TVSS
J
H
ELECTRICAL COVER SHEETE-001
ELECTRICAL SITE PLAN - EXISTING & DEMOLITIONED002
POWER PLAN - EXISTING & DEMOLITIONED201
SINGLE LINE DIAGRAM - EXISTING & DEMOLITIONED501
ELECTRICAL SITE PLAN - TEMPORARYET002
POWER PLAN - TEMPORARYET201
SINGLE LINE DIAGRAM - TEMPORARYET501
ELECTRICAL SITE PLAN - NEW WORKE-002
LIGHTING PLAN - NEW WORKE-101
POWER PLAN - NEW WORKE-201
GROUNDING PLAN - NEW WORKE-301
SINGLE LINE DIAGRAM - NEW WORKE-501
SWITCHGEAR ELEVATION - NEW WORKE-601
ELECTRICAL SCHEDULESE-602
E-603
E-605
SWITCHGEAR ELEVATION - EXISTING & DEMOLITIONED601
MANHOLE PLAN - EXISTING & DEMOLITIONED602
MANHOLE FOLDOUTS - EXISTING & DEMOLITIONED603
MANHOLE FOLDOUTS - EXISTING & DEMOLITIONED604
MANHOLE FOLDOUTS - NEW WORKE-604
E-606
MANHOLE FOLDOUTS - NEW WORK
MANHOLE PLAN - NEW WORK
SCADA PLAN - NEW WORK
ELECTRICAL DETAILSE-701
#52
GENERAL NOTES
ELECTRICAL SYMBOLS
ABBREVIATIONS
LINE TYPES
A
A
AA
3
ANSI/IEEE STANDARD DEVICE NUMBERS
LED, STRIP LIGHT, LETTER INDICATES TYPE.
LIGHTING FIXTURE, LETTER INDICATES TYPE.
LED LIGHTING FIXTURES ON EMERGENCY CIRCUIT, LETTER INDICATES TYPE.
20A, 120/277V THREE-WAY LIGHTING SWITCH MOUNTED +48" ABOVE FINISHED FLOOR (UNLESS
OTHERWISE NOTED)
EXISTING FEEDER TO REMAIN
EXISTING FEEDER TO BE DEMOLISHED
NEW FEEDER
EXISTING EQUIPMENT/MATERIAL TO REMAIN
EXISTING EQUIPMENT/MATERIAL TO BE MOVED/RELOCATED
EXISTING EQUIPMENT/MATERIAL TO DEMOLISHED
NEW OR RELOCATED EQUIPMENT/MATERIAL
JUNCTION BOX
RECTIFIER
TRANSIENT VOLTAGE SURGE SUPPRESSION
FOR CONTINUATION...
BATTERY
AUTOMATIC TRANSFER SWITCH
FUSED DISCONNECT SWITCH
DISCONNECT SWITCH
CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
FUSE
GROUND
METER
TRANSFORMER
MEDIUM VOLTAGE DRAWOUT CIRCUIT BREAKER
DRAWOUT CIRCUIT BREAKER
FIX MOUNTED CIRCUIT BREAKER
SPACE FOR FIX MOUNTED CIRCUIT BREAKER
SPACE FOR DRAWOUT CIRCUIT BREAKER
POWER QUALITY METER
KVAR KILOVOLT AMPERES REACTIVE
KW KILOWATT
LRA LOCKED ROTOR AMPERES
LTG LIGHTING
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MH METAL HALIDE
MIN MINIMUM
MLO MAIN LUG ONLY
MOP METHOD OF PROCEDURE
MTD MOUNTED
N.C. NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NETA NATIONAL ELECTRICAL TESTING AGENCY
N.F.S. NON-FUSED SAFETY SWITCH
NIC NOT IN CONTRACT
N.T.S. NOT TO SCALE
P POLES
PAF ARC-FLASH OVERCURRENT RELAY
P/T POTENTIAL TRANSFORMER
PF POWER FACTOR
PNL PANEL, PANELBOARD
PQM POWER QUALITY METER
Ø PHASE
RECEPT, RECEPTACLERECP
RLA RUNNING LOAD AMPERES
S, SW SWITCH
SWBD SWITCHBOARD
S/N SOLID NEUTRAL
SWGR SWITCHGEAR
TEL TELEPHONE
THRU THROUGH
TYP TYPICAL
UL UNDERWRITERS LABORATORY, INC.
UPS UNINTERRUPTIBLE POWER SUPPLY
U.O.N. UNLESS OTHERWISE NOTED
V VOLT
VA VOLTAMPERES
VAR VOLTAMPERES REACTIVE
V/T VOLTAGE TRANSFORMER
W WATT
WP WEATHER PROOF
A, AMP AMPERE
A/C AIR CONDITIONING
AC ALTERNATING CURRENT
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
A.I.C. AMPERES INTERRUPTING CAPACITY
AUX COMP. AUXILIARY COMPARTMENT
ATS AUTOMATIC TRANSFER SWITCH
BRK BREAKER
CB CIRCUIT BREAKER
C/T CURRENT TRANSFORMER
C. CND CONDUIT
CKT CIRCUIT
COMM COMMUNICATIONS
CR CARD READER
CU COPPER
DPR DIFFERENTIAL PROTECTIVE RELAY
DWG DRAWING
ELEV ELEVATOR
EW EMERGENCY WHITE LIGHT
EWC ELECTRIC WATER COOLER
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FLA FULL LOAD AMPERES
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FMR FEEDER MANAGEMENT RELAY
F.S.S. FUSED SAFETY SWITCH
GFCI GROUND FAULT CURRENT INTERRUPTER
GRD, G GROUND
HID HIGH INTENSITY DISCHARGE
HP HORSEPOWER
HOR HORIZONTAL
HPS HIGH PRESSURE SODIUM
HTR HEATER
HZ HERTZ
INCAND INCANDESCENT
JB JUNCTION BOX
K.A.I.C. 1000 AMPERES INTERRUPTING CAPACITY
KCMIL 1000 CIRCULAR MILS
KV KILOVOLT
KVA KILOVOLT AMPERES
51G GROUND TIME OVERCURRENT RELAY
52 AC CIRCUIT BREAKER
59 OVERVOLTAGE RELAY
67 AC DIRECTIONAL OVERCURRENT RELAY
81 FREQUENCY RELAY
86 LOCKOUT RELAY
87 DIFFERENTIAL PROTECTIVE RELAY
25 SYNCHRONISM CHECK DEVICE
27 UNDERVOLTAGE RELAY
32 DIRECTIONAL POWER RELAY
50 PHASE INSTANTANEOUS OVERCURRENT RELAY
50G GROUND INSTANTANEOUS OVERCURRENT RELAY
51 PHASE TIME OVERCURRENT RELAY
AFD ARC-FLASH DETECTOR
ELECTRICAL DRAWING LIST
M
PQM
GROUND ROD
S
X
EMPTY DUCT
FILLED DUCT
STRUNG DUCT
BLOCKED DUCT
G3
GLOWTUBE. SUBSCRIPT DENOTES NUMBER OF TUBES.
JUNCTION BAR
ELECTRIC HEATER CONNECTION.
MOTOR CONNECTION
K.3. ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER AND SHALL PRESENT A NEATAND CLEAN APPEARANCE WHEN COMPLETED. COVERS SHALL BE INSTALLED AND TIGHTLYFASTENED ON ALL ELECTRICAL ENCLOSURES. THE ENCLOSURES SHALL BE FREE OF DEBRISAND LOOSE HARDWARE ON THE INTERIOR AND EXTERIOR. ALL ENCLOSURES SHALL BECLEARLY IDENTIFIED ON THE EXTERIOR WITH PROPER NOMENCLATURE AND EXPECTED ARCFLASH LEVELS.
L. TESTING
L.1. AT THE TIME OF FINAL INSPECTION AND TEST, ALL CONNECTIONS AT PANELBOARDS,DEVICES AND EQUIPMENT, AND ALL SPLICES MUST BE COMPLETED. EACH CIRCUIT AND ITSRESPECTIVE CONNECTED EQUIPMENT MUST TEST FREE OF SHORT CIRCUITS AND GROUNDS.
L.2. PROVIDE TESTING OF ALL ELECTRICAL COMPONENTS PER NETA TEST PROCEDURESINCLUDING ALL THE OPTIONAL TESTING PROCEDURES.
M. SHOP DRAWINGS
P.1. SUBMIT SHOP DRAWINGS; ELECTRONIC FORMAT (PDF), OF ELECTRICAL EQUIPMENT TOENGINEER FOR REVIEW AND APPROVAL BEFORE ORDERING.
R. FIRE ALARM WORK
R.1. EXISTING FIRE ALARM IS TO REMAIN.
R.2. CONTRACTOR SHALL MAINTAIN THE CONTINUITY OF ALL EXISTING FIRE ALARM SYSTEMDEVICES AND KEEP THEM OPERATIONAL DURING ALL STAGES OF THIS CONTRACT.
A. THE INSTALLATION SHALL COMPLY WITH ALL LOCAL LAWS AND ORDINANCES, APPLICABLE TOELECTRICAL INSTALLATIONS, AND WITH THE REGULATIONS OF NFPA 70 (NATIONAL ELECTRICALCODE) AND 70E (STANDARD FOR ELECTRICAL SAFETY IN THE WORKPLACE) WHERE SUCHREGULATIONS DO NOT CONFLICT WITH THOSE LAWS. SUBCONTRACTOR SHALL OBTAIN ALLPERMITS AND COORDINATE ALL INSPECTIONS REQUIRED BY THE AUTHORITY HAVING JURISDICTION(AHJ).
B. ELECTRICAL CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR THIS WORK.
C. ALL MATERIALS, EQUIPMENT AND APPARATUS COVERED BY THIS SPECIFICATION SHALL BE NEW,OF CURRENT MANUFACTURER AND SHALL BEAR THE SEAL OF APPROVAL OF THE UNDERWRITERS'LABORATORIES (UL LISTED). NEW EQUIPMENT SHALL BE CLEARLY LABELED WITH THEMANUFACTURER'S NAMEPLATE DATA.
D. ALL EQUIPMENT TO BE PROVIDED BY THE CONTRACTOR SHALL BE AS MANUFACTURED BYGENERAL ELECTRIC, SQUARE-D COMPANY, SIEMENS AND/OR CUTLER HAMER. (WESTINGHOUSE.)
E. ALL ELECTRICAL EQUIPMENT SHALL BE NEW.
F. "PROVIDE" UNDER THIS CONTRACT IS DEFINED AS FURNISH AND INSTALL. "CONCEALED" UNDERTHIS CONTRACT IS DEFINED AS HIDDEN BY ARCHITECTURAL WALLS AND CEILINGS. "EXPOSED"UNDER THIS CONTRACT IS DEFINED AS VISIBLE TO VIEW. "INDICATED" UNDER THIS CONTRACT ISDEFINED AS SHOWN IN THE CONTRACT DOCUMENTS.
G. ALL ELECTRICAL PANELS, AND ALL MAJOR PIECES OF EQUIPMENT SHALL BE CLEARLY LABELEDWITH MINIMUM 25.4 MM [1"] HIGH LETTERS. PROVIDE A TYPED CIRCUIT DIRECTORY FOR EACHPANELBOARD INSTALLED UNDER THIS CONTRACT. EXISTING PANELBOARDS BEING REVISED SHALLHAVE DIRECTORY CORRECTED TO REFLECT TO NEW CONDITION.
H. THE SUBCONTRACTOR SHALL LEAVE THE ENTIRE ELECTRICAL SYSTEM INSTALLED UNDER THISCONTRACT IN PROPER WORKING ORDER AND SHALL REPLACE, WITHOUT ADDITIONAL CHARGE, ALLWORK OR MATERIAL WHICH MAY DEVELOP DEFECTS, ORDINARY WEAR AND TEAR OR DAMAGERESULTING FROM IMPROPER HANDLING EXCEPTED, WITHIN A PERIOD OF ONE YEAR FORM THEDATE OF INITIAL TESTING AND ACCEPTANCE BY THE CONTRACTOR.
I. COORDINATION
I.1. ALL CONTROL WIRING LESS THAT 120V FOR HVAC EQUIPMENT SHALL BE FURNISHED ANDINSTALLED BY DIVISION 23.
I.2. ALL CONTROL WIRING 120V AND ABOVE FOR HVAC EQUIPMENT SHALL BE FURNISHED ANDINSTALLED BY DIVISION 26.
J. EXISTING CONDITIONS AND DEMOLITION WORK
J.1. THIS CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH ALL THE EXISTINGCONDITIONS THAT MAY AFFECT HIS WORK.
J.2. THIS CONTRACTOR SHALL COORDINATE WITH ARCHITECTURAL DEMOLITION PLANS FOR ALLDEMOLITION WORK. REMOVE, PACKAGE AND STORE ALL EXISTING ELECTRICAL EQUIPMENTNOTED TO BE RE-USED, REFURBISH ALL OF THIS EQUIPMENT PRIOR TO INSTALLATION PER NEWWORK.
J.3. THIS CONTRACTOR SHALL MAINTAIN THE CONTINUITY OF ALL EXISTING ELECTRICAL WORKAFFECTED BY THIS CONTRACT. RESTORE CIRCUITS SERVING EXISTING EQUIPMENT TO REMAINWHICH ARE INTERRUPTED DURING THE COURSE OF THIS WORK. ANY REQUIRED ELECTRICALOUTAGE SHALL BE AFTER REGULAR HOURS AND REQUESTED IN WRITING FOR APPROVAL BY THEBUILDING OWNER/REPRESENTATIVE.
J.4. CONTRACTOR SHALL REFER TO THE CONTRACT DOCUMENTS FOR EXTENT OF DEMOLITION WORK.
K. MISCELLANEOUS
N.1. ALL EMPTY RACEWAY SHALL CONTAIN A PULL WIRE.
K.2. WORK AREA SHALL BE CLEAN OF DEBRIS AFTER COMPLETION OF WORK.
IGIN INTELLIGENT GRID INTERFACE NODE
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:1
7 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-001
MK
MK
GC
Project Number
ELEC
TRIC
AL C
OVE
R S
HEE
T
21
1ED201
SWGR1
SWGR2
SWGR3
1
1
1
1
2
2
2
2
EN-93
EN-101
EN-100
EN-99
EN-95
EN-114
EN-115
EN-96
PEPCO AREA
PEPCO AREA
EN-94
EN-94
EN-93
EN-101
EN-100
EN-99
T-69
EN-95
EN-114
EN-115EN-96
EN-98
EN-102
EN-92
EN-89
EN-88
EN-90
1. REFER TO DRAWINGS ED602, ED603, AND ED604 FOR MOREINFORMATION.
2. DUCT BANK ROUTING IS DIAGRAMMATIC. CONTRACTOR TOFIELD VERIFY ACUTAL ROUTES.
3. U.O.N. ALL DUCT BANKS ARE EXISTING TO REMAIN.
GENERAL DRAWING NOTES:
DISCONNECT AND REMOVE EXISTING FEEDERS AND DEMOLISHEXISTING DUCT BANK.
DEMOLISH EXISTING EMPTY DUCT BANKS BETWEEN THIS MANHOLEAND MANHOLE EN-95.
SPECIFIC DRAWING NOTES:1
2
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
KEY PLANSCALE: N.T.S.
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
BUILDING 17
BUILDING 21
11/2
/201
7 4:
01:2
9 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
ED002
MK
MK
GC
Project Number
ELEC
TRIC
AL S
ITE
PLAN
- EX
ISTI
NG
&D
EMO
LITI
ON
22
1 : 1252 ELECTRICAL SITE PLAN - EXISTING & DEMOLITION
0 62503125
1:125
N
1 : 5001 ELECTRICAL MANHOLE PLAN - EXISTING
0 2500012500
1:500
0 2500012500
1:500
SCADA SYSTEMENCLOSURE
BATTERIES
BATTERY CHARGER/RECTIFIER
125V DC SWBD
INTERFACE PANEL(RTU/NIH/TB)
SUPERVISORYPANEL
REVENUEMETERS
PANEL 54SS/UTILITY METER
ATS
VACUUMTESTCUBICLE
MANHOLEEN-94 3
2TYP.
4
4
4
1
5
5
5
6
SWGR 3
SWGR 2
SWGR 1
7
1
2
3
4
5
6
7
A
1. REFER TO DRAWINGS ED002, ED501, ED601, AND ED602 FORMORE INFORMATION.
2. REFER TO FIRE ALARM DRAWINGS FOR MORE INFORMATION.
GENERAL DRAWING NOTES:
DISCONNECT AND REMOVE ALL EXISTING LIGHTING FIXTURES ANDALL ASSOICATED WIRES/CONDUIT BACK TO SOURCE.
DISCONNECT AND REMOVE ALL EXISTING ELECTRICAL EQUIPMENTAND ALL ASSOCIATED WIRING/CONDUIT BACK TO SOURCE.
MANHOLE COVER TO BE RELOCATED. REFER TO STRUCTURALDRAWINGS FOR MORE INFORMATION.
DISCONNECT AND REMOVE EXISTING DUCTS BACK TO MANHOLEEN-93.
DISCONNECT AND REMOVE EXISTING DUCTS BACK TO MANHOLEEN-101.
DISCONNECT AND REMOVE EXISTING DUCTS BACK TO MANHOLEEN-96.
DISCONNECT AND REMOVE EXISTING GROUND BAR.
SPECIFIC DRAWING NOTES:1
2
3
4
5
6
7
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
KEY PLANSCALE: N.T.S.
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
BUILDING 17
BUILDING 21
11/2
/201
7 4:
01:3
0 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
ED201
MK
MK
GC
Project Number
POW
ER P
LAN
- D
EMO
LITI
ON
23
1 : 1001 SWITCHGEAR LEVEL - DEMOLITION
0 50002500
1:100
N
FDR 1TO BLDGS 2, 3,
4, 5 & 10(VAULTS 12 &
13)
FDR 4TO BLDG 59 &
BLDG 10(VAULTS 1, 2,
3, 4, & 5)
FDR 2TO BLDGS
12A, 12UPPER, 12
LOWER & 50
FDR 6TO BLDG 11
(4,160 V)
FDR 5TO BLDG 57
FDR 3TO BLDG 33 &
MLP-10
FDR 7TO BLDGS 6,
6A, 6B, 8, 13N,14A, 14B, 31A,
31B, & 31C
FDR 15TO BLDG 57
FDR 14TO BLDGS 3, 4,5, 16A, 16B, 21,
21B, & TG9
FDR 16TO BLDG 11
(4,160 V)
FDR 11TO BLDG 59
FDR 13TO BLDGS
12A. 12UPPER, 12
LOWER, 12E,12 GARAGE, &
50
FDR 12TO BLDGS 33
& 67
FDR 17TO BLDGS 6,
6A, 6B, 8, 13S,14A, 14B, 31A,
31B, & 31C
FDR 21TO BLDGS
12A. 12UPPER, 12
LOWER, 12E,12 GARAGE, &
50
FDR 25TO BLDG 57
FDR 19TO BLDG 33 &
UTILITYTUNNEL
FDR 26TO BLDG 11
(4,160 V)
FDR 18TO BLDG 59
FDR 27TO BLDGS 6, 6A,6B, 8, 13S, 13N,14A, 31A, 31B, &
31C
FDR 20TO BLDGS1, 2, 4, 5, 10
(VAULTS 12 &13), & 21
2000A, 3PH, 3W, 13.8KVSWGR 1
1
2
3
54SS PANEL400A, 3PH, 4W, 208Y/120V
200AF200AT
50AF50AT
200AF200AT
DCSWBD
ATS
TOPEPCOAREA
TOPEPCOAREA
4
BATTERYCHARGER
6
7
PEPCO METER
3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3
2 2 2
2 2
NIH1M2000AFN.C.
NIH1T2000AFN.C.
8 8
M
50 51
DPR
87
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
51 51G 51 51G
2000A, 3PH, 3W, 13.8KVSWGR 2
NIH2M2000AFN.C.
NIH2T2000AFN.C.
50 51
DPR
87
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
51 51G 51 51G
2000A, 3PH, 3W, 13.8KVSWGR 3
NIH3M2000AFN.C.
NIH3T2000AFN.C.
50 51
DPR
87
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
50 51
50G 51G
86
51 51G 51 51G
1200AF 1200AF 1200AF 1200AF 1200AF 1200AF 1200AF 1200AF 1200AF 1200AF 1200AF 1200AF 1200AF 1200AF
1200AF 1200AF 1200AF 1200AF 1200AF 1200AF 1200AF
28 KAIC1
28 KAIC
128 KAIC
11 11
11
11
11 11
12 12
12
9 9
9
10101010101010101010101010
10 10 10 10 10
PEPCO
NIH
52 52 52 52 52 52 52
52 52
52 52 52 52
52
52 5252
52
52 52 52 52
52
52 5252
52
52 52
52
52 52
52
52 52
52
52 52
30 MVA34.5-13.8 KV
PEPCOFEEDER
34002
N.C. N.C.
N.C.
33.6 MVA34.5-13.8 KV
PEPCOFEEDER
34009
N.C. N.C.
N.C.
20 MVA34.5-13.8 KV
PEPCOFEEDER
34001
N.C. N.C.
N.C.
20 MVA34.5-13.8 KV
PEPCOFEEDER
34010
N.C. N.C.
1. REFER TO DRAWINGS ED201 AND ED602 FOR MOREINFORMATION.
GENERAL DRAWING NOTES:
DISCONNECT AND REMOVE EXISTING SWITCHGEAR.
COORDINATE 13.8 KV BUSWAY MODIFICATIONS OR REPLACEMENTWITH PEPCO.
DISCONNECT AND REMOVE EXISTING 13.8 KV FEEDERS BACK TO NEWJUNCTION BARS IN MANHOLES.
DISCONNECT AND REMOVE EXISTING ATS, PANELBOARD, AND METER.COORDINATE WITH PEPCO.
DISCONNECT AND REMOVE EXISTING BATTERY CHARGER.
DISCONNECT AND REMOVE EXISTING BATTERIES.
DISCONNECT AND REMOVE EXISTING 125V DC SWITCHBOARD.
COORDINATE FEEDER MODIFICATIONS WITH PEPCO.
EXISTING GE MODEL 12IFC53A1A RELAY.
EXISTING GE MODEL 12IFC53B1A RELAY.
EXISTING GE MODEL MULTILIN 850 RELAY.
EXISTING GE MODEL 12VPVD21B1A RELAY.
SPECIFIC DRAWING NOTES:1
2
3
4
5
6
7
8
9
10
11
12
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:3
1 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
ED501
MK
MK
GC
Project Number
SIN
GLE
LIN
E D
IAG
RAM
- EX
ISTI
NG
&D
EMO
LITI
ON
24
N.T.S.1 SINGLE LINE DIAGRAM - EXISTING & DEMOLITION
RESERVETIE 1
1A
1B
V/T
FEEDER6
2A
2B
FEEDER1
3A
3B
FEEDER4
FEEDER5
4A
4B
FEEDER3
FEEDER2
5A
5B
FEEDER7
MAIN 1
6A
6B
V/T
SWGR 1
RESERVETIE 2
7A
7B
V/T
FEEDER15
8A
8B
FEEDER14
FEEDER16
9A
9B
FEEDER11
FEEDER13
10A
10B
FEEDER12
FEEDER17
11A
11B
MAIN 2
12A
12B
SWGR 2
MAIN 3
13A
13B
FEEDER21
14A
14B
FEEDER25
15A
15B
FEEDER19
FEEDER26
16A
16B
FEEDER18
FEEDER27
17A
17B
FEEDER20
RESERVETIE 3
18A
18B
SWGR 3
V/T
V/T V/TSPACE
SPACE
SPACE
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:3
2 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
ED601
MK
MK
GC
Project Number
SWIT
CH
GEA
R E
LEVA
TIO
N -
EXIS
TIN
G &
DEM
OLI
TIO
N
25
N.T.S.1 SWITCHGEAR ELEVATION - DEMOLITION
BUILDING 17
EN-93
EN-101
EN-100
EN-96
EN-90
FEEDERS 2,7, 13, 17, 21,27
EN-102
FEEDERS 3, 12, 19
EN-92
FEEDERS14, 20
EN-88
FEEDERS 1,4, 11, 14, 18
EN-89
FEEDER 20
EN-99
FEEDER 14
EN-98
FEEDERS5, 6, 15, 16,25, 26
EN-94
EN-95
FEEDERS3, 7, 12, 14,17, 19, 20,27
FEEDERS 17, 27
FEEDERS 1, 3,4A, 4B, 7, 11A,11B, 12, 14,18A, 18B, 19, 20
FEEDERS3, 7, 12, 14,20
FEEDERS2, 13, 21
FEEDERS5, 6, 15, 16,25, 26
EMPTY
2
2
1
1
1
1
3
1
1EMPTY
EMPTY
3
4
1. DRAWINGS ARE DIAGRAMMATIC.
2. REFER TO DRAWINGS ED002 AND ED603 FOR MOREINFORMATION.
GENERAL DRAWING NOTES:
DISCONNECT AND REMOVE EXISTING FEEDERS AND DUCT BANK.
DISCONNECT AND REMOVE EXISTING FEEDERS. CONTRACTOR TOREMOVE DUCT BANK ONLY IF REQUIRED TO ACCOMODATE NEWWORK.
DISCONNECT AND REMOVE EXISTING FEEDERS. DUCT BANK TOREMAIN AND BE REUSED.
DISCONNECT AND REMOVE EXISTING FEEDERS 1, 4, 11, AND 18.DUCT BANK TO REMAIN AND BE REUSED.
SPECIFIC DRAWING NOTES:1
2
3
4
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 26 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:3
3 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
ED602
Designer
Author
Checker
Project Number
MAN
HO
LE P
LAN
- EX
ISTI
NG
& D
EMO
LITI
ON
N.T.S.1 PARTIAL MANHOLE PLAN - DEMOLITION
FDR 27 (E)
3658 (12'0")
3150 (10'4")
1829 (6'0")
NORTH
TO MHEN-92
TO MHEN-102
TO MHEN-90
FDR 17 (E)
FDR 21 (E)
FDR 13 (E)
FDR 7 (E)FDR 2 (E)
SS
S S S
S S S S S S
SS
S
X X
X X
X X X X
X
XXXX
XXS
TO BLDG 17
TO MHEN-94
TO MHEN-95
TO BLDG 17
TO BLDG 17
FDR 20 (D)
FDR 14 (D)
S
S
S
S
X X X X
X X X X
X X X X
X X X
X
FDR 21 (D)
FDR 13 (D)
FDR 19 (D)FDR 17 (D)
FDR 14 (D)FDR 27 (D)
FDR 20 (D)
FDR 12 (D)FDR 27 (D)
FDR 3 (D)FDR 12 (D)
FDR 19 (D)
3099 (10'2")3658 (12'0")
1829 (6'0")
NORTH
TO MHEN-93
TO MHEN-100
XXXX
XXS
XXX
TO MHEN-95
TO BLDG 17
X
X
X
FDR 14 (D)
FDR 17 (D)FDR 20 (D)
FDR 27 (D)
FDR 7(D)
FDR 14 (D)FDR 3 (D)
FDR 20 (D)
FDR 17 (D)
FDR 27 (D)
FDR 3 (D)
FDR 7 (D)FDR 19 (D)
FDR 12 (D)
FDR 12 (D)
FDR 19 (D)
3048 (10'0")
3048 (10'0")
1981 (6'6")
NORTH
S
SS
S S
S
SS
S S
S
S
S
S
S
S
S
SS
S
S
S
S
S
SS
S
SS
S S
FDR 3 (E)FDR 19 (E)
FDR 12 (E)
TO MHEN-103
TO UNKNOWN
FDR 12 (E)
TO MHMH-2
FDR 3 (D)
FDR 12 (D)
FDR 19 (D)
2438 (8'0")
1829 (6'0")
1524 (5'0")
S
TO BLDG21
TO MHEN-93
FDR 14 (E)
FDR 20 (E)
NORTH
FDR 14 (D)
FDR 20 (D)
3048 (10'0")
2438 (8'0")
3048 (10'0")
NORTH
TO BLDG 17
TO BLDG 17
TO BLDG 17
X X X X X
SSXXX
X X X S S
XXXXX
S
S
X
X X
X
TO MHEN-93
X X X X
X X X X
X X X X
X X X
1. DRAWINGS ARE DIAGRAMMATIC.
2. REFER TO DRAWINGS ED002, ED602, AND ED604 FOR MOREINFORMATION.
GENERAL DRAWING NOTES:
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 27 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:3
4 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
ED603
Designer
Author
Checker
Project Number
MAN
HO
LE F
OLD
OU
TS -
EXIS
TIN
G &
DEM
OLI
TIO
N
N.T.S.3 MANHOLE EN-93 - EXISTING & DEMOLITION
N.T.S.2 MANHOLE EN-101 - EXISTING & DEMOLITIONN.T.S.4 MANHOLE EN-102 - EXISTING & DEMOLITION
N.T.S.5 MANHOLE EN-92 - EXISTING & DEMOLITION
N.T.S.1 MANHOLE EN-94 - EXISTING & DEMOLITION
1829 (6'0")
3658 (12'0")3048 (10'0")
TO MHEN-101
TO T-69
TO MHEN-95
NORTH
S S
S
S S
SS
S
SS
FDR 14 (E)
FDR 14 (E)
2438 (8'0")
3658 (12'0")
2438 (8'0")
FDR 15 (D)
FDR 25 (D)
FDR 5 (D)
FDR 15 (D)
NORTH
TO MHEN-98
FDR 16 (E)
FDR 6 (E)FDR 6 (E)
FDR 16 (E)FDR 26 (E)
FDR 26 (E)
FDR 25 (E)FDR 5 (E)
FDR 15 (E)
FDR 15 (E)
FDR 25 (E)FDR 5 (E)
S S S S
S
S
XX
TOBLDG 17
FDR 16 (D)
FDR 5 (D)
FDR 26 (D)
FDR 16 (D)
FDR 26 (D)FDR 25 (D)
FDR 6 (D)
FDR 6 (D)
3429 (11'3") 3658 (12'0")
1829 (6'0")
NORTH
TO MH EN-88& MH EN-89
TO MHEN-99
FDR 14 (E)
X
X
X
X X X
X X X
XX
X
XX
FDR 14 (E)
TO MH EN-101
TO BLDG 17
TO BLDG 17
TO MHEN-95
FDR 18 (D)FDR 18 (D)
FDR 1 (D)
FDR 11 (D)FDR 20 (D)
FDR 4 (D)
FDR 4 (D)
FDR 11 (D)
SS
SS
SS
SS
S
S
X
X
X
X
X
X
XX
XX
FDR 12 (D)
FDR 19 (D)
FDR 18 (D)
FDR 4 (D)FDR 3 (D)
FDR 1 (D)
FDR 11 (D)FDR 14 (D)
FDR 7 (D)
FDR 20 (D)
FDR 14 (D)
FDR 7 (D)FDR 20 (D)
FDR 3 (D)
FDR 19 (D)
FDR 12 (D)
2438 (8'0")
1829 (6'0")
1524 (5'0")
X
X
X
X X S X
S S
TO MHEN-100
TO MHEN-78
FDR 20 (E)
TO MHEN-87
NORTH
FDR 20 (D)
FDR 11 (E)
2438 (8'0")
1524 (5'0")
2667 (8'8")
X
XS
X
S
S
S
X
XX S
FDR 14 (E)
S
FDR 11 (E)
FDR 4 (E)FDR 4 (E)
FDR 18 (E)
FDR 1 (E)
FDR 25 (E)
FDR 18 (E)
FDR 14 (E)
TO MHEN-100
TO MHEN-87
NORTH
FDR 4 (D)
FDR 1 (D)
FDR 11 (D)
FDR 18 (D)
FDR 4 (D)
FDR 11 (D)
FDR 18 (D)
FDR 1 (D)
1. DRAWINGS ARE DIAGRAMMATIC.
2. REFER TO DRAWINGS ED002, ED602, AND ED604 FOR MOREINFORMATION.
GENERAL DRAWING NOTES:
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 28 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:3
5 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
ED604
Designer
Author
Checker
Project Number
MAN
HO
LE F
OLD
OU
TS -
EXIS
TIN
G &
DEM
OLI
TIO
N
N.T.S.2 MANHOLE EN-99 - EXISTING & DEMOLITIONN.T.S.1 MANHOLE EN-96 - EXISTING & DEMOLITION
N.T.S.3 MANHOLE EN-100 - EXISTING & DEMOLITION
N.T.S.4 MANHOLE EN-89 - EXISTING & DEMOLITION
N.T.S.5 MANHOLE EN-88 - EXISTING & DEMOLITION
TEMPSWGR 3
TEMPSWGR 2
TEMPSWGR 1
1ET201
TEMP OUTDOORSWGR 1
TEMP OUTDOORSWGR 2
TEMP OUTDOORSWGR 3
2
3
4
SWGR 3
SWGR 1
SWGR 2
5
5
EN-93
EN-101
EN-100
EN-99
EN-95
EN-114
EN-115
EN-96
PEPCO AREA
PEPCO AREA
EN-94
EN-94
EN-93
EN-101
EN-100
EN-99
T-69
EN-95
EN-114
EN-115EN-96
EN-98
EN-102
EN-92
EN-89
EN-88
EN-90
1. ALL NEW COMPONENTS WILL BE DESIGNED IN ACCORDANCEWITH THE NIH DRM AND PEPCO REQUIREMENTS.
2. REFER TO DRAWINGS ET201 AND ET501 FOR MOREINFORMATION.
3. DRAWINGS ARE DIAGRAMMATIC
4. CONTRACTOR MAY ELECT TO UTILIZE OTHER MEANS ANDMETHODS OF PROVIDING TEMPORARY POWER, WITH THEAPPROVAL OF NIH AND PEPCO, AT NO ADDITIONAL COST TO THEOWNER.
GENERAL DRAWING NOTES:
PROPOSED TEMPORARY FEEDER ROUTING. PROVIDE RACK ANDCONDUIT STRUCTURE FOR TEMPORARY FEEDERS AS REQUIRED.PROVIDE DESIGN OF STRUCTURE STAMPED AND SIGNED BY ALICENSED STRUCTURAL ENGINEER.
EXTEND TEMPORARY FEEDER ROUTING STRUCTURE TO MANHOLEEN-102.
EXTEND TEMPORARY FEEDER ROUTING STRUCTURE TO MANHOLEEN-92.
EXTEND TEMPORARY FEEDER ROUTING STRUCTURE TO MANHOLESEN-88 AND EN-89.
OUTLINE OF EXISTING SWITCHGEAR TO BE DEMOLISHED. REFER TODRAWING ET501 FOR PHASING PLAN AND FOR MORE INFORMATION.
SPECIFIC DRAWING NOTES:1
2
3
4
5
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 32
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
BUILDING 17
BUILDING 21
2/6/
2018
5:0
0:42
PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
ET002
Designer
Author
Checker
Project Number
ELEC
TRIC
AL S
ITE
PLAN
- TE
MPO
RAR
Y
1 : 1252 ELECTRICAL SITE PLAN - TEMPORARY
0 62503125
1:125
N
0 2500012500
1:500
1 : 5001 ELECTRICAL MANHOLE PLAN - EXISTING
DN
TEMPORARYSERVICE
ENTRANCESWGR 3
TEMPORARYSERVICE
ENTRANCESWGR 2
TEMPORARYSERVICE
ENTRANCESWGR 1
PEPCO BUSSECTION 3
PEPCO BUSSECTION 4
PEPCO BUSSECTION 2
PEPCO BUSSECTION 1
1
TEMPORARYFEEDERS(TYPICAL)
1
2
3
4
5
6
7
A 1. FEEDER ROUTING IS DIAGRAMMATIC.
2. ALL TEMPORARY COMPONENTS WILL BE DESIGNED INACCORDANCE WITH PEPCO REQUIREMENTS.
3. COORDINATE TEMPORARY POWER CONNECTIONS WITH PEPCO.
3. REFER TO DRAWINGS ET002 & ET501 FOR MORE INFORMATION.
GENERAL DRAWING NOTES:
REFER TO DRAWING ET002 FOR CONTINUATION.
SPECIFIC DRAWING NOTES:1
1 : 1001 SWITCHGEAR LEVEL - POWER - TEMPORARY
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
KEY PLANSCALE: N.T.S.
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 30 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
BUILDING 17
BUILDING 21
11/2
/201
7 4:
01:3
6 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
ET201
Designer
Author
Checker
Project Number
POW
ER P
LAN
- TE
MPO
RAR
Y
N
TVSSTVSS TVSS
FDR 1TO BLDGS 2, 3,
4, 5 & 10(VAULTS 12 &
13)
FDR 4TO BLDG 59 &
BLDG 10(VAULTS 1, 2,
3, 4, & 5)
FDR 2TO BLDGS
12A, 12UPPER, 12
LOWER & 50
FDR 6TO BLDG 11
(4,160 V)
FDR 5TO BLDG 57
FDR 3TO BLDG 33 &
MLP-10
FDR 7TO BLDGS 6,
6A, 6B, 8, 13N,14A, 14B, 31A,
31B, & 31C
FDR 15TO BLDG 57
FDR 14TO BLDGS 3, 4,5, 16A, 16B, 21,
21B, & TG9
FDR 16TO BLDG
11 (4,160 V)
FDR 11TO BLDG 59
FDR 13TO BLDGS 12A,12 UPPER, 12
LOWER, 12E, 12GARAGE, & 50
FDR 12TO BLDGS 33
& 67
FDR 17TO BLDGS 6,
6A, 6B, 8, 13S,14A, 14B, 31A,
31B, & 31C
FDR 21TO BLDGS 12A,
12 UPPER, 12LOWER, 12E, 12GARAGE, & 50
FDR 25TO BLDG 57
FDR 19TO BLDG 33 &
UTILITYTUNNEL
FDR 26TO BLDG 11
(4,160 V)
FDR 18TO BLDG 59
FDR 27TO BLDGS 6, 6A,6B, 8, 13S, 13N,14A, 31A, 31B, &
31C
FDR 20TO BLDGS1, 2, 4, 5, 10
(VAULTS 12 &13), & 21
1200AF
FMR
50 51
SUBSTATION RELAY
1200AF
FMR
50 51
1200AF
FMR
50 51
1200AF
FMR
50 51
1200AF
FMR
50 51
1200AF
FMR
50 51
1200AF
FMR
50 51
2000A, 3PH, 3W, 13.8KVTEMPORARY OUTDOOR SWGR 1
TO PEPCO
2
6
PEPCOMETER
6 6 65 5 5
4
TEMPORARY INDOOR SWGR 12000A, 3PH, 3W, 13.8KV
1
3
2000AF2000AT
50 5132
8667PQM
51G
14,400/120V
1200:5
1200AF
FMR
50 51
1200AF
SUBSTATION RELAY
FMR
50 51
1200AF
5150
FMR
1200AF
FMR
1200AF
50
FMR
1200AF
50 51
1200AF
FMR
51
TEMPORARY OUTDOOR SWGR 2
50 51 51
FMR
50
2000A, 3PH, 3W, 13.8KV
TO PEPCO
2
6
PEPCOMETER
6 6 65 5 5
4
TEMPORARY INDOOR SWGR 22000A, 3PH, 3W, 13.8KV
1
3
2000AF2000AT
50 5132
8667PQM
51G
14,400/120V
1200:5
1200AF
FMR
50 51
1200AF
SUBSTATION RELAY
FMR
50 51
1200AF
5150
FMR
1200AF
FMR
1200AF
50
FMR
1200AF
50 51
1200AF
FMR
51
TEMPORARY OUTDOOR SWGR 3
50 51 51
FMR
50
2000A, 3PH, 3W, 13.8KV
TO PEPCO
2
6
PEPCOMETER
6 6 65 5 5
4
TEMPORARY INDOOR SWGR 32000A, 3PH, 3W, 13.8KV
1
3
2000AF2000AT
50 5132
8667PQM
51G
14,400/120V
1200:5
300:5 300:5 300:5 600:5 300:5600:5 600:5 300:5 300:5 300:5 600:5 300:5600:5 600:5 300:5 300:5 300:5 600:5 300:5600:5 600:5
M M M
G3
G3
G3
52
52
52 52 52 52 52 52
52
52 52 52 5252 52 52
52
52 52 52 5252 52 52
PHASING NOTES
c. DISCONNECT AND REMOVE EXISTING SWITCHGEAR 3 AND ALL ASSOCIATED WIRING ANDRACEWAYS.
d. PROVIDE TEMPORARY SWITCHGEARS 1 AND 2 COMPLETE WITH FEEDERS AND ALL OTHERAPPURTANCES AS REQUIRED TO MAINTAIN THE CONTINUITY OF POWER TO THE EXISTINGSWITCHGEAR 1 AND 2 ELECTRICAL LOADS.
e. TRANSFER LOADS FROM EXISTING SWITCHGEAR 2 TO TEMPORARY 2.f. DISCONNECT AND REMOVE EXISTING SWITCHGEAR 2 AND ALL ASSOCIATED WIRING AND
RACEWAYS.e. TRANSFER LOADS FROM EXISTING SWITCHGEAR 1 TO TEMPORARY 1.f. DISCONNECT AND REMOVE EXISTING SWITCHGEAR 1 AND ALL ASSOCIATED WIRING AND
RACEWAYS.g. DEMOLISH DUCT BANKS TO BE DEMOLISHED.h. PROVIDE NEW DUCT BANKS.i. PROVIDE NEW UNDERGROUND DUCTS FOR SWITCHGEARS 1 AND 2.j. PROVIDE NEW PERMANENT SWITCHGEARS 1 AND 2.k. TEST AND COMMISSION NEW ELECTRICAL DISTRIBUTION EQUIPMENT AND SCADA SYSTEM.l. TRANSFER LOADS FROM TEMPORARY SWITCHGEAR 1 TO NEW PERMANENT SWITCHGEAR 1.j. TRANSFER LOADS FROM TEMPORARY SWITCHGEAR 2 TO NEW PERMANENT SWITCHGEAR 2.k. DISCONNECT AND REMOVE TEMPORARY SWITCHGEARS 1 AND 2 AND ALL ASSOCIATED WIRING
AND RACEWAYS.g. PROVIDE NEW UNDERGROUND DUCTS FOR SWITCHGEAR 3.h. PROVIDE NEW PERMANENT SWITCHGEAR 3.i. TEST AND COMMISSION NEW ELECTRICAL DISTRIBUTION EQUIPMENT AND SCADA SYSTEM.j. TRANSFER LOADS FROM TEMPORARY SWITCHGEAR 3 TO NEW PERMANENT SWITCHGEAR 3.k. DISCONNECT AND REMOVE TEMPORARY SWITCHGEAR 3 AND ALL ASSOCIATED WIRING AND
RACEWAYS.
I. GENERALa. THIS IS A DESIGN BID PROJECT AND THIS IS A HIGH LEVEL PHASING PLAN. THE CONTRACTOR WILL
PROVIDE A DETAILED PHASING PLAN COMPLETE WITH METHODS AND PROCEDURES (MOPS) FORREVIEW, APPROVAL, AND COORDINATION WITH NIH PRIOR TO EXECUTION OF WORK.
b. THE MOPS WILL PROVIDE A COORDINATED CONSTRUCTION PHASING PLAN TO MINIMIZEDOWNTIME TO THE AFFECTED FACILITIES. THE MOP SHALL INCLUDE BACK-OUT PROCEDURES TORETURN THE INFRASTRUCTURE TO ITS ORIGINAL STATE IF A MOP IS DISRUPTED.
c. ALL EXISTING SYSTEMS ARE TO OPERATE CONCURRENTLY AND CONTINUOUSLY, EXCEPT ASDESCRIBED HEREIN.
d. THE WORK SCHEDULE IN OCCUPIED AREAS SHALL BE COORDINATED AND AGREED UPON BY NIH.II. INFRASTRUCTURE MODIFICATION APPROVAL PROCESS
a. MOPS AND SCHEDULE SHALL BE SUBMITTED AND APPROVED BY NIH PRIOR TO INTERRUPTINGANY LIVE CIRCUITS OR SHUT DOWN OF ANY SYSTEM. NIH RESERVES THE RIGHT TO POSTPONEAPPROVED SHUT DOWNS AT THEIR DISCRETION. ALL OUTAGES SHALL BE SCHEDULED WITH NIHWITH A MINIMUM OF TWO WEEKS NOTICE PRIOR TO THE NEED OF A SHUT DOWN OF ANY SYSTEM.
b. INTERRUPTION SHALL BE PERFORMED IN COORDINATION WITH NIH, USING OSHA LOCKOUT ANDTAGOUT PROCEDURES.
c. ANY WORK THAT COULD IMPACT NIH'S PRODUCTION ENVIRONMENT SHALL BE PERFORMED USINGNIH'S CHANGE CONTROL PROCESS.
d. ANY WORK THAT COULD IMPACT NIH'S LIFE SAFETY SYSTEMS SHALL BE PERFORMED USING NIH'SBURN PERMIT PROCESS AND WITH A FIRE WATCH ON DUTY FOR THE DURATION OF THE OUTAGE.
e. THE CONTRACTOR SHALL COORDINATE ALL INCOMING UTILITY SERVICE OUTAGES WITH PEPCOAND NIH.
III. CONSTRUCTION PHASING:a. PROVIDE TEMPORARY SWITCHGEAR 3 COMPLETE WITH FEEDERS AND ALL OTHER APPURTANCES
AS REQUIRED TO MAINTAIN THE CONTINUITY OF POWER TO THE EXISTING SWITCHGEAR 3ELECTRICAL LOADS.
b. TRANSFER ALL EXISTING ACTIVE LOADS FROM EXISTING SWITCHGEAR 3 TO TEMPORARYSWITCHGEAR 3.
1. ALL TEMPORARY COMPONENTS WILL BE DESIGNED INACCORDANCE WITH THE NIH DRM AND PEPCO REQUIREMENTS.
2. REFER TO DRAWINGS ET002 AND ET201 FOR MOREINFORMATION.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTSASSOCIATED WITH PROVIDING TEMPORARY POWER INCLUDING,BUT NOT LIMITED TO, PROVIDING TEMPORARY SWITCHGEAR,TEMPORARY FEEDERS, & TEMPORARY CONDUIT STRUCTURE.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALLASPECTS OF WORK REQUIRED FOR THE PROVISION OFTEMPORARY POWER.
5. CONTRACTOR MAY ELECT TO UTILIZE OTHER MEANS ANDMETHODS OF PROVIDING TEMPORARY POWER, WITH WRITTENAPPROVAL FROM NIH AND PEPCO, AT NO ADDITIONAL COST TOTHE OWNER.
GENERAL DRAWING NOTES:
PROVIDE NEW TEMPORARY INDOOR 2000A, 3PH, 3W, 13.8 KVSWITCHGEAR.
PROVIDE NEW TEMPORARY OUTDOOR 2000A, 3PH, 3W, 13.8 KVSWITCHGEAR.
COORDINATE INSTALLATION OF TEMPORARY FEEDERS WITH PEPCO.
PROVIDE 5 SETS OF (3#500KCMIL) 15KV CABLES IN 5" CONDUITS.
PROVIDE 2 SETS OF (3#500KCMIL) CABLES IN 5" CONDUITS.
PROVIDE 1 SET OF (3#500KCMIL) 15KV CABLES IN 5" CONDUITS.
SPECIFIC DRAWING NOTES:1
2
3
4
5
6
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 31 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:3
7 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
ET501
Designer
Author
Checker
Project Number
SIN
GLE
LIN
E D
IAG
RAM
- TE
MPO
RAR
Y
N.T.S.1 TEMPORARY SINGLE LINE DIAGRAM
EN-93
EN-101
EN-100
EN-99
EN-95
EN-114
EN-115
EN-96
PEPCO AREA
PEPCO AREA
EN-94
1E-201
SWGR 1
SWGR 2
SWGR 3
1
1
1
1
1
1
2TYP
EN-94
EN-93
EN-101
EN-100
EN-99
T-69
EN-95
EN-114
EN-115EN-96
EN-98
EN-102
EN-92
EN-89
EN-88
EN-90
1. DUCT BANK ROUTES ARE DIAGRAMMATIC. CONTRACTOR TODETERMINE BEST ROUTE IN THE FIELD.
2. REFER TO DRAWINGS E-602, E-603, AND E-604 FOR MOREINFORMATION.
GENERAL DRAWING NOTES:
PROVIDE NEW 20-WAY DUCT BANK.
COORDINATE DUCT STUB UP LOCATIONS WITH SWITCHGEARMANUFACTURER'S RECOMMENDED CONDUIT LOCATIONS.
SPECIFIC DRAWING NOTES:1
2
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
KEY PLANSCALE: N.T.S.
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 32 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
BUILDING 17
BUILDING 21
11/2
/201
7 4:
01:1
8 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-002
Designer
Author
Checker
Project Number
ELEC
TRIC
AL S
ITE
PLAN
- N
EW W
OR
K
1 : 1252 ELECTRICAL SITE PLAN - NEW WORK
0 62503125
1:125
N
0 2500012500
1:500
1 : 5001 ELECTRICAL MANHOLE PLAN - EXISTING
DN
3
3
LUMINAIRE SCHEDULETYPE MANUFACTURER SERIES NUMBER LAMP TYPE DESCRIPTIONMOUNTING
A
WATTS VOLTS
LITHONIA 70 PENDANTLEDZL2NL482000LM 120V
DECO LIGHTING 50 PENDANTLEDDACH-LED-4-50 120V
COLUMBIA 48 PENDANTLEDLCS4-35ML 120V
4' STRIP
EMERGENCY LIGHTING FIXTURE. PROVIDEWITH BACK-UP, SEALED, MAINTENANCE FREENICKEL-CADMIUM BATTERY. BATTERY SHALLDELIVER 120 MINUTES POWER BACK UP.PROVIDE SELF-TESTING FIXTURES.
LITHONIA 2 WALLLEDLE-S-W-1-R-ELN 120V
HUBBELL 4LEDLX-U-R-W-E 120V
EATON 1LEDCX71SD 120V
WALL
WALL
OUTDOOR LIGHTING FIXTURE. PROVIDEWITH PHOTOCELL.LITHONIA 40LEDTWH-LED 120V
DECO LIGHTING 40LEDD404-LED 120V
HUBBELL 32LEDPVL3 120V
WALL
WALL
WALL
B
EMERGENCY LIGHTING FIXTURE. PROVIDEWITH BACK-UP, SEALED, MAINTENANCE FREENICKEL-CADMIUM BATTERY. BATTERY SHALLDELIVER 120 MINUTES POWER BACK UP.PROVIDE SELF-TESTING FIXTURES.
120V
120V
120V
WALL
WALL
WALL
LED
LED
LED
LITHONIA ELM2 LED HO SD 2
HUBBELL LZ
ABB LCAB-2SQLEDRID
3
3
1
2
3
4
5
6
7
A
A
54SS-31
A A
A A A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
B
54SS-33
1. COORDINATE WITH ALL CABLETRAYS, CONDUITS, ANDSWITCHGEAR LOCATION FOR LAYOUT AND INSTALLATION OF NEWLIGHTING FIXTURES.
GENERAL DRAWING NOTES:
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
KEY PLANSCALE: N.T.S.
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
BUILDING 17
BUILDING 21
11/2
/201
7 4:
01:1
9 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-101
MK
MK
GC
Project Number
LIG
HTI
NG
PLA
N -
NEW
WO
RK
33
1 : 1001 SWITCHGEAR LEVEL - NEW WORK - LIGHTING
0 50002500
1:100
N
DN
1
2
3
4
5
6
7
A
SWGR 2
1
2
TYP.
BATTERIES
BATTERYCHARGER
PEPCO METER
ATS
DDF CONTROL
REVENUEMETERS
EXISTINGSCADA SYSTEMENCLOSURE
SWGR 3
SWGR 1
3
3
3
3
3
4
4
4
4
4
5
5
5
5
5
DC PANEL
NEW SCADA SYSTEMENCLOSURE
NEW REMOTEINTERFACE PANEL
H
H
H
54SS-2
54SS-14
54SS-8
EF-13/4HP208V
54SS-7
54SS-1
54SS-17
54SS-19J
54SS-37
JJ
54SS-41
6
7NEWSUPERVISORYPANEL
J 8
54SS-35
CU-1
54SS-26
CU-1
54SS-32
RELOCATED MANHOLE COVER OF MANHOLE EN-94. REFER TOSTRUCTURAL DRAWINGS FOR MORE INFORMATION.
2000A, 13.8 KV BUS DUCT FROM PEPCO. COORDINATE ALLREQUIRED MODIFICATIONS OR REPLACMENT WITH PEPCO.
PROVIDE NEW 127 MM (5") DUCTS TO NEW MANHOLE EN-93.
PROVIDE NEW 127 MM (5") DUCTS TO MANHOLE EN-101.
PROVIDE NEW 127 MM (5") DUCTS TO NEW MANHOLE EN-100.
POWER CONNECTION FOR FOR MOTORIZED DAMPER. REFER TOMECHANICAL DRAWINGS FOR EXACT LOCATION.
POWER CONNECTION FOR SECURITY PANEL. REFER TO TELECOMMDRAWINGS FOR MORE INFORMATION.
POWER CONNECTION FOR HYDROGEN SENSOR AND MONITORINGSYSTEM. REFER TO MECHANICAL DRAWINGS FOR MOREINFORMATION.
SPECIFIC DRAWING NOTES:1
2
3
4
5
6
7
8
1. ALL NEW COMPONENTS WILL BE DESIGNED IN ACCORDANCEWITH THE NIH DRM AND PEPCO REQUIREMENTS.
2. REFER TO DRAWINGS E-501 & E-601 FOR MORE INFORMATION.
3. REFER TO MECHANICAL, TELECOMM, & FIRE ALARM DRAWINGS FORMORE INFORMATION.
GENERAL DRAWING NOTES:
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
KEY PLANSCALE: N.T.S.
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
BUILDING 17
BUILDING 21
11/2
/201
7 4:
01:2
0 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-201
MK
MK
GC
Project Number
POW
ER P
LAN
- N
EW W
OR
K
34
1 : 1001 SWITCHGEAR LEVEL - NEW WORK - POWER
0 50002500
1:100
N
DN
1
2
3
4
5
6
7
A
1
2
3
TYP.
1. ALL NEW COMPONENTS SHALL BE DESIGNED IN ACCORDANCEWITH THE NIH DRM.
GENERAL DRAWING NOTES:
PROVIDE NEW 6x50 (1/4"x2") GROUND BAR MOUNTED 4267 (14') AFF.COORDINATE LOCATION WITH ALL CABLETRAYS AND CONDUITS.EQUIPMENT AND GROUNDING ELECTRODE CONDUCTORS SHALL BELABELED. LABELING SHALL UTILIZE EMBOSSED BRASS METAL TAGSWITH NYLON TIE WRAPS. SEE DRAWING E-701 FOR GROUND BARDETAIL.
CONNECT NEW GROUND BAR TO EXISTING GROUND LOOP WITH#4/0 COPPER WIRE. CONTRACTOR TO FIELD VERIFY LOCATION OFEXISTING GROUND LOOP.
#4/0 GROUND COPPER CONDUCTOR. PROVIDE A LABEL ON EACHGROUND CONDUCTOR AT EVERY GROUND BAR INDICATING ORIGIN OFTERMINATION.
SPECIFIC DRAWING NOTES:1
2
3
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
KEY PLANSCALE: N.T.S.
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 35 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
BUILDING 17
BUILDING 21
11/2
/201
7 4:
01:2
1 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-301
Designer
Author
Checker
Project Number
GR
OU
ND
ING
PLA
N -
NEW
WO
RK
0 50002500
1:100
1 : 1001 SWITCHGEAR LEVEL - NEW WORK - GROUNDING
N
TVSS TVSS
TVSS
FDR 1TO BLDGS 2, 3,
4, 5 & 10(VAULTS 12 &
13)
FDR 4TO BLDG 59 &
BLDG 10(VAULTS 1, 2,
3, 4, & 5)
FDR 2TO BLDGS
12A, 12UPPER, 12
LOWER & 50
FDR 6TO BLDG 11
(4,160 V)
FDR 5TO BLDG 57
FDR 3TO BLDG 33 &
MLP-10
FDR 7TO BLDGS 6,
6A, 6B, 8, 13N,14A, 14B, 31A,
31B, & 31C
FDR 15TO BLDG 57
FDR 14TO BLDGS 3, 4,5, 16A, 16B, 21,
21B, & TG9
FDR 16TO BLDG
11 (4,160 V)
FDR 11TO BLDG 59
FDR 13TO BLDGS 12A,12 UPPER, 12
LOWER, 12E, 12GARAGE, & 50
FDR 12TO BLDGS 33
& 67
FDR 17TO BLDGS 6,
6A, 6B, 8, 13S,14A, 14B, 31A,
31B, & 31C
FDR 21TO BLDGS 12A.
12 UPPER, 12LOWER, 12E, 12GARAGE, & 50
FDR 25TO BLDG 57
FDR 19TO BLDG 33 &
UTILITYTUNNEL
FDR 26TO BLDG 11
(4,160 V)
FDR 18TO BLDG 59
FDR 27TO BLDGS 6, 6A,6B, 8, 13S, 13N,14A, 31A, 31B, &
31C
FDR 20TO BLDGS1, 2, 4, 5, 10
(VAULTS 12 &13), & 21
52 52
52
52 52
52
52 52
52
52 52
30 MVA34.5-13.8 KV
PEPCOFEEDER
34002
N.C. N.C.
N.C.
33.6 MVA34.5-13.8 KV
PEPCOFEEDER
34009
N.C. N.C.
N.C.
20 MVA34.5-13.8 KV
PEPCOFEEDER
34001
N.C. N.C.
N.C.
20 MVA34.5-13.8 KV
PEPCOFEEDER
34010
N.C. N.C.
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
SUBSTATION RELAY
PQM
50 50G 51 51G 81
59 25 6786
PQM
2000A, 3PH, 3W, 13.8KVSWGR 1
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
DPR
87
PQMPQM PQM PQM PQM PQM PQM PQM
PEPCO
NIH
2
5
3
54SS PANEL200A, 3PH, 4W, 208Y/120V
200AF200AT
100AF100AT
200AF200AT
DCPNL
TOPEPCOAREA
TOPEPCOAREA
BATTERYCHARGER
2
2 2
2000AF2000AT
2000AF2000AT
3 3 3 3 3 3 3 3 3 3 3 3 3
3 3 3 3 3 3 3
6
7
8
G3
PEPCOMETER M
PEPCOMETER M
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
PQM PQM
2000A, 3PH, 3W, 13.8KVSWGR 2
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
DPR
87
PQMPQM PQM PQM PQM PQM PQM PQM
2000AF2000AT
2000AF2000AT
PEPCOMETER M
PEPCOMETER M
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
1200AF
FMR
PQM PQM
2000A, 3PH, 3W, 13.8KVSWGR 3
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
50 51
50G 51G
PAF
67 86
AFD
DPR
87
PQMPQM PQM PQM PQM PQM PQM PQM
2000AF2000AT
2000AF2000AT
PEPCOMETER M
PEPCOMETER M
PEPCOMETER M
NG
4/0 CU
4
G3 G
3G
3
G3
G3
9 9
200N
200N
27
SUBSTATION RELAY
50 50G 51 51G 81
59 25 6786 27SUBSTATION RELAY
50 50G 51 51G 81
59 25 6786 27
SUBSTATION RELAY
50 50G 51 51G 81
59 25 6786 27
SUBSTATION RELAY
50 50G 51 51G 81
59 25 6786 27
SUBSTATION RELAY
50 50G 51 51G 81
59 25 6786 27
1
10
40 KAIC
1
10
40 KAIC
200:5 200:5 200:5 200:5400:5 300:5 400:5
2000:5 2000:5 2000:5 2000:5
2000:5 2000:5
200:5 200:5400:5 400:5100:5 100:5 300:5
400:5 400:5 200:5300:5300:5 100:5 200:5
52 52 52 52 52 52 52 52
52 52
52 52 52 52 52 52 52 52
52 52
52 52 52 52 52 52 52 52
52 52 1. ALL NEW COMPONENTS WILL BE DESIGNED IN ACCORDANCE
WITH THE NIH DRM AND PEPCO REQUIREMENTS.
2. REFER TO DRAWINGS E-601 AND E-602 FOR MORE INFORMATION.
GENERAL DRAWING NOTES:
PROVIDE NEW 2000A, 3PH, 3W, 13.8 KV SWITCHGEAR.
COORDINATE 2000A, 13.8 KV BUSWAY MODIFICATIONS ORREPLACEMENT WITH PEPCO.
PROVIDE NEW 13.8 KV FEEDERS TO NEW JUNCTION BARS INMANHOLES.
PROVIDE NEW 200A, 4P, 4W, 208Y/120V, SERVICE ENTRANCE RATEDATS. COORDINATE ANY ADDITIONAL REQUIREMENTS WITH PEPCO.
PROVIDE ONE SPARE 2000A MAIN BREAKER TO BE STORED IN THESWITCHGEAR ROOM FOLLOWING CONSTRUCTION.
PROVIDE NEW 200A, 3PH, 4W, 208Y/120V PANEL.
PROVIDE NEW BATTERY CHARGER WITH BEST BATTERY SELECTORAND NEW BATTERIES. COORDINATE REQUIREMENTS WITHSWITCHGEAR MANUFACTURER.
PROVIDE NEW 125V DC PANELBOARD. COORDINATE REQUIRMENTSWITH SWITCHGEAR MANUFACTURER.
COORDINATE FEEDER MODIFICATIONS WITH PEPCO.
BASIS OF DESIGN:SWITCHGEAR: SIEMENS GM-SGRELAYS: SEL-700 SERIESPQM: ELECTRO INDUSTRIES NEXUS 1500+
SPECIFIC DRAWING NOTES:1
2
3
4
5
6
7
8
9
10
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:2
2 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-501
MK
MK
GC
Project Number
SIN
GLE
LIN
E D
IAG
RAM
- N
EW W
OR
K
36
N.T.S.1 SINGLE LINE DIAGRAM - NEW WORK
RESERVETIE 1
1A
1B
V/T
PEPCOMETER
BAY
2 3A
3B
FEEDER2
FEEDER3
4A
4B
FEEDER4
FEEDER5
5A
5B
FEEDER6
MAIN 1
6A
6B
V/T
SWITCHGEAR 1
8 9A
9B
FEEDER7
EQUIPPEDSPACE
PEPCOMETER
BAY
SPARE
7A
7B
RESERVETIE 2
FEEDER11
FEEDER12
FEEDER13
FEEDER14
FEEDER15
10A
FEEDER16
FEEDER17
11
MAIN 2
12A
12B
13A
13B
14A
14B
15A
15B
16A
16B
17 18A
18B
PEPCOMETER
BAY
SPARE
PEPCOMETER
BAY
V/T
MAIN 3 EQUIPPEDSPACE
FEEDER18
FEEDER19
FEEDER20
FEEDER21
EQUIPPEDSPACE
SPARE
RESERVETIE 3
19A
19B
20 21A
21B
22A
22B
23A
23B
24A
24B
25A
25B
26
V/T
PEPCOMETER
BAY
27A
27B
PEPCOMETER
BAY
FEEDER27
V/T
SWITCHGEAR 2
SWITCHGEAR 3
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
2438[96"]
2502[98.5"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
2438[96"]
2502[98.5"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
914[36"]
2438[96"]
2502[98.5"]
V/T
FEEDER25
FEEDER26
FEEDER1
EQUIPPEDSPACE
EQUIPPEDSPACE
EQUIPPEDSPACE
BOD: SIEMENS
BOD: SIEMENS
BOD: SIEMENS
10B
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:2
4 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-601
MK
MK
GC
Project Number
SWIT
CH
GEA
R E
LEVA
TIO
N -
NEW
WO
RK
37
N.T.S.1 SWITCHGEAR ELEVATION - NEW WORK
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 38 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:2
4 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-602
Designer
Author
Checker
Project Number
ELEC
TRIC
AL S
CH
EDU
LES
BUILDING 17
EN-93
EN-101
EN-100
EN-96
EN-90
FEEDERS 2,7, 13, 17, 21,27
EN-102
FEEDERS 3, 12, 19
EN-92
FEEDERS14, 20
EN-88
FEEDERS 1,4, 11, 14, 18
EN-89
FEEDER 20
EN-99
FEEDER 14
EN-98
FEEDERS5, 6, 15, 16,25, 26
EN-94
EN-95
FEEDERS 1, 2,3, 4, 5, 6, 7
FEEDERS18, 19, 20,21, 25, 26,27
FEEDERS5, 6, 15,16, 25, 26
FEEDERS 2, 3, 7,11, 14, 15, 16, 18,20, 25, 26
FEEDERS 11, 12,13, 14, 15, 16, 17
FEEDERS 2, 3, 7,12, 13, 14, 17, 18,20, 25, 26
FEEDERS5, 6, 15, 16,25, 26
1
1
1
1
2
2
4
5
6
9
10
3
7
8
12
10
11
1. DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO DETERMINEBEST DUCT BANK ROUTES AND WINDOW LOCATIONS IN THEFIELD.
2. REFER TO DRAWINGS E-002, E-604, AND E-605 FOR MOREINFORMATION.
3. U.O.N. ALL EXISTING DUCT BANKS TO REMAIN.
4. CONTRACTOR SHALL PROVIDE NEW FEEDER TAGS FOR ALLNEW FEEDERS IN EACH MANHOLE.
5. ALL NEW FEEDERS SHALL BE PROVIDED WITH A FULL LOOP OFSLACK CABLING WITHIN EACH MANHOLE. PROVIDE RACKING ASREQUIRED.
6. PROVIDE JUNCTION BARS AND DEAD BREAK ELBOWS FOR ALLREQUIRED FEEDER CONNECTIONS/TERMINATIONS WITHINMANHOLES. IF SPACE CONSTRAINTS WITHIN THE MANHOLEPREVENT THE INSTALLATION OF JUNCTION BARS AND DEADBREAK ELBOWS, THEY SHALL BE INSTALLED IN THE CLOSESTPRACTICAL MANHOLE INSTEAD. CONTRACTOR SHALL EXTENDNEW OR TEMPORARY FEEDERS AS REQUIRED TO ACCOMODATETHIS AT NO ADDITIONAL COST TO THE OWNER.
GENERAL DRAWING NOTES:
PROVIDE NEW 20-WAY DUCT BANK WITH 127 MM [5"] DUCTS.
CONTRACTOR SHALL LEAVE EXISTING DUCTS INTACT WHEREPOSSIBLE.
PROVIDE 3-POINT JUNCTION BARS FOR FEEDER 14 AND INTERCEPTEXISTING FEEDERS IN MANHOLE. PROVIDE 4-POINT JUNCTION BARSFOR FEEDER 20 AND INTERCEPT EXISTING FEEDERS IN MANHOLE.
PROVIDE 3-POINT JUNCTION BARS FOR FEEDERS 2 & 19 ANDINTERCEPT EXISTING FEEDERS IN MANHOLE. PROVIDE 4-POINTJUNCTION BARS FOR FEEDER 12 AND INTERCEPT EXISTINGFEEDERS IN MANHOLE.
PROVIDE 3-POINT JUNCTION BARS FOR FEEDERS 7, 13, 17, 21, & 27AND INTERCEPT EXISTING FEEDERS IN MANHOLE.
PROVIDE 4-POINT JUNCTION BARS FOR FEEDER 14 AND INTERCEPTEXISTING FEEDERS IN MANHOLE.
PROVIDE 3-POINT JUNCTION BARS FOR FEEDER 1 AND INTERCEPTEXISTING FEEDERS IN MANHOLE. PROVIDE 5-POINT JUNCTION BARSFOR FEEDERS 4, 11, & 18 AND INTERCEPT EXISTING FEEDERS INMANHOLE.
PROVIDE 3-POINT JUNCTION BARS FOR FEEDER 20 AND INTERCEPTEXISTING FEEDERS.
PROVIDE 5-POINT JUNCTION BARS FOR FEEDERS 5, 6, 15, 16, 25, & 26AND INTERCEPT EXISTING FEEDERS IN MANHOLE.
PROVIDE NEW FEEDERS IN EXISTING DUCTS.
PROVIDE NEW FEEDERS IN EXISTING DUCTS. FEEDER 20 WILL RUNFROM MANHOLE EN-93 TO MANHOLE EN-92, INTERCEPT THEEXISTING FEEDERS VIA JUNCTION BARS, AND RETURN TO MANHOLEEN-92.
PROVIDE NEW FEEDERS IN EXISTING DUCTS FOR FEEDERS 1, 4, 11,& 18.
SPECIFIC DRAWING NOTES:1
2
3
4
5
6
7
8
9
10
11
12
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 39 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:2
5 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-603
Designer
Author
Checker
Project Number
MAN
HO
LE P
LAN
- N
EW W
OR
K
N.T.S.1 PARTIAL MANHOLE PLAN - NEW WORK
3099 (10'2")3658 (12'0")
1829 (6'0")
NORTH
TO MHEN-93
TO MHEN-100
XXXX
XXS
XXX
FDR 26 (N)
FDR 25 (N)
FDR 25 (N)
FDR 26 (N)
FDR 18 (N)
FDR 18 (N)FDR 20 (N)
FDR 17 (N)
FDR 12 (N)FDR 13 (N)
FDR 14 (N)
FDR 2 (N)FDR 7 (N)
FDR 3 (N)
FDR 15 (N)
FDR 16 (N)
FDR 16 (N)
FDR 25 (N)
FDR 26 (N)
FDR 26 (N)
FDR 15 (N)
FDR 25 (N)FDR 20 (N)
FDR 14 (N)
FDR 2 (N)FDR 3 (N)
FDR 7 (N)
FDR 18 (N)
FDR 11 (N)
FDR 18 (N)
FDR 15 (N)
FDR 13 (N)
FDR 11 (N)
FDR 11 (N)
FDR 17 (N)
FDR 16 (N)FDR 16 (N)
FDR 11 (N)
FDR 14 (N)
FDR 15 (N)
FDR 12 (N)
FDR 27 (E)
3658 (12'0")
3150 (10'4")
1829 (6'0")
NORTH
TO MHEN-92
TO MHEN-102
TO MHEN-90
FDR 17 (E)
FDR 21 (E)
FDR 13 (E)
FDR 7 (E)FDR 2 (E)
SS
S S S
S S S S S S
SS
S
X X
X X
X X X X
X
XXXX
XXS
TO BLDG 17SWGR 3
TO MHEN-101
FDR 20 (N)FDR 21 (N)
FDR 27 (N)
FDR 26 (N)
FDR 26 (N)
FDR 18 (N)
FDR 25 (N)
FDR 25 (N)
FDR 18 (N)
FDR 3 (N)FDR 12 (N)
FDR 19 (N)
FDR 26 (N)
FDR 25 (N)
FDR 18 (N)
FDR 26 (N)
FDR 25 (N)FDR 18 (N)
FDR 2 (N)
FDR 7 (N)
FDR 17 (N)
FDR 20 (N)FDR 3 (N)
FDR 14 (N)
FDR 12 (N)FDR 13 (N)
FDR 19 (N)
FDR 20 (N)
FDR 14 (N)
3048 (10'0")
3048 (10'0")
1981 (6'6")
NORTH
S
SS
S S
S
SS
S S
S
S
S
S
S
S
S
SS
S
S
S
S
S
SS
S
SS
S S
FDR 3 (E)FDR 19 (E)
FDR 12 (E)
TO MHEN-103
TO UNKNOWN
FDR 12 (E)
TO MHMH-2
FDR 3 (N)
FDR 12 (N)
FDR 19 (N)
2438 (8'0")
1829 (6'0")
1524 (5'0")
S
TO BLDG21
TO MHEN-93
FDR 14 (E)
FDR 20 (E)
NORTH
FDR 14 (N)
FDR 20 (N)
1. DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO DETERMINEBEST DUCT BANK ROUTES AND WINDOW LOCATIONS IN THEFIELD.
2. REFER TO DRAWINGS E-002, E-603, AND E-605 FOR MOREINFORMATION.
3. U.O.N. ALL EXISTING DUCT BANKS TO REMAIN.
4. CONTRACTOR SHALL PROVIDE NEW FEEDER TAGS FOR ALLNEW FEEDERS IN EACH MANHOLE.
5. ALL NEW FEEDERS SHALL BE PROVIDED WITH A FULL LOOP OFSLACK CABLING WITHIN EACH MANHOLE. PROVIDE RACKING ASREQUIRED.
6. PROVIDE JUNCTION BARS AND DEAD BREAK ELBOWS FOR ALLREQUIRED FEEDER CONNECTIONS/TERMINATIONS WITHINMANHOLES. IF SPACE CONSTRAINTS WITHIN THE MANHOLEPREVENT THE INSTALLATION OF JUNCTION BARS AND DEADBREAK ELBOWS, THEY SHALL BE INSTALLED IN THE CLOSESTPRACTICAL MANHOLE INSTEAD. CONTRACTOR SHALL EXTENDNEW OR TEMPORARY FEEDERS AS REQUIRED TO ACCOMODATETHIS AT NO ADDITIONAL COST TO THE OWNER.
GENERAL DRAWING NOTES:
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 40 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:2
6 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-604
Designer
Author
Checker
Project Number
MAN
HO
LE F
OLD
OU
TS -
NEW
WO
RK
N.T.S.1 MANHOLE EN-101 - NEW WORKN.T.S.2 MANHOLE EN-93 - NEW WORK
N.T.S.3 MANHOLE EN-102 - NEW WORKN.T.S.4 MANHOLE EN-92 - NEW WORK
2438 (8'0")
3658 (12'0")
2438 (8'0")
NORTH
TO MHEN-98
FDR 16 (E)
FDR 6 (E)FDR 6 (E)
FDR 16 (E)FDR 26 (E)
FDR 26 (E)
FDR 25 (E)FDR 5 (E)
FDR 15 (E)
FDR 15 (E)
FDR 25 (E)FDR 5 (E)
S S S S
S
S
XXTO MHEN-96
FDR 6 (N)
FDR 5 (N)FDR 5 (N)
FDR 6 (N)
FDR 25 (N)
FDR 16 (N)FDR 16 (N)
FDR 25 (N)FDR 26 (N)
FDR 26 (N)
FDR 15 (N)FDR 15 (N)
1829 (6'0")
3658 (12'0")3048 (10'0")
TO MHEN-101
TO T-69
TO MHEN-95
NORTH
S S
S
S S
SS
S
SS
FDR 14 (E)
FDR 14 (E)
TO MHEN-101
TO MHEN-96
FDR 15 (N)
FDR 5 (N)
FDR 6 (N)
FDR 15 (N)
FDR 5 (N)FDR 6 (N)
FDR 16 (N)FDR 16 (N)
FDR 26 (N)
FDR 26 (N)FDR 25 (N)
FDR 25 (N)
FDR 26 (N)
FDR 26 (N)FDR 25 (N)
FDR 25 (N)FDR 15 (N)
FDR 5 (N)
FDR 5 (N)
FDR 15 (N)
FDR 6 (N)
FDR 6 (N)
FDR 16 (N)
FDR 16 (N)
3429 (11'3") 3658 (12'0")
1829 (6'0")
NORTH
TO MH EN-88& MH EN-89
TO MHEN-99
FDR 14 (E)
X
X
X
X X X
X X X
XX
X
XX
FDR 14 (E)
TO MH EN-101
TO MH EN-101 TO BLDG 17 SWGR 1
FDR 5 (N)
FDR 15 (N)
FDR 6 (N)FDR 5 (N)
FDR 16 (N)FDR 16 (N)
FDR 25 (N)
FDR 6 (N)
FDR 26 (N)
FDR 26 (N)FDR 25 (N)
FDR 15 (N)
FDR 16 (N)
FDR 15 (N)
FDR 15 (N)
FDR 26 (N)
FDR 25 (N)
FDR 25 (N)
FDR 16 (N)
FDR 26 (N)
FDR 6 (N)
FDR 5 (N)
FDR 6 (N)
FDR 2 (N)
FDR 14 (N)
FDR 20 (N)
FDR 2 (N)
FDR 11 (N)
FDR 7 (N)
FDR 13 (N)
FDR 18 (N)FDR 11 (N)
FDR 18 (N)FDR 4 (N)
FDR 7 (N)FDR 1 (N)FDR 5 (N)
FDR 3 (N)
FDR 4 (N)
FDR 18 (N)FDR 18 (N)
FDR 1 (N)
FDR 11 (N)FDR 20 (N)
FDR 4 (N)
FDR 4 (N)
FDR 11 (N)FDR 11 (E)
2438 (8'0")
1524 (5'0")
2667 (8'8")
X
XS
X
S
S
S
X
XX S
FDR 14 (E)
S
FDR 11 (E)
FDR 4 (E)FDR 4 (E)
FDR 18 (E)
FDR 1 (E)
FDR 25 (E)
FDR 18 (E)
FDR 14 (E)
TO MHEN-100
TO MHEN-87
NORTH
FDR 4 (N)
FDR 1 (N)
FDR 11 (N)
FDR 18 (N)
FDR 4 (N)
FDR 11 (N)
FDR 18 (N)
FDR 1 (N)
2438 (8'0")
1829 (6'0")
1524 (5'0")
X
X
X
X X S X
S S
TO MHEN-100
TO MHEN-78
FDR 20 (E)
TO MHEN-87
NORTH
FDR 20 (N)
1. DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO DETERMINEBEST DUCT BANK ROUTES AND WINDOW LOCATIONS IN THEFIELD.
2. REFER TO DRAWINGS E-002, E-603, AND E-604 FOR MOREINFORMATION.
3. U.O.N. ALL EXISTING DUCT BANKS TO REMAIN.
4. CONTRACTOR SHALL PROVIDE NEW FEEDER TAGS FOR ALLNEW FEEDERS IN EACH MANHOLE.
5. ALL NEW FEEDERS SHALL BE PROVIDED WITH A FULL LOOP OFSLACK CABLING WITHIN EACH MANHOLE. PROVIDE RACKING ASREQUIRED.
6. PROVIDE JUNCTION BARS AND DEAD BREAK ELBOWS FOR ALLREQUIRED FEEDER CONNECTIONS/TERMINATIONS WITHINMANHOLES. IF SPACE CONSTRAINTS WITHIN THE MANHOLEPREVENT THE INSTALLATION OF JUNCTION BARS AND DEADBREAK ELBOWS, THEY SHALL BE INSTALLED IN THE CLOSESTPRACTICAL MANHOLE INSTEAD. CONTRACTOR SHALL EXTENDNEW OR TEMPORARY FEEDERS AS REQUIRED TO ACCOMODATETHIS AT NO ADDITIONAL COST TO THE OWNER.
GENERAL DRAWING NOTES:
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 41 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:2
7 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-605
Designer
Author
Checker
Project Number
MAN
HO
LE F
OLD
OU
TS -
NEW
WO
RK
N.T.S.1 MANHOLE EN-96 - NEW WORKN.T.S.2 MANHOLE EN-99 - NEW WORK
N.T.S.3 MANHOLE EN-100 - NEW WORKN.T.S.4 MANHOLE EN-88 - NEW WORK
N.T.S.5 MANHOLE EN-89 -NEW WORK
~
422
3 3 3
1
1
1
1
1
1
2
1A
1B
RELAY
CB
TIE 1
PQM
2
PEPCOMETER
BAY
3A
3B
RELAY
FEEDER 1
PQMCB
RELAY
FEEDER 2
PQMCB
4A
4B
RELAY
FEEDER 3
PQMCB
RELAY
FEEDER 4
PQMCB
5A
5B
RELAY
FEEDER 5
PQMCB
RELAY
FEEDER 6
PQMCB
6A
6B
RELAY
FEEDER 7
PQMCB
RELAY
SPACE
PQMCB
7A
7B
RELAY
SPACE
PQMCB
RELAY
SPARE
PQMCB
8
PEPCOMETER
BAY
9A
9B
RELAY
CB
MAIN 1
PQM
10A
10B
RELAY
CB
TIE 2
PQM
11
PEPCOMETER
BAY
12A
12B
RELAY
FEEDER 11
PQMCB
RELAY
FEEDER 12
PQMCB
13A
13B
RELAY
FEEDER 13
PQMCB
RELAY
FEEDER 14
PQMCB
14A
14B
RELAY
FEEDER 15
PQMCB
RELAY
FEEDER 16
PQMCB
15A
15B
RELAY
FEEDER 17
PQMCB
RELAY
SPACE
PQMCB
16A
16B
RELAY
SPACE
PQMCB
RELAY
SPARE
PQMCB
17
PEPCOMETER
BAY
18A
18B
RELAY
CB
MAIN 2
PQM
19A
19B
RELAY
CB
MAIN 3
PQM
RS485P-PANEL
20
PEPCOMETER
BAY
21A
21B
RELAY
FEEDER 18
PQMCB
RELAY
FEEDER 19
PQMCB
22A
22B
RELAY
FEEDER 20
PQMCB
RELAY
FEEDER 21
PQMCB
23A
23B
RELAY
SPACE
PQMCB
RELAY
SPARE
PQMCB
24A
24B
RELAY
SPACE
PQMCB
RELAY
FEEDER 25
PQMCB
25A
25B
RELAY
FEEDER 26
PQMCB
RELAY
FEEDER 27
PQMCB
26
PEPCOMETER
BAY
27A
27B
RELAY
CB
TIE 3
PQM
IGIN CABINET
BATTERYCHARGER
TO NIHCOMM.CLOSET
TIE 1PQM/RLY
FDR 1PQM/RLY
FDR 2PQM/RLY
FDR 3PQM/RLY
FDR 4PQM/RLY
FDR 5PQM/RLY
FDR 6PQM/RLY
FDR 7PQM/RLY
SPACEPQM/RLY
SPACEPQM/RLY
SPAREPQM/RLY
MAIN 1PQM/RLY
RS485 PATCH PANEL
RS485 PATCH PANEL
IGIN CABINET
SWITCHGEAR 1
TIE 2PQM/RLY
FDR 11PQM/RLY
FDR 12PQM/RLY
FDR 13PQM/RLY
FDR 14PQM/RLY
FDR 15PQM/RLY
FDR 16PQM/RLY
FDR 17PQM/RLY
SPACEPQM/RLY
SPACEPQM/RLY
SPAREPQM/RLY
MAIN 2PQM/RLY
SWITCHGEAR 2
MAIN 3PQM/RLY
FDR 18PQM/RLY
FDR 19PQM/RLY
FDR 20PQM/RLY
FDR 21PQM/RLY
SPACEPQM/RLY
SPAREPQM/RLY
SPACEPQM/RLY
FDR 25PQM/RLY
FDR 26PQM/RLY
FDR 27PQM/RLY
TIE 3PQM/RLY
SWITCHGEAR 3
RS485 PATCH PANEL RS485 PATCH PANEL
IGIN CABINET IGIN CABINET
RS485P-PANEL
RS485P-PANEL
RS485 PATCH PANEL RS485 PATCH PANEL
1. ALL CABLING, TERMINATIONS, AND PATCH PANELS INTERNAL TOTHE SWITCHGEAR SHALL BE SUPPLIED AND INSTALLED BY THESWITCHGEAR VENDOR.
2. THE RS485 CABLING SHALL BE PROVIDED FOR THE DNPPROTOCOL CONNECTIONS FROM EACH IED (RELAYS ANDMETERS) TO THE PATCH PANELS LOCATED WITHIN THESWITCHGEAR THEN TO THE PATCH PANELS PROVIDED WITHINTHE IGIN CABINET.
GENERAL DRAWING NOTES:
PROVIDE 2 SETS RS485 (TWISTED PAIR) CABLE AND TERMINATIONS.
PROVIDE 102 MM (4") CONDUIT.
PROVIDE A PATCH PANEL AND TERMINATE ALL RS485 WITHIN EACHSWITCHGEAR LINEUP.
SPECIFIC DRAWING NOTES:1
2
3
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 42 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:2
7 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-606
Designer
Author
Checker
Project Number
SCAD
A PL
AN -
NEW
WO
RK
191 [71_2"]
146 [53_4"]
146 [53_4"]
191 [71_2"]
191 [71_2"]
152 [6"]
762 [30"]MAXIMUM
191[71
2"]191[71
2"]191[71
2"]146[53
4"]146[53
4"]191[71
2"]
GRADE
UNDISTURBEDEARTH
PLASTIC CAUTION TAPE ALONGTHE ENTIRE LENGTH OF DUCTBANK.
CONCRETE
127 [5"]CONDUIT(TYPICAL)
51 [2"] MINIMUMSTANDOFF
8 [9/32"] HOLES FOR LUG CONNECTIONS
6.5 [1/4"] COPPERGROUND BUS
THAN 203 [8"]
GROUND BUS - ELEVATION
GROUND BUS - PLAN VIEW
STANDOFF
WALL
GROUND BUS
NO LESS
ISOMETRIC VIEW
OM 51 [2"] CENTERS (TYPICAL FOR 2)
11 [7/16"]
79 [3 1/8"]
38 [1 1/2"]
38 [1 1/2"]
51 [2"] 76 [3"]
51 [2"]
101 [4"]
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PRO
JEC
TTI
TLE
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEAL
CO
NTR
ACTO
RS
BUIL
DIN
GPR
OJE
CT
DR
AWIN
GA/
E N
ame
and
LOG
O
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET 43 OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 4:
01:2
8 PM
C:\U
sers
\mic
hael
.klin
e.ED
G2\
Doc
umen
ts\R
evit
2015
\160
18E-
R20
15_m
icha
el.k
line.
rvt
E-701
Designer
Author
Checker
Project Number
ELEC
TRIC
AL D
ETAI
LS
N.T.S.1 20-WAY DUCT BANK DETAILN.T.S.2 GROUND BAR
1. THIS DRAWING SET PROVIDES APPROXIMATE EQUIPMENT LOCATIONS, FIELD VERIFY AND COORDINATE CAMERA LOCATION WITH VIEWING OBJECTIVE. LOCATEAS APPLICABLE. NOTIFY CONTRACTING OFFICER OF ANY DEVIATIONS GREATER THAN 610mm [24 INCHES].
2. PROMPTLY NOTIFY CONTRACTING OFFICER PRIOR TO INSTALLATION OF WORK IF MOUNTING LOCATIONS NOTED ON THE DRAWINGS ARE OBSTRUCTED AND/ORIF ANY MOUNTING CONFLICTS OR PROBLEMS ARE DISCOVERED. DO NOT PROCEED WITHOUT CONTRACTING OFFICER'S WRITTEN AUTHORIZATION.
3. COORDINATE REQUIREMENTS FOR RELEASE OF SECURITY SYSTEM CONTROLLED DOORS WITH FIRE ALARM SYSTEM AND BUILDING EMERGENCY EVACUATIONALARM SYSTEM. SECURITY SYSTEM SHALL NOT VIOLATE LIFE SAFETY REQUIREMENTS. WHERE REQUIRED, PROVIDE MEANS FOR FIRE ALARM/BUILDINGEMERGENCY EVACUATION SYSTEM TO AUTOMATICALLY UNLOCK SECURITY MANAGEMENT SYSTEM CONTROLLED DOORS WITHOUT SECURITY MANAGEMENTSYSTEM ACTION.
4. REFER TO ARCHITECT'S APPROVED DOOR HARDWARE SCHEDULE FOR SECURITY MANAGEMENT SYSTEM CONTROLLED LOCKS AND DOOR HARDWARE SET.COORDINATE WITH SECURITY DRAWINGS. PROVIDE UL APPROVED POWER SUPPLIES AS REQUIRED.
5. UNLESS NOTED OTHERWISE EACH MONITORED INPUT DEVICE OF THE SECURITY MANAGEMENT SYSTEM SHALL BE CONSIDERED AN INDIVIDUAL ZONE ANDSHALL BE ELECTRICALLY SUPERVISED AND HOMERUN TO ITS ASSOCIATED SYSTEM CONNECTION. TAMPER SWITCH INPUTS SHALL BE CONSIDERED ADDITIONALZONES SEPARATE FROM OTHER ALARM SIGNAL INPUTS. END-OF-LINE SUPERVISION DEVICE SHALL BE INSTALLED AT THE FIELD DEVICE END.
6. ELECTRICAL CONTRACTOR WILL PROVIDE PRIMARY 120 VAC INPUT POWER FOR POWER SUPPLIES AND OTHER SYSTEM COMPONENTS. COORDINATE POWERREQUIREMENTS WITH ELECTRICAL CONTRACTOR. COORDINATE FINAL LOCATIONS OF POWER CIRCUITS FOR SECURITY SYSTEM DEVICES WITH OTHER TRADES.SECURITY EQUIPMENT SHALL BE SUPPLIED FROM DEDICATED CIRCUIT BREAKERS CONNECTED TO THE BUILDING'S EMERGENCY DISTRIBUTION SYSTEM WITHLOCAL BATTERY UNITS AS INDICATED. REFER TO ELECTRICAL DRAWINGS FOR LOCATION OF POWER CIRCUITS.
7. WIRING SYSTEMS SHALL BE CONSISTENTLY COLOR CODED AND TAGGED. REFER TO SPECIFICATIONS FOR DETAILED REQUIREMENTS.
8. ALL FIELD DEVICES SHALL BE STUBBED UP IN MINIMUM 21mm [3/4"] CONDUIT TO A MINIMUM 100mm x 100mm x 54mm [4" x 4" x 2-1/8"] FIELD DEVICE JUNCTION BOXIN A SECURE, ELECTRONICALLY PROTECTED AREA NEAR CEILING.
9. PROVIDE A PULL CORD CAPABLE TO OF MEETING, AT A MINIMUM, THE MAXIMUM CABLE PULL TENSIONS AS IDENTIFIED THE 27 11 00 SPECIFICATION. PROVIDEIDENTIFICATION AT EACH END, IN ALL CONDUIT.
10. FIRESTOP ALL STRUCTURE PENETRATIONS WITH FIRESTOPPING MATERIAL EQUAL TO OR GREATER THAN THAT OF PENETRATED STRUCTURE. INSTALLFIRESTOPPING MATERIAL AFTER COMPLETE INSTALLATION AND TESTING OF CABLING. USE ONLY LISTED FIRESTOPPING MATERIAL IN ACCORDANCE WITH UL,NFPA, AND OTHER AHJ.
11. THE DRAWINGS INDICATE THE GENERAL LOCATION OF EQUIPMENT, CABLE PATHWAYS, DEVICE TYPES AND CONFIGURATIONS. MINOR VARIATIONS FROM THEDETAILS MAY OCCUR DUE TO FIELD CONDITIONS, ALTHOUGH THE DRAWINGS DO NOT NECESSARILY DICTATE THE ACTUAL ROUTES OF CONDUITS, LOCATIONOF EQUIPMENT AND DEVICES, AND OTHER SUPPORTING ITEMS, THEY SHALL BE FOLLOWED AS CLOSELY AS POSSIBLE TO THE DESIGN IN THIS DOCUMENT. ITWILL BE THE INSTALLING CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE INSTALLATION OF ALL RELATED ITEMS WITH ALL AHJ AND CONTRACTORSWORKING THIS PROJECT.
12. THESE DRAWINGS ARE PREPARED AND COORDINATED WITH THE PROJECT SPECIFICATIONS. TOGETHER THESE DOCUMENTS FORM THE CONTRACTDOCUMENTS. ANYTHING MENTIONED IN THE SPECIFICATIONS AND NOT SHOWN IN THE DRAWINGS, OR SHOWN IN THE DRAWINGS AND NOT MENTIONED IN THESPECIFICATIONS, SHALL BE OF LIKE EFFECT AS IF SHOWN AND MENTIONED IN BOTH. IN CASE OF DIFFERENCES BETWEEN THE DRAWINGS AND THESPECIFICATIONS, THE STRICTER PROVISION AS DETERMINED BY THE CONTRACTING OFFICE SHALL GOVERN. OMISSIONS FROM THE DRAWINGS ORSPECIFICATIONS, OR THE INCORRECT DESCRIPTION OF DETAILS OF WORK WHICH ARE EVIDENTLY NECESSARY TO CARRY OUT THE INTENT OF THE DRAWINGSAND SPECIFICATIONS, OR WHICH ARE CUSTOMARILY PERFORMED, SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED ORINCORRECTLY DESCRIBED DETAIL OF THE WORK. RATHER, THE WORK SHALL BE PERFORMED AS IF THE DRAWINGS HAVE BEEN VERIFIED, CHECKED ANDCOORDINATED WITH SHOP DRAWINGS AND SAMPLES OF THE WORK AND OF THE SPECIFICATIONS.
13. CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUITS, DEVICE BOXES, JUNCTION BOXES, PANELS AND ASSOCIATED DEVICES, AND REQUIRED SLEEVESFOR WALL, FLOOR AND CEILING PENETRATIONS FOR A COMPLETE INSTALLATION.
14. CONTRACTOR TO MAINTAIN A 305mm [12"] MINIMUM SPACING BETWEEN CABLES AND SOURCES OF EMI, SUCH AS FLUORESCENT LIGHTS OR UNSHIELDEDPOWER LINES.
15. 120 VAC INPUT POWER CONDUCTORS SHALL NOT BE INSTALLED IN THE SAME CONDUIT AS LOW VOLTAGE VIDEO, CONTROL, DC POWER OR ANY OTHER LOWVOLTAGE CABLES. ELECTRICAL CONTRACTOR TO ENSURE PROPER SEPARATION OF CLASS 1, CLASS 2, AND CLASS 3 PER NEC 725-54 (D) AND/OR AHJ.
16. CONTRACTOR SHALL INSTALL APPROPRIATELY SIZED CONDUIT IAW STANDARD ANSI/TIA-569-B, "PATHWAYS AND SPACES AND THE NATIONAL ELECTRIC CODE(NEC)." ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BACK BOXES, PULL-BOXES, JUNCTION BOXES AND CONDUIT INSTALLATION. MINIMUM SIZECONDUIT SHALL NOT BE LESS THAN 21mm [3/4"]. MAXIMUM CONDUIT FILL RATIO SHALL NOT BE MORE THAN 40%.
17. ALL INSTALLED CABLE AND COMPONENTS SHALL MEET THE WARRANTY REQUIREMENTS AS NOTED IN THE SPECIFICATIONS. THE CONTRACTOR IS REQUIREDTO BE A CERTIFIED STRUCTURED CABLING INSTALLER FOR THE TELECOMMUNICATIONS SYSTEM PROVIDED.
18. TELECOMMUNICATION INSTALLATION WORK SHALL FOLLOW ANSI, BICSI, EIA/TIA STANDARDS, NEC, AND OTHER APPLICABLE STANDARDS AND CODES.
19. NO USE OF STAPLES FOR CABLE ROUTING OR MOUNTING WILL BE PERMITTED.
20. IN ALL AREAS, PROTECT CABLE FROM TENSION, COMPRESSION, TORSION, BENDING, SQUEEZING AND VIBRATION. DO NOT PULL CABLES IMPROPERLY OREXCEED THE MANUFACTURERS TENSILE RATING.
T
B
SYMBOLS: GENERAL NOTES:CONDUIT ROUTE, SIZE AS NOTED
A-C PLYWOOD BACKBOARD TREATED WITH FIRE-RETARDENTPAINT. 2440mm [8'] HIGH MOUNTED 150mm [6"] AFF.
CEILING MOUNTED CAMERA WITH VARI-FOCAL LENS. REFERTO T-503 DETAIL 3 FOR TYPICAL INSTALLATION DETAIL.
CARD ACCESS READER. REFER TO T-501 AND T-505 FORTYPICAL INSTALLATION DETAIL.MOUNTING HEIGHT 1220mm [48"] AFF.
T: 1 = ONE FORM FACTOR AUTHENTICATION 2 = TWO FORM FACTOR AUTHENTICATION
WALL PHONE OUTLET EXISTING LOCATION.
WALL DATA OUTLET EXISTING LOCATION.
ABBREVIATIONS:% PERCENT& ANDA/V AUDIO VISUALAC ALTERNATING CURRENTACP ACCESS CONTROL PANELACS ACCESS CONTROL SYSTEMAFF ABOVE FINISH FLOORAHJ AUTHORITY HAVING JURISDICTIONALA ALARMANSI AMERICAN NATION STANDARD INSTITUTEAUX AUXILIARYAWG AMERICAN WIRE GAUGEBET BUILDING ENTRANCE TERMINALBICSI BUILDING INDUSTRY CONSULTING SERVICES INTERNATIONALBMS BALANCED MAGNETIC SWITCHC CONDUITCAT CATEGORYCAT3 CATEGORY 3CAT6 CATEGORY 6CB CIRCUIT BREAKERCCTV CLOSED CIRCUIT TELEVISIONCIT CENTER FOR INFORMATION TECHNOLOGYCLG CEILINGCOAX COAXIAL CABLECODEC ODER/DECOVERCONC CONCRETECONTR CONTRACTORCPS CAMERA POWER SUPPLYCPU CENTRAL PROCESSING UNITCR CARD READERD DATAD/A DIGITAL TO ANALOGdB DECIBELDC DIRECT CURRENTDIA DIAMETERDIST DISTRIBUTIONDPS DOOR POSITION SWITCHDPSM DIVISION OF PHYSICAL SECURITY MANAGEMENTDRI DOOR READER INTERFACEDS DOOR STRIKEDTL DETAILDWG DRAWINGEA EACHEIA ELECTRONIC INDUSTRIES ALLIANCEELEC ELECTRICELEV ELEVATIONEMI ELECTROMAGNETIC INTERFERENCEEMT ELECTRICAL METALLIC TUBINGENG ENGINEEREQP EQUIPMENTER EQUIPMENT ROOMES ELECTRIC STRIKEEXST EXISTINGEXT EXTERIORFO FIBER OPTICFPC FIBER OPTIC CABLEFPP FIBER OPTIC PATCH PANELGbps GIGA BITS PER SECONDSGFGI GOVERNMENT FURNISHED GOVERNMENT INSTALLEDGND GROUNDHH HANDHOLEHRZ HORIZONTALHSS HIGH SECURITY SWITCHHz HERTZIAW IN ACCORDANCE WITHIDS INTRUSION DETECTION SYSTEMIEEE INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERSINL INTERLOCKIR INFRAREDJB JUNCTION BOXKbps KILO BITS PER SECONDKHz KILOHERTZKP KEYPAD ASSEMBLYLAN LOCAL AREA NETWORKLCD LIQUID CRYSTAL DISPLAYLED LIGHT EMITTING DIODELPS LOCK POWER SUPPLYMAX MAXIMUMMbps MEGA BITS PER SECONDMHz MEGAHERTZMH MAINTENANCE HOLEMIN MINIMUMMISC MISCELLANEOUSMM MULTI-MODEmm MILLIMETERMTD MOUNTEDMS MAGNETIC SWITCHMUX MULTIPLEXORN/A NOT APPLICABLEN NORTHNEC NATIONAL ELECTRIC CODENFPA NATIONAL FIRE AND PROTECTION AGENCYNAG NEGATIVENIC NOT IN CONTRACTNIH NATIONAL INSTITUTE OF HEALTHNPT NATIONAL PIPE THREADNTS NOT TO SCALEOC ON CENTEROD OUTSIDE DIAMETEROPT OPTICALOSP OUTSIDE PLANTPC PERSONAL COMPUTERPIN PERSONAL IDENTIFICATION NUMBERPNL PANELPOS POSITIVEPP PATCH PANELPR PAIRPVC POLYVINYL CHLORIDEPWR POWERQTY QUANTITYRCDD REGISTERED COMMUNICATIONS DISTRIBUTION DESIGNERREF REFERENCEREQ REQUIREDREX REQUEST TO EXITRF RADIO FREQUENCYRM ROOMRU RACK UNITRX RECEIVER/RECEIVERSM SINGLE-MODESMS SECURITY MANAGEMENT SYSTEMSOC SECURITY OPERATIONS CENTERSQ SQUARESS STAINLESS STEELSTP SHIELD TWISTED PAIRSTR STRAMDSW NETWORK SWITCHSYS SYSTEMTBB TELECOMMUNICATIONS BONDING BACKBONETEL TELEPHONETELECOM TELECOMMUNICATIONSTERM TERMINATIONSTIA TELECOMMUNICATIONS INDUSTRIES ASSOCIATIONTGB TELECOMMUNICATIONS GROUNDING BUSBARTMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBARTR TELECOMMUNICATIONS ROOMTX TRANSMIT/TRANSMITTERTx Rx TRANSCEIVERTYP TYPICALUL UNDERWRITERS LABORATORIESUON UNLESS OTHERWISE NOTEDUPS UNINTERRUPTIBLE POWER SUPPLYUTP UNSHIELDED TWISTED PAIRWAP WIRELESS ACCESS POINTWP WEATHERPROOF
BALANCED MAGNETIC AUTOMATIC MONITORING SWITCH,SURFACE MOUNT.
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PR
OJE
CT
TITL
E
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEA
LC
ON
TRAC
TOR
SB
UIL
DIN
GP
RO
JEC
TD
RAW
ING
A/E
Nam
e an
d LO
GO
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 1:
51:5
9 PM
L:\D
CS\
Proj
ects
\BD
L\60
5044
85_S
wtc
hgrU
pg\9
00-W
ork\
910-
CAD
\05-
MO
DEL
S\N
IH_S
WG
R-T
ELEC
OM
v20
15.rv
t
T-100
PR
PR
RW
Project Number
GEN
ERAL
NO
TES
AND
SYM
BOLS
44
DN
J
J
J
EXISTING WALL MOUNTED TELEPHONE. TELEPHONE AND CABLING TOREMAIN IN PLACE.
EXISTING WALL MOUNTED TELEPHONE PUNCH DOWN BLOCK. PUNCH DOWNBLOCK AND CABLING TO REMAIN IN PLACE.
EXISTING FIBER OPTIC PATCH PANEL ENCLOSURE WITH MULTIMODE ANDSINGLE MODE FIBER OPTIC CABLING WITH ST TYPE CONNECTORS. PATCHPANEL AND CABLING TO REMAIN IN PLACE.
CONTRACTOR TO VERIFY WITH NIH CIT, THAT EXISTING INCOMING FIBER ISUSABLE FOR DATA NETWORK AND THAT THERE IS SUFFICIENT AMOUNT OFFIBER FOR DATA NETWORK REQUIREMENTS.
EXISTING SUPERVISORY PANEL. SUPERVISORY PANEL IS SCHEDULED TO BEREPLACED IN KIND BY ELECTRICAL CONTRACTOR. REFER TO ELECTRICALDRAWINGS. BEFORE REPLACEMENT OF PANEL, DISCONNECT FIBER OPTICCABLING FROM PATCH PANEL AND COIL IN PLACE. PROVIDE A NEW PATCHPANEL AFTER CONSTRUCTION, REPULL AND TERMINATE FIBER AS BEFORE INNEW PATCH PANEL.
EXISTING INTERFACE PANEL (RTU-NIH-TB). REFER TO ELECTRICAL DRAWINGSFOR DISPOSITION OF SUPERVISORY PANEL.
NEW SCADA ENCLOSURE PROVIDED BY ELECTRICAL CONTRACTOR.PROVIDE 2 STRANDS FIBER OPTIC CABLE FROM THE EXISTING FIBER PATCHPANEL TO THE NEW SCADA ENCLOSURE. RUN NEW FIBER IN EMT CONDUITAND TERMINATE FIBER CABLING WITH ST CONNECTORS AT THE EXISTINGFIBER PATCH PANEL. COORDINATE FIBER TYPE AND PATCH PANELTERMINATION WITH NIH CIT.
EXISTING SCADA ENCLOSURE. REFER TO ELECTRICAL DRAWINGS FORDISPOSITION. PROVIDE 2 STRANDS OF MULTIMODE FIBER OPTIC CABLE FROMEXISTING FIBER OPTIC PATCH PANEL TO THE EXISTING SCADA ENCLOSUREAND RUN FIBER CABLING IN EMT.
PROVIDE AND INSTALL CEILING MOUNTED FIXED DOME CAMERA FOR VIEWINGOF FRONT DOOR. COORDINATE CAMERA HEIGHT AND LOCATION WITHEXISTING CEILING EQUIPMENT. REFER TO T-501, DETAIL 3.
PROVIDE A 610mm x 406mm x 168mm (24"H x 16"W x 6.6"D) NEMA 1 TYPEENCLOSURE WITH HINGED COVER AND LOCK FOR SECURITY EQUIPMENT.
1" CONDUIT. FIELD VERIFY ROUTE.
PROVIDE A 660mm x 660mm x 216mm DEEP (26" x 26" x 8.5"D) WALL MOUNTEDTHINLINE TELCO 4 RACK UNIT CABINET (CHATSWORTH 13050-112 ORAPPROVED EQUAL) FOR A NIH CIT PROVIDED PoE NETWORK SWITCH.
DOUBLE GANG ELECTRICAL BOX FOR GFGI WAP. SPACE ELECTRICAL BOXES10m APART.
305mm x 305mm x 153mm (12" x 12" x 6") JUNCTION BOX.
53mm CONDUIT.
KEYED NOTES:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
1. SEE SHEET T-100 FOR SYMBOLS.2. ALL NEW TELECOMMUNICATIONS AND SECURITY CABLING SHALL RUN
IN EMT CONDUIT OR RACEWAY AND NOT BE EXPOSED.3. EXISTING EXPOSED CABLING SHALL BE RUN IN APPROVED PATHWAY.
GENERAL NOTES:
1
2
3
4
5
6
7
A
SWITCHGEAR
FIRE PUMP (NIC)
TOILET (NIC)
B B
B B
2
EXISTING CEILINGMOUNTED HEATER
2T-101
EXISTING CEILINGMOUNTED HEATER
1T-501
2T-501
12
SWITCHGEAR LEVEL[1'-8"]508
GRADE LEVEL[0'-0 1/2"]8
AIR DUCT
HEATER
[4' -
6"]
1372
[4' -
6"]
1372
SWITCHGEAR
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PR
OJE
CT
TITL
E
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEA
LC
ON
TRAC
TOR
SB
UIL
DIN
GP
RO
JEC
TD
RAW
ING
A/E
Nam
e an
d LO
GO
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
BUILDING 17
BUILDING 21
11/2
/201
7 1:
52:0
4 PM
L:\D
CS\
Proj
ects
\BD
L\60
5044
85_S
wtc
hgrU
pg\9
00-W
ork\
910-
CAD
\05-
MO
DEL
S\N
IH_S
WG
R-T
ELEC
OM
v20
15.rv
t
T-101
PR
PR
RW
Project Number
TELE
CO
M F
LOO
R P
LAN
45
0 50002500
1:100
1 : 1001 SWITCHGEAR LEVEL FLOOR PLAN
1
1
2
3
6
5
N
8
9
10
10
0 25001250
1:50
7
4
1 : 502 EAST WALL ELEVATION
98 73
12
11
13
13
13
12
13
14
15
1220
[48"
]
1372
[54"
]
CEILING LINE
FLOOR LINE
SECURE SIDE
NON-SECURE SIDE
CEILING LINE
FLOOR LINE
SECURE SIDE
NON-SECURE SIDE
NC C NO NC C NOAC FAILBAT FAIL
TRIGGERACDC AC1
EOLNOGNDSUPERVISEDRESET
+AUX-
- DC
+
OP
EN
- 24VC
LOS
ED
- 12V
eFlow4NB
L1 min enable2 hr disable GN
- BAT +
1P 1
N
2P 2
N
3P
3N
4P
4N
PO
WE
R D
ISTR
IBU
TIO
NU
NIT
PD4U
L
RS-485 TOFIBER
OPTIC LINK/ REPEATER
ETHERNETTO FIBER
OPTIC MEDIACONVERTER
REMOTEREADER
INTERFACE
12OVACDOUBLE
GANG QUADOUTLET
12 VDC / 7AHBATTERY
12 VDC / 7AHBATTERY
24VDC @ 4AMP
POWERSUPPLY
4 OUTPUTPOWER
DISTRIBUTIONMODULE
RUN CONDUIT FOR VIDEO ANDPOWER CABLES TO SECURITY PANEL
CEILING
100mm x 100mm[4" x 4"] JUNCTION BOX
VIDEO AND POWR CABLESTO SECURITY PANEL
38mm [1.5"] NPT
CAMERA
27mm [1"] NPT
21mm [3/4"] EMT TOFIBER PATCH PANEL
21mm [3/4"] EMT TOSECURITY DEVICES (TYP.)
21mm [3/4"] EMTFOR 120 VAC
DIN RAIL DIN RAIL
DIN RAIL
PROVIDE AND INSTALL 100 x 100 [4" x 4"] JUNCTION BOX AND ROUTE CABLINGFROM BMS TO JUNCTION BOX. WIRE THE 2 BMS IN SERIES.
PROVIDE AND INSTALL SURFACE MOUNT BMS.
PROVIDE AND INSTALL CARD READER. FLUSH MOUNT DUAL GANG BOX ONTHE UNSECURED SIDE TO MOUNT CARD READER AND SURFACE MOUNTDUAL GANG BOX ON SECURED SIDE FOR CONDUIT.
ELECTRIC MORTISE LOCKSET WITH INTEGRAL REQUEST-TO-EXIT SWITCHPROVIDED BY DIVISION 8 CONTRACTOR.
PROVIDE AND INSTALL 405W x 610H x 165D 16"W x 24"H x 6.62"D] NEMA 1 TYPEMETAL ENCLOSURE ON SECURE SIDE.
POWER TRANSFER DEVICE PROVIDED BY DIVISION 8 CONTRACTOR.
PROVIDE AND INSTALL ETHERNET TO FIBER OPTIC MEDIA CONVERTER.
PROVIDE AND INSTALL 25mm [1"] NON-METALLIC WIRE RACEWAY.
PROVIDE AND INSTALL REMOTE READER INTERFACE MODULE.
DOUBLE GANG 120VAC/15 AMP QUAD OUTLET FOR 24VDC POWER SUPPYAND PLUG-IN CAMERA POWER SUPPLY, PROVIDED BY ELECTRICALCONTRACTOR.
PROVIDE AND INSTALL 12VDC, MINIMUM 7AH BATTERIES.
PROVIDE AND INSTALL RS-485 TO FIBER OPTIC CONVERTER WITH ST FIBEROPTIC CABLE CONNECTORS.
PROVIDE AND INSTALL 4-OUPUT POWER DISTRIBUTION MODULE.
PROVIDE AND INSTALL 24VDC @ 4 AMP POWER SUPPLY.
PROVIDE AND INSTALLL A SINGLE GANG BOX JUNCTION BOX TO ROUTECABLING FROM POWER TRANSFER DEVICE.
KEYED NOTES:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PR
OJE
CT
TITL
E
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEA
LC
ON
TRAC
TOR
SB
UIL
DIN
GP
RO
JEC
TD
RAW
ING
A/E
Nam
e an
d LO
GO
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 1:
52:0
7 PM
L:\D
CS\
Proj
ects
\BD
L\60
5044
85_S
wtc
hgrU
pg\9
00-W
ork\
910-
CAD
\05-
MO
DEL
S\N
IH_S
WG
R-T
ELEC
OM
v20
15.rv
t
T-501
PR
BM
RW
Project Number
TELE
CO
M S
ECU
RIT
Y D
ETAI
LS
46
NOT TO SCALE1 SECURITY DOUBLE DOOR ELEVATION DETAILNOT TO SCALE2 SECURITY DOUBLE DOOR BMS ELEVATION DETAIL
NOT TO SCALE3 SECURITY CAMERA MOUNTING DETAIL NOT TO SCALE4 SECURITY PANEL DETAIL
2
5
1
2
3
4
6
21mm [3/4"] CONDUIT
21mm [3/4"] CONDUITSURFACE MOUNT, TYP.
21mm [3/4"] CONDUITSURFACE MOUNT (TYP.)
FEED CONDUCTORSTHROUGH DOOR
3
2
2
1
27mm [1"] CONDUIT TOFIBER PATCH PANEL
5
21mm [3/4"] CONDUIT TOSECURITY PANEL
7
8
9
10
11
TYP.
12
8
13
8
14
5
15
ACTIVE LEAF FIXED LEAF
JUNCTION BOX
NON-SECUREDSIDE
2 STRANDMM FIBER
2 STRANDMM FIBER
2 STRAND FIBER(EXISTING)
18AWG/2C SHIELD
18AWG/2CSHIELD
18AWG/2CSHIELD
18AWG/2C SHIELD
22AWG/2C SHIELD
22AWG/3 PAIROVERALL SHIELD
22AWG/2 PAIROVERALL SHIELD
CAT 6 SHIELDTWISTED PAIR
22AWG/2 TWISTEDPAIR, OVERALL SHIELD
18AWG/2CSHIELDED
EXISTING FIBEROPTIC CABLE FIBER OPTIC
CABLE (GFGI)
INTEGRATEDWITH LOCK
2 STRANDMM FIBER
2 STRAND FIBERCOORDINATE WITH CIT
POWERDISTRIBUTION
MODULE
24VDCPOWER SUPPLY
REMOTEREADER
INTERFACE
RS485 TOFIBERMEDIA
CONVERTER
ETHERNET TOFIBER MEDIACONVERTER
ELECTRICLOCK
REXSWITCH
CARDREADER BMS
BATTERIES
12VDCPOWERSUPPLY
CAMERA
EXISTINGFIBEROPTICPATCHPANEL
120VAC
120VAC
RS485 TO FIBERMEDIA
CONVERTER
ETHERNET TOFIBER MEDIACONVERTER
TO EXISTING VIDEOHEAD END
TO EXISTING ACCESSCONTROL HEAD END
BUILDING 17SECURITY HEAD END LOCATION
BMS
BMS BMS
NEWSUPERVISORY
PANEL
SOUTH DOOR DEVICES NORTH DOOR DEVICES
TO BUILDING 21
EXISTINGSCADA
ENCLOSURE
NEWSCADA
ENCLOSURE
1
4
2
2
3
5
5
3
EXISTING FIBER OPTIC PATCH PANEL CONTAINING 12 STRANDS OFMULTIMODE FIBER OPTIC CABLE AND 12 STRANDS OF SINGLE MODE FIBEROPTIC CABLE. CABLE IS EQUIPPED WITH ST TYPE CONNECTORS.COORDINATE WITH NIH CIT FOR FIBER PATCHING INTO PANEL AND WITHDPSM FOR CONNECTIVITY TO SECURITY HEAD END EQUIPMENT.
PROVIDE FIBER OPTIC CONNECTORS TO INTERFACE TO THE MEDIACONVERTORS AND THE EXISTING FIBER OPTIC PATCH PANEL. COORDINATEWITH NIH CIT.
CONTRACTOR TO VERIFY THAT EXISTING FIBER OPTIC CABLING ISSOURCED FROM THE EXISTING FIBER OPTIC PATCH PANEL. COORDINATEWITH ELECTRICAL CONTRACTOR FOR FIBER OPTIC CABLING ANDCONNECTOR TYPE.
12VDC POWER SUPPLY AS SPECIFIED BY CAMERA BY MANUFACTURER.
PROVIDE AND INSTALL MEDIA CONVERTERS AND CABLING TO EXISTINGHEAD END EQUIPMENT. COORDINATE LOCATION AND CONNECTION TOHEAD END EQUIPMENT WITH DPSM.
KEYED NOTES:1
2
3
4
5
Last
Plo
tted:
File
nam
e:
12345
A
B
C
D
5 4 3 2 1
OFFICE OFRESEARCH FACILITIES
PR
OJE
CT
TITL
E
DR
AWIN
GTI
TLE
MARK DATE DESCRIPTION
REV
ISIO
NS
SEA
LC
ON
TRAC
TOR
SB
UIL
DIN
GP
RO
JEC
TD
RAW
ING
A/E
Nam
e an
d LO
GO
A/E CON. NO.
A/E TASK NO.
CONS. CONTR.
CONS. WORK
PRIME A/E
SUB A/E
CONSTR. CON.
FACILITY CODE
BUILDING NO.
NAME
STREET
CITY
STATE/ZIP
OTHER
BUILDING NO.
PROJ. NO.
PROJ. OFFICER
PROJ. MGR.
SUBMISSION
SUB. DATE
WRK REQ. NO.
Bethesda NIH Campus
9000 Rockville Pike
Bethesda
MD, 20892
ISSUE FOR CONSTRUCTION
11/03/2017
DESIGNED BY
DRAWN BY
CHECKED BY
FILE NAME
DRAWING NO.
SHEET OF 47
AECOM
UPG
RAD
E EL
E CTR
ICAL
SU
BSTA
TIO
N
HHSN292201400001I
HHSN29200011
EDG-2
17
17
DT
JL
C102846
11/2
/201
7 1:
52:0
9 PM
L:\D
CS\
Proj
ects
\BD
L\60
5044
85_S
wtc
hgrU
pg\9
00-W
ork\
910-
CAD
\05-
MO
DEL
S\N
IH_S
WG
R-T
ELEC
OM
v20
15.rv
t
T-601
PR
BM
RW
Project Number
SEC
UIR
TY R
ISER
DIA
GR
AM
47
NOT TO SCALE1 SECURITY RISER DIAGRAM