geo work plan symposium 2011 infrastructure may 5, 2011
TRANSCRIPT
GEO Work Plan Symposium 2011
Infrastructure
May 5, 2011
Infrastructure
• Preamble text is needed for each of the three sections proposed in Work Plan V0.
• Infrastructure includes:
– GEOSS Common Infrastructure
– Earth Observing Systems
– Earth Data Sets
– GEOSS Communication Networks
– Standards and Interoperability
• Gap Analysis, Capacity Building, User Engagement to be addressed in each of the IN tasks
6 GEOSS Design and
Interoperability
6 GEOSS Design and
Interoperability
V01 GEOSS Common
Infrastructure
V01 GEOSS Common
Infrastructure
1 GEOSS Common
Infrastructure
1 GEOSS Common
Infrastructure
V03 Earth Data Sets
V03 Earth Data Sets
4 GEOSS Communication
Networks
4 GEOSS Communication
Networks
V05 Gap Analysis
V05 Gap Analysis
V02 Earth Observing Systems
V02 Earth Observing Systems
2 Earth Observing Systems
2 Earth Observing Systems
3 Earth Data Sets
3 Earth Data Sets
V0
Break-out Recommendation
V04 GEOSS Communication
Networks
V04 GEOSS Communication
Networks
To be addressed in
each task
V1 proposal
Presentation of each 2012-2015 Work Plan Task
• Target-based Definition, Deliverables and underpinning Leads and Priority Actions
• 2009-2011 sub-task re-organization• Related 2009-2011 Work Plan implementation
progress• Inclusion of new proposals• Estimation of resources available• Issues, gaps and possible measures
IN-01 GEOSS Common Infrastructure
• Definition: Text to be modified: Focus will be on the operations, maintenance, and enhancement of GEOSS Common Infrastructure. Split-out of GEOSS design/requirements/research into a new Task
• Deliverables: Text to specify contributions from multiple sources (e.g. DSTF), Gap analysis to be included.
• Related Tasks: Add Data Sharing task and Quality Assurance task, Move WIS to EO Systems (under IN-03)
IN-01, continued
• New Proposals: None• Resources Available: GCI Component Operators are
responsible for operations and enhancement through 2015; adding EuroGEOSS, GENESI-DEC. Upcoming GEO-WOW FP project funded through Sept 2014
• Issues and Gaps: Propose close relationship with GEOSS Design and Interoperability task (new task); Engagement with users, Communication with data providers
• Performance indicators: Provided earlier to M&E
IN-02 Earth Observing Systems
• Definition: re-ordered to reflect highest priority activities• Deliverables: Inserted User Interface language and
other editorial changes; Gap analysis to be included.• Related tasks: Include WIS, Add crowd-sourcing• New Proposals: Discussion indicated no discrepancies• Resources Available: Not discussed• Issues and Gaps: Increased advocacy for sustained
EO networks and increased coordination for in situ networks; alignment between deliverables and definition; coordination with Earth Data Sets
• Performance Indicators: No additions
IN-03 Earth Data Sets
• Definition: Additional words provided by UIC related to sustainability; ADC: common vocabulary, core metadata, and registration
• Deliverables: Clarify to encourage development of data sets rather than develop directly
• Related tasks: No changes.• New Proposals: Discussion indicated no
discrepancies• Resources Available: Not discussed.• Issues and Gaps: Coordination with EO Systems,
overlap with global data sets (DS/IS)• Performance Indicators: Not discussed
IN-04 GEOSS Communication Networks
• Definition: Editorial changes proposed• Deliverables: added focus on targeted users• Related tasks: WIS moved to EO Systems (IN-02)• New Proposals: Discussion indicated no
discrepancies• Resources Available: Not discussed.• Issues and Gaps: Data Democracy Task could move
to Institutions• Performance Indicators: Not discussed.
IN-05 Gap Analysis
• To be incorporated in all other IN Tasks
IN-06 GEOSS Design and Interoperability
• Addresses the evolutionary technical architecture (design) of GEOSS and contributed EO data and service resources.
• Primary focus on enabling a sustainable GEOSS• Success will be demonstrated by the research, evaluation,
deployment, population, and sustained operations of a user-friendly and accessible GEOSS and its Common Infrastructure, including the core components, functions, and data sufficient to readily respond to scientific and societal demands.
• Incorporates the annual Architecture and Implementation Pilot and Standards and Interoperability Forum (SIF).
IN-06 continued
• Deliverables:– A ‘living’ technical architecture document that
describes and illustrates the components of GEOSS
– Annual review or revision of the GEOSS Tactical and Strategic Guidance and new tutorial documents
– Annual execution and documentation of the Architecture Implementation Pilot and related research activities
– A register of Interoperability Agreements (Standards and Special Arrangements)
IN-06, continued
• Related tasks: – Enabling Deployment of GEOSS Architecture– Architecture and Implementation Pilot– Sensor Web Enablement for In-Situ Observing
Network Facilitation – Model Web Development– Data Integration and Analysis Systems – Standards and Interoperability Forum
IN-06, continued
• Resources Available: Not discussed.• Issues and Gaps: Interaction clarify, no overlaps with
GCI Task (IN-01)• Performance Indicators: Not discussed.
Questions and Discussion