gautam buddha for mscphysical applied chem · pdf file gautam buddha university...

Click here to load reader

Post on 25-Aug-2020

2 views

Category:

Documents

0 download

Embed Size (px)

TRANSCRIPT

  • 1

    Gautam Buddha University (Established by the Uttar Pradesh Gautam Buddha University Act 2002

    UP Act No. 9 of 2002, passed by the Uttar Pradesh Legislature)

    Greater Noida – 201 312 Website : www.gbu.ac.in

    BID FORM

    FOR THE SUPPLY / INSTALLATION OF LABORATORY EQUIPMENTS FOR M.Sc. PHYSICAL CHEMISTRY LAB

    OF

    SCHOOL OF VOCATIONAL STUDIES & APPLIED SCIENCES

    http://www.gbu.ac.in/

  • Gautam Buddha University

    (Established by the Uttar Pradesh Gautam Buddha University Act 2002 UP Act No. 9 of 2002, passed by the Uttar Pradesh Legislature)

    Greater Noida – 201 312

    SCHOOL OF VOCATIONAL STUDIES & APPLIED SCIENCES

    Tender SUPPLY/INSTALLATION OF LABORATORY EQUIPMENTS OF M.Sc. PHYSICAL CHEMISTRY LAB

    Opening Date of Bid 20th September 2014

    Closing Date & Time of Bid 29th September 2014 upto 3.00 p.m.

    Last date & Time of Bid Submission

    29th September 2014 upto 5.00 p.m.

    Technical Bid Opening Date, Time & Place

    30th September 2014 at 12.00 Noon

    Venue : Conference Room of the Registrar Office, 1st Floor, Administrative Building, G.B.U., Gr. Noida. (Bidder/authorized representative of bidders may attend the bid opening proceedings on the above mentioned day and time).

    Earnest Money Deposit Tender Fee

    2% of total quoted value (Refundable) Rs.1050.00 (Non-refundable)

    Completion Period Within 8 weeks from the date of Purchase Order issued

    Bid System Two Tier : 1) Technical Bid 2) Financial Bid

    Technical Bid Shall Contain

    i. Technical specifications of each equipment quoted ii. All documents in support of commercial terms &

    conditions and eligibility criteria. iii. Bidders Proforma iv. EMD in form of FDR/BG only

    v. Tender Fee in form of demand drafts / pay orders.

    Financial Bid The Financial Bid shall contain rate schedule only. The price shall be in words as well as in numeric numbers.

  • Gautam Buddha University (Established by the Uttar Pradesh Gautam Buddha University Act 2002

    UP Act No. 9 of 2002, passed by the Uttar Pradesh Legislature) Greater Noida – 201 312

    “TECHNICAL BID (BIDDER’S PROFORMA)”

    (To be submitted in separate envelope)

    Name of the Organization

    Pl. mentioned whether a Government Company / Public Ltd. / Private Ltd. / Partnership / Proprietorship

    Date of incorporation/registration (pl. enclose photocopy of cert.)

    Specify the number of years in this line of activity by the company

    PAN/TIN registration No. (pl. enclose photocopy of cert.)

    Service Tax, Sales Tax/VAT registration No. (pl. enclose photocopy of cert.)

    Provide the postal address, telephone & fax numbers, and email address of the nearest service center.

    Are you the manufacturer / authorized dealer / distributor/ retailer for the product quoted (please attached relevant certificate):

    Mention delivery period from the date of the placement of an official purchase order

    Whether technical specification are attached with Technical Bid or not.

    Deviations in specifications, if yes, please mention in separate sheet.

  • Turnover in the last three financial years (Figures should be in Indian Rupees in Lakhs; please attach the certified copies of balance sheet with trading, profit & loss account.

    2011-12 2012-13

    2013-14

    Detail of the similar item(s) supplied & installed during last three years at IITs, NIT’s or Central / State Universities or any Academic Institute of National

    Repute (please enclose Performance Certificate/Purchase Order)

    Name of the item(s) P.O. Value (Rs.) Name of the Institution, item supplied.

    Whether your firm have been blacklisted by any

    Government Organization including Universities,

    Institutions and Colleges during last three years

    (Yes / No)

  • Gautam Buddha University (Established by the Uttar Pradesh Gautam Buddha University Act 2002

    UP Act No. 9 of 2002, passed by the Uttar Pradesh Legislature) Greater Noida - 201 312

    DECLARATION

    I/We hereby declare that the information given in the technical bid by the undersigned is correct and fulfill all conditions as published in the tender document.

    (SIGNATURE OF THE BIDDER) WITH SEAL

    NAME: ………………………………………………………………..

    ADDRESS : ……………………………………………………………

    Tel./Mobile No. : ….......................................................................................

  • Gautam Buddha University (Established by the Uttar Pradesh Gautam Buddha University Act 2002

    UP Act No. 9 of 2002, passed by the Uttar Pradesh Legislature) Greater Noida - 201 312

    TECHNICAL SPECIFICATIONS OF ITEMS FOR M.Sc. PHYSICAL CHEMISTRY LAB

    S.No. Name of Instruments

    Specifications Qty.

    1 Colorimeter Microprocessor based Wavelength range 400 to 700 nm with 8 optical filters Complete with operating manual, dust cover and cuvette. Light source LED Measuring mode : %T, ABS, Conc and K-factor. Display: LED/LCD K-factor range display : 0-1999 Cuvette : Round /Square Photometric Range Transmittance 0 ~ 100% T Absorbance 0 ~ 1.999 Abs Concentration 0 ~ 1999 Conc. Detector: Hermetically seald photodiode. Sample holder : 10mm square cuvette and 12mm round flat bottom test tube. All specifications must be guaranteed along with printed authentic documents.

    1

    2 Conductivity/TDS meter(Microprocessor based)

    Conductivity /TDS meter should be Bench top conductivity /TDS meter should include: conductivity electrodes, standards solutions, calibration flasks, and accessories for quick start up. Salient technical details / features must of equipment as follows: Conductivity Range: 0.01 μS/cm to 199.9 mS/cm Total Dissolved Solids Range: 0.01 ppm to 99.9 ppm. Resolution: -0.01 Temp.: 0 to 99.9 °C Resolution: 0.1°C Accuracy: > 0.2 °C Temperature compensation: Automatic Report Format: A] GLP compliant Report of selected conductivity readings as well as TDS Readings in TDS mode. B] Calibration report with respect to Conductivity Standards as per GLP norms. Report output: Printer Demonstrated/ certified precision limits: Shall carry a test certificate with the certified limits. Calibrations standards / reference materials needed and supplied as part of equipment.List of Accessories needed : Sensor holder & User manual All specifications must be guaranteed along with printed authentic documents.

    2

  • 3 Electronic Balance 0.1mg

    Maximum Capacity: 220 g Readability: 0.1mg Weighing technology: MonoBloc Calibration/ Adjustment: Manual internal Weighing pan dimensions: ø 90 mm Power requirement: Full independence from power supply for 8 hours Connectivity: RS232 interface for connection to PC or printer All specifications must be guaranteed along with printed authentic documents.

    1

    4 Ice Maker Ice Flaking Machine Ice production Capacity: Approx 50Kgs per 24 hours Storage Bin Capacity: 15Kgs Ice Bin: Ice holding tank made of stainless steel, insulated with PUF so that ice can be stored for longer period without melting. Auto cut off in case of water supply failure and maximum ice level. Overflow-Drain Line: Overflow and drain lines for Ice flaking machine continuous draining of water. Electrical and Safety Systems: all important components like compressors and gear box driving motor etc. Replaceable connectors for wiring approximate electrical load 1 KVA 220 Volts 50 cycles All specifications must be guaranteed along with printed authentic documents.

    1

    5 Mechanical Stirrer Fitted with speed regulator, height and space adjustable.. motor 1/20 H.P Propeller Stirrer, 4 bladed Standard stirring elements- For drawing the material to be mixed from the top to the bottom. Generates axial flow in the vessel. Used at medium to high speeds. Telescopic stand, Boss Head Clamp

    1

    6 Overhead Stirrer Digital overhead stirrer should be for medium-high viscosity liquids. System should have techno polymer structure ensures optimum chemical resistance and enhanced handling, preventing any possible rust and being extremely light. The robust motor ensures years of continuous operation, with no extra costs for maintenance. The user-friendly self-locking chuck should be easy to close, and can accommodate shafts with up to 10 mm diameter. System should block the stirrer in case of incorrect functioning thus ensuring safe operation. All the parameters, including set speed, real speed, torque and timer, should be available at a glance. The operating time should be set up to 999:59 minutes, with automatic switch off. System should come with stirring shaft with floating blades of stainless steel. Electronic speed regulation: from 50 to 2000 rpm Stirring volume (H2O): up to 40 L Max. Torque: 50 Ncm Viscosity: up to 50000 mPas

    All specifications must be guaranteed along with printed au

View more