6
GEM Mock-up in 904 Saleh Muhammad National Centre for Physics QAU Islamabad Ian Crotty CERN 08/08/2014 GE1/1 Technical Coordination Meeting - August 08, 2014

Upload: others

Post on 25-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GEM Mock-up in 904 - CERN · •Gas and cooling lines with at the Mock-up position. •Pipes and cable •Connectors and unions •Power supply for resistors •Vertical wood station

GEM Mock-up in 904

Saleh Muhammad

National Centre for Physics QAU Islamabad

Ian Crotty

CERN

08/08/2014 GE1/1 Technical Coordination Meeting - August 08, 2014

Page 2: GEM Mock-up in 904 - CERN · •Gas and cooling lines with at the Mock-up position. •Pipes and cable •Connectors and unions •Power supply for resistors •Vertical wood station

Outlines

• Super Chamber Patch Panel

• GEM Mock-up structure idea

• Objectives

• Requirements in General but for preciselist we are working

08/08/2014 GE1/1 Technical Coordination Meeting - August 08, 2014

Page 3: GEM Mock-up in 904 - CERN · •Gas and cooling lines with at the Mock-up position. •Pipes and cable •Connectors and unions •Power supply for resistors •Vertical wood station

Patch Panel Services • High Voltage (Ian and Saleh)

• Low Voltage (Ian and Saleh)

• Gas (Ian and Saleh)

• Coolant (Antonio, Plamen and Georgi)

• Optical readout connector (Yifan Yang)

• Alignment (Zoltan)

G G

C C

O.F O.F O.F O.F O.F

O.H.P H

LV

LV LV. APP 45

A

H HV. Jupiter Connector

G

08/08/2014 GE1/1 Technical Coordination Meeting - August 08, 2014

Page 4: GEM Mock-up in 904 - CERN · •Gas and cooling lines with at the Mock-up position. •Pipes and cable •Connectors and unions •Power supply for resistors •Vertical wood station

GEM Mock-up Structural Idea

• 40° • 4 super chambers • 8 chambers total

08/08/2014 GE1/1 Technical Coordination Meeting - August 08, 2014

Page 5: GEM Mock-up in 904 - CERN · •Gas and cooling lines with at the Mock-up position. •Pipes and cable •Connectors and unions •Power supply for resistors •Vertical wood station

Objectives • Finalization of the Patch Panel

• Gas circulation studies in sector.

• Coolant prototype

• Cables and pipes routing

• For gas impedance measurement a real GEM with all stuff inside is requested to Brian, he has two GE1/1-3. He is agreed to provide at least one for this test.

08/08/2014 GE1/1 Technical Coordination Meeting - August 08, 2014

Page 6: GEM Mock-up in 904 - CERN · •Gas and cooling lines with at the Mock-up position. •Pipes and cable •Connectors and unions •Power supply for resistors •Vertical wood station

General Requirements (Precise list will be presented latter)

• 4 SCs structure (2 are available + 2 needed)

• Coolant mechanical structure for 4 SCs

• Gas and cooling lines with at the Mock-up position.

• Pipes and cable

• Connectors and unions

• Power supply for resistors

• Vertical wood station with all accessories to install the mock-up.

• Temperature and humidity sensors and their readout