gb seminarbangkok drjatuwat leed ap

Upload: pocpac

Post on 30-May-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    1/80

    : Green Building: .

    Energy Crisis

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    2/80

    : Green Building: .

    Environmental Crisis

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    3/80

    : Green Building: .

    Environmental Crisis

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    4/80

    : Green Building: .

    LEED What is LEED? What is the benefits and why success?

    . , LEED AP

    Jatuwat Varodompun, Ph.D. LEED AP

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    5/80

    : Green Building: .

    What is LEED?

    What is green building?

    Is the energy efficientbuilding is a green building?

    Is a building built with recyclematerial is a green building?

    Is a building that we are inright now a green building?

    LEED?

    ?

    ?

    ?

    ?

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    6/80

    : Green Building: .

    Is the energy efficientbuilding is a green building?

    What if the building islocated on the sitedepending on personalautomobile which consumes

    fossil fuel avoidably.

    ?

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    7/80

    : Green Building: .

    Is a building built with recyclematerial is a green building?

    What if the building consumetons of portable water forlandscaping and indoor

    usages.?

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    8/80

    : Green Building: .

    Is a building that we are in right now a green building?

    Do we consider how good and how bad the IEQ (IndoorEnvironmental Quality) of this building?

    ?

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    9/80

    : Green Building: .

    The built environment has aprofound impact on our naturalenvironment, economy, health, andproductivity.

    In the United States alone, buildingsaccount for:

    72% of electricity consumption, 39% of energy use, 38% of all carbon dioxide (CO2)

    emissions,

    40% of raw materials use, 30% of waste output (136 milliontons annually), and

    14% of potable waterconsumption.

    : 72% 39% 38% CO2 40%

    30% (136 ) 14%

    Source: USGBC

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    10/80

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    11/80

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    12/80

    : Green Building: .

    LEEDLeadership in Energy and Environmental Design

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    13/80

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    14/80

    : Green Building: .

    LEED Development: LEED

    If Department of Energy

    (DOE), not given the Councilits first $100,000 and thenanother $200,000 in 2000,LEED would not have evolved.

    LEED Steering Committeeinvolves some 2,000 buildingindustry leaders who donatedtheir time to get the first ratingsystem into pilot.

    100,000 200,000 ..2000 LEED

    LEED 2000

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    15/80

    : Green Building: .

    LEED Development: LEED

    After lunching LEED v1.0 in

    2000, LEED has evolved inmany versions. There aremany product fitting differentbuilding categories. LEED-NCis the most well-known system

    with the current version of 2.2. LEED v1.0 2000 LEED

    LEED-NC 2.2

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    16/80

    : Green Building: .

    LEED Development: LEED

    As of January 2009, there are 17,450 registered with USGBCworldwide. 2,122 projects have been certified. Most of them are NewConstruction categories

    2009 17,450 USGBC 2,122

    2,12263352002,434CertifiedProjects17,450068525,271,233,8410,189RegisteredProjects

    TotaletailchoolsNeighborhoodDevelopmentCore &Shell

    ExistingBuildings

    CommercialInteriors

    NewConstructionEED

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    17/80

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    18/80

    : Green Building: .

    LEED-NC Categories: LEED-NC

    Sustainable Site

    Water Efficiency

    Energy &Atmosphere

    Material &Resources

    IndoorEnvironmental

    Quality

    14 pts

    1 preq

    5 pts 17 pts

    3 preq

    13 pts

    3 preq

    15 pts

    2 preq

    5 ptsInnovation &

    Design Process

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    19/80

    : Green Building: .

    LEED-NC Categories: LEED-NC

    52-69

    39-51

    33-38

    26-32

    + 7 preq

    LEED-NC 2.2 has 7prerequisites and possible 69points. There four ranksincluding Platinum, Gold,Silver, and Certified. Onceachieved platinum rank,

    USGBC will return all fee.LEED-NC 2.2 7 69 4

    USGBC

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    20/80

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    21/80

    : Green Building: .

    LEED-NC Categories: LEED-NC

    Reduce portable water demandfor landscaping

    Reduce portable water demandfor flush water

    Reduce portable water indoor

    Water Efficiency

    5 pts

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    22/80

    : Green Building: .

    LEED-NC Categories: LEED-NC

    Reduce energy cost

    Renewable energy promotion

    Systematic building

    commissioningLow impact refrigerant

    Certified green electricity

    purchasing

    Energy &Atmosphere

    17 pts

    3 preq

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    23/80

    : Green Building: .

    LEED-NC Categories: LEED-NC

    Waste collection for recycle

    Building and components reuse

    Construction waste reduction

    Recycle material

    Regional and local material

    Rapid growth material

    Certified wood

    Material &Resources

    13 pts

    3 preq

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    24/80

    : Green Building: .

    LEED-NC Categories: LEED-NC

    IAQ (Indoor Air quality) control,monitoring and enhancement

    ETS (Environmental Tobaccosmoke) reduction

    Indoor pollution controlLow emission material selection

    IAQ during construction and

    before occupancySupport Thermal comfortdemand

    Support daylight and view

    demand

    Indoor

    EnvironmentalQuality

    15 pts

    2 preq

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    25/80

    : Green Building: .

    LEED-NC Categories: LEED-NC

    Innovation beyond LEED scopeand exemplary performances

    Involvement of LEED AccreditedProfessionals

    5 pts

    LEED

    LEEDAccredited Professionals

    Innovation &Design Process

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    26/80

    : Green Building: .

    LEED-NC Categories: LEED-NC

    Similar to the food compositiontags, the result from LEEDcertification is the tag showingquantifiable performances of agreen building

    LEED

    5 pts

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    27/80

    : Green Building: .

    41% 33% 87%

    20% 700 ft

    PROXIMTIY HOTEL, LEED NCPLATIMUM

    LEED-NC Categories: LEED-NC

    Use 41% less energy 33% less water Recycled 87% of the

    construction debris (1,535 tons)

    Sourced over 40% of the buildingmaterials locally

    Used over 20% recycled content Restored 700 feet of an adjacent

    stream Installed the first regenerative

    drive elevators in North America,generating electricity on thedescent for the ascent

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    28/80

    : Green Building: .

    Provided natural lighting (day-lighting) to 97% of the occupiedspace

    Used elaborate energy recovery

    systems to provide largeamounts of fresh outside air to allguests

    Sourced 90% of the furniturelocally

    Plus more than 60 othersustainable practices

    LEED-NC Categories: LEED-NC

    PROXIMTIY HOTEL, LEED NCPLATIMUM

    97%

    90%

    60

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    29/80

    : Green Building: .

    LEED Benefits: LEED

    Embrace corporate and building

    images as a green buildingleader who cares about theworld and humanity.

    Nikes commitment to innovation

    and sustainability was recognizedtoday at an event highlighting the

    companys recent success inearning a LEED-EB Gold Ratingfrom the U.S. Green BuildingCouncil for its Ken Griffey, Jr.building.

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    30/80

    : Green Building: .

    LEED Benefits: LEED

    Increase the properties and

    asset value as for futurebusiness opportunities such ashigher rental fee or higher saleprices.

    7.5% Building value increases*6.6% return on investment improves** Mc Graw-Hill Construction, Key Trends in the European and USConstruction Marketplace SmartMarket Report, 2008

    Aardex Signature Center inDenver West in Jefferson County,opening the door to what may be

    metro Denver's "greenest" officebuilding. With LEED platinum, therental fee can be increased by 33%from $17 per sq.ft to $25 per sq.ft

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    31/80

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    32/80

    : Green Building: .

    The average premium for these

    green buildings is slightly less than2%, or $3-5/ft2, substantially lowerthan is commonly perceived.

    On average, green buildings use30% less energy than conventionalbuildings.Kats, G. H (2003). Green Building Costs and Financial

    Benefits, USA for Massachusetts TechnologyCollaborative.

    LEED Benefits: LEEDConstruction cost is notnecessary to be higher, while

    operation cost such as energyand water is lower.

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    33/80

    : Green Building: .

    A 1% increase in productivity(equal to about 5 minutes perworking day) is equal to $600 to$700 per employee per year, or$3/ft2 per year.

    A 1.5 % increase in productivity (ora little over 7 minutes each workingday) is equal to about $1000 per

    year. Increases in tenant control overventilation, temperature andlighting each provide productivitygains of 7.1% with lighting control,1.8% with ventilation control, and1.2% with thermal control.

    Kats, G. H (2003). Green Building Costs and Financial Benefits,

    USA for Massachusetts Technology Collaborative.

    LEED Benefits: LEED

    Enhance the occupants well-

    being which, in turn, increasesthe work performances andproductivities

    Workers spend more than 90 percent oftheir time indoors, at home or work, in

    shopping centers, or in vehicles. That facthas a tremendous impact on our healthand productivity..

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    34/80

    : Green Building: .

    In a survey of 100 U.S. office buildings, 23

    percent of office workers experiencedfrequent symptoms ofSick BuildingSyndrome (SBS) which decrease inproductivity around 2 percent nationwide,resulting in an annual cost to the United

    States of approximately $60 billion. Past study also indicates that a 10 percent

    decrease in tenant satisfaction with IAQresults in a 1 percent drop in productivity

    The model shows a decrease in performanceby 2 percent for each degree increase ofspace temperature between 77 degrees Fand 89.4 degrees F. Optimal productivityperformance was found to occur when the

    space temperature was 72 degrees F

    LEED Benefits: LEED

    William J. Fisk, Health and Productivity Gainsfrom Better Indoor Environments in The Roleof Emerging Energy-Efficient Technology inPromoting Workplace Productivity and Health,a report by Lawrence Berkeley NationalLaboratory, February 2002.

    Bjarne W. Olsen, Indoor Environment Health, Comfort and Productivity, Clima 2005Lausanne, 8th REHVA World Congress,Switzerland, Oct. 9-12, 2005

    Olli Seppanen and William Fisk, A Method toEstimate The Cost Effectiveness of IndoorEnvironments in Office Work, Clima 2005Lausanne, 8th REHVA World Congress,Switzerland, Oct. 9-12, 2005.

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    35/80

    : Green Building: .

    The study in Japan showed that productivitydropped by 2.1 percent when the averageindoor air temperature increased by 1 degreeC (1.8 degrees F). This study found also thatindividual air velocity control was able toreduce the perception of mental fatigue bythe workers.

    Students with the most daylighting in theirclassrooms progressed 20 percent faster onmath comprehension and 26 percent fasteron reading comprehension.

    Wal-Mart sales per square foot located withinthe departments with access to natural lightwere significantly higher than departmentslocated under the conventional roof

    LEED Benefits: LEED

    Shin-Ichi Tanabe, Productivity and FutureHVAC, Clima 2005 Lausanne, 8th REHVAWorld Congress, Switzerland, Oct. 9-12, 2005.

    Lisa Heschong, Daylighting and HumanPerformance in The Role of EmergingEnergy-Efficient Technology in PromotingWorkplace Production and Health, a report byLawrence Berkeley National Laboratory,February 2002.

    Joseph J. Romm & William D. Browning,Greening The Building and the Bottom Line.Rocky Mountain Institute Publication,December 1994.

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    36/80

    : Green Building: . In Seattle, new regulations were

    made to provide greater heightsand/or greater maximum floor areafor commercial and residentialbuildings. To gain greater heightor density, projects must achieve aLEED Silver rating.In Nevada, certain purchases ofparts of building that has beenapproved by the Nevada Office ofEnergy as meeting the

    qualifications of a LEED building,are exempt from any local taxesIn Cincinnati, as of January 2008,new LEED-certified Silver and Gold

    homes can receive 15 years of cityand county tax relief for homesvalued up to $500,000; LEEDPlatinum homes have nomaximum-value limit.

    LEED Benefits: LEED

    In some countries (not yet inThailand), tax break andexemption program areavailable for LEED buildings.

    () LEED

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    37/80

    G B ildi

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    38/80

    : Green Building: . US policy of newly elected Barack

    Obamajust announces newaggressive policy on promote greenbuildings and green jobs. He aims toimplement LEED to new andexisting government building whichshould increase energy efficiency40% and 25% respectively. Fivemillions new jobs related to greenindustry will be supported by morethan 150 billion US dollars.

    LEED Benefits: LEED

    Green building and world crisis

    Energy CrisisEnvironmental Crisis

    Economic Crisis

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    39/80

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    40/80

    : Green Building: .

    LEED Success: LEED

    Success factors

    World crisis and timing

    Firmly development

    Government support

    LEED benefits toowners and occupants

    Experts Involvement

    Ranking systemflexibility

    Marketing

    LEED

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    41/80

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    42/80

    : Green Building: .

    LEED Success: LEED

    Source: USGBC

    LEED registered

    projects growevery year evenlast year whichfaces economiccrisis

    LEED

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    43/80

    : Green Building: .

    LEED Success: LEED

    Source: USGBC

    LEED has been

    awarded for morethan 283.3 millionsq.ft from allprojects

    LEED 283.3

    28

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    44/80

    : Green Building: .

    Conclusion:

    What is LEED?

    What are LEED benefits?

    Why is LEED successful?

    LEED?

    LEED?

    LEED ?

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    45/80

    g.

    Questions and Answers

    Cal Science Academy inSan Francisco

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    46/80

    g.

    LEED LEED APProject Preparation for LEED Certification andSelf-Preparation for LEED AP Exam

    . , LEED APJatuwat Varodompun, Ph.D. LEED AP

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    47/80

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    48/80

    .

    LEED Products: LEED

    Though LEED has manyproducts across multiple

    building types, certificationprocess distinguishes twomajor products, newconstruction and existing &

    operation maintenance. LEED

    2

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    49/80

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    50/80

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    51/80

    .

    LEED Certification Process: LEEDLEED-EB:OM

    1 Operation for 1year LEED-EBOMPlanning for LEED EBOM 1 Performance Period for 1 year

    Continuously maintainsustainable management

    Existing Building Operation ProceduresBuilding Renovation

    LEED-EBOM USGBCLEED EBOM Approval

    Final SubmittalsUSGBCUSGBC Registration

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    52/80

    .

    Design Submittals

    Apply to some points that canbe justified by the drawing

    Results would beanticipated clarify and

    denied Construction Submittals

    Apply to all points and alldesign submittals must be

    resubmittedThe results would be final butcan be appealed

    LEED Certification Process: LEED

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    53/80

    .

    Credit Interpretation Ruling (CIR)

    previously recorded creditsinterpretation asked by theapplicants for certain case.

    New applicants can refer CIR

    for their similar circumstancesCIR can be viewed online byUSGBC member and currentregistered project applicants

    Once the related CIR can notbe found, new applicants canissue the new one

    LEED Certification Process: LEED

    Credit Interpretation Ruling (CIR)

    CIR

    CIR

    USGBC CIR

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    54/80

    .

    LEED Certification Process: LEED

    5,0005,000Expedite Process

    500 per credit500 per creditAppeal

    Non-member ($)

    Member ($)

    LEED-NC

    ????Expertise Cost

    750-7,500(50,000-500,000 ft2)

    500-5,000(50,000-500,000 ft2)

    Construction Submittals

    1,500-15,000(50,000-500,000 ft2)

    1,250-12,500(50,000-500,000 ft2)

    Design Submittals

    600450Project Registration

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    55/80

    .

    LEED Certification Process: LEED

    2525PROJECT TEAM Acceptor Appeal:

    15 (Expedite 7 business days)(Anticipated, Denied)

    15 (Expedite 7 business days)(Earned, Denied)

    Final (design) review ()

    25 (Expedite 10 business days)25 (Expedite 10 business days)PROJECT TEAMPreliminary ReviewResponse for clarify

    Split Design & ConstructionReview

    Combined Design &Construction Review* Existing

    Buildings Review

    Review Phase

    25 (Expedite 12 business days)25 (Expedite 12 business days)Appeal

    25 (Expedite 12 business days)(Anticipated, Clarify, Denied)

    25 (Expedite 12 business days)(Earned, Clarify, Denied)

    Preliminary review

    : Green Building:

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    56/80

    .

    LEED Platinum

    Projects that are awardedLEED platinum certificationwill receive a rebate for allcertification fees.

    Registration fees, appealreview fees, and anyadditional fees required toexpedite LEED certificationwill not be refunded.

    LEED Certification Process: LEED

    LEED Platinum

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    57/80

    Sustainable Site

    Water Efficiency

    Energy &Atmosphere

    Material &Resources

    IndoorEnvironmental

    Quality

    Innovation &Design Process

    LEED Credits: LEED

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    58/80

    Sustainable Site 14 Points

    4Alternative TransportationPublic Transportation Access, Bicycle Storage & Changing Rooms, LowEmitting & Fuel Efficient Vehicles, Parking Capacity

    SS4.1-4

    2Site DevelopmentProtect or Restore Habitat, Maximize Open Space

    SS5.1-2

    2Storm Water DesignQuantity Control, Quality Control

    SS6.1-2

    2Heat Island EffectRoof, Non roof

    SS7.1-2

    1Light Pollution ReductionSS8

    14 Points

    Brownfield Redevelopment

    Development Density & Community Connectivity

    Site Selection

    Construction Activity Pollution PreventionSS P1

    1SS1

    1SS3

    1SS2

    LEED Credits: LEED

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    59/80

    Water Efficiency 5 Points5 Points

    Water Use Reduction20-30% reduction

    Innovative Wastewater Technologies

    Water Efficient LandscapingReduce by 50%, No Potable Use or No Irrigation

    2WE1.1-2

    1WE2

    2WE3.1-2

    LEED Credits: LEED

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    60/80

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    61/80

    Proposed design save energy costby 66% and save total energy by65%.

    Obtain full 10 points from EA1 (maxat 42 % saving)

    Obtain 1 point for Innovation indesign (saving over 45.5%)

    Might eligible for an additionalInnovation in design point by

    reducing Process water (HVACwater)

    Remarks: Energy simulation results arenot necessary to exactly match the

    actual energy consumption.

    Energy & Atmosphere Credit 1LEED Credits: LEED

    66 % 65%

    10 EA1 ( 42 % )

    1 ( 45.5%)

    1

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    62/80

    Materials & Resources 13 PointsLEED Credits: LEED

    2Recycled Content10-20% (post-consumer + 1/2 pre-consumer)

    MR4.1-3

    2Regional Materials10-20% Extracted, Processed & Manufactured Regionally

    MR5.1-2

    1Rapidly Renewable Materials2.5%

    MR6

    1Certified WoodMR7

    13 Points

    Materials Reuse5%-10%

    Construction Waste Management,Divert 50% from Disposal 1, Divert 75% from Disposal

    Building ReuseMaintain 75-95% of Existing Walls, Maintain 50% of Interior Non-Structural Elements

    Storage & Collection of RecyclablesMR P1

    3MR1.1-3

    2MR3.1-2

    2MR2.1-2

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    63/80

    Indoor Environmental Quality 15 PointsLEED Credits: LEED

    2Daylight & Views

    Daylight 75% of Spaces, Views for 90% of Spaces

    IE8.1-2

    2Controllability of SystemsLighting, Thermal Comfort

    IE6.1-2

    2Construction IAQ Management PlanDuring Construction, Before Occupancy

    IE3.1-2

    4Low-Emitting MaterialsAdhesives & Sealants, Paints & Coatings, Carpet Systems, CompositeWood & Agrifiber Products

    IE4.1-4

    1Indoor Chemical & Pollutant Source ControlIE5

    2Thermal ComfortDesign, Verification

    IE7.1-2

    15 Points

    Increased Ventilation

    Outdoor Air Delivery Monitoring

    Environmental Tobacco Smoke (ETS) Control

    Minimum IAQ PerformanceIE P1

    IE P2

    1IE2

    1IE1

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    64/80

    Innovation in Design 5 PointsLEED Credits: LEED

    5 Points

    LEED Accredited Professional

    Innovation in DesignExemplary performances, not categorized or yet identified

    4ID1.1-4

    1ID2

    5

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    65/80

    Preparation for LEED

    AP ExaminationLEED AP Role

    GBCIExam structureExam example

    Future of LEED AP

    LEED AP

    LEED AP

    GBCI

    LEED AP

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    66/80

    Earn 1 free point in Innovation &Design Process category LEED APconsultancy

    Identify possible points to pursuematching aimed certification level

    Ensure that each point isstrategized correctly and matchesLEED intent

    Identify the points that needs furtherin-depth simulation (additional costcould be applied)

    Role of LEED AP: LEED AP

    1

    LEED AP

    LEED

    ()

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    67/80

    Identify related standards referred

    by LEEDCross-checking the data forverification before LEEDsubmission

    Coordinate and control the overallproject direction toward LEEDintention

    Represent and coordinate betweenUSGBC and the project teamduring the submission process

    Role of LEED AP: LEED AP

    LEED LEED

    LEED

    USGBC

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    68/80

    GBCI was created to administercertification and credentialingprograms related to green buildingpractice and to ensure that the

    LEED Accredited Professional(LEED AP) program continues to bedeveloped in accordance with bestpractices for credentialingprograms.

    GBCI: Green Building Certification Institute

    GBCI LEED AP

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    69/80

    To underscore this commitment,

    GBCI will undergo the AmericanNational Standards Institute (ANSI)accreditation process for personnelcertification agencies complying

    with International Organization forStandardization (ISO) Standard17024. Beginning in 2009, GBCIwill begin administering the LEEDcertification process for buildings.

    For more information, please visitwww.GBCI.org

    GBCI ANSI ISO 17024 2009 GBCI

    LEED www.GBCI.org

    GBCI: Green Building Certification Institute

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    70/80

    Resources (for NC) go to USGBC

    website and goHome/LEED/ProfessionalAccreditation/Exam Preparation

    LEED for New Construction

    Reference Guide Version 2.2 LEED Certification Process

    Project Registration

    LEED Online

    Candidate Handbook

    Exam Structure:

    NC-Ref Guide EBOM-RefGuide

    CI-Ref Guide

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    71/80

    3 Tracks available including NC,

    EB, and CIThere are 4 components

    Knowledge of LEED Credit

    Intents and RequirementsCoordinate Project and Team

    Implement LEED Process

    Verify, Participate In, andPerform Technical AnalysesRequired for LEED Credits

    Exam Structure:

    3 NC,

    EB, CI 4

    LEED

    LEED

    LEED

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    72/80

    Anyone can take the exam but

    he/she should be Tenure in green building and

    construction industry knowledge

    Familiarity with documentation processfor LEED certified projects

    Knowledge of LEED credit intents,requirements, submittals, technologiesand strategies within your discipline

    Practical experience working with

    multiple design disciplines Understanding of life cycle cost and

    benefits of LEED

    Familiarity with LEED resources andprocesses

    Exam Structure:

    LEED

    LEED

    LEED

    LEED

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    73/80

    There is 2 hours and 20 minutes for

    examinationTest will be computer-base withPrometric

    80 multiple choices must becompleted within 2 hours or 1.5minute each

    Once exam is complete, the resultwill be announced immediately

    Full score is 200 points and at least170 points are required to pass theexam

    Exam Structure:

    2

    20 Prometric

    80 2

    200 170

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    74/80

    Which two of the following are considered sources ofpotable water in LEED? (Choose two.)

    A. irrigation wells

    B. captured rain water

    C. municipal water system

    D. municipally supplied reclaimed waste water

    Exam example: Section 1: Knowledge of LEED-NC Credit Intents and Requirements

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    75/80

    A value engineering exercise has proposed that exterior horizontal

    louvers above south-facing windows will be deleted from the project.The change requires that various project team members reviewstrategies and reconfirm calculations for several credits.

    Which three credits would be affected by this decision? (Choose

    three.)A. EA Credit 6, Green Power

    B. SS Credit 7.1, Heat Island Effect: Non-Roof

    C. EA Credit 1, Optimize Energy PerformanceD. EQ Credit 1, Outdoor Air Delivery Monitoring

    E. EQ Credit 8.1, Daylight and Views: Daylight 75% of Spaces

    Exam example: Section 2: Coordinate Project and Team

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    76/80

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    77/80

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    78/80

    March 31, 2009 will be the last date

    that candidates will be able toregister for the current LEED forNew Construction (NC) v2.2 andLEED for Commercial Interiors (CI) v2.0 LEED Accredited Professional

    (LEED AP) credentialing exams.

    Future of LEED AP: LEED AP

    31 2009

    LEED NC v2.2 LEED CIv2.0 LEED AP

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    79/80

    As of 2009, there will be the development in 3

    tracksLEED Green Associate

    LEED Accredited Professional+ Buildings Design and Construction (LEED-NC)

    Commercial Interiors Design and Construction(LEED-CI)

    Operations and Maintenance (LEED-EB)

    Homes (a new LEED-Homes track)

    Neighborhood Design (a new LEED-ND track)

    LEED AP Fellow

    Legacy LEED AP

    Future of LEED AP: LEED AP

    : Green Building: .

  • 8/14/2019 GB SeminarBangkok Drjatuwat LEED AP

    80/80

    Questions and Answers

    Useful Links

    www.usgbc.org

    www.gbci.orgwww.GreenExamPrep.com/LEED