geothermal energy system
DESCRIPTION
Geothermal Energy System. Progress Update. Impact. Will cut annual energy use by 50% Will reduce carbon dioxide emissions by 25,000 tons per year Will cut water usage by 8,000,000 gallons per year. Click to add title. Current Construction. - PowerPoint PPT PresentationTRANSCRIPT
Geothermal Energy System
Progress Update
• Will cut annual energy use by 50%
• Will reduce carbon dioxide emissions by 25,000 tons per year
• Will cut water usage by 8,000,000 gallons per year
Impact
Click to add title
Current Construction
• 645 total geothermal wells to serve 15 campus facilities– 425’-450’ deep– 20’ on centers
• 624 wells drilled to date• Ten percent of campus parking was impacted
with 8 lots being out of service at different times• Two lots remain under construction with
completion scheduled next month
Schedule
• Project Design Complete – October 10, 2012
• Project Advertisement – October 17, 2012• Project Pre-Bid – October 30, 2012• Bid Opening – November 15, 2012• Construction Activities Begin – January,
2012
Upcoming Construction
• Trenching for loop piping to begin early Spring 2012
• Trenching will occur for the entire geothermal loop, but in isolated portions at different timeframes
• Building mechanical system modifications will be addressed simultaneously