1 GE Title or job number

5/10/2012

GE Aeroderivative gas turbines for highly efficient and flexible power generation and grid services Sofia – May 11th

2 GE Title or job number

5/10/2012

Today’s global energy needs

2

8.9B Expected world population by 2050 — to our current 7 billion

20% World without electricity

35% Expected increase in electricity demand by 2020

2030 Projected global water demand to outpace supply by 40%

3 GE Title or job number

5/10/2012

Issues facing the energy industry today

Energy security Emissions F

ue

l co

sts

Fuel diversification

An

cill

ary

ma

rke

t o

pp

ort

un

itie

s Economic uncertainty

Resource Scarcity

Aging assets

Ch

an

gin

g

reg

ula

tory

la

nd

sca

pe

Grid stability

Increasing renewables

3

4 GE Title or job number

5/10/2012

GE Energy works connecting people and ideas

everywhere to create advanced technologies for powering a cleaner,

more productive world

5 GE Title or job number

5/10/2012

GE Energy

5

Oil & Gas Power & Water Energy Management

Drilling & Surface

Global Services

Measurement & Control

PII Pipeline Solutions

Subsea Systems

Turbomachinery

Aeroderivative Gas Turbines

Gas Engines

Nuclear Energy

Power Generation Services

Renewable Energy

Thermal Products

Water & Process Technologies

Digital Energy

Industrial Solutions

Power Conversion

6 GE Title or job number

5/10/2012

LMS100 100MW

CF6-80C2/E1 LM6000

LM2500

LM2500+/G4

TF39/CF6-6

40-55MW

18-24MW

28-34MW

Aviation heritage

5/10/2012

7 GE Title or job number

5/10/2012 5/10/2012

LM6000 … 40 to 50+ MW @ 42% efficiency • 1000th unit shipped … +21.5 mln hrs

• New PG & PH … higher performance same GT shape

• Fast Response flexible CC … 150MW @ 53% • DLE – no need of water for emissions control

• Dual fuel … Ethanol capable

LMS100 … 100 MW @ 44% in SC • New waterless emission control technology

(DLE2.0)

• Global acceptance: 44 ordered / 23 in operation

• Unique design for excellent hot day performance

LM2500 … 24 to 34 MW @ 41% eff • 1300 units installed … +58 million hours

• 60 LM2500+G4 orders with 99% reliability and one million hours by 2012

• Dual fuel … DLE …

• TM2500 Mobile units Rental/Sales

• LM1800e … 18MW solution

7

New technology

8 GE Title or job number

5/10/2012

Serving the global industry

Industrial • Efficiency

• Reliability

• Availability

• Flexibility

• Low Emissions

> 3,300 LM units in the field

> 85 million operating hrs

> 76 countries

Marine

Platform

Pipeline District Heating

Wind farm

Utility

Mobile Power

9 GE Title or job number

5/10/2012

Applications

10 GE Title or job number

5/10/2012

Peaking and grid support

11 GE Title or job number

5/10/2012

NYPA – Power Now! Project

New York was facing severe power shortages in 2001

Six sites were selected to add capacity quickly

Widely distributed throughout the city

Close to Manhattan,the major load centers

12 GE Title or job number

5/10/2012

Technology selection

LM6000 gas turbines were chosen for the following reasons:

• Ability to deliver close to 50MW per unit in an area smaller than 5000m2

• Quick delivery and ease of installation

• Proven performance and reliability

– High simple cycle efficiency

– Load following capability

– Ability to start in 10 minutes

• Environmentally friendly

– low emissions and noise

13 GE Title or job number

5/10/2012

150ft/46m 300ft/ 92m

Pouch Terminal in Staten Island

Residential area

Shopping center

LM6000

4

14 GE Title or job number

5/10/2012

LNG Regasification

Zeebrugge, Belgium 1xLM6000-PD

The heart of the CHP facility is a gas turbine type LM6000 that generates 40 MW of electrical power. The hot exhaust gases from the turbine pass through a heat recovery tower and transfer their heat to raise the temperature of a closed hot water circuit. This hot water will then be circulated and injected in the waterbath of the vaporisers and transfer its heat to regasify the LNG.

Source courtesy of : Fluxys; Gaz de France LNG Carrier at Montoir, France

CHP LNG Regas – 1xLM6000-PD

Treatment of

boil-off gas

Recondensor

Unloading

gantry

LNG Carrier

130,000m3

Flow to vaporizers

2514m3/hr @ 40ºC

LNG Pumps

Quenching

200m3/hr @15ºC

Submerged

gas burners

Vaporisers

Natural Gas

Return vaporizers

2300m3/hr @ 15ºC

Bypass heater

Alternator

LM6000-PD

Gas Turbine

15 GE Title or job number

5/10/2012

Renewables sustainability

16 GE Title or job number

5/10/2012

ENIPOWER Challenge: Increase efficiency and power recovery cogeneration in comparison with the existing plant while reducing NOx and CO limits imposed by the law in force.

Solution: LM6000-PF Sprint aero derivative gas turbine and related services.

Results: The new plant will have a flexibility of operation reached by the modular structure of type of machine chosen and by the use of heat power accumulators. The network will extend to ring for about 52 km and will provide heat and hot water for 20.000 homes while reaching the respect of NOx and CO limits.

17 GE Title or job number

5/10/2012

Industrial Cogen ALBAPOWER Challenge: AlbaPower is an on purpose company by Ferrero S.p.A. and Egea S.p.A. Ferrero needed of substituting two old plants with one able to produce energy at lower costs.

Solution: 1x LM6000 PD SPRINT

Results: The plant supplies both electrical (400 GW-h per year) and thermal power to the factory Ferrero in Alba and electrical power for Egea’s customers. It supplies heat power to the district heating grid of the town of Alba.