getting to know iri and pci - nwpma-online.org · getting to know iri and pci:getting to know iri...

27
Getting to Know IRI and PCI: Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference, October 20-23, 2015

Upload: letram

Post on 25-Sep-2018

234 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

Getting to Know IRI and PCI:Getting to Know IRI and PCI:Their Applications for Local Agencies

Sui Tan, PEMTC

2015 NWPMA Conference, October 20-23, 2015

Page 2: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

2

Why is it Important?

MAP-21 Requirements Focus on:

• Performance• Accountability• Accountability• Transparency

Page 3: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

Kudos to FHWA:

3

Kudos to FHWA:

Page 4: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

Basics

International Roughness Index (IRI)

Basics

▫Measures pavement smoothness or ride quality▫Uses profiler to collect (low speed and high speed)▫ Reported in inches for one mile (inches per mile) in a

single wheel path. ▫More info:

http://www.pavementinteractive.org/article/roughness/

Page 5: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

BasicsPavement Condition Index (PCI)

d d d ( d

Basics

▫ Based on ASTM D6433 standard (20 AC and 19 PCC distresses) ▫ Rating from 0-100 100 as new pavementRating from 0 100, 100 as new pavement ▫Measures pavement surface distresses ▫ Data collected through walking, windshield, and semi-

automated.

Page 6: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

BasicsPresent Serviceability Rating (PSR)

Basics

▫ PCI to PSR conversion (for HPMS reporting): ▫ PSR is NOT PCI, it is adjusted PCI with low severity cracking

removed

▫ Conversion equation:Conversion equation:http://www.dot.ca.gov/hq/tsip/hpms/hpmslibrary/hpmspdf/2006wkbk.pdf

Page 7: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

PCI Applications

• Treatment Strategy Selection

PCI Applications

▫ 70< PCI <90 – Preventive Maintenance▫ 50< PCI <70 – Minor Rehab (load vs non-load related)

j h b▫ 25< PCI <50 – Major Rehab▫ PCI <25 – ReconstructionPerformance Meas res• Performance Measures ▫ Develop key performance indicators related to

pavement preservationpavement preservation

Page 8: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

Performance-Based Funding Allocation8

25% 25%

Funding

Lane MilesPM

Performance

Funding Allocation Formula

PopulationShortfall

25% 25%

Page 9: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

9

Pavement Preservation Index (PPI)

Actual PM % Recommended PM%Recommended PM%

Page 10: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

IRI Applications

• HPMS Reporting▫ Required by FHWA since 1990▫ All state DOTs have to report▫ Includes interstate and non-interstate NHS▫Non-interstate NHS = other principle arterials = Mostly

local

Page 11: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

Estimated MAP-21 NHS Mileages

State Pre MAP-21 NHS

Non-NHS PAS*

Post MAP-21 NHS

Change

California 7,155 6,994 14,149 98%Oregon 3,751 632 4,383 17%Washington 3,410 1,166 4,576 34%

Source: 2011 HPMS*PAS - Principal Arterial System

Page 12: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

IRI Applications

• New Construction Specifications▫ Use in some state DOTs – Washington, Virginia, Arizona,

Kansas▫ Virginia DOT – Acceptable 55 to 70 in/mi, bonus below 55

i / iin/mi▫ WSDOT – Acceptable at 60 in/mi▫ One municipality City and County of Denver▫ One municipality – City and County of Denver

Hot In-Place Recycle with 1” finishing course = 165 in/mil

Page 13: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

IRI Applications

• Treatment Filter▫ Caltrans - poor IRI (without distresses) triggers capital

preventive maintenance vs major rehabilitation/reconstruction ▫ Local agency – County of Charleston, SC

Overall Condition Index – based on IRI, cracking and rutting. Will soon get rid of IRI.

Page 14: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

IRI Applications

• Vehicle Operating Costs

IRI Applications

Vehicle Operating Costs▫ Consider VOC in pavement investment strategies▫ Rougher roads, higher VOCg , g▫Model developed based on IRI - NCHRP 720

A W d f C ti f PlA Word of Caution for Planners

IRI PCIIRI PCI

Page 15: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

Engineering Behavior of IRI and PCIEngineering Behavior of IRI and PCI

Page 16: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

When Pavement in Good ConditionWhen Pavement in Good Condition

Apply pp yPreventive Maintenance

Page 17: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

When Pavement in Poor ConditionWhen Pavement in Poor Condition

Apply Major pp y jRehab

Page 18: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

P t P ti

• PCI

Pavement Preservation

PCI▫ Detect low severity cracks▫ Provide maintenance intervention earlier

• IRI▫ Ignore low severity cracks▫Use for non-cracking, construction defects type of

t t ttreatment

Page 19: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

P f M t

19

Performance Management

Leading Indicator Lagging Indicatorg

Activities you must undertake to achieve

gg g

“output” oriented, easy to measure but undertake to achieve

the desired outcomeeasy to measure buthard to improve

VSVS

Page 20: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

P f M t

20

Performance Management

Leading Indicator Lagging IndicatorLeading Indicator Lagging Indicator

PCIPCI IRIIRI

Detect low severity cracks early

Will only detect cracks when they are sizable

Page 21: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

IRI Collection Challenges in Urban Setting

• Utility castings (manhole)• Difficult to control travel speed (signals & stop signs)• Short vertical curves and cross crowns• Grade breaks (drainage)• Street sections are shorter

Page 22: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

IRI Collection Challenges in Urban SettingIRI Collection Challenges in Urban Setting

• Urban IRI is highly localized▫ New York – Poor roads IRI > 800 in/mi (2001 study)

Washington DC (2014 Study)▫ Washington DC – (2014 Study)Mean IRI for local roads = 362 in/mi Mean PCI for local roads = 71Mean PCI for local roads 71

Conclusion:“ models developed could not be adequately used to predict“… models developed could not be adequately used to predict PCI from IRI.”

Page 23: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

Correlation of PCI and IRI

Page 24: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

City of Seattle (preliminary results)City of Seattle (preliminary results)

100

SDOT 2013 Pavement Condition Index (PCI) vs.WSDOT 2013 International Roughness Index (IRI)

70

80

90

100

(PCI

)

40

50

60

men

t Con

ditio

n In

dex

0

10

20

30

Pave

00 100 200 300 400 500 600 700 800

International Roughness Index (IRI)

SDOT 2013 PCI vs. WSDOT 2013 IRI

Page 25: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

Lit t R iLiterature Reviews

Jurisdiction Model R2 MSEUS Mid-Atlantic States and Canada

log(PCI)=2-0.436.log(IRI) 0.59 -

California IRI=0 0171*(153 PCI) 0 53California IRI=0.0171*(153 - PCI) 0.53 -

Washington, DC ln(IRIFreeways)= 6.672 – 0.42.PSR 0.55 -

India Artificial Neural Networks (Vydia) 0.86 0.041( y )

Iran Artificial Neural Networks (Shahnazri) 0.99 0.99

Iran Genetic Programming 0 98 2 63Iran Genetic Programming 0.98 2.63

Page 26: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

L L d▫ Understand the limitations of the study

“ model for IRI is limited to the range of 46 127 in/mile ” (Park & Lee 2007)

Lessons Learned

“…model for IRI is limited to the range of 46-127 in/mile.” (Park & Lee 2007)“ … model was based on data collected for construction zones…” (Vidya et al. 2013)

▫ Many studies used data from national database like LTPP▫ Many studies used data from national database like LTPP▫ Definitions on distresses, severity, and extends▫ The only VALID study to compare IRI and PCI on urban streets:

Both are collected on the same sectionBoth are collected on the same section Both are collected within reasonable time framePCI is based on ASTM D6433IRI is collected using low speed profilerIRI is collected using low speed profiler

Page 27: Getting to Know IRI and PCI - nwpma-online.org · Getting to Know IRI and PCI:Getting to Know IRI and PCI: Their Applications for Local Agencies Sui Tan, PE MTC 2015 NWPMA Conference,

Sui Tan, PEStreetSaver Program [email protected] 400 8428510-400-8428