General Aviation Terminal & Airport Office Building IMPROVEMENT PROGRAM

Upload: others

Post on 27-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

General Aviation Terminal & Airport Office BuildingIMPROVEMENT PROGRAM

Page 2: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 2

1Evaluate Existing Conditions

Page 3: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

1

3

Review Existing DocumentationOriginal Construction – 1997

Structural Assessment- 2006

North and South Additions- 2008

Restrooms and Vending Expansion- 2011

Evaluate Existing Conditions

Page 4: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

1

4

Existing Conditions AssessmentFacility Assessment Report & Engineer’s Systems Analysis required for Terminal Improvements

• Architectural

• Life Safety/ Code Compliance

• Civil

• Structural

• HVAC

• Plumbing

• Electrical

Evaluate Existing Conditions

Facility Assessment ReportGeneral Aviation Terminal

and Airport Office Building

Page 5: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 5

2Program and Goals

Page 6: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

2

6

GAT Level 1: FBO Facility

• More impressive Lobby and Customer spaces

• “Front door to Naples”

• CSR facilities- improve counters, line of sight

to customer and airfield

• Customer Seating- provide more open area for

seating and variety of spaces

• Café space- supported by Catering company

• Reduce Car Rental Space and allocate to

Customer space

• Flight Planning Relocated

• Line Support needs additional space

Program and Goals

Page 7: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 7

GAT Level 2: Administration Offices

• Additional space for staff

• More offices

• More storage

• Better filing and office supplies areas

• Additional meeting spaces

2Program and Goals

Page 8: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

2

8

AOB Exterior

• Renovate exterior to better match GAT

• Remove metal siding and replace with painted

stucco to match

• Add metal sunshades to match

• Add Covered Canopy connection to GAT

• Replace existing pedestrian canopy

• Add GSE Storage Canopy to west side of

Hangar

Program and Goals

Page 9: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

2

9

AOB Interiors

• Renovate Common Entry Corridor

New finishes, paint, ceilings and lights

• Renovate Restrooms

New plumbing fixtures, floor tile, paint,

ceilings and lights

• Renovate Elevator finishes

Program and Goals

Page 10: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 10

Site- LandsideSite Planning

Utility Design and Relocations

Parking Reconfiguration

Coordination with Existing Valet Operations

Walkway to Offices

New AOA Access Gate

Signage/Wayfinding Improvements

Landscape and Screen Wall Additions

2Program and Goals

Page 11: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 11

Site- Airside

Fuel Truck Parking Locations

AOA Access

GSE Parking

Utility and Manhole Relocations

Potential Airside Canopy

Airspace- Temporary and Permanent

Aircraft Parking and Hangar Access Analysis

2Program and Goals

Page 12: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

3Design

12

Page 13: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

3

13

GAT Level 1: FBO Facility

• More impressive Lobby and Customer spaces

• “Front door to Naples”

• CSR facilities- improve counters, line of sight

to customer and airfield

• Customer Seating- provide more open area for

seating and variety of spaces

• Café space- supported by Catering company

• Reduce Car Rental Space and allocate to

Customer space

• Flight Planning Relocated

• Line Support additional space

• Build out GSE Garage areas

Design

Existing

Proposed

Page 14: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

3

14

Design Enlarged Proposed Plan

Page 15: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 15

GAT Level 2: Administration Offices

• Additional space for staff

• Adds 2 net offices

• Adds more storage

• Better filing and office supplies areas

• Convert 3 modular office back to 2nd

Conference Room

3Design

Existing

Proposed

Page 16: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 16

3DesignOverall Second Floor Plan

Page 17: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 17

Site

• Add Vehicular AOA Gate

• Widen Arrival/Departure Lane

• Relocate rental car parking

• Relocate Lavatory Dump Station

• Repair paving and inlet structures

• Enhance Landscaping

• Relocate GSE Parking

3Design

Page 18: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 18

3D Study Model Images- Landside Canopy3Design

Page 19: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 19

3D Study Model Images- Connector Canopy3Design

Page 20: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

4Construction Phasing

20

Page 21: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

4

21

Construction Phase 1

• Build GSE Storage at east side of AOB

• Renovate AOB Core and Restrooms

Page 22: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

4

22

Construction Phase 2

• Renovate current GSE Bays to interior space

• Relocate Line Support to Temporary Modulars on Ramp and renovate Line Support areas

Temporary Modulars

Page 23: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

4

23

Construction Phase 3

• Move Line Support back to renovated area

• Utilize modularsforCustomer Lobby

• Renovate Customer areas

• Construct New Drop off Canopy

Temporary Modulars

Page 24: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

4

24

Construction Second Floor

• Second floor renovation can happen while occupied

• Work areas demised

Page 25: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

5Cost Analysis

25

Page 26: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 26

4Cost Analysis

Conceptual Level ROM EstimateConstruction Costs

GAT Renovation = $ 2,500,000

AOB Renovation = $ 1,250,000

Site Renovation = $ 220,000

Renovation Total = $ 3,970,000

--

Page 27: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

6New General Aviation Terminal

27

Page 28: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 28

6New General Aviation Terminal

Site Plan

• Demo (1) Existing Hangar and Locate

Terminal at end of Radio Road for

• Arrival on axis and prominence on site

• Centered on aircraft Ramp

• Increased Parking from 124 spaces to

approximately 200

Page 29: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 29

Concept6New General Avaition Terminal

Page 30: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 30

6New General Aviation Terminal

Page 31: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 31

6New General Aviation Terminal

Page 32: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 32

6New General Aviation Terminal

Page 33: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 33

6New General Aviation Terminal

Page 34: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 34

6New General Aviation Terminal

Conceptual Level ROM EstimateConstruction Costs

26,000 sf Two Story Terminal

Site Work = $ 4,200,000

Terminal Building = $ 14,200,000

Total Project Hard Costs = $ 18,400,000

--

Page 35: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements

7New General Aviation TerminalOption 2- South Parcel

35

Page 36: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 36

7New General Aviation TerminalOption 2- South Parcel

Page 37: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 37

7New General Aviation TerminalOption 2- South Parcel

Page 38: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 38

7New General Aviation TerminalOption 2- South Parcel

Page 39: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 39

7Conceptual Level ROM EstimateConstruction Costs

Site Work = $ 16,000,000

Terminal Building = $ 14,200,00026,000 sf Two Stories

Storage Hangars = $ 6,400,000(2) 20,000 sf

GSE/Office/Line = $ 700,0004,000 sf

Total Project Hard Costs = $ 37,300,000

New General Aviation TerminalOption 2- South Parcel

Page 40: General Aviation Terminal & Airport Office Building · 2019. 10. 31. · GAT and AOB Improvements. 1. 3. Review Existing Documentation. Original Construction – 1997 Structural Assessment

GAT and AOB Improvements 40

Questions/Comments