gcc lab: update & future perspective...competitive advantages americas powertech kinectrics...
TRANSCRIPT
GCC Lab: Update & Future PerspectiveBeirut
October 24, 2017
Omaintec– 2017 – Lebanon
Saudi Aramco: Public
GCC Lab’s International Partnership
Omaintec– 2017 – Lebanon
To Provide an Overview on Testing &
Certifications’ Business Opportunities
GCC Lab as a Successful Case
OBJECTIVE
Outlines
1 Strategic Drives
2 Competitive Advantages
3 Business Portfolio
4 Partnerships & Collaboration
5 Development Update
6 Remarks
GCC Cigre – 2017 – Muscat - Oman
Outlines
1 Strategic Drives
2 Competitive Advantages
3 Business Portfolio
4 Partnerships & Collaboration
5 Development Update
6 Remarks
GCC Cigre – 2017 – Muscat - Oman
All drivers are in support of a GCC electrical lab
Localization
incentives
for electrical
manufacturing
Focus on
efficiency and
adoption of new
technologies
Large
and growing
electricity demand
Favourable
GCC national
agendas
1 2
4 3
Strategic Drives
Localization
incentives
for electrical
manufacturing
Focus on
efficiency and
adoption of new
technologies
Large
and growing
electricity demand
Favourable
GCC national
agendas
1 2
4 3
Strategic Drives
GCC COMMON ECONOMIC DEVELOPMENT THEMES
Expanding the Productive Base
Building a Diversified Economy
Enhancing Market Efficiency
National agenda of GCC countries1
Saudi Arabia
QATAR
UAE
Bahrain
Kuwait
OMAN
Localization of Knowledge & Industry
Strategic Drives
Localization
incentives
for electrical
manufacturing
Focus on
efficiency and
adoption of new
technologies
Large
and growing
electricity demand
Favourable
GCC national
agendas
1 2
4 3
Strategic Drives
GCC Cigre – 2017 – Muscat - Oman
GCC Installed Power Generation CapacityGigawatts, 2016-2030
Source: Business Monitor International (BMI)
2
Strategic Drives
Localization
incentives
for electrical
manufacturing
Focus on
efficiency and
adoption of new
technologies
Large
and growing
electricity demand
Favourable
GCC national
agendas
1 2
4 3
Strategic Drives
Strategic Drives
GCC countries localization initiatives
KSA• Saudi Vision 2030: Localize Manufacturing to 75%,
renewables, industrial equipment manufacturing
• Emiratization Initiative: Employ its citizens in a meaningful
and efficient manner in the public and private sectors
• In-Country Value (ICV) program: Maximize capital spend in
Oman for a variety of manufacturing activities
• Qatar 2030 Vision: Natural resource management and
development of knowledge based economy
• Kuwaitization Law: Increase Kuwaiti’s percentage in the private
sector to enhance knowledge transfer and localization
• Bahrainization: Bring more Bahraini citizens into the workplace and
reduce reliance on expats
3
UAE
Oman
Qatar
Kuwait
Bahrain
Localization
incentives
for electrical
manufacturing
Focus on
efficiency and
adoption of new
technologies
Large
and growing
electricity demand
Favourable
GCC national
agendas
1 2
4 3
Strategic Drives
Renewables solar targets by countryUSD billion, Gigawatts
1.Assuming a 25-30% percent drop in solar CAPEX in the short term and excluding storage costSource: Saudi 2030 vision, Sun&Life, KACARE
46GW Capacity Over $50 billion of investments by 2032
UAE3.0B$ 2020
1.5 GW
Oman0.5B$ 2015
0.2 GW
Qatar1B$ 20180.5 GW
Kuwait0.5B$ 2014
0.2 GW
KSA~50B$1 2032
41 GW
4
Strategic Drives
All drivers are in support of a GCC electrical lab
Localization
incentives
for electrical
manufacturing
Focus on
efficiency and
adoption of new
technologies
Large
and growing
electricity demand
Favourable
GCC national
agendas
1 2
4 3
Strategic Drives
Outlines
1 Strategic Drives
2 Competitive Advantages
3 Business Portfolio
4 Partnerships & Collaboration
5 Development Update
6 Remarks
Competitive Advantages
1. 1st Mover in a Growing Market
2. Strategic Shareholders
3. International Partners
4. Strategic Location
5. Regional Focus on Quality & Certification
Competitive Advantages
Americas
Powertech
Kinectrics
LAPEM CFE
DNV GL – KEMA
Manitoba Hydro
Cepel
Eaton Corporation
S&C Electric Co.
Europe
VEIKI – VNL ICMET Charles Parsons Schneider Volta Labs
CESI Tecnalia TDHVL PSW Siemens
CESI (2 labs) EGU ABB – NEFI Ormazabal
DNV GL – KEMA SEDIVER ABB AB EDP
DNV GL – KEMA LCOE – FFII ABB Brugg Cables
IPE STRI AB EDF
Industrial – HV and HP1 laboratories
HV HP
HP
HV HP
HV HPHV HP
HV HP
HV
HV HP
HV HP
HV HP
HV HP
HV HP
HV
HV
HV
HV
HV
HV
HP
HP
HV
HV
HV HP
HV
HV
HV HP
HV
HV HP
HV HP
Manufacturer or utility labs
Independent 3rd party labs
APAC
Central Power Research Institute
ERDA
HGK
KERI
Ausgrid (Lane Cove)
Xi’an HV Apparatus
Hitachi
Meidensha Corp
Mitsubishi
NGK Insulators
Nissin Electric
Toshiba
HV HP
HV HP
HV HP
HV HP
HV HP
HV HP
HP
HV HP
HV HP
HV HP
HV HP
HV HP
HV HP
HP
HV-High Voltage /HP–HighPowerSource: Project team
Competitive Advantages
1. 1st Mover in a Growing Market
2. Strategic Shareholders
3. International Partners
4. Strategic Location
5. Regional Focus on Quality & Certification
10 Shareholders (Market Leaders)
End Users 70 %
Manufacturers 10%
Neutral 20%
Right Mix
Competitive Advantages
1. 1st Mover in a Growing Market
2. Strategic Shareholders
3. International Partners
4. Strategic Location
5. Regional Focus on Quality & Certification
Saudi Aramco: Public
Key Highlights
LV, MV, HV & HP Services
Design & QA
Asset Management
Consultation & Training
Marketing Services
R&D Services
Exclusivity:
Middle East
North Africa
Turkey
GCC Power LabPartnership with CESI-Italy
Saudi Aramco: Public
Key Highlights
Testing of Solar Cells
DC Systems
Feasibility & bankability Studies
Smart Meters
Safety/Efficiency
Audits
Training & Certification
R&D
Exclusivity:
GCC Countries
Middle East
GCC Renewable & Safety LabPartnership with UL-USA
Saudi Aramco: Public
Key Highlights
Calibration Services
On-site Inspection
Testing & Certifications
Training
GCC Calibration Partnership with Motabaqah
Saudi Aramco: Public
1 Optimize Quality, Time & Cost
2 Create Knowledge Economy
3 Localize Manufacturing & Services
4 Create High-skilled Jobs
5 Promote Applied R&D
6 Retrofit Solutions for Obsolescence
GCC Lab Benefits to the GCC/MENA
GCC Cigre – 2017 – Muscat - Oman
Competitive Advantages
1. 1st Mover in a Growing Market
2. Strategic Shareholders
3. International Partners
4. Strategic Location
5. Regional Focus on Quality & Certification
27Saudi Aramco: Public
Key Highlights
• 136,000 SQM.
• 20 years lease.
• Right to rent to JV
• Waived liquidated damages.
• Site Preparation
GCC Lab Land AllocationModon–Dammam 3
Site
– Area of 140,000 m2
– Adjacent to EIC
Road
– Abqaiq Highway
– GCC highway
Air & Seaports
– KFIA- Dammam
– King Abdul-Aziz Seaport
Rail
– Abqaiq Railway Station
– Rail connection to Dammam 3
1
2
7
8
3
4
6
5
Competitive Advantages
1. 1st Mover in a Growing Market
2. Strategic Shareholders
3. International Partners
4. Strategic Location
5. Regional Focus on Quality & Certification
Outlines
1 Strategic Drives
2 Competitive Advantages
3 Business Portfolio
4 Partnerships & Collaboration
5 Development Update
6 Remarks
30Saudi Aramco: Public
iii. Accelerate
business growth
i. Develop
internal capabilities
iv. Establish
partnerships
ii. Build
infrastructure
Long-term strategic objectives
Vision
Mission
Short-term strategic priorities
1
2
3
4
Business goals
5
I. Provide world
class TIC services
in the power sector
II. Attain financial
sustainability
III. Advance local
innovation &
knowledge Economy
IV. Develop local
workforce
Achieve global leadership in testing, inspection, certification and innovation for the power Industry
Advance safety, efficiency and innovation in the GCC power sector by profitably delivering
world class services and solutions enabled by highly skilled people, efficient workflows and
state of the art operating facilities
2017
• US$ 1 million revenues
• Preferred TIC1 services vendor with SEC and Saudi Aramco
• 2 major Saudi customers acquisition
2018
• US$ 5 million revenues
• 1st non-KSA GCC customer
2019
• US$ 7 million revenues
• 2nd non-KSA GCC customer
2017
• Efficient operating model deployment
• Support functions and enablers implementation
• HR plan execution for Calibration & Testing labs
2018
• HR plan execution for Renewables & Smart Grid lab
2019
• HR plan execution for Industrial lab (Phase 1)
2017
• JV partnership for Renewables & Smart Grid lab
• JV partnership for Industrial labs
• R&D strategy development
2018
• Partnership for Appliances & Electronics lab
• Partnership to provide training to GCC Lab personnel
2019
• Strategic partnership with international R&D organization
2017
• 4 fully operational Calibration & Testing labs
• Asset company establishment
• Fully fledged IT capabilities & systems
• Operational Renewables & Smart Grid lab Phase 1
2018
• Fully operational Renewables & Smart Grid lab
2019
• Fully operational Industrial labs (Phase 1)
1. Testing, Inspection and CertificationSource: Project team
GCC Lab- Strategic Objectives
GCC Cigre – 2017 – Muscat - Oman
Saudi Aramco: Public
Operating Model
Operating Model that facilitates agility for specialized & competitive growth.
Calibration & Testing
Industrial (Power Lab) OpCo
Renewables & Smart Grid
Eq
uity
Div
ide
nd
s
Dividends
Asset leasing
contract
Leasing payments
Equity EquityFunding and Services
Holding Company (Corporate)
Industrial Asset Company
Dividends Profits
JV JVProfit center
Debtfunding
Debt capital
Interests and debt
repayments
GCC Cigre – 2017 – Muscat - Oman
Outlines
1 Strategic Drives
2 Competitive Advantages
3 Business Portfolio
4 Partnerships & Collaboration
5 Development Update
6 Remarks
GCC Cigre – 2017 – Muscat - Oman
Saudi Aramco: Public
Key Highlights
Assessment Studies
R&D
Test Fields
Standards Development
Workshops
GCC Lab CollaborationsCollaboration with KACARE
GCC Cigre – 2017 – Muscat - Oman
Saudi Aramco: Public
Key Highlights
Standards Development
R&D
Testing & Certifications
Consultations
GCC Lab CollaborationsCollaboration with KACST
GCC Cigre – 2017 – Muscat - Oman
Saudi Aramco: Public
Courses’ Topics:
Electrical Safety (Arc Flash)
Equipment Testing & Certifications
Calibration
Solar Field O&M
Protection Systems
Training Collaborations
SCE
IEEE
CIGREE
SEC/Aramco
Bahrain
GCC Lab CollaborationsCollaboration for Training
GCC Cigre – 2017 – Muscat - Oman
Outlines
1 Strategic Drives
2 Competitive Advantages
3 Business Portfolio
4 Partnerships & Collaboration
5 Development Update
6 Remarks
Saudi Aramco: Public
GCC Lab Business Development
2016 2017 20192018 2020
4. Q3 2017:
Calibration, Training Services
3. Q4 2016:
Partner(s) Identified
1. Q1 2016:
Company Business Plan Created
5. Q4 2017:
Renewables/ Smart Grid Lab
7. 2018
LV-MV Labs
6. Q4 2017:
Industrial Lab EPC Initiated
8. 2019
Inspection/ Audit Services
2. Q2-Q4 2016:
Partner SelectionProcess
9. 2020
Industrial Lab Full Operations
Implementation Timeline
GCC Cigre – 2017 – Muscat - Oman
Outlines
1 Strategic Drives
2 Competitive Advantages
3 Business Portfolio
4 Partnerships & Collaboration
5 Development Update
6 Remarks
GCC Cigre – 2017 – Muscat - Oman
Saudi Aramco: Public
GCC Lab Business Development
Operationalize Calibration Labs
2017 Ongoing Activities
Partnership Deals with Partners
Consultation Services
Develop Strategic SLAs with Major Customers
Participate in Developing PV Standards
Provide Training & Inspection Svs
GCC Cigre – 2017 – Muscat - Oman
Saudi Aramco: Public
• Synergy with Visions of GCC & MENA Countries
• Enable Manufacturing & Knowledge Economy
• Mitigate Challenges (Safety, Quality, Reliability & Cost)
• Create Centers of Excellence (Asset Management, Spare Parts, Retrofit Condition Assessment)
• Influence Technical Specifications (Life-Cycle Control, Climate)
• R&D and Innovation (Conventional, New Technologies)
• Collaboration with ALL
Remarks
Saudi Aramco: Public
THANKS