geosynthetic subsurface drainage systems for … · geosynthetic subsurface drainage systems for...

103
Geosynthetic Geosynthetic Subsurface Subsurface Drainage Systems For Drainage Systems For Pavements Pavements Foundation Performance Foundation Performance Association Association January 10, 2007 January 10, 2007

Upload: phamkien

Post on 21-Aug-2018

244 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

GeosyntheticGeosynthetic Subsurface SubsurfaceDrainage Systems ForDrainage Systems For

PavementsPavements

Foundation PerformanceFoundation PerformanceAssociationAssociation

January 10, 2007January 10, 2007

Page 2: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 3: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 4: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Subbase

Compacted Subgrade

Surface CourseBinder CourseBase Course

Natural Subgrade

Seal Coat Tack Coat

CONVENTIONAL FLEXIBLEPAVEMENTS

Page 5: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

MECHANISTIC-EMPIRICAL FRAMEWORK IN

THE 2002 PAVEMENT DESIGN GUIDE.

Page 6: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Related References

FHWA, 1992, Demonstration project 87: “Drainable pavement systems”, ParticipantNotebook, FHWA-SA-92-008.

US Army Corps of Engineers, 1992, “Engineering and design drainage layers forpavements”, Engineer Technical Letter, 1110-3-435, Department of Army.

Cedergren, 1987, “Drainage of highway and airfield pavements”, R. E. Kriegerpublishing Co, FL

Christopher and McGuffey, 1997, NCHRP Synthesis of highway practice 239,“Pavement subsurface drainage systems”, Transportation Research Board.

Christopher, Hayden, and Zhao, 1999, “Roadway Base and Subgrade GeocompositeDrainage Layers, “ ASTM STP 1390, American Society for Testing and Materials, June.

Christopher and Zhao, 2001, “Design manual for roadway geocomposite underdrainsystems”, Tenax Corporation.

Page 7: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Waterin thePavementStructure

PrimaryCause ofDistress

Page 8: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 9: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 10: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Water in Pavement Systems

AASHTO (1993) reports: Water in the asphalt surface

Moisture damage, modulus reduction and loss of tensile strengthMoisture damage, modulus reduction and loss of tensile strength Saturation reduces dry modulus of the asphalt Saturation reduces dry modulus of the asphalt ∃∃ 30 % 30 %

Moisture in unbound aggregate base and subbase Loss of stiffness Loss of stiffness ∃∃ 50 %50 %

Water in asphalt-treated base Modulus reduction of up to 30 percentModulus reduction of up to 30 percent Increase erosion susceptibility of cement or lime treated basesIncrease erosion susceptibility of cement or lime treated bases

Saturated fine grained roadbed soil Modulus reductions Modulus reductions ∃∃ 50 % 50 %

Page 11: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

% of Time Structural Section is Saturated

0 10 20 30 40 50

0

20

40

60

80

100S = Severity Factor

S=5

S=10

S=20

For a pavement section with a moderate severity factor of 10, if 10% of timethe pavement is approaching saturation, the pavement service life could bereduced by half.

Ref. Cedergren, H.R. 1987, Drainage of highway and airfield pavements, Robert E Krieger Publishing Co, FL.

Severity factormeasuresthe relativedamagebetween wetand dry periods

Page 12: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

TireTire

Subgrade Subgrade

DRAINAGE

Page 13: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

CONTAMINATION/ PUMPING

HMABase

Subgrade

Page 14: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

AGGREGATE PENETRATION

HMABase

Subgrade

Page 15: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 16: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 17: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

JOINT DETERIORATION

Page 18: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 19: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Water in Pavements Summary

• Stripping in HMA

• Loss of Subgrade Support

• Reduction of Granular LayerStiffness

• Erosion of Cement-Treated BaseLayers

• Reduction in the Pavement ServiceLife If Base Is Saturated forSometime

• Debond between Layers

Page 20: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

HOW TO ADDRESS THE PROBLEM?

Pavement geometry (slopes and ditches) Crack sealing Treated Layer Thicker Layers Full Width Subsurface Drainage

0.02 m/m 0.04 m/m

1 : 41 : 6

Subgrade

Treated baseHMA

Aggregate base

Page 21: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 22: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 23: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 24: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 25: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 26: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 27: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 28: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 29: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

SeepageThrough Permeable Surface

Water Table

Capillary Vapor

Water Table

Capillary RiseCapillary Rise

Page 30: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Three important components fora good pavement design

Drainage

Drainage

Drainage

Page 31: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

AASHTO Drainage Definitions

Quality of Drainage

Excellent

Good

Fair

Poor

Very Poor

Water Removed Within*

2 Hours

1 Day

1 Week

1 Month

Water will not Drain

AASHTO Guide for Design of Pavement Structures, 1993

*Based on time to drain*Based on time to drain

Page 32: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Design for Drainage(AASHTO, 1993 Design Method)

Structural Number (SN) for a pavement section is:

SN = a1*d1 + a2*d2*m2 + a3*d3*m3

a1 a2 a3 = layer coefficients for AC, BC and Sub base layers

d1, d2, d3 = their thickness

m2, m3 = drainage coefficients for the base and sub base layer

log10W18 = (ZR)(S0) + (9.36)(log10(SN+1) - 0.20 + log10[ΔPSI/(4.2-

1.5)]/[0.40 + (1.094/(SN+1)5.19)] + (2.32)(log10MR) - 8.07

Page 33: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

0.400.75-0.400.95-0.751.05-0.95Very Poor

0.600.80-0.601.05-0.801.15-1.05Poor

0.801.00-0.801.15-1.051.25-1.15Fair

1.001.15-1.001.25-1.151.35-1.25Good

1.201.30-1.201.35-1.301.40-1.35Excellent

GreaterThan 25%5-15%1-5%Less Than

1%

Percent of Time Pavement Structure is Exposed toMoisture Levels Approaching SaturationQuality of

Drainage

AASHTO Guide for Design of Pavement Structures, 1993

Recommended Drainage Coefficient, mi, forFlexible Pavements

Page 34: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Time to drain

For two lane road - Lane width = 24 ft, Slope = 0.01

Base k time to drain Quality

OGB 1000 ft/day 2 hrs to drain Excellent

DGAB 1 ft/day 1 week Fair

DGAB w/ fines 0.1 ft/day 1 month Poor

Reality no drains does not drain Very Poor

Page 35: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Pavement Drainage

Page 36: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 37: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 38: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 39: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

SUBSURFACE DRAINAGE

OGDL EDGE DRAIN

Page 40: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Crushed Outlet

Clogged Outlet

Page 41: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 42: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 43: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Geocomposite Drainage Layers

Page 44: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Uses of Horizontal Geocomposite Drainage Layers

Page 45: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Drainage For Rigid Pavements

Improved DesignImproved Design >> Cd Cd

For Flexible Pavements Improved design lifeImproved design life

Geocomposite Drainage Layer Solutions -Replace OGAB

Page 46: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Drainage - Improved Pavement DesignImproved Pavement Design > m or> m or C Cdd

> SN> SN Separation

Improved long term performanceImproved long term performance

Geocomposite Drainage Layer Solutions -Improve Performance of DGAB

Stabilization Improved constructionImproved construction

Reinforcement Improved Support - LCRImproved Support - LCR

Page 47: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Geocomposite Drain Requirements

Sufficient stiffness to support trafficwithout significant deformationunder dynamic loading

Inflow capacity > infiltration fromadjacent layers

Sufficient transmissivity to rapidlydrain the pavement section andprevent saturation of the base

Sufficient air voids within geo-composite to provide a capillarybreak

Page 48: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Drainage Geocomposite -Important Properties

Transmissivity = 4500 ft2/day (0.005 m2/sec) Estimated Discharge: 30 ftEstimated Discharge: 30 ft33/day /ft/day /ft

Creep Resistance under high Loads Long-term Resistance to Compression Stability Traffic Loads = Univ. of Illinois Study Effective Porosity = 0.7 Geotextile Filtration Requirements

Page 49: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Tri-Planar Important Properties (Cont.)

Transmissivity = 4500 ft2/day (0.005 m2/sec):

TransmissivityTransmissivity of 4in-OGDL (k =1000 of 4in-OGDL (k =1000––3000 ft/day) = 300-3000 ft/day) = 300-1000 ft1000 ft33/day/ft/day/ft

OGDL flow rate @2% = 6OGDL flow rate @2% = 6––20 ft20 ft33/day/ft/day/ft

TransmissivityTransmissivity of tri-planar = 1500 ft of tri-planar = 1500 ft33/day/ft @15ksf/day/ft @15ksf(considering an equivalency factor between tri-planar and(considering an equivalency factor between tri-planar andsoil drains)soil drains)

Tri-planar flow rate @2% = 30 ftTri-planar flow rate @2% = 30 ft33/day/ft/day/ft

Page 50: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Tri-Planar Drainage System

Replaces OGDL

Provides ExcellentDrainage Capability

Capillary Break

May Provide StrainEnergy AbsorptionCapabilities

Page 51: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Time-to-Drain Design Assumptions

During a rainfall event water infiltrates intothe permeable base until it is saturated

Excess rainwater runs off to a side ditch

Time required to drain certain amount ofwater from the drainage layer after a rainevent

Page 52: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Time-to-Drain

PavementPermeable baseBase layer

Shoulder

qi

qd

Q

Page 53: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

AASHTO Drainage Definitions(For Pavements - 50% time to drain)

Quality of Drainage

Excellent

Good

Fair

Poor

Very Poor

Water Removed Within

2 Hours

1 Day

1 Week

1 Month

Water will not Drain

AASHTO Guide for Design of Pavement Structures, 1993

• For Interstate highways: 50% drained in 2 hrs• If heavy traffic, in 1 hr

Page 54: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

RoaDrain Time to Drain

Case 1 - Beneath Pavement Time to Drain < 2 minTime to Drain < 2 min

Case 2 - Beneath Subbase for 12 in subbase with k = 1 ft/dayfor 12 in subbase with k = 1 ft/day Time to drain ~ 1 hoursTime to drain ~ 1 hours

Case 3 - Base drainage alone Time to drain ~ 840 hoursTime to drain ~ 840 hours

Page 55: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Quality of Drainage

m

Structural Number

(maintaining section)

Reduction

in Base (maintaining SN =

4.3 and HMA thickness and )

Reduction in

Asphalt (maintaining SN = 4.3 and base

thickness )

Estimated

Performance Period

(maintainin g section)*

Excellent

1.3

4.93

- 3.5 in.

-1.43 in.

38 yrs

Good (Standard )

1.0

4.3

0

0

20 yrs

Poor (Actual )

0.7

3.67

+6.5 in.

+1.43 in.

8 yrs

Total savings

-

-

10 in.

2.86 in.

??????

* Based on 20 -year performance period and a 3 percent growth

Potential Cost BenefitPotential Cost Benefit

Page 56: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Some Case Studies

Page 57: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Maine DOT -Maine DOT -Frankfort to Winterport HighwayFrankfort to Winterport Highway

Page 58: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 59: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 60: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Drainage Test Sections

Page 61: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Construction DetailsGeocomposite Placement

Installing theRoadrain

Plastic ties tosecure connectionbetween rolls

Page 62: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 63: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Construction DetailsConstruction DetailsCollection Pipe Inlet/Outlet SystemCollection Pipe Inlet/Outlet System

Page 64: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Underneath HMA

Page 65: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Important Parameters

Flow through pavementthrough pavement

and baseand base at outlets (time toat outlets (time to

drain)drain) Pore pressure

base, sub base &base, sub base &subgradesubgrade

positive & negativepositive & negative Moisture content

Long-term support pavement, base and subpavement, base and sub

basebase Road surface movement Water level Temperature with depth Weather

rainfall & temperaturerainfall & temperature atmospheric pressureatmospheric pressure

Page 66: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Drainage Discharge

Page 67: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Monthly Discharge Volumes(Per Length of Drain and Rainfall)

0

200

400

600

800

1000

1200

1400

1600Rainfall Tilt Bucket

Page 68: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Falling Weight Deflectometer (FWD) Results (Drainage Sections), Maine DOT

0

1

2

3

4

5

6

7

8

Str

uct

ura

l N

um

ber

,

SN

(in

ch)

D1 D2 D3 F1

(Control)

Test Sections

Original

Jul-98

Jul-99

Page 69: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Maine DOTPost-Installation

Page 70: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Southwest ParkwayAustin, TX

Page 71: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 72: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 73: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 74: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 75: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 76: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 77: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 78: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 79: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 80: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 81: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

VADOT-Route 58 Rehabilitation ProjectVADOT-Route 58 Rehabilitation Project

Page 82: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Route 58 Rehabilitation Project

2-lane in each direction 24ft wide (3ft inner and 4ft outer shoulders) 2% surface slope (CL center line) 9in reinforced jointed concrete (spaced @

61.5ft) 6in cement treated subgrade 9in HMA overlay (3 layers):

1in SM, 2in IM, and 5.5in BM1in SM, 2in IM, and 5.5in BM Geocomposite installed in the passing lane The project has edgedrain

Page 83: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Tack coat applied and geocomposite placement

Page 84: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Traffic over the geocomposite panel

Page 85: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Asphalt placementover the geocomposite

Page 86: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

HMA over HMA over GeocompositeGeocomposite

Page 87: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

GPR Survey

Page 88: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Missouri DOTRoute 63- Ashland MO

Concrete Joint RepairWith JointDrain

Page 89: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Failed Joints on Route 63- Ashland, MOMO DOT Project

Cutting out a 25’ section of concretebetween 2 failed concrete joints

Clearing debris to prepare subgrade Compacting subgrade in preparation forthe installation of JointDrain

Page 90: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

A drainage trench must be dug at the edge of the road to collectmoisture that drains through the JointDrain.

Drilling dowel holes at the edge of eachconcrete “cut”

Applying epoxy into dowel holes beforeplacement of dowel rods

Placement of dowel rods

Page 91: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Rolling out material to cut a 12’x24’ JointDrain panel. Rollscome in 6.7’ and 12’ widths and lengths of 200 ft.

Placement of 1st panel of JointDrain. The panel is installedunder the dowel bars with the main drainage path going toward

the drainage trench.

Placement of 2nd panel of JointDrain. Please note that geotextileis shingled from 1 panel to the other where the panels meet. This

keeps drainage course free from concrete debris.

A PerforatedPVC Pipe isplaced as adrainage outletat the end of the25’ section.

Page 92: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

After last panel of JointDrain is placed,metal mesh is placed. Metal mesh isrested on dow bars, and on top of

JointDrain panel.

Ready-mix concrete is poured directlyon JointDrain panels.

Screed is used to smooth and flattenthe poured concrete.

After a couple of passes of thescreed, the concrete is ready for

finishing touches.

As a final step, the concrete is brushedfor a finished look.

The final poured concrete that waspoured on top of JointDrain in

order to repair 2 faulty concretejoints.

Page 93: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Equalization Basin Detail

Page 94: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 95: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 96: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 97: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 98: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Pouring of Concrete on Geocomposite

Page 99: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 100: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 101: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage
Page 102: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

Conclusions

The RoaDrain geocomposite drainage layer is aneffective alternative for pavement drainage.

Calculations based on time-to drain approach indicate: adequate infiltration rates to handle significant storm events.adequate infiltration rates to handle significant storm events. < 10 min. to drain the geocomposite layer.< 10 min. to drain the geocomposite layer. < 2 hours hours to drain the road even when placed beneath< 2 hours hours to drain the road even when placed beneath

moderately permeable dense graded aggregate base.moderately permeable dense graded aggregate base. i.e. excellent drainage based on AASHTO 1998 criteria.i.e. excellent drainage based on AASHTO 1998 criteria.

Page 103: Geosynthetic Subsurface Drainage Systems For … · Geosynthetic Subsurface Drainage Systems For Pavements Foundation Performance Association January 10, ... i.e. excellent drainage

QUESTIONS ?