Basements & Underground Structures Conference
6th October 2010
INTEGRATING GEOTHERMAL LOOPS INTO THE DIAPHRAGM WALLS OF THE
KNIGHTSBRIDGE PALACE HOTEL PROJECT
Tony Amis, Geothermal International Limited
Christopher A. W. Robinson, Cementation Skanska Ltd
Samuel Wong, WSP Cantor Seinuk
© Geothermal International
![Page 2: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/2.jpg)
• Introduction – Tony Amis• Structural Perspective - Sam Wong• Designing the Energy Wall – Chris Robinson• Designing the Geothermal solution – Tony Amis• Installing Geothermal Loops – Tony Amis
© Geothermal International
INTEGRATING GEOTHERMAL LOOPS INTO THE DIAPHRAGM WALLS
OF THEKNIGHTSBRIDGE PALACE HOTEL PROJECT
![Page 3: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/3.jpg)
Introduction - Tony Amis
© Geothermal International
![Page 4: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/4.jpg)
Geothermal Solutions
© Geothermal International
![Page 5: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/5.jpg)
© Geothermal International
EnergyPiles® Installed in the UK to Date
![Page 6: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/6.jpg)
Energy Walls ®
© Geothermal International
![Page 7: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/7.jpg)
Energy Walls ®
© Geothermal International
![Page 8: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/8.jpg)
Opportunities For Crossrail
1km of Diaphragm wall or piles - 40m deep could provide..
• 500kW of Peak Heating• 500kW of Peak Cooling• Save 350 tonnes of CO2 per Annum• Reduce Energy Bill by approx £90k per annum when
compared against conventional systems
© Geothermal International
![Page 9: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/9.jpg)
Knightsbridge Palace Hotel First Energy Diaphragm Wall Project in UK
© Geothermal International
• System:– Diaphragm Wall &
Energy Piles®
• Size:– 150kW Heating– 150kW Cooling
• Collector type:– 50 Energy Piles– 150m Energy D. Wall
• On Site:– D. Wall underway– Piling start Feb 2010
![Page 10: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/10.jpg)
Knightsbridge Palace Knightsbridge Palace HotelHotel
Structural PerspectiveStructural Perspective
Dr. Sam WongBSc PhD FIStructE MICE MASCEContact: [email protected] +44 207 314 4674
![Page 11: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/11.jpg)
Building dataBuilding data
• 6 basement levels, 22m deep6 basement levels, 22m deep• 1010 storeys above ground storeys above ground• Plain RC and PTPlain RC and PT• Steelwork at G/F to B2 for long span structure (up to 15m) Steelwork at G/F to B2 for long span structure (up to 15m)
over ballroom over ballroom • Major transfer beams at Level 1 and transfer slabs at Major transfer beams at Level 1 and transfer slabs at
upper level set-backs.upper level set-backs.• Incorporating geothermal loops in Diaphragm wall and load Incorporating geothermal loops in Diaphragm wall and load
bearing pilesbearing piles
![Page 12: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/12.jpg)
Bridge over Raphael Bridge over Raphael StreetStreet
![Page 13: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/13.jpg)
Section adjacent to Raphael StreetSection adjacent to Raphael Street
![Page 14: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/14.jpg)
![Page 15: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/15.jpg)
![Page 16: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/16.jpg)
Diaphragm wallgeothermal pipework (Slinky)
![Page 17: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/17.jpg)
Plunge column Plunge column constructionconstruction
![Page 18: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/18.jpg)
Top down construction Top down construction sequencesequence
Stage 1Stage 1
![Page 19: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/19.jpg)
Stage 2Stage 2
![Page 20: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/20.jpg)
Stage 3Stage 3
![Page 21: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/21.jpg)
Stage 4Stage 4
![Page 22: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/22.jpg)
Stage 5Stage 5
![Page 23: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/23.jpg)
Stage 6Stage 6
![Page 24: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/24.jpg)
Stage 7Stage 7
![Page 25: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/25.jpg)
Stage 8Stage 8
![Page 26: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/26.jpg)
Stage 9Stage 9
![Page 27: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/27.jpg)
Stage 10Stage 10
![Page 28: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/28.jpg)
Stage 11Stage 11
![Page 29: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/29.jpg)
Stage 12Stage 12
![Page 30: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/30.jpg)
Stage 13Stage 13
![Page 31: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/31.jpg)
Ground movement assessmentGround movement assessment
![Page 32: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/32.jpg)
![Page 33: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/33.jpg)
Building when completed
![Page 34: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/34.jpg)
Designing The Diaphragm Wall
Chris Robinson Cementation Skanska
© Geothermal International
![Page 35: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/35.jpg)
Knightsbridge Palace Hotel
![Page 36: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/36.jpg)
36
Scope of geotechnical works
35 No. plunge column Energy Piles®, max. 61.5m deep
15 No. tension piles, max. 47.5m deep
Approx. 155 lin. m 800mm wide Energy Wall® (Diaphragm wall panels with integrated
geothermal loops), max. 36m deep
6 storey basement, max. dig depth 24m
![Page 37: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/37.jpg)
37
Ground conditions
General sequence:-
EGL – 9.00m OD Made ground
9.00 – 4.50m OD Firm silty clay
4.50 – -2.00m OD Terrace Gravels
-2.00 – EOH London Clay
![Page 38: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/38.jpg)
38
Diaphragm Energy Wall® Construction
Conventional construction
Hydraulic grab – crane mounted
Panels excavated under bentonite support fluid
![Page 39: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/39.jpg)
39
Pile and Diaphragm Energy Wall® Layout
![Page 40: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/40.jpg)
40
Diaphragm Energy Wall® Panel Layout
199 Knightsbridge
Knightsbridge Palace Hotel
![Page 41: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/41.jpg)
41
Principle issues
Attaching loops to D-wall cages
Maintaining integrity of loops
Testing loops during panel construction
Mitigating additional cage congestion
Maintaining high quality construction
Ensure no adverse effect of panel construction programme
![Page 42: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/42.jpg)
42
Cage and loop installation
![Page 43: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/43.jpg)
43
Rebar cage detailing with loops
![Page 44: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/44.jpg)
44
FF Cover Increase – Rebar Requirements
![Page 45: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/45.jpg)
45
Cage detailing to maintain quality
![Page 46: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/46.jpg)
Designing The Geothermal Solution
Tony Amis Geothermal International
© Geothermal International
![Page 47: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/47.jpg)
Knightsbridge Palace Hotel First Energy Diaphragm Wall Project in UK
© Geothermal International
• System:– Diaphragm Wall &
Energy Piles®
• Size:– 150kW Heating– 150kW Cooling
• Collector type:– 50 Energy Piles– 150m Energy D. Wall
• On Site:– D. Wall underway– Piling start Feb 2010
![Page 48: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/48.jpg)
Knightsbridge Palace Hotel Schematic
© Geothermal International
![Page 49: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/49.jpg)
What are the issues with installing loops in wall piles and diaphragm walls
• What are the effects of transferring heat into piles to provide cooling?
• What are the effects of cooling piles to provide heating?
• What are the thermal effects of removing soil from one face to form basement?
© Geothermal International
![Page 50: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/50.jpg)
Key Energy Pile® / Wall Research to date
• Brandl 2006 – reported on several projects across Austria concluded that shaft resistance, base pressure and bearing resistance of soil are not affected by heat absorption and that temperature induced settlement or heave negligible
• Laloui 2006 – Identified that the heating-cooling process of the building foundations induces significant modifications in the soil-structure leading to additional stresses in the piles, decrease of the lateral friction and the possibility of a gap between the pile and the soil
• Bourne Webb et al 2009 - temperature change in piles leads to increases and decreases in shaft resistance and axial load. Working stresses in pile should be kept low, and maintain high factor of safety on shaft to withstand heating and cooling loads
© Geothermal International
![Page 51: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/51.jpg)
What conductivity values should be used in ground loop design?
© Geothermal International
Basement
Energy Diaphragm wall / Pile
One side of wall exposed
Geothermal Loop
wall completely buried
![Page 52: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/52.jpg)
Geothermal International Research & Development at Knightsbridge Palace Hotel
Stage 1: Installation of loops in diaphragm wall - completed
© Geothermal International
![Page 53: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/53.jpg)
Stage 2: Undertake conductivity test prior to excavation – February 2010
© Geothermal International
Diaphragm wall
Geothermal Loop
![Page 54: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/54.jpg)
Stage 3: Undertake second conductivity test once excavation complete – December 2010
© Geothermal International
Basement
Energy Diaphragm wall / Pile
One side of wall exposed
Geothermal Loop
wall completely buried
![Page 55: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/55.jpg)
Stage 4: Report Results 2011
© Geothermal International
![Page 56: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/56.jpg)
Installation of Geothermal Loops
Tony Amis Geothermal International
© Geothermal International
![Page 57: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/57.jpg)
Pre-installation Quality Control & Testing
![Page 58: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/58.jpg)
Lifting the DWall Cage
![Page 59: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/59.jpg)
Installing the Loops
![Page 60: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/60.jpg)
Installing the Loops
![Page 61: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/61.jpg)
Installing the second cage
![Page 62: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/62.jpg)
Fixing the loops to the cage
![Page 63: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/63.jpg)
© Geothermal International
![Page 64: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/64.jpg)
Trimming and Protecting
![Page 65: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/65.jpg)
Pre-concrete Pressure Test
![Page 66: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/66.jpg)
Concreting the DWall
![Page 67: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/67.jpg)
Key Lessons learnt• Ensure early coordination between all parties at all stages of
the project– Design team– Construction team
• Keep it simple – Minimise joints in loops where possible– Prefabricate loops– Pressure test loops at key stages
• Build-ability issues– Good Preparation– Good coordination between Contractors– Avoid men having to place hands in cages
© Geothermal International
![Page 68: GE Presentation 6th October 2010](https://reader033.vdocuments.mx/reader033/viewer/2022061111/54556565af79593f4a8b678d/html5/thumbnails/68.jpg)
Thanks For Listening
For More Information on Ground sourced heating and Cooling Systems Contact
Tony Amis at [email protected] T: 0247 6673131
Chris Robinson at [email protected] T: 01302 821114 Dr. Sam Wong at [email protected] T 0207 314 4647
© Geothermal International