INDEX 1. Gestamp Renewables

2. Gestamp Solar

3. Gestamp Wind

4. Gestamp Biomass

Page 3: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 3

GESTAMPRENEWABLES

Page 4: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 4 GE

STA

MP

RE

NE

WA

BLE

S –

GLO

BA

L P

RE

SE

NC

E

Gestamp BiomassGestamp WindGestampSolar

Page 5: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 5

Design, engineering and manufacturing of industrial components

• Systems of precisely defined processes, including equipment, tools and control procedures.

• Lins design and stress calculation of them.

• Preparation of basic projects and legal approval.

• Design and calculation for metal structures.

Development

• Location of sites• Feasibility studies• Project definition• Management of permits and licenses• Financial and investment analysis

Construction

• Earth removal.• Design and manufacture of

structures. • Modules supply• Transport and assembly.• Wiring.• Negotiation with suppliers• Project legal approval

• Plant Operation.• Plant monitoring and

Maintenance.• Compiling of information for

investors about planned activity.

• Fuel management

Maintenance

GE

STA

MP

RE

NE

WA

BLE

S –

VA

LUE

CH

AIN

Page 6: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 6

GESTAMP

SOLAR

Page 7: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 7

Solar Plants

Roof top Projects

GE

STA

MP

SO

LAR

– L

INE

S O

F A

CT

IVIT

Y

Gestamp Solar has participated in more than 500 MW of photovoltaic installations, manufacturing and supplying steel structures

to support this capacity

Employs over 150 people.

Solutions for solar systems

Page 8: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 8 GE

STA

MP

SO

LAR

– L

INE

S O

F A

CT

IVIT

Y

... And 120MW projected, mostly on parking shelters. Gestamp solar has installed over 75W of PV electricity generation facilities of some of the most important automobile makers in the world.

+ 75 MW in large Roof Tops

1 Vehicle and material protection against

meteorological elements

2 Cost reduction in insurances

3 Infrastructure improvements

4 Ecological and green image

5 Availability of electricity

Page 9: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 9 GE

STA

MP

SO

LAR

– G

LOB

AL

PR

ES

EN

CE

Page 10: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 10 GE

STA

MP

SO

LAR

– E

VO

LUT

ION

477 mw

2011 2012 2013 2014

390 mw 514 mw 684 mw

Page 11: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 11

Development

• Location of sites• Feasibility studies• Project definition• Management of permits and licenses• Financial and investment analysis

Construction

• Earth removal.• Design and manufacture of

structures. • Modules supply• Transport and assembly.• Wiring.• Negotiation with suppliers• Project legal approval

• Plant Operation.• Plant monitoring and

Maintenance.• Compiling of information for

investors about planned activity.

• Fuel management

Maintenance

GE

STA

MP

SO

LAR

– V

ALU

E C

HA

IN

Page 12: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 12

GESTAMP

WIND

Page 13: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 13

Development Construction Maintenance

GE

STA

MP

WIN

D –

KE

Y T

O S

UC

CE

SS

Gestamp Wind’s mission is to develop, construct, and operate its own wind farms through out the world, with the goal of becoming a significant player in the Wind Energy sector over the next few years.

In order to achieve this, Gestamp Wind has to rely on the international platform and industrial capabilities of Corporación Gestamp as well as in a team of highly qualified and experienced professionals.

Gestamp Wind is composed by a work force with extensive experience in the renewable energy sector especially in developing wind energy in the international market.

Design

Construction

Operation & Maintenance

Page 14: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 14 GE

STA

MP

WIN

D –

VA

LUE

CH

AIN

ManagementTeam

IndustrialProjects

With a Track record Management Team of more than 3.500 MW of wind power development from greenfield until its commercial operation, Gestamp Wind is a specialist in wind farm projects in strategic markets.

Deep knowledge of target markets

Wide experience in corporate operations with success in fulfilling the expectations of generating more value for more than 2.450 MW acquired.

Control of all phases of the business value chain

Gestamp Wind & Gonvarri Steel Industries.

Annual production target of 1.750 wind towers in 2013 with plants in 10 countries.

Planned investment of 110 MM€ in 4 years.

Supported by the strengths of Corporación Gestamp and their market knowledge on wind energy.

Strategic positioning differential:

Development linked to local, social and economic impact on investment.

Relationship with WTG manufacturers, improving the supply agreements and offering opportunities for joint development.

Page 15: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 15 GE

STA

MP

WIN

D –

TO

TAL

MW

Gestamp Wind Commercial Offices

Countries with Gestamp Wind Projects

MW IN OPERATION

2013

548

450

MW IN OPERATION

2014

784 MW IN OPERATION

2015

Page 16: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 16 GE

STA

MP

WIN

D –

VA

LUE

CH

AIN

Developiment Construction Maintenance

Sale of Energy

Towers construction

Page 17: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 17

GESTAMPBIOMASSGESTAMP

BIOMASS

Page 18: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 18 GE

STA

MP

BIO

MA

SS

– M

W U

ND

ER

CO

NS

TR

UC

TIO

N

has. forest

40,000

2013

Toneladas

90,0002013

Biomass energy production

Biomass energy production

HIASAFirst Facility

10M€Invest

Saves+3M€/year

2013 has. forest

40,000

Page 19: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 19 GE

STA

MP

BIO

MA

SS

– A

CT

IVIT

Y

USANewco Energy Holding

(33%)

75 Mwe

Uruguay

50 Mwe

In operation projects

Under development projects

UK

15 MW

Over 100 Mwe under development

92 Mwe in operation

17 3317

17

SPAINBioelectric Garray

(90%)

17Mwe

201367 MW

Underdevelopment

Page 20: Gestamp renewables eng july 2015

GESTAMP RENEWABLES July 2015| 20 GE

STA

MP

BIO

MA

SS

– A

CT

IVIT

Y

20 Mwe Spain

75 MweBerlin

15 Mwe United Kindom

50 MweUruguay

Garray Plant