gfe at the nw forecast center harold opitz hydrologist in charge northwest river forecast center
DESCRIPTION
GFE at the NW Forecast Center Harold Opitz Hydrologist in Charge Northwest River Forecast Center. GFE at NWRFC Impetus. New direction by NWS Replacement for WR MM system Collaboration ISC capabilities Expansion to other modeling DHM. GFE at NWRFC Mechanics. Mechanical Hurdles - PowerPoint PPT PresentationTRANSCRIPT
11
GFE at the NW Forecast Center
Harold Opitz
Hydrologist in ChargeNorthwest River Forecast Center
22
New direction by NWSNew direction by NWS
Replacement for WR MM Replacement for WR MM systemsystem
CollaborationCollaboration ISC capabilitiesISC capabilities
Expansion to other modelingExpansion to other modeling DHMDHM
GFE at NWRFCImpetus
33
Mechanical HurdlesMechanical Hurdles Can GFE run at an RFC?Can GFE run at an RFC?
Initial distribution on DX1Initial distribution on DX1 Performance issues/Compete with CPU Performance issues/Compete with CPU
resourcesresources Grid Resolution/Domain sizeGrid Resolution/Domain size
PowerPC attached to AWIPS productionPowerPC attached to AWIPS production Stand Alone GFEStand Alone GFE
ATAN Site ATAN Site
GFE at NWRFCMechanics
44
Experiment with GridsExperiment with Grids
GFE at an RFC?GFE at an RFC? PowerPC attached to AWIPSPowerPC attached to AWIPS Stand alone GFEStand alone GFE
3-Phase project3-Phase project
ATANATAN
GFE at NWRFC3-Phase Project
55
Parallel with Legacy SystemParallel with Legacy System Mitigate Performance issuesMitigate Performance issues Generate Precip/Temp grid and point dataGenerate Precip/Temp grid and point data
Explore “Smart” Tool and Formatter DevelopmentExplore “Smart” Tool and Formatter Development
Demonstrate ISC capabilitiesDemonstrate ISC capabilities
VerificationVerification Emulate WFO verificationEmulate WFO verification BOIverifyBOIverify
GFE at NWRFCPhase I
66
Emulate Current Legacy System ServicesEmulate Current Legacy System Services
10-day forecast Precip, Temp, Freeze Level10-day forecast Precip, Temp, Freeze Level Day 1-3 & Day 4-10Day 1-3 & Day 4-10
Forecast ProductionForecast Production Use Model Input - eg, GFS40, ETA12, DGEXUse Model Input - eg, GFS40, ETA12, DGEX WFO Input - ISCWFO Input - ISC Blank screenBlank screen OR any mix of the aboveOR any mix of the above
Exercise ISC capabilitiesExercise ISC capabilities
GFE at NWRFC
77
Precipitation 10 days - 6 hr steps
Temp(mx) 10.5 days - 6 hr steps
• 2.5 km• 604x644=388976 grid cells
• Point data•Precip•Temp (max/min)• Freeze Levels
• Mean Areal Precip (phase 2)• Mean Areal Temp (phase 2)
• 10 days• 6 hour time steps
GFE at NWRFC
88
Daily Products Daily Products
Formatters to SHEF Formatters to SHEF encodeencode
GFE at NWRFC
99
Spring 2006 used GFE as Spring 2006 used GFE as Supplemental tool during April Supplemental tool during April Through JuneThrough June
Fall 2006 has GFE moving up Fall 2006 has GFE moving up quickly in priority as an quickly in priority as an operational tooloperational tool Used extensively during all event in Nov/DecUsed extensively during all event in Nov/Dec Priority Change due to Priority Change due to newnew HAS staff HAS staff
GFE remains “supplemental” in GFE remains “supplemental” in operations.operations.
GFE at NWRFC
1010
Phase 2Phase 2 Mean Areals directly from grid dataMean Areals directly from grid data Apply PRISM techniquesApply PRISM techniques Reverse ISC – Xmit RFC grids to Reverse ISC – Xmit RFC grids to
WFOs…WFOs…
Phase 3Phase 3 Operational?Operational? Training?Training?
GFE at NWRFCThe Other Phases
1111
VerificationVerification
TrainingTraining Meteorologist / HydrologistMeteorologist / Hydrologist Probabilistic / EnsembleProbabilistic / Ensemble
SupportSupport Hardware/SoftwareHardware/Software EnhancementEnhancement
GFE at NWRFCTo Be Accomplished or What to do to be Operational