Geomagnetic Disturbance Mitigation for Nuclear Generator Main Power Transformers April 16, 2013 Kenneth R. Fleischer, P.E.

Upload: others

Post on 01-Jan-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

Geomagnetic Disturbance Mitigation for

Nuclear Generator Main Power Transformers

April 16, 2013

Kenneth R. Fleischer, P.E.

Page 2: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

2

• Purpose

• Background

• GMD Mitigation Procedures

• Monitoring & Validation Period

• Solar Cycle 24 Storm Reviews & Impacts

– Lessons Learned: Adjustments

• Conclusion

Agenda

NextEra Nuclear GMD Mitigation

Page 3: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

3

Purpose:

• Identify NextEra Northern Nuclear sites susceptible to Severe/Extreme Solar Geomagnetic Disturbances.

– Geomagnetic Induced Currents (GIC) in the large power generator step-up (GSU) Transformer high side neutrals.

– NRC Information Notice 90-42 “Failure of Electrical Power Equipment Due to Solar Magnetic Disturbances”

• Develop written GMD mitigation operating procedures.

– Abnormal Operating Procedures (AOP)

– For use by the Nuclear Main Control Room (24/7)

Entry/Exit Criteria (NOAA SWPC Notifications)

Monitoring actions (GSU GIC Monitors)

Defined GIC limits and actions

NextEra Nuclear GMD Mitigation

Page 4: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

4

Background: • NextEra Energy Resources (subsidiary of NextEra Energy) expands outside of

Florida to 28 states during first decade of 2000:

– Includes three Northern Nuclear Generating Stations (Seabrook, Point Beach, Duane Arnold)

• Seabrook had recorded GSU Transformer GIC during weekly switchyard rounds during this time.

– Acquired in 2003

– Many instances of readings coinciding with Solar Geomagnetic Storms, confirming Seabrook susceptibility.

– No GMD mitigation procedures prior to acquisition.

• Point Beach:

– Acquired in 2007

– Power Uprate: New generator step-up (GSU) transformers – added GIC Study/Hardening to scope of work due to GIC susceptible area

– EPRI “Geomagnetically Induced Current Estimation in the Wisconsin 345kV Power Grid”, August 2008 confirms Point Beach GIC susceptibility

– No GMD Mitigation Procedures; however, had GIC Monitor feed to Transmission Operator.

NextEra Nuclear GMD Mitigation

Page 5: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

5

Background (Cont’d):

• October 29, 2003 Solar Storm:

– Seabrook records 80A GIC on GSU Transformer

Note: Seabrook was returning from outage and Holding at 30% Power for Reactor Physics

– Point Beach Unit 1 down powers (Unit 2 in Refueling Outage)

K-Index 9 issued from WE PSS to Point Beach Control Room

Peak GIC was 48A DC (varying between 9A and 48A)

– “Significant Growling” reported in Operations Logs

Transmission Company opened one of the transmission lines reducing GIC to about 4A (GSU noise reduced)

GIC rises again to 68A DC

PBNP U1 reduced power between 70% - 84% for 54 hours.

– 10/29/2003 @ 03:13 to 10/31/2003 @ 09:00.

NextEra Nuclear GMD Mitigation

Page 6: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

6

Background (Cont’d):

Nuclear Solar Cycle 24 Readiness: Spring 2010

– GMD Assessments of Seabrook, Point Beach, Duane Arnold

– Seabrook historical evidence of elevated GSU neutral current readings during past storms (kept weekly records).

Also reported “growling” during solar storms

– Point Beach had GIC monitors on both GSU transformers

Only feed was to the former WEPCo Transmission Office

– No local feed to the Point Beach Station Nuclear Control Room

Useful during days when Point Beach was regulated

Also reported “growling” during solar storms

– DAEC no historical information, was confirmed off-line during both March & Sept 1989 storms, so no Ops Logs records.

NextEra Nuclear GMD Mitigation

Page 7: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

7

Background (Cont’d):

• Seabrook GSU Transformer Data: – General Electric

– Single Phase: Wye - Delta

– Four leg core type

– 345kV/24.5kV

– Neutral: Solid Ground

• Point Beach GSU Transformer Data: – Mitsubishi

– Single Phase: Wye - Delta

– Core form

– 225MVA

– 345kV/18.5kV

– Neutral: Solid Ground

NextEra Nuclear GMD Mitigation

Page 8: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

8

Background (Cont’d):

• Chief Executive Officer (CEO) forms Solar GMD Team for entire company in Summer of 2010.

• Company to follow Nuclear GMD proposed mitigation approach

NextEra Nuclear GMD Mitigation

Page 9: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

9

GMD Mitigation Procedure:

• Establish GMD Protocol with respective Transmission Operator (TO) for NOAA K-Index Notification to the Stations.

– FPL Transmission & Performance Diagnostic Center (TPDC) Backup

• Develop Nuclear Abnormal Operating Procedures (AOP) for procedure Entry (initially set at K-Index 7 WARNING) for the three Nuclear sites

– Install clamp-on hall effect DC ammeter w/100 foot cable and data logger

– Manual action to turn on all transformer cooling bank fans

– Established max GIC level/duration tables with action levels

– Action would be to down power the Nuclear unit to a prescribed value (e.g. 78%). Three tiered approach

– Also monitored other available parameters (e.g., GSU winding hot spot temperatures, oil temperatures, dissolve gas analysis, etc.)

– Record data for post storm analysis by Engineering

– Procedure Exit: Expiry of NOAA K-Index 7 WARNING.

NextEra Nuclear GMD Mitigation

Page 10: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

10

Monitoring & Validation Period:

• During majority of 2011 period, installed DC Hall Effect split-ring transducer during NOAA K-Index 6 WARNINGS.

• Seabrook and Point Beach confirmed GIC “Hot Spots”

• DAEC barely registered past 3A DC during Solar Cycle 24

• Seabrook has reached greater than 40A DC multiple times

• Point Beach reached 55.8A DC during the October 24 & 25, 2011 Solar Storm:

– Note: With one of the PBNP units in a refueling outage GIC on the remaining unit was double past GIC readings (Note: Kewaunee was on-line).

– No down power required.

• Over time, GMD procedures were improved (Lessons Learned) and NOAA K-Index Entry temporarily moved from K-7 to K-6

NextEra Nuclear GMD Mitigation

Page 11: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

11

Solar Storm of October 24 & 25, 2011:

• Highest NOAA ALERT: K-Index of 6

• Point Beach:

– Point Beach Unit 2 GIC data peaked at 55.8A on October 24, 2011 at 8:27 PM (Central)

– Point Beach Unit 1 was off-line for refueling outage

– Kewaunee (5 miles north) was on-line

• Significant GIC event duration was approximately 22 minutes (short duration)

• Seabrook:

– No GIC data available as Seabrook was off-line in an outage

NextEra Nuclear GMD Mitigation

Page 12: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

12

NextEra Nuclear GMD Mitigation

Point Beach U1: October 24/25, 2011

0

10

20

30

40

50

60

1 18 35 52 69 86 103 120 137 154 171 188 205 222 239 256 273 290 307 324 341 358 375 392 409 426 443 460 477 494

Series1

Page 13: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

13

NextEra Nuclear GMD Mitigation Solar Storm of July 15, 2012:

• Highest NOAA ALERT: K-Index of 6

• Seabrook:

– Highest GIC peak: 40A DC

– Three GIC peaks of 30A DC

– First Down power from 85%* to 78%

– Second Down power from 78% to 63%

– Duration: 40 hours (long elevated GIC event)

7/14/2012 at 14:10 (EDT) to 7/16/2012 at 06:46 (EDT)

• Point Beach:

– GIC not as significant in Wisconsin; however, storm registered

– Both Units peaked approximately 3.5A DC

*Seabrook was derated to 85% power due to an unrelated issue with the main generator.

Page 14: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

14

NextEra Nuclear GMD Mitigation

Seabrook: 7/15/2012 Solar Storm

7/13 to 7/16/12 Seabrook GIC Data

-40

-30

-20

-10

0

10

20

30

40

50

Time

AD

C Min.

Max.

Page 15: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

15

NextEra Nuclear GMD Mitigation

Seabrook: 7/15/2012 Solar Storm

Page 16: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

16

NextEra Nuclear GMD Mitigation

7/15/2012 Solar Storm

Page 17: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

17

NextEra Nuclear GMD Mitigation

Point Beach U1: 7/15/2012 Solar Storm

POB.XF.T1_NEUT_CURR.A_N.ANALOG

-.5

.

.5

1.

1.5

2.

2.5

3.

3.5

4.

15...15...

15...16...

16...16...

16...

POB.XF.T1_NEUT_CURR.A_N.ANALOG

Page 18: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

18

NextEra Nuclear GMD Mitigation

Point Beach U2: 7/15/2012 Solar Storm

POB.XF.T2_NEUT_CURR.A_N.ANALOG

.

.5

1.

1.5

2.

2.5

3.

3.5

4.

15-Jul-12 09:36:00

15-Jul-12 14:24:00

15-Jul-12 19:12:00

16-Jul-12 00:00:00

16-Jul-12 04:48:00

16-Jul-12 09:36:00

16-Jul-12 14:24:00

POB.XF.T2_NEUT_CURR.A_N.ANALOG

Page 19: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

19

NextEra Nuclear GMD Mitigation

Lessons Learned: Review of Seabrook GSU GIC Rating:

• No formal engineered GIC rating was available

• Up to this point: followed Solar Cycle 23 Salem GIC rating of 10A as a conservative starting point

• Solar Cycle 24 storm monitoring and data analysis indicated that Seabrook is GIC “Hot Spot”

– Single site, 345kV transmission lines, igneous rock.

– GIC consistently greater than Salem/Creek (3 unit site)

– GSU trends were always stable and never increased during all Cycle 24 solar storms; confirming 10A was conservative.

• Commissioned Vendor to perform GIC studies/rating of Seabrook Transformer

– New GIC rating: Orders of magnitude higher

– New GIC rating would have prevented 7/15/2012 down power

Page 20: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

20

NextEra Nuclear GMD Mitigation

Review of Three Other Past

Solar Storms

Page 21: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

21

NextEra Nuclear GMD Mitigation

Jan 24, 2012 K-Index 6 WARNING Solar Storm

1/24/12 Seabrook GIC Trend

-25

-20

-15

-10

-5

0

5

10

15

AD

C GSU DC NeutralCurrent

Page 22: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

22

NextEra Nuclear GMD Mitigation

Jan 24, 2012 K-Index 6 WARNING Solar Storm

POB.XF.T1_NEUT_CURR.A_N.ANALOG

-5

0

5

10

15

20

1/24/2012 4:48 1/24/2012 9:36 1/24/2012 14:24 1/24/2012 19:12 1/25/2012 0:00 1/25/2012 4:48 1/25/2012 9:36

POB.XF.T1_NEUT_CURR.A_N.ANALOG

Page 23: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

23

NextEra Nuclear GMD Mitigation

March 9, 2012 K-Index 7 ALERT Solar Storm

3/9/12 0749-2036 Seabrook GIC Data

-20

-15

-10

-5

0

5

10

15

Time

AD

C Min.

Max.

Page 24: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

24

NextEra Nuclear GMD Mitigation

March 9, 2012 K-Index 7 ALERT Solar Storm

POB 2 Neutral Current

0

2

4

6

8

10

12

14

16

18

40975 40975 40976 40976 40977 40977 40978

Series1

Page 25: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

25

NextEra Nuclear GMD Mitigation

June 16 & 17, 2012 K-Index 6 ALERT Solar Storm

6/16 to 6/18/12 Seabrook GIC Data

-30

-20

-10

0

10

20

30

40

Time

AD

C Min.

Max.

Page 26: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

26

NextEra Nuclear GMD Mitigation

June 16 & 17, 2012 K-Index 6 ALERT Solar Storm

POB.XF.T2_NEUT_CURR.A_N.ANALOG

0

0.5

1

1.5

2

2.5

3

3.5

4

15-Jun-12 12:00:00 16-Jun-12 00:00:00 16-Jun-12 12:00:00 17-Jun-12 00:00:00 17-Jun-12 12:00:00 18-Jun-12 00:00:00 18-Jun-12 12:00:00

POB.XF.T2_NEUT_CURR.A_N.ANALOG

Page 27: Geomagnetic Disturbance Mitigation for Nuclear Generator ......generator step-up (GSU) Transformer high side neutrals. –NRC Information Notice 90-42 “Failure of Electrical Power

27

Conclusion:

• NextEra Energy Resources Nuclear Power Plants are Solar Cycle 24 Ready:

– NextEra Energy Resources Nuclear Power Plant GSU Transformers are protected from damage during Severe/Extreme GMDs:

GSU Transformer GIC Ratings established

Formal written procedures exist for GMD Mitigation

– NOAA SWPC Notifications for Procedure Entry/Exit

Temporary unit down power is ultimate mitigation action to protect GSU transformers

– Protocol with Transmission Operators (TO) to mutually manage severe/extreme GMD events:

Formal communication of NOAA SWPC Notifications.

FPL Transmission: Back up NOAA SWPC Notifications.

Sharing of Nuclear Station GMD Mitigation w/TO

NextEra Nuclear GMD Mitigation