GENERAL NOTES:
1. ALL PROJECT WORK IS TO BE COMPLETED IN
ACCORDANCE WITH THE MOST UP TO DATE
ONTARIO BUILDING CODE (IF APPLICABLE).
2. ALL DIMENSIONS ARE TO BE VERIFIED ON SITE.
DO NOT SCALE THESE DRAWINGS.
3. ANY DISCREPANCIES MUST BE BROUGHT TO THE
ATTENTION OF THE TORONTO ZOO.
4. CONTRACTORS MUST ADHERE TO TORONTO ZOO
POLICIES AND OH&S ACT AT ALL TIMES WHEN
ON ZOO PROPERTY.
5. CONTRACTORS ARE TO CHECK IN AND OUT AT
SECURITY EVERY TIME THEY ARE ENTERING OR
EXITING ZOO PROPERTY.
6. ADJACENT AREAS MUST BE PROTECTED DURING
SITE WORK, DELIVERY, PLACEMENT AND
INSTALLATION OF THE NEW BUILDING.
7. CONTRACTORS ARE TO MAKE GOOD ANY
DAMAGES INFLICTED BY THEIR WORK TO
ADJACENT AREAS UPON COMPLETION OF THIS
PROJECT.
8. THE CONTRACTOR IS RESPONSIBLE FOR THE
SUPPLY AND INSTALLATION OF ANY MATERIALS
NOT SPECIFICALLY DRAWN OR DESCRIBED BUT
REASONABLY IMPLIED AND NECESSARY FOR
COMPLETION OF WORK WITHOUT ADDITIONAL
COSTS UNDER HIS OR HER CONTRACT.
DRAWING LIST:
1 A0.00 GENERAL NOTES, DRAWING LIST AND KEY PLAN
2 A1.01 EXISTING FLOOR PLAN
3 A1.02 PROPOSED FLOOR PLAN
4 A2.01 CONCRETE WALL (W2) & TRAINING WINDOW
5 A2.02 STEEL FRAME WALL (W1)
6 A2.03 EXISTING PALISADE CONSTRUCTION
DRAWING #:
SCALE:
DRAWN BY:
CHECKED BY:
361A OLD FINCH AVE.
TORONTO, ON
M1B 5K7
REVIEWED BY
REVISIONSNO. DATE
DESCRIPTIONNO. DATE
DATE:
PROJECT #:
MANAGER:
DATE:
CURATOR:
DATE:
APPROVED BY
COO:
DATE:
PALISADE
REPLACEMENT AT
PYGMY HIPPO &
RED RIVER HOG
GENERAL NOTES, DRAWING
LIST & KEY PLAN
18OP01
DG
JJ
2018.05.08
NTS
A0.00
GENERAL NOTES + DRAWING LIST
1
Scale: NTS
KEY PLAN
2
2018.07.25FOR TENDER0
DN
DN
DN
DN
DN TO RED
RIVER HOG
HOLDING
KEEPER
STORAGE
RED RIVER
HOG EXHIBIT
PYGMY HIPPO
EXHIBIT
POOL
POOL
PUBLIC VIEWING
AREA
PUBLIC
VIEWING AREA
REPTILE
EXHIBIT
ABOVE
KEEPER
AREA
PLANTER
DN TO
PYGMY HIPPO
HOLDING
POOL
DEMO PALISADE WALLS (SEE A2.03)
DEMO PALISADE WALLS
REMOVE EXISTING TRAINING LINE &POST AT KEEPER AREA. POST ATSLIDING SHIFT DOOR TO REMAIN.
ANIMAL SHIFT DOOR
REMOVE SHIFT DOOR PULLEY FROM PALISADE- TO BE REINSTALLED ON NEW WALL
DEMO DOOR
SCALE: 3/16" = 1'-0"
FLOOR PLAN
1
2018.07.25FOR TENDER0
DRAWING #:
SCALE:
DRAWN BY:
CHECKED BY:
361A OLD FINCH AVE.
TORONTO, ON
M1B 5K7
REVIEWED BY
REVISIONSNO. DATE
DESCRIPTIONNO. DATE
DATE:
PROJECT #:
MANAGER:
DATE:
CURATOR:
DATE:
APPROVED BY
COO:
DATE:
PALISADE
REPLACEMENT AT
PYGMY HIPPO &
RED RIVER HOG
EXISTING FLOOR PLAN
18OP01
DG
JJ
2018.05.08
3/16" = 1'-0"
A1.01
DN
DN
DN
DN
KEEPER
STORAGE
RED RIVER
HOG EXHIBIT
PYGMY HIPPO
EXHIBIT
POOL
POOL
PUBLIC VIEWING
AREA
PUBLIC
VIEWING AREA
REPTILE
EXHIBIT
ABOVE
KEEPER
AREA
PLANTER
POOL
7'-5"
CONSTRUCT NEW WALL W/ MUD BANK FINISH
CONSTRUCT NEW WALLW/ MUD WALL FINISH
EXAMPLE OF MUD WALLFINISH TO BE ACHIEVEDON NEW WALL
REINSTALL SHIFT DOORPULLEY ON INTERIOR WALL
INSTALL NEW STEEL ACCESS DOOR (SEESPECIFICATIONS. PAINT DOOR TO MATCH NEW WALL.
INSTALL NEW STEEL DOOR (SEE DOOR SPECIFICATIONS).PAINT DOOR TO MATCH NEW WALL.
INSTALL 316" SS AIRCRAFT CABLE
TRAINING LINE. FIX TO SHIFT DOORPOST & NEW WALL W/ EYEBOLT
INSTALL NEW WALL AT KEEPER AREA. INSTALL SSTRAINING WINDOW W/ MESH SCREEN & COVER(SEE A2.01).
DRAWING #:
SCALE:
DRAWN BY:
CHECKED BY:
361A OLD FINCH AVE.
TORONTO, ON
M1B 5K7
REVIEWED BY
REVISIONSNO. DATE
DESCRIPTIONNO. DATE
DATE:
PROJECT #:
MANAGER:
DATE:
CURATOR:
DATE:
APPROVED BY
COO:
DATE:
PALISADE
REPLACEMENT AT
PYGMY HIPPO &
RED RIVER HOG
PROPOSED FLOOR PLAN
18OP01
DG
JJ
2018.05.08
3/16" = 1'-0"
A1.02
SCALE: 3/16" = 1'-0"
FLOOR PLAN
1
2018.07.25FOR TENDER0
3'
2'
MIN
5'
2'
2'
TO PYGMY
HIPPO HOLDING
NEW MUD BANK FINISH WALL
EYEBOLT FOR TRAINING LINEPUBLIC VIEWING
PUBLIC VIEWING
TO PYGMY
HIPPO HOLDING
NEW TRAINING WALL - 2"x2"x 18" SS ANGLE FRAME BOLTED TO CONCRETE WALL
W/ TAPCONS. Ø 14"x2"x2" SS WIRE MESH WELDED TO FRAME ON ANIMAL SIDE.
7'-
6"
7'
7'
4'-
6"
6'-
5"
NOTES:NEW WALLS TO HAVE MINIMUM 5' HEIGHT IN PYGMYHIPPO EXHIBIT (MINIMUM CONTAINMENT HEIGHT).HEIGHT TO VARY FROM 5' TO 9' ORGANICALLY.MATCH HEIGHT OF EXISTING PALISADES.TOTAL LENGTH OF ALL NEW WALLS = APPROX. 70'
NEW TRAINING WALL - FABRICATE SS TRACK FOR COVER PANEL &FIX TO NEW WALL/ EXISTING SLAB W/ TAPCONS. COVER PANEL
TO BE REMOVABLE 12" SEABOARD W/ HANDLE FOR REMOVAL
1'
NEW MUD BANK FINISH WALL
3'
5'
2'
h/3
CIP CONCRETE WALL,REINFORCE AS REQ'D
TRAINING WINDOW -WELDED SS ANGLEFRAME BOLTED TO
CONCRETE WALL
Ø 14"x2x2 SSWIRE MESH
MUD BANK FINISHON EXHIBIT SIDE OF
CONCRETE WALL
PYGMY HIPPO
EXHIBIT
KEEPER SIDE
12" SEABOARD COVERPANEL W/HANDLEFOR REMOVAL
FABRICATE SS TRACKFOR COVER PANEL,BOLTED TO CONCRETEWALL W/ TAPCONS
LEDGE AT NEWTRAINING WALL
INCORPORATED INMUD BANK FINISH
NEW REINFORCEDCIP CONCRETE WALL
PYGMY HIPPO
EXHIBIT
KEEPER SIDE
Ø 14"x2"x2" SS WIREMESH WELDED TO
STEEL ANGLE FRAME
2"x2"x 18" WELDED
SS ANGLE FRAMEFIXED TO WALL W/
TAPCONS
MUD BANK FINISH
REINFORCED CIPCONCRETE WALL
FABRICATE SS TRACK& FIX TO NEW WALL& EXISTING SLAB W/TAPCONS
12" SEABOARDCOVER PANEL
DRAWING #:
SCALE:
DRAWN BY:
CHECKED BY:
361A OLD FINCH AVE.
TORONTO, ON
M1B 5K7
REVIEWED BY
REVISIONSNO. DATE
DESCRIPTIONNO. DATE
DATE:
PROJECT #:
MANAGER:
DATE:
CURATOR:
DATE:
APPROVED BY
COO:
DATE:
PALISADE
REPLACEMENT AT
PYGMY HIPPO &
RED RIVER HOG
CONCRETE WALL (W2)
& TRAINING WINDOW
18OP01
DG
JJ
2018.05.08
AS SHOWN
A2.01
2018.07.25FOR TENDER0
SCALE: 3/8" = 1'-0"
ELEVATION - EXHIBIT SIDE
2
SCALE: 3/8" = 1'-0"
ELEVATION - KEEPER SIDE
1
SCALE: 2" = 1'-0"
TRAINING WALL DETAIL
4
SCALE: 3/4" = 1'-0"
SECTION AT TRAINING WALL
3
4'
2'
Ø4
1 2"
OD
GALV. STE
EL P
OST
IN C
ON
CRE
TE F
OO
TIN
G
MAX 8
' o/
c
MUD
BAN
K FIN
ISH
REBAR
FRA
ME W
ORK
LATH
OVER
REBAR
FRA
ME
PO
URED
CO
NCRE
TE P
IER
FO
OTI
NG
2"
x2"
x9G
A G
ALV. STE
EL C
HAIN
LIN
K M
ESH D
IG B
ARR
IER.
ATT
ACH
TO R
EBAR
FRA
MEW
ORK
AN
D B
URY
ON
PYG
MY
HIP
PO
SID
E (
2'
MIN
BELO
W G
RAD
E)
NO
TES:
NEW
WALLS T
O H
AVE M
INIM
UM 5
' HEIG
HT
IN P
YGM
YHIP
PO
EXHIB
IT (
MIN
IMUM
CO
NTA
INM
EN
T HEIG
HT)
.HEIG
HT
TO V
ARY
FRO
M 5
' TO
9'
ORG
AN
ICALLY.
MATC
H H
EIG
HT
OF E
XIS
TIN
G P
ALIS
AD
ES.
TOTA
L L
EN
GTH
OF A
LL N
EW
WALLS =
APPRO
X. 70
'TO
BE A
PPRO
VED
BY
TZ B
EFO
RE C
ON
STR
UCTI
ON
.
1'
4'
2'
2'
MUD
BAN
K FIN
ISH O
N W
ALL
LATH
OVER
REBAR
FRA
ME
Ø4
1 2"
OD
GALV. STE
EL P
OST
IN C
ON
CRE
TE F
OO
TIN
G
REBAR
FRA
ME W
ORK
PO
URED
CO
NCRE
TE P
IER
FO
OTI
NG
2"
x2"
x9G
A G
ALV. STE
EL C
HAIN
LIN
KM
ESH D
IG B
ARR
IER.
ATT
ACH T
O R
EBAR
FRA
MEW
ORK
AN
D B
URY
ON
PYG
MY
HIP
PO
SID
E. D
IG B
ARI
ER
REQ
UIRE
D A
TPYG
MY
HIP
PO
EXHIB
IT P
ERI
METE
RO
NLY
(2
' M
IN B
ELO
W G
RAD
E)
.
1'
DRAWING #:
SCALE:
DRAWN BY:
CHECKED BY:
361A OLD FINCH AVE.
TORONTO, ON
M1B 5K7
REVIEWED BY
REVISIONSNO. DATE
DESCRIPTIONNO. DATE
DATE:
PROJECT #:
MANAGER:
DATE:
CURATOR:
DATE:
APPROVED BY
COO:
DATE:
PALISADE
REPLACEMENT AT
PYGMY HIPPO &
RED RIVER HOG
STEEL FRAME WALL (W1)
18OP01
DG
JJ
2018.05.08
1/2" = 1'-0"
A2.02
2018.07.25FOR TENDER0
SCALE: 1/2" =
1'-0"
RO
CKW
ORK W
ALL
1
SCALE: 1/2" =
1'-0"
TYPICAL SECTIO
N TH
RU
W
2
2
SCALE: 1/2" =
1'-0"
SECTIO
N TH
RU
W
2 FO
OTIN
G
3
10"
VARI
ES
DEMO WOOD PALISADESAND CONCRETESUPPORTS AS REQUIREDFOR NEW INSTALLATION
10"
VARI
ES
A) WITHOUT CONCRETEB) EMBEDDED IN CONCRETE
VARI
ES
VARI
ES
DRAWING #:
SCALE:
DRAWN BY:
CHECKED BY:
361A OLD FINCH AVE.
TORONTO, ON
M1B 5K7
REVIEWED BY
REVISIONSNO. DATE
DESCRIPTIONNO. DATE
DATE:
PROJECT #:
MANAGER:
DATE:
CURATOR:
DATE:
APPROVED BY
COO:
DATE:
PALISADE
REPLACEMENT AT
PYGMY HIPPO &
RED RIVER HOG
EXISTING PALISADE
CONSTRUCTION
18OP01
DG
JJ
2018.05.08
1/2" = 1'-0"
A2.03
2018.07.25FOR TENDER0
SCALE: 3/4" = 1'-0"
PALISADE CONSTRUCTION
1