gauging procedure buttress casing pipe

Upload: mas-bagaz-novianto

Post on 02-Jun-2018

262 views

Category:

Documents


5 download

TRANSCRIPT

  • 8/11/2019 Gauging Procedure Buttress Casing Pipe

    1/1

    PT,applpa

    Indonesla

    No :

    QI.01

    P

    DATE:28-03-07

    R E V : 0 0

    P a g e : 1 o f 1

    Unit : inch

    RESS

    CASING

    P E

    Preparedy:

    /%

    Reviewed

    v,2Z'a'/

    Approved bv;-r/.--Z

    r \

    v l Jvh l L r | LLN

    L 4

    /

    ru r

    Fh

    Thread

    profile

    check

    if

    found

    deviat ion.cast ing shall

    be done

    Thread angle

    : Load f lank 30

    +

    10

    Stab f lank 10o

    +

    10

    -

    Overlay 3/4"API-BC-P-OV-450-7625

    APr-BC-P-OV-8625-1337

    -

    Overlay 1'API-BC-P-OV-100

    This check

    is not for acceptance

    or reiec

    PD& OVATITY

    lvlRP

    auge

    check

    b

    Pitch diameter

    Ovality

    This check is

    no t

    foT acceptance

    or rejection

    Refer to

    visual

    check

    P-T.L= L7

    for length of rmperfect

    thread

    'g'

    perfect

    thread

    'LT.vanish

    point

    L4.

    min-perfect

    hread'k'

    and

    riangle tamp

    1

    refer

    to

    No.9

    Chamfer+54--0o

    visual check

    Blackcrest:1

    or

    2 Thread

    bLt Not>25 %

    of

    pipe surface circumference

    rnern

    gauge

    chsk

    0.066'

    13%"and maler)

    16" and larger)

    Toleiance

    T4"IPF)

    0.088(1"TPF)Max'mum

    procedure

    e

    drawingBall

    diametr -090"

    1" after L7

    for impe

    area but

    no

    recording equired

    oer nch'5'

    G)

    nelcnr

    \-./

    I nreao nergnt

    gauge

    cntrk

    Verif icat ion 0.000"

    Tolerance

    B a l l d ia : -