GENERAL NOTES:
ALL ELECTRICAL WORKS HEREIN SHALL BE DONE INACCORDANCE WITH THE NATIONAL BUILDING CODE,PROVISIONS OF THE LATEST APPROVED PHILIPPINEELECTRICAL CODE, THE LAWS AND ORDINANCES OF THELOCAL CODE ENFORCING AUTHORITIES AND REQUIREMENTSOF THE LOCAL ELECTRIC, TELEPHONE COMPANY ANDBUILDING ADMINISTRATION REQUIREMENTS.
1. CONTRACTOR SHALL SECURE ALL WIRING PERMIT ANDALL FEES REQUIRED FOR THE WORKS AND FURNISH THEOWNER THE CERTIFICATE OF FINAL ELECTRICALINSPECTION,
2. CONTRACTOR SHALL CONDUCT EARTH GROUND TEST,WIRE INSULATION AND LOAD TEST UPON COMPLETION OFWORKS,
3. INCASE OF DISCREPANCY BETWEEN PLANS AND SITECONDITION, SPECIFICATIONS & REVISIONS CHANGES,THE CONTRACTOR SHOULD IMMEDIATELY VERIFY &CONSULT TOWITH THE ELECTRICAL ENGINEER OF THEPNP ENGINEERING SERVICE (PNPES),
4. ALL LOCATION & MOUNTING HEIGHT ARE SUBJECT TOAPPROVAL OF ELECTRICAL ENGINEER OF PNPES,
5. CONTRACTOR SHALL BE RESPONSIBLE IN THEPREPARATION OF AS-BUILT PLANS DULY SIGNED ANDSEALED BY PROFESSIONAL ELECTRICAL ENGINEER, ANDELECTRONIC AUTOCAD FILES,
6. FINAL LIGHTING FIXTURES AND WIRING DEVICES SHALL BEAPPROVED BY PNPES, REPRESENTATIVEENGINEER,
7. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATIONOF SHOP OR CONSTRUCTION DRAWING REQUIRED BYOWNERARCHITECHENGINEER, THIS INCLUDES DEVICESAND FIXTURES ELEVATION,
8. CONTRACTOR SHALL VISIT SITE CONDITION AND INCLUDEALL COST NECESSARY TO COMPLETE THE SYSTEM AT NOCOST TO OWNER, INCLUDING COST OF CORING SERVICEAND EXPENSES FOR THE RESTORATION OF ANY DAMAGEAFFECTED CIVIL ARCHITECTURAL FINISHES ORRELOCATION OF EXISTING FACILITIES ON BUILDING,
9. CONTRACTOR SHALL LOCATE ALL SPLICING BOXES TOACCESSIBLE PLACE OR WITH ACCESS PANELS,
10. NOMINATED CONTRACTOR TO VERIFY ALL EQUIPMENTSTO BE INSTALLED OR PLACE WITHIN THE BUILDING, ANDMAKE AN ADJUSTMENT WITH THE PNPES ENGINEERARCHITECT CONSENT,
11. THIS DRAWINGS ARE DIAGRAMATIC LAYOUT ONLY, ANYMATERIALS AND FITTINGS NOT SHOWN ON THIS PLANSBUT NEEDED TO COMPLETE THE SYSTEM AND OPERATIONSHALL BE INCLUDED WITH THE CONTRACTOR'S SCOPE OFWORKS.
12. ALL WORKS SHALL BE DONE UNDER THE DIRECTSUPERVISION OF LICENSE DULY REGISTERED ELECTRICALENGINEER OR REGISTERED MASTER ELECTRICIAN.
13. ADDITIONAL NOTES:
· USE OF MICA SHALL BE LIMITED TO 150mm MAXIMUM· USE OF FLEXIBLE METALLIC CONDUTIT SHALL BE
LIMITED TO 1m MAXIMUM· PROVIDE PROPER CONDUIT SUPPORT, G.I. WIRES AS
SUPPORT SHALL NOT BE ALLOWED· PROVIDE DOUBLE COAT OF RUST PROTECTIVE PAINT
(RED OXIDE PRIMER) ON HANGERS AND SUPPORTS.
SPECIFICATIONS:
1. POWER SUPPLY TO THE BUILDING SHALL BE 230V, THREEPHASE, 4-WIRES, 60HZ.
2. ALL MATERIALS TO BE USED SHALL BE NEW AND APPROVEDTYPE FOR PURPOSE & LOCATION.
3. NORMAL AND EMERGENCY CIRCUIT SHALL NOT BECOMBINED IN ONE RACEWAY OR CONDUIT.
4. RECEPTACLES FOR GENERAL USE SHALL BE DUPLEX 20A,250VAC, GROUND TYPE.
5. ALL WIRES SHOULD HAVE A MAXIMUM LOAD OF 80 OF WIREAMPACITY.
6. LIGHT SWITCHES MINIMUM RATING SHALL BE 16A 230VAC.
7. ALL MATERIALS TO BE USED SHALL BE BRAND NEW ANDSHALL HAVE THE "P.S." MARKS.
8. MOUNTING HEIGHTS SHALL BE AS FOLLOWS:
A. LIGHT SWITCHES - 1.37m above Floor finishB. CONVENIENCE OUTLET - 0.3m above Floor finishC. TELEPHONE OUTLET - 0.3m above Floor finishD. PANEL BOARD - 1.8m ABOVE FLOOR FINISH
9. CONDUIT EMBEDED WITHIN CONCRETE WALL SHALL HAVE AMINIMUM CEMENT PLASTERED OF 20mm THICK.
10. ALL CONDUIT PIPE ABOVE CEILING SHOULD HAVEINDEPENDENT HANGER SUPPORTS.
11. ALL LIGHTING FIXTURES SHOULD HAVE INDEPENDENTHANGER SUPPORTS.
12. ALL BOXES SHALL BE OCCUPIED ONLY OF 50 OF WIREVOLUME.
13. VOLTAGE DROP SHALL BE LIMITED TO 2.5 FROM SOURCE TOPANEL BOARD AS P.E.C. REQUIREMENT OR ACCEPTABLE TOTHE LABORATORY EQUIPMENT.
14. CIRCUIT BREAKERS SERVING MOTORS AND LIGHTING SHALLBE INDUSTRIAL AND COMMERCIAL BOLT-ON TYPERESPECTIVELY WITH MINIMUM OF 10kAIC.
15. ALL WIRES AND CABLES SHALL BE BRAND NEW ANDAPPROVED TYPE.
16. ALL CIRCUITS SHALL BE 4-WIRES FOR 3Ø & 3-WIRES FOR 2ØAND SHALL BE COLOR CODED AS FOLLOWS:
LINE 1 - BLACKLINE 2 - REDLINE 3 - BLUEGROUND WIRE - GREENSTRIPE
GREEN-YELLOWGRAY
17. PREFERRED DISTRIBUTION BOARDS MUST BE INDUSTRIALTYPE, BOLT-ON WITH 18kAIC MINIMUM UNLESS OTHERWISESPECIFIED.
18. USE SOLDERLESS CONNECTOR, MECHANICAL 1 PRESSURETYPE COPPER LUGS FOR CONNECTION OF WIRES LARGERTHAN 8mm².
19. USE FILLER COMPOUND, "SCOTCH FILL" OR APPROVED EQUALAT SHARP EDGES TO PROVIDE SMOOTH SURFACE BEFORETAPING WITH ELECTRICAL TAPE.
LOCATIONSITE PLAN
MDP1MDP2
ATS
MDB
SERVICE ENTRANCE
GUARD POST
BPO BUILDING BFO BUILDING
GATE 1
P E D E S T R I A N L A N E
ENTRANCE
EXIT
TRANSFORMATION OVAL
3 sets: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia PVC CONDUIT (DIRECTLY BURRIED)PROVIDE ALSO 1-3" DIA PVC CONDUIT FOR SERVICEENTRANCE OF TELECOMMUNICATION SYSTEM
3-500mmsq THWNTHHN Cu WIRE1-60mmsq THHNTHWN Cu WIRE with messanger (OVERHEAD)(app 15mts)
3-250mmsq THWNTHHN Cu WIRE1-50mmsq THHNTHWN Cu WIRE
in 100mm dia RSC CONDUIT (DIRECTLY BURRIED)
3-500mmsq THWNTHHN Cu WIRE1-60mmsq THHNTHWN Cu WIREwith messanger(OVERHEAD)(app 25mts)
(Existing concrete pole)To serve as guying system Additional: 3-38mmsq
coated ACSR (app 40mts)
Additional: 1-38mmsq coated ACSR(app 30mts)
Existingconcrete polewithtransformers
Provide New 45' Concrete pole
THIS SITE
Provide appropriateguying system
3-100kVA DistributionTransformer
(Provide new concretepole)
Provide appropriateguying system
Sab
Sabc
1DP3
ATS
Sa
LEGEND & SYMBOLS
DP1
7W LED DOWNLIGHT
LED EMERGENCY LIGHT
2-18W LED TUBE with LOUVER 1' x 4' CASING (SURFACED)
PHOTOVOLTAIC SWITCH
MOTION SENSOR SWITCH
ONE GANG OF 1-SINGLE POLE SWITCH
ONE GANG OF 2-SINGLE POLE SWITCHES
ONE GANG OF 3-SINGLE POLE SWITCHES
DUPLEX CONVENIENCE OUTLET WITH GROUND
EXHAUST FAN (CEILING MOUNTED)
CIRCUIT HOMERUN INDICATING PANEL DESIGNATION
AUTOMATIC TRANSFER SWITCH
DISTRIBUTION PANEL 1DUPLEX RECEPTACLE WITH GROUND WEATHERPROOFWP
MS
F
X
PS
2-18W LED TUBE with 1' x 4' DUST PROOF CASING (RECESSED)
1-18W LED TUBE with 1' x 4' DUST PROOF CASING (RECESSED)
2-9W LED TUBE with 1' x 2' DUST PROOF CASING (RECESSED)
1-18 LED TUBE with WATER TIGHT CASING (SURFACED)
DUPLEX RECEPTACLE WITH GROUND (FLOOR MOUNTED)
AIR-CONDITIONING UNIT CB IN NEMA 3R ENCLOSURE
MDP MAIN DISTRIBUTION PANEL
2-18 LED TUBE with WATER TIGHT CASING (SURFACED)
TUNNELWALL LED LIGHTS, PHOTOSWITCH OPERATEDPS
THREE WAY SWITCHS3W
PROVIDE ALSO TELECOMMUNICATION SYSTEM BOX
E-1
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
54.00
P E D E S T R I A N L A N E
ENTRANCE
EXIT
2.00
6.006.00 6.00 6.00 6.006.006.006.006.00
1234
32.7
0
INFORMATION
STOR
AGE
RM
CABI
NET
CABI
NET
EXAMINATION RM - 2
OFFICE
SENIOR CITIZENS & PWD LOUNGE
TRANSACTION WINDOWS
STO
CLIENTS WAITING AREA
PWD CR
CRIME LAB DRUG TESTING
MUL
TI P
URPO
SE R
M
H A L L W A Y
LOBBY
DI & NBI CLEARANCELANDBANK
WASH AREA
RECEPTION AREA
EXIT
MALE CR
FEMALE CR
EXAM RM
CLIENTS LOUNGE CLIENTS LOUNGE
CLIENTS LOUNGE
RAMP UP
COUNTER TABLE COUNTER TABLE STORAGE
PIPE
CHAS
E
UP
6.00
6.00
6.00
24.0
0
NP SECTION
EXIT
INTERVIEW RM INTERVIEW RM
H A L L W A Y
1
2
34
UP
CHIEF
RAMP UP
ELECTRICAL RM
6.00
ENTR
ANCE
FRO
MTR
ANSF
ORM
ATIO
N
ENTEXIT
COM
PUTE
R TA
BLE
STORAGE
UP
FE
H A L L W A Y
CR
OVAL
TRANSACTION WINDOWS
STO
NBI STO
LANDBANK DI AND NBI
PANELINTERVIEW
LOCKER RM
DI STO
EXAMINATION RM - 1
CHIEF
SERVERCCTV RM
FEMALECR
WASH AREA
URINE COLLECTION
MALE FEMALE
MALECR
GFCI GFCI
8DP1
5DP2
6DP2
7DP2
17DP1
9DP1
10DP1
11DP1
12DP1
8DP2
13DP1
21DP1
15DP1
9DP2
10DP2
16DP1
18DP1
19DP1
20DP1
14DP1
MAIN ENTRY
RAMP UP
PORCH
CANOPY LINE
UP
1DP5
6DP5
7DP5
9DP4
3DP5
4DP5
8DP4
2DP5
10DP4
5DP5
11DP4
13DP4
14DP4
9DP510
DP5
21DP3
22DP3
23DP3
DP1 DP5MDP1DP2 MDP2
ATS
MDB
SERVICE ENTRANCE
With SEPARATE CONDUIT FOR TELECOM & FIRE PUMP
GROUND FLOOR PLANSCALE 1 : 100MTS
POWER LAYOUT
F F
F FF F
F
FF
F
FF
F
FF
GFCI GFCI
3 sets: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE
in 100mm dia PVC CONDUIT (DIRECTLY BURRIED)PROVIDE ALSO 1-3"DIA PVC CONDUIT FOR SERVICE
ENTRANCE OF TELECOMMUNICATION SYSTEM
E-2
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
CANOPY LINE
FEO
TRAN
SACT
ION
WIN
DOW
S
UP DN
STORAGE PIPE
CHAS
E
CONFERENCE RM
COUNTER TABLE
INFO
RMAT
ION
6.00
6.00
6.00
6.00
24.0
0
CLIE
NTS
LOUN
GE
54.00
6.00 6.00 6.00 6.006.006.006.006.00
MALE CR
FEMALE CR
PERIMETER LINE
ROOF LINE
PULL DOWN STAIR
6.00
FIRE EXIT
UP
6.00
UPDN
SOSI
A ST
AFF
CHIEF
CHIEF
SOSI
A TR
ANSA
CTIO
N W
INDO
WS
FEO
RECO
RDS
RM
FEO STAFF
MAL
E CR FEMALE CR
RECO
RDS
RM
FEO
STAF
F
F F F F
F FF F
F F F F
FF
7DP3
16DP3
6DP4
9DP3
8DP3
6DP3
10DP3
11DP3
12DP3
13DP3
14DP3
15DP3
17DP3
18DP3
5DP4
4DP4
6DP419
DP3
20DP3
7DP4
12DP5
11DP5
15DP4
13DP5
14DP5
15DP5
16DP5
16DP4
17DP4
20DP4
19DP5
17DP5
DP4
DP3
18DP5
19DP4
18DP4
SECOND FLOOR PLANSCALE
POWER LAYOUT
1 : 100MTS
12DP4
8DP5
F
F
F
F F F F F
F F F F F
F
E-3
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
UP DN
(COVERED ROOFDECK)
6.00
6.00
6.00
24.0
0
6.00
PERIMETER LINE
MULTI-PURPOSE AREA
54.00
6.00 6.00 6.00 6.006.006.006.006.00
DN6.00
FIRE EXIT
DN
DP6
ROOFDECK FLOOR PLANSCALE 1 : 100MTS
POWER LAYOUT
8DP6
7DP6
E-4
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
J
54.00
P E D E S T R I A N L A N E
ENTRANCE
EXIT
2.00
6.006.00 6.00 6.00 6.006.006.006.006.00
1234
32.7
0
INFORMATION
STOR
AGE
RM
CABI
NET
CABI
NET
EXAMINATION RM - 2
OFFICE
SENIOR CITIZENS & PWD LOUNGE
TRANSACTION WINDOWS
STO
CLIENTS WAITING AREA
PWD CR
CRIME LAB DRUG TESTING
MUL
TI P
URPO
SE R
M
H A L L W A Y
LOBBY
DI & NBI CLEARANCELANDBANK
WASH AREA
RECEPTION AREA
EXIT
MALE CR
FEMALE CR
EXAM RM
CLIENTS LOUNGE CLIENTS LOUNGE
CLIENTS LOUNGE
RAMP UP
COUNTER TABLE COUNTER TABLE
STORAGE
PIPE
CHAS
E
UP
6.00
6.00
6.00
24.0
0
NP SECTION
EXIT
INTERVIEW RM INTERVIEW RM
H A L L W A Y
1
2
34
UP
CHIEF
RAMP UP
ELECTRICAL RM
6.00
ENTR
ANCE
FRO
MTR
ANSF
ORM
ATIO
N
ENTEXIT
COM
PUTE
R TA
BLE
STORAGE
UP
FE
H A L L W A YCR
OVAL
TRANSACTION WINDOWS
STO
NBI STO
LANDBANK DI AND NBI
PANELINTERVIEW
LOCKER RM
DI STO
EXAMINATION RM - 1
CHIEF
SERVERCCTV RM
FEMALECR
WASH AREA
URINE COLLECTION
MALE FEMALE
MALE CR
2DP1
1DP2
5DP1
6DP1
4DP2
1DP1
3DP2
X
X
X
X
X
J
7DP1
3DP1
2DP2
Sa
a
Sab
a abb
PS
PS
PS
PS
PS
PS
MS
4DP1
Sab
ba a
MS
MS
Saba
b
a abb
a
Sab Sa
a a b a b
b a b a
a
MS
Sab
a
b
Sa
a
Sab
Sc
Sabc
a a b b c
Sa
a a
a
b b
c
PS
Sabc
a a b b c
d
d d dS3Wy
yyS3Wy
S3Wy
y
SabMS
c
cf
f
Sg
Sf
gg
Sh
Sk
h
Scd
k
Sji
j i d c
MS
Sxy
y
y
x
MS
MS
MSSa a
S
Sab S
Sabc
Sb
MSa
MSc
MSf
MSe
MSd
MS
MS
aa
cc
d
d
e e f
MSMS
Sabc
c
ab b
Sab
S
a
a a
b
bb
Sce
c
c e
e
e
e
c
c
SabScd
S
d db b
a c cS
S
Sd
b b
a
c
MAIN ENTRY
RAMP UP
PORCH
UP
CANOPY LINE
b b b
d d d
X
MS
X
MS
a a
b
S
X
MS
X
MS
X
GROUND FLOOR PLANSCALE 1 : 100MTS
LIGHTING LAYOUT21
DP4
SINAGE LIGHTING AT CANOPY
PS
E-5
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
CANOPY LINE
FEO
TRAN
SACT
ION
WIN
DOW
S
UP DN
STORAGE PIPE
CHAS
E
CONFERENCE RM
COUNTER TABLE
INFO
RMAT
ION
6.00
6.00
6.00
6.00
24.0
0
CLIE
NTS
LOUN
GE
54.00
6.00 6.00 6.00 6.006.006.006.006.00
MALE CR
FEMALE CR
PERIMETER LINE
ROOF LINE
PULL DOWN STAIR
6.00
FIRE EXIT
UP
DN
6.00
UPDN
SOSI
A ST
AFF
CHIEF
CHIEF
SOSI
A TR
ANSA
CTIO
N W
INDO
WS
FEO
RECO
RDS
RM
FEO STAFF
MAL
E CR FEMALE CR
RECO
RDS
RM
FEO
STAF
F
X
X
X
MS
Sxy
y
y
x
MS MSSa a
S
X
MS
Sa
X
MS
Sa
a
a
MS
Sa
a
a
b
Sb
Scde
cc
d
d
e
Sfg
Shi
Swx
wxw
Sjk
g g
hi
i h
j
k
j
k
ff
MS
Sabc
a
a
a
b
b
c
c
Sde
d
d
d
d
e
e
e
e a
SijkSfgh
f
f
f
g
g
h
h
i
j
j
j
k
k
k
k
Slm Sno
l
l
l
l
l
l
l l
m
m
m
m
m
m
m
m
n
n
n
n
n
n
n
n n o
o
o
o
o
o
o Sno
1DP3
2DP3
3DP3
4DP3
5DP3
1DP4
2DP4
3DP4
4.55
SECOND FLOOR PLANSCALE 1 : 100MTS
LIGHTING LAYOUT
PS
PS
Sb
a
b
n
n
n
n
n
n
oo
o
o
o
p
p
p
q
q
q
p
Spq
21DP4
PNP LOGO LIGHTINGS
PSONE STOP LIGHTINGS
E-6
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
UP DN
(COVERED ROOFDECK)
6.00
6.00
6.00
24.0
0
6.00
PERIMETER LINE
MULTI-PURPOSE AREA
54.00
6.00 6.00 6.00 6.006.006.006.006.00
DN6.00
FIRE EXIT
DN
X
X
X
MS
Sxy
y
y
x
MS MSSa a
S1
DP6
2DP6
a
a
a
a
a
b
b
b
b
b
SabScdSefSgh
3DP6
d
d
d
d
d
c
c
c
c
c
c d
4DP6
e f
e f
e f
f e
f e
f e
5DP6
6DP6
g h
h g
g h
h g
g h
h g
SijSkl
i
i
i
i
j
j
jk
k
k
l
l
l
ROOFDECK FLOOR PLANSCALE 1 : 100MTS
LIGHTING LAYOUT
PS
PS
MS
MS
E-7
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
54.00
P E D E S T R I A N L A N E
ENTRANCE
EXIT
2.00
6.006.00 6.00 6.00 6.006.006.006.006.00
1234
32.7
0
INFORMATION
STOR
AGE
RM
CABI
NET
CABI
NET
EXAMINATION RM - 2
OFFICE
SENIOR CITIZENS & PWD LOUNGE
TRANSACTION WINDOWS
STO
CLIENTS WAITING AREA
PWD CR
CRIME LAB DRUG TESTING
MUL
TI P
URPO
SE R
M
H A L L W A Y
LOBBY
DI & NBI CLEARANCELANDBANK
WASH AREA
RECEPTION AREA
EXIT
MALE CR
FEMALE CR
EXAM RM
CLIENTS LOUNGE CLIENTS LOUNGE
CLIENTS LOUNGE
RAMP UP
COUNTER TABLE COUNTER TABLE STORAGE
PIPE
CHAS
E
UP
6.00
6.00
6.00
24.0
0
NP SECTION
EXIT
INTERVIEW RM INTERVIEW RM
H A L L W A Y
1
2
34
UP
CHIEF
RAMP UP
ELECTRICAL RM
6.00
ENTR
ANCE
FRO
MTR
ANSF
ORM
ATIO
N
ENTEXIT
COM
PUTE
R TA
BLE
STORAGE
UP
FE
H A L L W A Y
CR
OVAL
TRANSACTION WINDOWS
STO
NBI STO
LANDBANK DI AND NBI
PANELINTERVIEW
LOCKER RM
DI STO
EXAMINATION RM - 1
CHIEF
SERVERCCTV RM
FEMALECR
WASH AREA
URINE COLLECTION
MALE FEMALE
MALECR
MAIN ENTRY
RAMP UP
PORCH
CANOPY LINE
UP
GROUND FLOOR PLANSCALE 1 : 100MTS
FIRE ALARM LAYOUT
SD
SD
SD
SD
SD
SD
SD SD SD
SD
SDSD SD SD
SD
SD
SD
SD
SD
SD SD
SD SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
HD
HD
M
M
M
B
B
B
FACP
M
Z101FACP
Z102FACP
Z103FACP
Z104FACP
Z105FACP
Z201FACP
Z202FACP
Z203FACP
Z204FACP
SD
SD
SD
SD
SD
SD
Z106FACP
Z205FACP
Z107FACP
22DP1
E-8
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
CANOPY LINE
FEO
TRAN
SACT
ION
WIN
DOW
S
UP DN
STORAGE PIPE
CHAS
E
CONFERENCE RM
COUNTER TABLE
INFO
RMAT
ION
6.00
6.00
6.00
6.00
24.0
0
CLIE
NTS
LOUN
GE
54.00
6.00 6.00 6.00 6.006.006.006.006.00
MALE CR
FEMALE CR
PERIMETER LINE
ROOF LINE
PULL DOWN STAIR
6.00
FIRE EXIT
UP
DN
6.00
UPDN
SOSI
A ST
AFF
CHIEF
CHIEF
SOSI
A TR
ANSA
CTIO
N W
INDO
WS
FEO
RECO
RDS
RM
FEO STAFF
MAL
E CR FEMALE CR
RECO
RDS
RM
FEO
STAF
F
SECOND FLOOR PLANSCALE 1 : 100MTS
FIRE ALARM LAYOUT
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD SD
SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
M
M
B
B
Z301FACP
Z302FACP
Z402FACP Z401
FACP
Z403FACP
E-9
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
UP DN
(COVERED ROOFDECK)
6.00
6.00
6.00
24.0
0
6.00
PERIMETER LINE
MULTI-PURPOSE AREA
54.00
6.00 6.00 6.00 6.006.006.006.006.00
DN6.00
FIRE EXIT
DN
ROOFDECK FLOOR PLANSCALE 1 : 100MTS
FIRE ALARM LAYOUT
SMOKE DETECTOR SD
M
B
FACP
FIRE MANUAL SWITCH
FIRE ALARM BELL
FIRE ALARM CONTROL PANEL
HEAT DETECTOR HD
Z106FACP CIRCUIT HOME RUN & DESIGNATION
SD
SD
HD
HD
HD HD
SD
M
B
Z501FACP
Z502FACP
HD HD
HD HD
LEGEND
E-10
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
L O A D OCPDNO. & SIZEof WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,
kAICWIRE mm²PVC mmØ
1 L.O. (Multi-purpose & Exam Rm 2) 11 11 230 1.10 4.78 4.78 4.78 15, 50, 2, 18 2-3.5+1-2.0 20
3 L.O. (CL Drug Testing & PWD Lounge) 20 20 230 2.00 8.70 8.70 8.70 15, 50, 2, 18 2-3.5+1-2.0 20
5 L.0. (Main Entrance, Client's Waiting Area & Electrical Rm) 15 15 230 1.50 6.52 6.52 6.52 15, 50, 2, 18 2-3.5+1-2.0 20
7 L.0. (Landbank & DI-NBI T. Windows and M & F C.R.) 18 18 230 1.80 7.83 7.83 7.83 15, 50, 2, 18 2-3.5+1-2.0 20
9 Receptacle (NP Office and Interview Rooms) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
11 Receptacle (NP Office and Interview Rooms) 11 11 230 1.98 8.61 8.61 8.61 20, 50, 2, 18 2-3.5+1-2.0 20
13 Receptacle (T. Windows and Sr Citizen's & PWD Lounge) 8 8 230 1.44 6.26 6.26 6.26 20, 50, 2, 18 2-3.5+1-2.0 20
15 Receptacle (CL Drug TestingEnt. InformationWaiting Areas) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
17 Receptacle (Examination Room 1) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
19 Receptacle (DI & NBI Teller & Stock Rooms) 8 8 230 1.44 6.26 6.26 6.26 20, 50, 2, 18 2-3.5+1-2.0 20
21 Receptacle (CL Examination Room and Main Entry) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
23 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25
Sub-total 64 53 117 18.94 49.48 58.00 57.22 82.35
L O A D OCPDNO. & SIZEof WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,
kAICWIRE mm²PVC mmØ
2 L.O. (NP Section Reception Area, Interview Rm & Hallway) 17 17 230 1.70 7.39 7.39 7.39 15, 50, 2, 18 2-3.5+1-2.0 20
4 L.O. (CL Drug TestingEnt. InformationWaiting Areas) 19 19 230 1.90 8.26 8.26 8.26 15, 50, 2, 18 2-3.5+1-2.0 20
6 L.0. (DI & NBI & Landbank C. Table, Hallway & Server Room) 15 15 230 1.50 6.52 6.52 6.52 15, 50, 2, 18 2-3.5+1-2.0 20
8 Receptacle (Multi-purpose and NP Examination Room 1) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
10 Receptacle (NP Interview Rooms) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
12 Receptacle (NP Interview Rooms) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
14 Receptacle (CL Drug Testing) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
16 Receptacle (Landbank Couter Tables) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
18 Receptacle (Landban, DI and NBI Transaction Windows) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
20 Receptacle (DI & NBI Counter Tables) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
22 S P A R E (Fire Alarm Control Panel) 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25
24 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25
Sub-total 51 44 95 19.02 52.96 51.22 61.22 82.70
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 1
COMPUTATION OF SERVICE EQUIPMENT: DP1
Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of
Largest motor
CONDUCTOR: Number Size
Type Icb (Main Over Current Protective Device)= Iw + Largest motor
DISTRIBUTION PANEL 1: 24 BRANCHES, 250AF,
CENTER MAIN
TOTAL CURRENT, (It) = 57.22 + 61.22 = 118.44 Line: 3
38 mm sq
THWN
Copper
Icb (Main OCPD) = 100.67 + 0.00 = 100.67 BREAKERS: Number PoleAT, AF, kAIC
DEMAND FACTOR, (df) = 0.85 Grounding:
1
8 mm sq
THWN
Copper
Main 1 3125, 150, 25
25 OF LARGEST MOTOR = 0.25 x 0.00 = 0.00 CONDUIT: 1 40 mm Ø PVC Branches 7 215, 50, 18
WIRE AMPACITY, (Iw) = 100.67 + 0.00 = 100.67 Branches 14 220, 50, 18
Branches 3 230, 50, 18
125AT
3 - 50 mm² THHN/THWN CU WIRE1 - 8 mm² THHN/THWN CU WIRE
in 50 mm Ø PVC PIPE
1 3 G
15AT 15AT
15AT 15AT
20AT
20AT
20AT
GROUNDING LUGSFOR EVERY CIRCUIT
15AT
PROVIDE GROUNDING RODCOPPER CLAD STEEL ROD (16MMØ X 3000MM)
1 - 8 MM ² THHNTHWN COPPER WIREin 20 MM Ø PVC PIPE
2
15AT
20AT
15AT
30AT
30AT 30AT
20AT
20AT 20AT
20AT 20AT
20AT 20AT
20AT 20AT
20AT
E-11
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
L O A D OCPDNO. & SIZEof WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,
kAICWIRE mm²PVC mmØ
1 L.O. (Examination Room 1 and NP Storage Room) 10 10 230 1.00 4.35 4.35 4.35 15, 50, 2, 18 2-3.5+1-2.0 20
3 L.O. (Client's Lounge, NP Section and Interview Rooms) 22 22 230 2.20 9.57 9.57 9.57 15, 50, 2, 18 2-3.5+1-2.0 20
5 Receptacle (NP Examination Room 2) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
7 Receptacle (NP Examination Room 1) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
9 Receptacle (Waiting Area) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
11 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25
Sub-total 32 19 51 9.62 24.09 26.78 32.78 41.83
L O A D OCPDNO. & SIZEof WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,
kAICWIRE mm²PVC mmØ
2 L.O. (Client's Area, CL Drug Testing & Hallway) 14 14 230 1.40 6.09 6.09 6.09 15, 50, 2, 18 2-3.5+1-2.0 20
4 L.O. (Female & Male C.R., Storage Room and Hallway) 10 10 230 1.00 4.35 4.35 4.35 15, 50, 2, 18 2-3.5+1-2.0 20
6 Receptacle (NP Examination Room 2) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
8 Receptacle (NP Office & Locker Rm, Hallway & Lounge) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
10 Receptacle (Client's Waiting Area & Electrical Room) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
12 S P A R E 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 25
Sub-total 24 19 43 8.82 20.61 29.30 26.78 38.35
COMPUTATION OF SERVICE EQUIPMENT: DP2
Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of
Largest motor
CONDUCTOR: Number Size
Type Icb (Main Over Current Protective Device)= Iw + Largest motor
DISTRIBUTION PANEL 1: 12 BRANCHES, 100AF,
CENTER MAIN
TOTAL CURRENT, (It) = 32.78 + 26.78 = 59.56 Line: 3
22 mm sq
THWN
Copper
Icb (Main OCPD) = 50.63 + 0.00 = 50.63 BREAKERS: Number PoleAT, AF, kAIC
DEMAND FACTOR, (df) = 0.85 Grounding:
1
8 mm sq
THWN
Copper
Main 1 360, 100, 18
25 OF LARGEST MOTOR = 0.25 x 0.00 = 0.00 CONDUIT: 1 40 mm Ø PVC Branches 4 215, 50, 18
WIRE AMPACITY, (Iw) = 50.63 + 0.00 = 50.63 Branches 8 220, 50, 18
Branches 0 230, 50, 18
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 2
60AT
3 - 22 mm² THHN/THWN CU WIRE1 - 8 mm² THHN/THWN CU WIRE
in 40 mm Ø PVC PIPE
1 3 G
15AT 15AT
15AT 15AT
20AT 20AT
GROUNDING LUGSFOR EVERY CIRCUIT
PROVIDE GROUNDING RODCOPPER CLAD STEEL ROD (16MMØ X 3000MM)
1 - 8 MM ² THHNTHWN COPPER WIREin 20 MM Ø PVC PIPE
2
20AT
20AT 20AT
20AT
20AT 20AT
E-12
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
L O A D OCPDNO. & SIZE of
WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF,
POLE, kAICWIRE mm²EMT mmØ
2 L.O. (SOCIA Area & CR) 18 18 230 1.80 7.83 7.83 7.83 15, 50, 2, 18 2-3.5+1-2.0 20
4 L.O. (Client's Lounge) 17 17 230 1.70 7.39 7.39 7.39 15, 50, 2, 18 2-3.5+1-2.0 20
6 Receptacle (FEO Staff) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20
8 Receptacle (FEO Staff) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20
10 Receptacle (FEO Staff) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
12 Receptacle (SOCIA Staff) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
14 Receptacle (FEO Transaction Windows) 5 5 230 0.90 3.91 3.91 3.91 20, 50, 2, 18 2-3.5+1-2.0 20
16 Receptacle (SOCIA Transaction Windows) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20
18 Receptacle (FEO Transaction Windows) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20
20 Receptacle (Counter Table) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
22 1 TR (Server Room) 1 230 2.07 9.00 9.00 9.00 20, 50, 2, 18 2-5.5+1-3.525
24 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
Sub-total 35 38 1 73 15.41 43.78 43.57 46.65 67.00
L O A D OCPDNO. & SIZE of
WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF,
POLE, kAICWIRE mm²EMT mmØ
1 L.O. (FEO Area) 19 19 230 1.90 8.26 8.26 8.26 15, 50, 2, 18 2-3.5+1-2.0 20
3 L.O. (FEO & SOCIA Transaction Windows) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20
5 L.O. (Client's Lounge & CR) 17 17 230 1.70 7.39 7.39 7.39 15, 50, 2, 18 2-3.5+1-2.0 20
7 Receptacle (FEO Staff) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20
9 Receptacle (FEO Staff) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20
11 Receptacle (FEO Staff) 3 3 230 0.54 2.35 2.35 2.35 20, 50, 2, 18 2-3.5+1-2.0 20
13 Receptacle (FEO Transaction Windows) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20
15 Receptacle (FEO Transaction Windows) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20
17 Receptacle (SOCIA Transaction Windows) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20
19 Receptacle (SOCIA Staff) 6 6 230 1.08 4.70 4.70 4.70 20, 50, 2, 18 2-3.5+1-2.0 20
21 SERVER ROOM 1 230 10.00 43.48 43.48 43.48 50, 50, 2, 18 25
23 1 TR (Server Room) 1 230 2.07 9.00 9.00 9.00 20, 50, 2, 18 2-5.5+1-3.525
Sub-total 52 28 2 80 22.31 75.13 41.09 77.78 97.00
COMPUTATION OF SERVICE EQUIPMENT: DP3
Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of
Largest motor
CONDUCTOR: Number Size
Type Icb (Main Over Current Protective Device)= Iw + Largest motor
DISTRIBUTION PANEL 1: 24 BRANCHES, 150AF,
CENTER MAIN
TOTAL CURRENT, (It) = 77.78 + 46.65 = 124.43 Line: 3
50 mm sq
THWN
Copper
Icb (Main OCPD) = 108.02 + 9.00 = 117.02 BREAKERS: Number PoleAT, AF, kAIC
DEMAND FACTOR, (df) = 0.85 Grounding:
1
8 mm sq
THWN
Copper
Main 1 3125, 150, 25
25 OF LARGEST MOTOR = 0.25 x 9.00 = 2.25 CONDUIT: 1 50 mm Ø PVC Branches 5 215, 50, 18
WIRE AMPACITY, (Iw) = 105.77 + 2.25 = 108.02 Branches 17 220, 50, 18
Branches 1 230, 50, 18
Branches 1 250, 50, 18
125AT
3 - 50 mm² THHN/THWN CU WIRE1 - 8 mm² THHN/THWN CU WIRE
in 50 mm Ø PVC PIPE
1 3 G
15AT 15AT
15AT 15AT
20AT
20AT
20AT
GROUNDING LUGSFOR EVERY CIRCUIT
15AT
2
15AT
20AT
20AT
20AT
20AT 30AT
20AT
20AT 20AT
20AT 20AT
20AT 20AT
20AT 20AT
50AT
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 3
E-13
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
L O A D OCPDNO. & SIZE of
WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF,
POLE, kAICWIRE mm²EMT mmØ
2 L.O. (SOCIA Area & CR) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20
4 Receptacle (Client's Lounge) 7 7 230 1.26 5.48 5.48 5.48 20, 50, 2, 18 2-3.5+1-2.0 20
6 Receptacle (Counter Table) 8 8 230 1.44 6.26 6.26 6.26 20, 50, 2, 18 2-3.5+1-2.0 20
8 2.5TR (GF Exam Room 2) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525
10 2.5TR (GF Exam Room 1) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525
12 2.5TR (GF Waiting Area) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525
14 1.5TR (GF EntryHallway) 1 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525
16 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 9.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
18 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
20 1.5TR (2F SOCIA STAFF) 1 1 230 2.16 9.40 5.48 9.40 20, 50, 2, 18 2-5.5+1-3.525
22 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
24 S P A R E 230 3.00 17.00 13.04 13.04 30, 50, 2, 18 25
Sub-total 16 15 7 38 35.28 87.68 98.50 110.63 153.38
L O A D OCPDNO. & SIZE of
WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF,
POLE, kAICWIRE mm²EMT mmØ
1 L.O. (Client's Lounge) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20
3 L.O. (FEO & SOCIA Transaction Windows) 13 13 230 1.30 5.65 5.65 5.65 15, 50, 2, 18 2-3.5+1-2.0 20
5 Receptacle (Client's Lounge at Column) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20
7 Receptacle (InfoClient's Lounge) 4 4 230 0.72 3.13 3.13 3.13 20, 50, 2, 18 2-3.5+1-2.0 20
9 3TR (Interview Rooms) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525
11 4TR (Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
13 3TR (Client's Testing Area) 1 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-8.0+1-5.525
15 1.5TR (2nd Floor FEO Staff) 1 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525
17 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
19 4TR (2nd Floor Client's Lounge) 1 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
21 S P A R E (Sinage Lightings) 230 3.00 13.04 13.04 13.04 20, 50, 2, 18 2-3.5+1-2.0 20
23 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
Sub-total 29 8 6 43 33.71 91.58 101.46 100.07 146.56
COMPUTATION OF SERVICE EQUIPMENT: DP4
Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of
Largest motor
CONDUCTOR: Number Size
Type Icb (Main Over Current Protective Device)= Iw + Largest motor
DISTRIBUTION PANEL 1: 24 BRANCHES, 250AF,
CENTER MAIN
TOTAL CURRENT, (It) = 100.07 + 110.63 = 210.70 Line: 3
100 mm
sq
THWN
Copper
Icb (Main OCPD) =
183.95 + 19.40 = 203.35 BREAKERS: Number PoleAT, AF, kAIC
DEMAND FACTOR, (df) =
0.85
Grounding:
1
14 mm sq
THWN
Copper
Main 1 3200, 250, 25
25 OF LARGEST MOTOR = 0.25 x 19.40 = 4.85 CONDUIT: 1 65 mm Ø PVC Branches 3 215, 50, 18
WIRE AMPACITY, (Iw) = 179.10 + 4.85 = 183.95 Branches 8 220, 50, 18
Branches 8 230, 50, 18
Branches 5 240, 50, 18
200AT
3 - 100 mm² THHN/THWN CU WIRE1 - 14 mm² THHN/THWN CU WIRE
in 65 mm Ø PVC PIPE
1 3 G
15AT 15AT
15AT
GROUNDING LUGSFOR EVERY CIRCUIT
2
20AT
30AT
30AT 30AT
20AT
20AT
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 4
20AT
30AT
30AT
40AT
40AT
40AT
40AT
40AT
20AT
20AT
30AT
30AT
30AT
20AT
20AT
E-14
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
L O A D OCPDNO. & SIZEof WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,
kAICWIRE mm²PVC mmØ
1 1.5 TR (Multi-purpose Room) 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525
3 3 TR (NP Section) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
5 3 TR (Exam Room 1) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
7 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
9 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
11 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
13 2.5 TR (C, FEOConference Room) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
15 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
17 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
19 3 TR (C,SOCIA & Staff) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
21 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
23 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
Sub-total 10 46.11 131.64 131.64 137.69 200.49
L O A D OCPDNO. & SIZEof WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,
kAICWIRE mm²PVC mmØ
2 3 TR (Exam Room 2) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
4 3 TR (NP Section Intreview Rooms) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
6 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
8 3 TR (Waiting Areas) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
10 1.5 TR (CL Exam Room) 1 230 2.16 9.40 9.40 9.40 20, 50, 2, 18 2-5.5+1-3.525
12 3 TR (FEO Staff) 1 230 3.91 17.00 17.00 17.00 30, 50, 2, 18 2-5.5+1-3.525
14 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
16 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
18 4 TR (Client's Lounge) 1 230 4.46 19.40 19.40 19.40 40, 50, 2, 18 2-8.0+1-5.525
20 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
22 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
24 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
Sub-total 9 44.65 125.29 135.29 127.69 194.13
250AT
3 - 125 mm² THHN/THWN CU WIRE1 - 22 mm² THHN/THWN CU WIRE
in 65 mm Ø PVC PIPE
1 3 G
GROUNDING LUGSFOR EVERY CIRCUIT
2
30AT
30AT 30AT
20AT
40AT
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 5
30AT
30AT
30AT
30AT
30AT
40AT
40AT
40AT
40AT
40AT
40AT
40AT
40AT
COMPUTATION OF SERVICE EQUIPMENT: DP5
Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of
Largest motor
CONDUCTOR: Number Size
Type Icb (Main Over Current Protective Device)= Iw + Largest motor
DISTRIBUTION PANEL 1: 24 BRANCHES, 250AF,
CENTER MAIN
TOTAL CURRENT, (It) = 137.69 + 127.89 = 265.58 Line: 3
125 mm
sq
THWN
Copper
Icb (Main OCPD) =
230.59 + 19.40 = 249.99 BREAKERS: Number PoleAT, AF, kAIC
DEMAND FACTOR, (df) =
0.85
Grounding:
1
22 mm sq
THWN
Copper
Main 1 3250, 250, 25
25 OF LARGEST MOTOR = 0.25 x 19.40 = 4.85 CONDUIT: 1 65 mm Ø PVC Branches 0 215, 50, 18
WIRE AMPACITY, (Iw) = 225.74 + 4.85 = 230.59 Branches 2 220, 50, 18
Branches 13 230, 50, 18
Branches 9 240, 50, 18
30AT
30AT
30AT
30AT
20AT
30AT
PROVIDE GROUNDING RODCOPPER CLAD STEEL ROD (16MMØ X 3000MM)
1 - 22 MM ² THHNTHWN COPPER WIREin 25 MM Ø PVC PIPE
E-15
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
L O A D OCPDNO. & SIZEof WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,
kAICWIRE mm²PVC mmØ
1 L.O. (Female & Male C.R., Storage Room and Hallway) 13 13 230 1.30 5.65 5.65 5.65 15, 50, 2, 18 2-3.5+1-2.0 20
3 L.O. (Multi-purpose Hall) 12 12 230 1.20 5.22 5.22 5.22 15, 50, 2, 18 2-3.5+1-2.0 20
5 L.O. (Multi-purpose Hall) 12 12 230 1.20 5.22 5.22 5.22 15, 50, 2, 18 2-3.5+1-2.0 20
7 Receptacle (Multi-purpose Hall) 9 9 230 1.62 7.04 7.04 7.04 20, 50, 2, 18 2-3.5+1-2.0 20
9 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
11 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
Sub-total 37 9 46 11.32 30.96 30.96 36.52 49.22
L O A D OCPDNO. & SIZEof WIRE &CONDUIT
DESCRIPTION LO COSPONEMA
3RTotal Volts kVA L1 L2 L3 Amps AT, AF, POLE,
kAICWIRE mm²PVC mmØ
2 L.O. (Multi-purpose Hall) 13 13 230 1.30 5.65 5.65 5.65 15, 50, 2, 18 2-3.5+1-2.0 20
4 L.O. (Multi-purpose Hall) 12 12 230 1.20 5.22 5.22 5.22 15, 50, 2, 18 2-3.5+1-2.0 20
6 L.O. (Multi-purpose Hall) 16 16 230 1.60 6.96 6.96 6.96 15, 50, 2, 18 2-3.5+1-2.0 20
8 Receptacle (Multi-purpose Hall) 9 9 230 1.62 7.04 7.04 7.04 20, 50, 2, 18 2-3.5+1-2.0 20
10 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
12 S P A R E 230 3.00 13.04 13.04 13.04 30, 50, 2, 18 25
Sub-total 41 9 50 11.72 30.96 32.70 38.26 50.96
COMPUTATION OF SERVICE EQUIPMENT: DP6
Iw (Wire Ampacity)= (Total current, It x Demand factor,df) + 25 of
Largest motor
CONDUCTOR: Number Size
Type Icb (Main Over Current Protective Device)= Iw + Largest motor
DISTRIBUTION PANEL 1: 12 BRANCHES, 150AF,
CENTER MAIN
TOTAL CURRENT, (It) = 36.52 + 38.26 = 74.78 Line: 3
38 mm sq
THWN
Copper
Icb (Main OCPD) = 63.56 + 0.00 = 63.56 BREAKERS: Number PoleAT, AF, kAIC
DEMAND FACTOR, (df) = 0.85 Grounding:
1
8 mm sq
THWN
Copper
Main 1 3100, 150, 18
25 OF LARGEST MOTOR = 0.25 x 0.00 = 0.00 CONDUIT: 1 40 mm Ø PVC Branches 6 215, 50, 18
WIRE AMPACITY, (Iw) = 63.56 + 0.00 = 63.56 Branches 2 220, 50, 18
Branches 4 230, 50, 18
SCHEDULE OF LOADS & DETAIL OF DISTRIBUTION PANEL 6
100AT
3 - 38 mm² THHN/THWN CU WIRE1 - 8 mm² THHN/THWN CU WIRE
in 40 mm Ø PVC PIPE
1 3 G
15AT 15AT
15AT 15AT
30AT 30AT
GROUNDING LUGSFOR EVERY CIRCUIT
2
20AT
30AT 30AT
20AT
15AT 15AT
E-16
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
CKT
NO.
L O A D OCPDNO. & SIZEof WIRE &CONDUIT
DESCRIPTION Volts kVA Amps LOAD CURRENTL1 L2 L3
AT, AF, POLE,kAIC
WIRE mm²PVC mmØ
1 DISTRIBUTION PANEL 1 230 37.96 165.04 102.44 109.22 118.44 125, 150, 3, 25 3-50+1-8 50
2 DISTRIBUTION PANEL 3 230 37.72 164.00 118.91 84.66 124.43 125, 150, 3, 25 3-50+1-8 50
3 DISTRIBUTION PANEL 5 230 90.76 394.61 256.93 266.93 265.58 250, 250, 3, 25 3-125+1-4 65
4 S P A R E 230 3.60 27.11 15.65 15.65 15.65 40, 50, 3, 18 32
T O T A L 170.04 750.76 493.93 476.46 524.10
CKT
NO.
L O A D OCPDNO. & SIZEof WIRE &CONDUIT
DESCRIPTION Volts kVA Amps LOAD CURRENTL1 L2 L3
AT, AF, POLE,kAIC
WIRE mm²PVC mmØ
1 DISTRIBUTION PANEL 2 230 18.44 80.17 44.70 56.08 59.56 60, 100, 3, 25 3-22+1-8 40
2 DISTRIBUTION PANEL 4 230 68.99 299.96 179.26 199.96 210.70 200, 250, 3, 25 3-100+1-14 65
3 DISTRIBUTION PANEL 6 230 23.04 100.17 61.92 63.66 74.78 100, 150, 3, 18 3-38+1-8 40
4 S P A R E 230 3.60 27.11 15.65 15.65 15.65 30, 50, 3, 18 32
T O T A L 114.07 507.41 301.53 335.35 360.69
COMPUTATIONS OF LOADS: MAIN DISTRIBUTION PANEL 1& GENERATOR with ATS
Iw (Main Service Entrance Conductor)= (Highest Line Load x Demand Factor) + 25 of the Full Load Current of Largest motor
Iw (Wire ampacity) = 445.49 + 4.85 = 450.34USE: 6 - 250 mm² THHN/THWN + 2 - 50 mm² THHN/THWN Copper Wire in 2-100 mm Ø RSC
PIPE
Icb (Main Over Current Protective Device)= Iw + Full Load Current of Largest motor
Icb (Main OCPD) = 450.34 + 19.40 = 469.74USE: 500 AT CB Main CB, 42kAIC, 4 Branches Main Distribution Panel, Bolt-on individual CB, 3 Pole,
240V, 60Hz with Grounding LugsGenerator Rating:
Generator Rating (kVA) = Total kVALoad*1.25= 284.1 x 1.250 = 355.14
USE: 1-350 KVA GENERATOR SET, 3 PHASE, SILENT TYPE and 800AT Automatic Transfer Switch
COMPUTATIONS OF LOADS: MAIN DISTRIBUTION PANEL 2& TRANSFORMER with Main Disconnecting Means
Iw (Main Service Entrance Conductor)= ((Highest Line Load230) x (1.732) x Demand Factor)) + 25 of the Current of Largest motor
Iw (Wire ampacity) = 305.85 + 4.85 = 310.70USE: 3 - 250 mm² THHN/THWN + 1 - 50 mm² THHN/THWN Copper Wire in 1-100 mm Ø RSC
PIPE
Icb (Main Over Current Protection Device)= Iw + Current of Largest motor
Icb (Main OCPD) = 310.70 + 19.40 = 330.10USE: 350 AT CB Main, 42kAIC, 4 Branches Main Distribution Panel, Bolt-on individual CB, 3 Pole,
240V, 60Hz with Grounding LugsTransformer Rating, MDB and Main Service Entrance Conductor:
Total Load (kVA) = kVA MDP1+kVAMDP2*div.f* demand f1.732= 181.1 1.732 = 104.57
USE: 3-100 KVA DISTRIBUTION TRANSFORMERMain Disconnecting Means 700 AT CB9 - 250 mm2 THHNTHWN + 3-50 mm2 THHNTHWN Copper Wire in 3-100 mm dia RSC
SCHEDULE OF LOADS MAIN DISTRIBUTION PANEL 1 SCHEDULE OF LOADS MAIN DISTRIBUTION PANEL 2
E-17
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING
RISER DIAGRAM
M
MCB800AT
in NEMA 3REnclosures
DP6100AT
KWHR METERCT RATED
SERVICE ENTRANCE3PHASE, 4-WIRE, 240V, 60HZ
3-250mmsq THWNTHHN Cu WIRE1-50mmsq THHNTHWN Cu WIRE
in 100mm dia RSC CONDUIT
GF LINE
2nd F LINE
3rd F LINE
3-50mmsq THWNTHHN Cu WIRE1-8mmsq THHNTHWN Cu WIRE
in 50mm dia PVC CONDUIT
3-38mmsq THWNTHHN Cu WIRE1-8mmsq THHNTHWN Cu WIREin 40mm dia PVC CONDUIT
3 sets: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia RSC CONDUIT
ATS800AT
DP4200AT
MDP2350AT
EXTERIOR OF THEBUILDING
EXTERIOR OF THEBUILDING
3 SETS: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia PVC CONDUIT
3-100mmsq THWNTHHN Cu WIRE1-14mmsq THHNTHWN Cu WIRE
in 65mm dia PVC CONDUIT
DP3125AT
DP1125AT
MDP1500AT
DP5250AT
2 SETS: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia PVC CONDUIT
3-50mmsq THWNTHHN Cu WIRE1-8mmsq THHNTHWN Cu WIREin 50mm dia PVC CONDUIT
3-22mmsq THWNTHHN Cu WIRE1-8mmsq THHNTHWN Cu WIREin 40mm dia PVC CONDUIT
3-125mmsq THWNTHHN Cu WIRE1-22mmsq THHNTHWN Cu WIREin 65mm dia PVC CONDUIT
DP260AT
PROVIDE GROUNDING RODCOPPER CLAD STEEL ROD
(16MM DIA x 3000MM)
1 - 60 MMSQ THHNTHWN COPPER WIREin 32 MM DIA PVC PIPE
PROVIDE GROUNDING RODCOPPER CLAD STEEL ROD
(16MM DIA x 3000MM)
SEE SCHEDULE OF LOADS & COMPUTATIONSFOR SIZE OF GROUNDING ELECTRODE CONDUCTOR
DRIP LOOPat least 1500
3-100mmØ RIGID STEELCONDUIT EMBEDED ON
CONCRETE POLE
58" Ø EYEBOLT
GALVANIZED
KWHR METERCT RATED in
NEMA 3RENCLOSURES
SERVICE DROP LINE3-500mm² THWN Cu Wire1-60mm² THWN Cu Wire
USE SOLDERLESSCONNECTORS CURRENT TRANFORMER
ENCLOSED, CTR: 5:800
20 mm Ø RSC with clamps6-3.5mm² THHN Cu Wire
SERVICE ENTRANCE POLE3700mm High for residential property and driveways5500mm High for public streets, alleys, roads, parking areassubject to truck traffic
800AT MAIN DISCONNECTING MEANSIN NEMA 3R ENCLOSURES
SEE DETAIL OF MDB
PROVIDE GROUNDING RODCONNECTOR
PROVIDE GROUNDINGELECTRODE ROD
COPPER CLAD STEEL ROD(16MM DIA x 3000MM)
NGL
DETAIL OF SERVICE ENTRANCE EQUIPMENT & GROUNDINGNOT DRAWN TO SCALE
1.50
2.50
0.55
1.00
N. G. L.
0.40
0.35
0.80
TOP
1.50
RIGID STEELCONDUITRIGID STEEL BARSSTIRRUPS
NOTE:COORDINATE TO THE STRUCTURALENGINEER THE SIZE OF STEEL BARS
9 STEEL BARS5 x 4 PCS
3 SETS SERVICEENTRANCE CAP
58" EYEBOLT
3-100MM Ø RIGID STEELCONDUIT EMBEDDED ON
CONCRETE POLE
SERVICE POLE DETAILNOT DRAWN TO SCALE
3 SETS: 3-250mmsq THWNTHHN Cu WIRE 1-50mmsq THHNTHWN Cu WIRE in 100mm dia PVC CONDUIT
E-18
SHEET NO.PROJECT TITLE:
LOCATION: CAMP CRAME, QUEZON CITY
PREPARED BY:
POLICE CHIEF INSPECTOR
CHIEF, PLANS & DESIGN SECTION
FERDINAND S MAGALLANESABELARDO C MATILLANO
DEPUTY DIRECTOR, ENGINEERING SERVICE
CHECKED BY:
ACTING CHIEF, INFRASTRUCTURE DIVISION
POLICE SUPERINTENDENT POLICE SENIOR SUPERINTENDENT
MANUEL G FABROS
CHIEF OF STAFF, ENGINEERING SERVICE
APPROVED BY:RECOMMEND APPROVAL:
SUBMITTED BY:
POLICE SENIOR SUPERINTENDENT
DIRECTOR, ENGINEERING SERVICE
POLICE CHIEF SUPERINTENDENT
HONORIO R AGNILA
ANTONIO A TAYLAN, JR
PROPOSED COMPLETION OF ONE-STOP SHOP BUILDING