bucharest
The Potential Scandinavian Gas Market in 2013
Existing pipelines
Existing storage facilities DK
Baltic Pipe
Potential storage capacity
Potential pipelinesSkanled
Existing compressors
Existing hubs
Potential hubs
Potential compressors
7Lessons from Denmark GIE 2008 Bucharest
Customers and Market Development:
Pia H. Nielsen, [email protected]
Marcus Hansen, [email protected]
Tariffs and Infrastructure:
Søren Juel Hansen, [email protected]
Frederik Kjerulf, [email protected]
Settlement:
Christian Andersen, [email protected]
Gas Storage:
Bjørn Denninger, [email protected]
Gas Division:
Peter A. Hodal, [email protected]
Torben Brabo, [email protected]
Thank you for your attention!Thank you for your attention!
Contacts in Energinet.dk Gas Division