22 22 Pipeline News | July 2019 | pipeline-news.com ONGOING PROJECTS Construction Underway GAS | The Americas U.S. ASPEN MIDSTREAM – (12/18) Project: Austin Chalk Pipeline Type: Project includes pipeline construction Length: 90 miles Location: Katy, TX Capacity: 200 MMcf/d Completion: 3Q 2019 ATLANTIC COAST PIPELINE LLC – (4/19) Owners: Dominion Energy; Duke Energy; Piedmont Natural Gas and Southern Company Gas Project: Atlantic Coast Pipeline Type: Project includes construction of pipeline Length: 600 miles Diameter: 20, 36 and 42 inches Location: Harrison County, WV – Chesapeake, VA Capacity: 1.5 Bcf/d Completion: 2021 Comments: Project will transport domestically- produced, clean-burning natural gas from West Virginia to communities in Virginia and North Carolina. Work held up until 3Q 2019 due to permitting issues. Contractor: Spring Ridge Constructors LLC Type: Project includes pipeline construction Contractor: Michels Corp. Type: Project includes pipeline construction Contractor: Price Gregory International Inc. Type: Project includes pipeline construction Contractor: Rockford Corp. Type: Project includes pipeline construction Contractor: U.S. Pipeline Inc. Type: Project includes pipeline construction Project: Atlantic Coast Pipeline Segment: Supply Header Project Type: Project includes pipeline construction and facility modifications Length: 38 miles Diameter: 30 inches Location: Westmoreland County, PA; Wetzel County, WV Capacity: 1.5 MMDth/d Completion: 4Q 2019 Comments: Project will move Marcellus Shale gas from Ohio, West Virginia and Pennsylvania into the Atlantic Coast Pipeline for further delivery to Virginia and North Carolina Contractor: Ace Pipeline Inc. Type: Project includes pipeline construction BLUE MOUNTAIN MIDSTREAM LLC – (7/18) Project: Blue Mountain Delivery Project Type: Project includes pipeline construction Length: 10 miles Location: Grady County, OK Capacity: 255 MMcf/d Comments: Project will run from Blue Mountain Midstream’s natural gas processing plant in Grady County, OK CARDINAL MIDSTREAM III LLC – (3/19) Owner: Cardinal Midstream LLC Project: Iron Horse Gathering System Type: Project includes construction of a gas gathering and processing system Length: 100 miles Location: Canadian, Grady, Caddo and McClain counties, OK Capacity: 200 MMcf/d Comments: System includes the Iron Horse Plant, designed to accommodate additional expansions that would bring total processing capacity to 600 MMcf/d to serve production growth, and is anchored by a long-term acreage dedication from Travis Peak Resources LLC COGENT MIDSTREAM – (6/19) Project: Cogent Residue Pipeline Capacity: 400 MMcf/d Location: Midland Basin, Texas Dimensions: 25 miles, 20-inch pipeline Completion: Q4 2019 Summary: The pipeline that will deliver residue gas from Cogent’s Big Lake Natural Gas Processing Complex to Kinder Morgan’s GCX Pipeline. COLUMBIA PIPELINE GROUP INC. – (4/18) Owner: TransCanada Corp. Project: B-System Project Type: Project includes construction of pipeline, replacement of existing pipeline and upgrades to equipment and facilities Length: 20.8 miles Diameter: 20 inches Location: Fairfield and Franklin counties, OH Comments: Project will also retire an existing 17.6 mile pipeline as part of Columbia’s ongoing Modernization Program to ensure the safe and reliable delivery of vital natural gas supply lines for the wider Columbus, OH metro area Contractor: Price Gregory International Inc. Type: Project includes construction of pipeline, replacement of existing pipeline and upgrades to equipment and facilities CONSUMERS ENERGY – (10/17) Project: Saginaw Trail Pipeline Type: Project will be executed in five phases and includes take up and relay of existing pipeline Length: 94 miles Diameter: 24 inches Location: Saginaw, Genesee,Oakland counties, MI Completion: 2022 Comments: Project is part of the Transmission Enhancements for Deliverability & Integrity (TED-I) and will be built in five stages Contractor: Welded Construction Type: Project includes construction of Phase 1 of the pipeline DTE ENERGY – (8/18) Operator: NEXUS Gas Transmission System Project: NEXUS Project Type: Project includes pipeline construction and four compressor stations Length: 255 miles Diameter: 42 inches Location: Ohio and Michigan Capacity: 1.5 Bcf/d Completion: 4Q 2019 Contractor: Fluor Type: Front-end engineering and design Contractor: Michels Corp. Type: Pipeline construction Location: Ohio and Michigan Contractor: Latex Construction Type: Pipeline construction Location: Ohio Contractor: M.G. Dyess Inc. Type: Pipeline construction Location: Ohio ENABLE MIDSTREAM PARTNERS – (3/19) Operator: Oklahoma Gas and Electric (OG&E) Project: Muskogee Pipeline Type: Project includes construction of pipeline and associated metering facilities Length: 68 miles Diameter: 20 inches Location: Oklahoma Capacity: 228,000 dth/d Completion: 2019 Comments: The 20-year contract will support OG&E’s planned conversion of two 500 megawatt coal-fired generating units to GAS Projects added and updated for the current month are highlighted

Upload: vannhan

Post on 06-Aug-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

2222 Pipeline News | July 2019 | pipeline-news.com

ONGOING PROJECTS Construction Underway

GAS | The AmericasU.S.ASPEN MIDSTREAM – (12/18)Project: Austin Chalk Pipeline Type: Project includes pipeline constructionLength: 90 milesLocation: Katy, TXCapacity: 200 MMcf/dCompletion: 3Q 2019

ATLANTIC COAST PIPELINE LLC – (4/19)

Owners: Dominion Energy; Duke Energy; Piedmont Natural Gas and Southern Company Gas

Project: Atlantic Coast PipelineType: Project includes construction of pipelineLength: 600 milesDiameter: 20, 36 and 42 inchesLocation: Harrison County, WV – Chesapeake, VACapacity: 1.5 Bcf/dCompletion: 2021Comments: Project will transport domestically-

produced, clean-burning natural gas from West Virginia to communities in Virginia and North Carolina. Work held up until 3Q 2019 due to permitting issues.

Contractor: Spring Ridge Constructors LLCType: Project includes pipeline construction

Contractor: Michels Corp.Type: Project includes pipeline construction

Contractor: Price Gregory International Inc.Type: Project includes pipeline construction

Contractor: Rockford Corp.Type: Project includes pipeline construction

Contractor: U.S. Pipeline Inc.Type: Project includes pipeline construction

Project: Atlantic Coast PipelineSegment: Supply Header ProjectType: Project includes pipeline construction

and facility modificationsLength: 38 milesDiameter: 30 inchesLocation: Westmoreland County, PA; Wetzel

County, WVCapacity: 1.5 MMDth/dCompletion: 4Q 2019Comments: Project will move Marcellus Shale

gas from Ohio, West Virginia and Pennsylvania into the Atlantic Coast Pipeline for further delivery to Virginia and North Carolina

Contractor: Ace Pipeline Inc.

Type: Project includes pipeline construction

BLUE MOUNTAIN MIDSTREAM LLC – (7/18)

Project: Blue Mountain Delivery ProjectType: Project includes pipeline constructionLength: 10 milesLocation: Grady County, OKCapacity: 255 MMcf/dComments: Project will run from Blue Mountain

Midstream’s natural gas processing plant in Grady County, OK

CARDINAL MIDSTREAM III LLC – (3/19)

Owner: Cardinal Midstream LLCProject: Iron Horse Gathering SystemType: Project includes construction of a gas

gathering and processing systemLength: 100 milesLocation: Canadian, Grady, Caddo and McClain

counties, OKCapacity: 200 MMcf/dComments: System includes the Iron Horse Plant,

designed to accommodate additional expansions that would bring total processing capacity to 600 MMcf/d to serve production growth, and is anchored by a long-term acreage dedication from Travis Peak Resources LLC

COGENT MIDSTREAM – (6/19)

Project: Cogent Residue PipelineCapacity: 400 MMcf/dLocation: Midland Basin, TexasDimensions: 25 miles, 20-inch pipelineCompletion: Q4 2019Summary: The pipeline that will deliver residue

gas from Cogent’s Big Lake Natural Gas Processing Complex to Kinder Morgan’s GCX Pipeline.

COLUMBIA PIPELINE GROUP INC. – (4/18)

Owner: TransCanada Corp.Project: B-System ProjectType: Project includes construction of pipeline,

replacement of existing pipeline and upgrades to equipment and facilities

Length: 20.8 milesDiameter: 20 inchesLocation: Fairfield and Franklin counties, OHComments: Project will also retire an existing 17.6

mile pipeline as part of Columbia’s ongoing Modernization Program to ensure the safe and reliable delivery of vital natural gas supply lines for the wider Columbus, OH metro area

Contractor: Price Gregory International Inc.Type: Project includes construction of pipeline,

replacement of existing pipeline and upgrades to equipment and facilities

CONSUMERS ENERGY – (10/17)

Project: Saginaw Trail PipelineType: Project will be executed in five phases

and includes take up and relay of existing pipeline

Length: 94 milesDiameter: 24 inchesLocation: Saginaw, Genesee,Oakland counties, MICompletion: 2022Comments: Project is part of the Transmission

Enhancements for Deliverability & Integrity (TED-I) and will be built in five stages

Contractor: Welded ConstructionType: Project includes construction of Phase 1

of the pipeline

DTE ENERGY – (8/18)

Operator: NEXUS Gas Transmission SystemProject: NEXUS ProjectType: Project includes pipeline construction

and four compressor stationsLength: 255 milesDiameter: 42 inchesLocation: Ohio and MichiganCapacity: 1.5 Bcf/dCompletion: 4Q 2019

Contractor: FluorType: Front-end engineering and design

Contractor: Michels Corp.Type: Pipeline constructionLocation: Ohio and MichiganContractor: Latex ConstructionType: Pipeline constructionLocation: Ohio

Contractor: M.G. Dyess Inc.Type: Pipeline constructionLocation: Ohio

ENABLE MIDSTREAM PARTNERS – (3/19)

Operator: Oklahoma Gas and Electric (OG&E) Project: Muskogee PipelineType: Project includes construction of pipeline

and associated metering facilitiesLength: 68 milesDiameter: 20 inchesLocation: OklahomaCapacity: 228,000 dth/dCompletion: 2019Comments: The 20-year contract will support

OG&E’s planned conversion of two 500 megawatt coal-fired generating units to

GASProjects added and updated for the current month are highlighted

Page 2: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

23pipeline-news.com | July 2019 | Pipeline News

natural gas

Contractor: R&R Pipeline Inc.Type: Project includes pipeline construction

Contractor: Troy Construction Co.Type: Project includes pipeline construction

Project: Enable Gas Transmission Expansion/Enable Oklahoma Intrastate Transmission Expansion

Type: Project includes the expansion of two existing pipelines

Location: Oklahoma (SCOOP/STACK)

ENBRIDGE INC. – (5/19)

Project: South Texas Expansion ProjectType: Project includes mainline reversal, new

compression and station reversal on existing pipeline

Location: Vidor, TX – Petronila, TXCapacity: 400 MDth/dCompletion: 2019Comments: Project will expand the existing South

Texas Pipeline System in South Texas, an area with increasing load from the market in Mexico

ENERGY TRANSFER PARTNERS – (1/18)

Project: Revolution PipelineType: Project includes the construction of

pipeline and a fractionation facilityLength: 120 milesDiameter: 24 and 30 inchesCapacity: 440 MMcf/dLocation: Butler County, PA – Revolution Plant

Contractor: Capstone EnergyType: Project includes pipeline constructionContractor: WillbrosType: Project includes pipeline construction

Contractor: PumpcoType: Project includes pipeline construction

EQT MIDSTREAM PARTNERS LP – (2/18)

Project: Equitrans Expansion ProjectType: Project includes construction of pipeline and

expansion of existing compressor stationsLength: 8 milesDiameter: 6 and 30 inchesLocation: Greene, Allegheny and Washington

counties, PA; Wetzel County, WVCapacity: 600 MMcf/d

GULF COAST EXPRESS PIPELINE LLC – (6/18)

Project: Gulf Coast Express Pipeline ProjectType: Project includes pipeline constructionLength: 447 milesDiameter: 36 and 42 inchesLocation: Coyanosa, TX - Agua Dulce, TXCapacity: 1.92 Bcf/dCompletion: 4Q 2019Project: Driver to High Plains LateralType: Project includes construction of a

pipeline lateralLength: 9 miles Diameter: 36 inchesLocation: Midland, TXComments: Project is associated with the Gulf Coast

Express Pipeline

Contractor: Taylor Construction Co. Inc.Type: Project includes pipeline constructionContractor: Pumpco Inc.Type: Project includes pipeline construction

Contractor: Strike LLCType: Project includes pipeline construction

GAS

1209 Hardy StreetHouston, TX 77020Tel: (713) 222-0146Tel: (800) 231-7205Fax: (713) 222-7403

Copyright 2015Knapp Polly Pig, Inc.All rights reserved

E-mail: [email protected]

By-pass ports::Gauging plates::Transmitter cavities::Medium or heavy density foam

Available options:

Single piece bodyBi-Directional

Condensate removalParaffin scrapingDewateringCommissioning

Quality-built in Houston, Texasfor over 25 years

FOAM DISC PIGThe Original Manufacturer of the

Steel wire brush

Rounded nose Extended-Length

Plastic brush

Page 3: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

2424 Pipeline News | July 2019 | pipeline-news.com

ONGOING PROJECTS Construction Underway

JACKALOPE GAS GATHERING SERVICES LLC – (9/18)

Project: Jackalope Gas Gathering System ExpansionType: Project includes expansion of an existing

gathering system and the associated Bucking Horse Gas Processing Facility

Location: Converse County, WYCapacity: 200 MMcf/dCompletion: 4Q 2019

KINDER MORGAN INC.– (9/18)

Project: SK PipelineType: Project includes construction of pipeline

and additional compressor facilitiesLength: 40 milesDiameter: 30 inchesLocation: West Columbia, TX - Stratton Ridge, TXCapacity: 320 MDth/d Completion: 3Q 2019

Operator: Kinder Morgan Louisiana Pipeline LLC Project: Sabine Pass Expansion ProjectType: Project includes construction of a

tap and lateral; modification of three existing delivery interconnects; construction of additional compression;

construction of header pipelines; and the abandonment and replacement of a meter station

Length: 1.6 milesLocation: Cameron Parish, LACapacity: 600 MDth/dCompletion: 2Q 2019

Operator: Tennessee Gas Pipeline Co. LLCProject: Abandonment and Capacity Restoration

Project (ACR Project)Type: Project includes abandonment of

certain natural gas pipeline facilities and modifications of existing pipeline facilities and compressor stations

Length: 964 miles (abandonment) 14 miles (construction)Diameter: 2 , 16, 30 and 36 inchesLocation: Natchitoches Parish, LA; Columbiana County, OH; KentuckyComments: Project will abandon pipeline facilities

from Station 40 in Natchitoches Parish, LA, to Station 216 in Columbiana

County, OH, and construct replacement facilities in OH and KY.

Construction of the replacement facilities will enable TGP to abandon the lines by sale to UMTP, which plans to convert the lines to non-jurisdictional natural gas liquids transportation as a component of the UMTP Project

Project: Gulf Coast Southbound Expansion Phase IIType: Project includes construction of

additional compression facilities at NGPL’s new compressor station

Location: Chicago Market, IL - Agua Dulce Hub, LACapacity: 250 MDth/dCompletion: 4Q 2019

MILLENNIUM PIPELINE CO. LLC – (3/19)

Project: Eastern System UpgradeType: Project includes construction of

looped pipeline, new compression capabilities and upgrades to existing stations

Length: 10 milesDiameter: 36 inchesLocation: Rockland County, NYCapacity: 200 MDth/dCompletion: Delayed

sidebooms.com I 918-858-4201

Modernize your 583R pipelayer with a state-of-the-art MIDWESTERN hydraulic conversion kit. Our new 583R-MMC kit replaces the old, unconventional OEM draw works and linkage controls with a high-efficiency, electro-hydraulic winch package that puts all the boom controls back in your right hand! This is a cost effective way to get your 583R back on the right-of-way, while improving safety and increasing productivity. Let MIDWESTERN put you back to work!

583R-MMC

GAS

Page 4: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

25pipeline-news.com | July 2019 | Pipeline News

Call Jim Filipowicz today! (800)334-5964 or (406)761-4848Steel Etc. • 1408 52nd St. N • Great Falls, MT

Flume PipeNew & Used STD & Heavy Wall PipeUsed Railroad Flat Cars & Tank Cars

Get your product where you need it, when you need it!

Material delivered to job sites ON TIME in the Continental US & Canada

Featurin

g:

Coal Slag Blast Abrasive

Grit Sizes8-20 Course • 16-40 Medium

20-40 Med Fine • 30-60 Fine • 40-60 Extra Fine

Environmentally friendly NO heavy metal<.2% Free silica

Consistent, hard angular particlesFast cleaning

Blastox blending® availableCARB & QPL approved

GAS

MOUNTAIN VALLEY PIPELINE LLC – (3/19)Project: Mountain Valley PipelineType: Project includes construction of pipeline

and three compressor stationsLength: 301 milesDiameter: 42 inchesLocation: Wetzel County, WV - Pittsylvania

County, VACapacity: 2 Bcf/dCompletion: 4Q 2019Contractor: Precision Pipeline LLCType: Project includes pipeline constructionContractor: Price Gregory InternationalType: Project includes pipeline construction

Contractor: US Trinity Energy Services LLCType: Project includes pipeline construction

ONEOK INC. – (3/19)

Type: Project includes expansions of the existing WesTex Transmission and ONEOK Gas Transportation systems, and making the Roadrunner Gas Transmission Pipeline bi-directional

Location: Permian Basin and Oklahoma

Capacity: 1.7 Bcf/dCompletion: 2019Comments: Projects are backed by multiple firm

transportation commitments

PASO NORTE PIPELINE GROUP – (REV 5/18)

Project: Paso Norte PipelineType: Project includes pipeline constructionLength: 340 milesDiameter: 32 inchesLocation: Deming, NM - Mexico/ChihuahuaCapacity: 366 MMcf/dComments: Project will deliver efficient, clean

burning, and cost effective natural gas from the United States to a dynamic region of North Central Mexico; the western portion of the State of Chihuahua

PIEDMONT NATURAL GAS CO. INC. – (3/18)

Project: Line 434 ProjectType: Project includes construction of gas

distribution lines and facilitiesLength: 35 milesDiameter: 30 inchesLocation: Laurinburg, NCCapacity: 80 Bcf/y

Comments: Project will put swine-waste gas on Piedmont’s system for use by Duke Energy at two of its plants (H.F. Lee Station Combined Cycle Plant and Sutton Combined Cycle Plant)

Contractor: Troy Construction Co.Type: Project includes pipeline construction

POMELO CONNECTOR LLC – (4/18)

Owner: Canyon Midstream Partners LLCProject: Pomelo Connector PipelineType: Project includes construction of pipeline

and a compressor stationLength: 14 milesDiameter: 30 inchesLocation: Nueces County, TXCapacity: 400,000 Dth/dComments: Project will provide firm transportation

capacity between Texas Eastern Transmission LP and the Nueces Header to be constructed by Valley Crossing Pipeline LLC

SPIRE INC. – (3/18)

Operator: Spire STL Pipeline LLC

Page 5: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

2626 Pipeline News | July 2019 | pipeline-news.com

ONGOING PROJECTS Construction Underway

Project: Spire STL PipelineType: Project includes installation of steel

pipeline and minor modifications to Line 880

Length: 65 milesDiameter: 24 inchesLocation: Scott County, IL - St. Louis County, MOCapacity: 400 MMcf/dCompletion: 4Q 2019Comments: Project will connect to the existing

Rockies Express Pipeline

Contractor: T.G. Mercer Consulting Services Inc.Type: Project includes offloading of pipeContractor: Michels Corp.Type: Project includes pipeline construction

STERLING ENERGY – (3/18)

Project: Jackson Lake Gas Gathering SystemType: Project includes construction of a

pipeline gathering systemLength: 12.2 milesDiameter: 12 inchesLocation: Morgan County, CO – Weldona, COCompletion: 1Q 2020Comments: Project will connect to the Jackson

Lake Gas Processing Facility and be built adjacent to another pipeline that is already on the property

TALLGRASS INTERSTATE GAS TRANSMISSIONLLC – (2/18)

Owner: Tallgrass Energy Partners LPProject: Segment 55 Pipeline Abandonment ProjectType: Project includes abandoning an existing

pipeline segment in placeLength: 47 milesDiameter: 16 inchesLocation: Converse and Platte counties, WYComments: Segment will be sold to Tallgrass Midstream

LLC and converted to a crude oil pipeline

TELLURIAN

Project: Haynesville Global Access Pipeline (HGAP)

Capacity: 2 Bcf/dLocation: Southwest LouisianaDimensions: 160 miles of gas pipeline.Completion: 2Q 2023 (work to begin 2022)Summary: Tellurian is currently seeking shippers for

its pipeline and production facilities in DeSoto Parish, which will be connected to existing and proposed infrastructure near Gillis in Calcasieu Parish.

TELLURIAN

Project: Delhi Connector Pipeline (DCPL)Capacity: 2 Bcf/dLocation: Southwest LouisianaDimensions: 180 miles of 42-inch gas pipeline.Completion: 2023 (work to begin 2021)

Summary: Tellurian began a binding open season for the Delhi Connector, joining the Perryville/Delhi Hub in Richland Parish, to Gillis, La.

TRANSCONTINENTAL GAS PIPE LINE CO. LLC – (5/18)

Project: St. James Supply LateralType: Project includes construction of pipeline,

compressor stations and a pig receiver siteLength: 0.7 milesDiameter: 20 inchesLocation: St. James Parish, LACapacity: 161,500 Dth/dCompletion: 2020

UGI ENERGY SERVICES – (4/19)

Project: Auburn Gathering System ExpansionType: Project includes construction of two

additional compressor stationsLocation: Susquehanna and Wyoming counties, PACapacity: 150 MMcf/dCompletion: 1Q 2020Comments: Project will transport gas from acreage

being produced by Cabot Oil & Gas and will boost total system capacity to 620 MMcf/d

WBI ENERGY INC. – (10/18)

Project: Valley Expansion Pipeline ProjectType: Project includes construction of pipeline,

interconnect facilities, an electric compressor station, replacement of two existing town border stations and the construction a regulator station

Length: 38 milesDiameter: 16 inchesLocation: Clay County MN; Cass, Burleigh,

Stutsman and Barnes counties, NDCapacity: 40 MMcf/d

Project: Line Section 27 ExpansionType: Project includes expansion of the

existing Line Section 27 pipeline including pipeline construction and installation of associated facilities

Length: 13 milesDiameter: 24 inchesLocation: Northwest North DakotaCapacity: 200 MMcf/dComments: Upon completion, the total

transportation capacity on WBI Energy’s Line Section 27 will be over 600 MDth/d

WILLIAMS PARTNERS LP – (11/18)

Operator: Transcontinental Gas Pipe Line Co. LLCProject: Rivervale South to Market ProjectType: Project includes pipeline looping,

upgrades and existing facility modifications

Length: 11 milesLocation: New JerseyCapacity: 190 MDth/dCompletion: 2Q 2019Operator: Northwest Pipeline LLCProject: North Seattle Lateral Upgrade ProjectType: Project includes pipeline removal and

replacement with 20-inch diameter line and facility upgrades

Length: 7 milesDiameter: 8 inchesLocation: Snohomish County, WA

Operator: Transcontinental Gas Pipe Line Company, LLC

Project: Gulf Connector Expansion ProjectType: Project includes increasing compression

on the existing pipelineLocation: Texas – LouisianaCapacity: 475 MDth/dCompletion: 1Q 2019

WILLIAMS – (0619)

Project: Northeast Supply Enhancement (NSE)Capacity: 400.2 Btu/dLocation: NortheastDimensions: 10 miles of 42-inch pipe; offshore 23

miles of 26-inch pipe.Completion: Fall 2020 (to begin work 3Q 2019)Summary: FERC issued a certificate of public

convenience and necessity to Williams authorizing the Northeast Supply Enhancement (NSE) project – an expansion of the existing Transco natural gas pipeline designed to serve New York markets.

The project will expand existing Transco pipeline infrastructure in Pennsylvania, New Jersey and New York primarily by looping – placing new pipe alongside of existing pipe parallel to the existing right-of way.

The project will also add 21,902 hp at an existing compressor station, a new 32,000 hp compressor station and related facilities.

WILLIAMS PARTNERS LP – (1/19)

Project: Gateway Expansion ProjectType: Project includes installation of additional

electric horsepower at an existing compressor station (Station 303), modifications to an existing meter station and the replacement of an existing meter station

Location: Essex County, NJ; Passaic County, NJCapacity: 65 MDth/dStart: 4Q 2019Completion: 4Q 2020/2021Status: Project has FERC approval

GAS

Page 6: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

27pipeline-news.com | July 2019 | Pipeline News

Comments: Williams has executed agreements with PSEG Power and UGI Energy Services for firm transportation service under the project

WILLIAMS TRANSCONTINENTAL – (REV 3/18)

Owner: Williams Partners LPProject: Southeast Market Pipelines ProjectSegment: Hillabee Expansion (Phases I, II and III)Type: Project includes pipeline looping and

installation of additional compression on the mainline

Length: 45 milesDiameter: 42 inchesLocation: Coosa, Chilton and Choctaw counties, ALCapacity: 1.2 MMDth/dCompletion: 4Q 2021

CanadaENBRIDGE INC. – (6/18)Project: Spruce Ridge ProgramType: Project includes the addition of two

new sections of pipeline and additional compression on an existing pipeline

Length: 25 milesDiameter: 24 and 36 inches

Location: Chetwynd, BC and Fort St. John, BCCapacity: 402 MMcf/dCompletion: 3Q 2019

KEYERA CORP. – (2/18)

Project: North Wapiti Pipeline SystemType: Project includes construction of

a sour gas gathering pipeline, a condensate and water pipeline, and a compressor station

Length: 21 milesDiameter: 8 and 12 inchesLocation: Grande Prairie, ABCapacity: 150 MMcf/dCompletion: 2Q 2019

NOVA GAS TRANSMISSION LTD. – (9/18

Project: Northwest Mainline Loop (Boundary Lake North Section)

Type: Project includes pipeline loopingLength: 14 milesLocation: Clear Hills County, ABComments: Project will transport sweet natural gas

from a tie in connection adjacent to the Owl Lake South Meter Station to the existing Hidden Lake Compressor Station

PEMBINA PIPELINE CORP. – (7/18)

Project: Peace Pipeline Expansion (Phase VI)Type: Project includes pipeline construction and

installation of additional pump stationsDiameter: 16 and 20 inchesLocation: LaGlace - Wapitiand, AB and Kakwa to

Lator, ABCompletion: 1Q 2020

TRANSCANADA CORP. – (11/18)

Operator: Coastal GasLink Pipeline Ltd.Project: Coastal GasLink PipelineType: Project includes construction of pipeline

and compressor stationsLength: 416 milesDiameter: 48 inchesLocation: Dawson Creek - Kitimat, B.C.Completion: 2Q 2024

Contractor: Pacific Atlantic Pipeline Construction Inc.Type: Contract includes pipeline construction

Contractor: Surerus Murphy Joint VentureType: Contract includes pipeline construction

Contractor: SA Energy GroupType: Contract includes pipeline construction

GAS

Our name says it all.

Untitled-2 1 1/3/2018 7:09:52 AM

Page 7: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

28 Pipeline News | July 2019 | pipeline-news.com

ONGOING PROJECTS Construction Underway

“SAFETY FIRST - SERVICE ALWAYS”

• Pipeline Stringing - 60’ + 80’ pipe

• Unloading/Stockpiling Pipe from rail sidings

•Ship discharge/Project Pipe

• General/Heavy Hauling (Nationwide)

•Logistics/Cost Estimates

Contact:Jimmy MontgomeryJimmy@mtilogistics

Phone: (877) 787-4644, (713) 592-6766Fax: (713) 592-6769

Website: MTILOGISTICS.COM

Untitled-1 1 1/3/2018 7:08:24 AM

Contractor: Macro Spiecapag Joint VentureType: Contract includes pipeline constructionProject: North Montney ProjectType: Project includes construction of pipeline,

associated metering facilities, valve sites and compression facilities

Length: 190 milesDiameter: 42 inchesLocation: Peace River, ABCompletion: 3Q 2019

Contractor: Quanta Services Inc.Type: Contract includes pipeline construction

for spread three of the mainlineLength: 39 milesLocation: Fort St. John, BC

Contractor: Macro Enterprises Inc.Type: Contract includes pipeline construction

for spread two of the project

Contractor: SpiecapagType: Contract includes pipelaying for the project

TRANSGAS – (1/19)

Project: South Saskatoon Type: Project includes pipeline constructionLength: 38 miles

Location: Vascoy to Patience LakeCompletion: 4Q 2019Comments: The project involves initial construction

work to prepare the area, begin drilling the river crossing, and marking out right of ways. After initial construction, pipeline construction will begin.

Caribbean/South & Central AmericaENERGÍA ARGENTINA S.A. – (REV 3/19)Project: Argentina Northeast Gas PipelineSegment 1: Formosa, Salta and Santa FeSegment 2: Formosa, Chaco and Santa FeSegment 3: Corrientes and MisionesType: Project includes the construction of

three sections, comprising 1,810km of trunk lines and 2,334km of branch lines

Length: 2,574 miles (trunklines: 1,450) (gathering lines: 1,124 miles)Diameter: 24 inches (trunklines) 4 to 10 inches (gathering lines)Location: Formosa, Chaco, Santa Fe, Salta, Corrientes

and Misiones provinces, ArgentinaCapacity: 11.2 MMcf/dComments: Project will supply natural gas to 168 cities

and will connect to the national pipeline network and to the Juana Azurduy Pipeline linking Argentina with Bolivia

Contractor: TenarisType: Contract includes pipe supplyLength: 1,330 miles (trunklines) 403 miles (gathering lines)

Contractor: SIAT S.A. Type: Contract includes pipe supply

Contractor: Techint E&C-PanedileType: Contract includes engineering and

constructionSegment: Section I

Contractor: Vertúa S.A.Type: Contract includes engineering and

constructionSegment: Section II

Contractor: Helport-CPC-Rovella Carranza and Contreras Hnos

Type: Contract includes engineering and construction

Segment: Section III

PATAGONIA – (6/19)

GAS

Page 8: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

29pipeline-news.com | July 2019 | Pipeline News

GAS

brandt.ca 1-877-533-3133

SAY HELLO TO THE TOUGHEST, SAFEST, AND MOST STABLE

PIPELAYERS ON EARTH.Brandt pairs the performance advantages of John Deere’s 1050K-based dozer platform with our exclusive boom and winch configuration and best- in-class SmartLiftTM Dynamic Stability Monitoring system for unrivalled capacity, load control and operator visibility.

The result? You get the safest, best-handling and most stable machine on the job site. That’s Powerful Value. Delivered.

Project: Cordillerano Pipeline ExtensionType: Project includes the compressor plant in

Rio Senguer, along with 62 miles (100 km) of reinforcing gas pipelines, running parallel to the current one

Location: Bariloche, ArgentinaLength: 62 miles, 12-inch pipelineCompletion: 1Q 2020Comments: According to government sources work,

which is underway in Pilcaniyeu, Villa La Angostura, Trevelin and Gobernador Costa is more than 40% complete.

PERU – (REV 11/17)

Project: Southern Peruvian GaslineType: Project includes pipeline constructionLength: 620 milesDiameter: 32 inchesLocation: Camisea field - Southern PeruCapacity: 800 MMcf/dStatus: Peru has canceled a contract for

construction of the pipeline after the consortium hired to build it failed to meet its financing deadline. Odebrecht SA, the subject of a multinational corruption investigation, led the consortium with a 55% stake, Enagas SA held 25% and Grupo Grana y Montero 20%

Comments: If built, project will improve the existing Peruvian Energy Network, contributing to the development of an Energy Node and Petrochemical Hub in Southern Peru

Contractor: Tipiel SAType: Project includes the front-end

engineering and design for the pipeline

MexicoCOMISION FEDERAL DE ELECTRICIDAD – (12/17)

Project: Empalme Branch PipelineType: Project includes pipeline constructionLength: 12.5 milesDiameter: 24 inchesLocation: Sonora - EmpalmeCapacity: 236 MMcf/dStatus: Project is experiencing commissioning

delays Comments: Project will transport gas from the Sásabe-

Guaymas and Guaymas-El Oro pipelines to a combined cycle power plant

Contractor: Gasoducto de AguaprietaType: Project includes pipeline constructionProject: Hermosillo Branch PipelineType: Project includes pipeline constructionLength: 30 milesDiameter: 16 inchesLocation: Sonora - HermosilloCapacity: 100 MMcf/dStatus: Project is experiencing commissioning delays\Comments: Project will transport gas from the Sásabe -Guaymas Pipeline to a combined cycle power plant

Contractor: Gas Natural del NoroesteType: Project includes pipeline construction FERMACA PIPELINE EL ENCINO, S DE R.L. DE C.V. – (REV 6/17)

Owner: FermacaProject: La Laguna–Aguascalientes Natural Gas

PipelineType: Project involves building and operating a

natural gas pipelineLength: 290 milesDiameter: 42 inchesLocation: Durango - Zacatecas - AguascalientesCapacity: 1.2 Bcf/dComments: Pipeline will supply CFE’s power plants in

Aguascalientes and Jalico states, as well as central and western parts of the country

Contractor: Fermaca Pipeline el Encino, S de R.L. de C.V.

Type: Project includes engineering, procurement and construction for the pipeline

TRANSCANADA CORP. – (REV 4/19)

Project: Tuxpan-Tula PipelineType: Project includes the construction and

operation of a natural gas pipelineLength: 178 milesDiameter: 36 inches

Location: Tuxpan, Veracruz - TulaCapacity: 703 MMcf/dCompletion: DelayedComments: Pipeline will transport natural gas brought

from the US (through a future South Texas-Tuxpan Maritime Pipeline) to the states of Veracruz, Puebla and Hidalgo where it will be connected to the country’s pipeline network

Contractor: Jacobs Engineering GroupType: Project includes engineering, procurement

and construction for the pipelineProject: Tula - Villa de Reyes PipelineType: Project involves pipeline constructionLength: 284 milesDiameter: 36 inchesLocation: Tula, Hidalgo - Villa de Reyes, San Luis

PotosíCapacity: 550 MMcf/dComments: Work halted due to permitting costs.

Page 9: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

3030 Pipeline News | July 2019 | pipeline-news.com

ONGOING PROJECTS Construction Underway

GAS | International Africa

GAS

DANGOTE INDUSTRIES LTD. – (4/19)Owner: Dangote GroupProject: East West Offshore Gas Gathering SystemType: Project includes construction of two

parallel subsea pipelinesLength: 684 milesDiameter: 38 inchesLocation: Bonny, Rivers - Ogidigben – Olokola -

Lekki, LagosCapacity: 3 Bcf/dCompletion: 2Q 2025 (Phase II)Comments: Project will create a corridor for

evacuation of trapped gas from offshore platforms in Nigeria to allow their monetization and will deliver gas to a new build gas receiving plant to be located at the Dangote Refinery Complex in Lekki, Lagos

Contractor: Paradigm Environmental System Consultants

Type: Contracts includes conducting an Envir-onmental Impact Assessment for the project

GALSI PIPELINE – (REV 10/16)

Owners: Sonatrach/Edison/Enel/Hera GroupProject: Galsi PipelineType: Project includes the construction of

351 miles of offshore pipeline crossing the Mediterranean Sea and 161 miles of onshore pipeline, including gas compression facilities

Length: 512 milesLocation: Koudiet Draouche - PiombinoCompletion: Delayed indefinitelyComments: The initial transport capacity will be

8 Bcm per year

KINGDOM OF MOROCCO/FEDERAL REPUBLIC OF NIGERIA – (1/17)

Pipeline: Trans-African Pipeline Type: Project includes the construction of a

new gas pipelineLocation: Nigeria – Morocco - Europe.Comments: The Trans-African Pipeline will improve access

to energy across West Africa and establish a competitive regional market for electricity

NIGERIAN NATIONAL PETROLEUM CORP. – (6/18)Project: Ajaokuta - Kaduna – Kano (AKK) PipelineType: Project includes pipeline constructionLength: 381 milesDiameter: 40 inchesLocation: Kaduna - KanoCost: $2.8 billionCompletion: 4Q 2020Comments: Project will help establish connectivity

between the East, West and North parts of Nigeria

Contractor: OilServe/OandoType: Contract includes construction of Lot 1

of the pipelineLength: 125 milesCost: $855 million

Contractor: Brentex/China Petroleum Pipeline Bureau

Type: Contract includes construction of Lot 3 of the pipeline

Length: 137 milesCost: $1.2 billion

Page 10: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

31pipeline-news.com | July 2019 | Pipeline News

GASNOBLE ENERGY

Project: Alen Gas ProjectLocation: Republic of Equatorial GuineaCapacity: 950 MMcfe/dDimensions: 43 miles (70 km); 24-inch natural gas

equivalent Completion: 2021Summary: Designed to transport natural gas

processed through the Alen offshore platform to onshore facilities.

Asia PacificAPA GROUP – (3/18)

Owner 1: Gold Road Resources Ltd., 50%Owner 2: Gold Fields Ltd., 50%Project: Yamarna Gas PipelineType: Project includes pipeline construction

and a gas-fired stationLength: 123 milesLocation: Yamarna, Western AustraliaCost: $180 millionComments: Project is part of the Gruyere Project and

will be built east of Laverton in Western Australia, running from a connection point off the existing Eastern Goldfields Gas Pipeline to the new Gruyere gold mine project site

Contractor: NacapType: Project includes pipeline construction

AZERBAIJAN INTERNATIONAL OPERATING CO. – (REV 11/15)

Project: Azeri PipelineType: Project includes the construction of new

pipelineLength: 2,175 milesLocation: Georgia, Turkey, Greece, Bulgaria,

Albania and ItalyCompletion: 2019Comments: Pipeline will have a capacity of 16 Bcm/y

GAIL INDIA LTD. – (3/18)

Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas Pipeline (Phase I)

Type: Project includes construction of a transmission pipeline and multiple spur lines

Length: 470 milesDiameter: 4, 8, 12, 18, 30 and 36 inchesLocation: Phulpur – Dobhi

Capacity: 565 Bcf/d (Phase I and II)Cost: $50 millionComments: Project will usher Industrial development

in eastern part of India by supplying environmentally clean natural gas to fertilizer and power plant, refineries, steel plants and other Industries

Contract: JSIW Infrastructure Pvt. Ltd.Type: Project includes engineering, design,

procurement and construction

Contract: IL&FS Engineering & Construction Co. Ltd.

Type: Project includes pipelaying

Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas Pipeline (Phase II)

Type: Project includes pipeline constructionLength: 1,180 milesDiameter: 4, 8, 12, 18, 30 and 36 inchesLocation: Jharkhand - West Bengal - OdishaCapacity: 565 Bcf/d (Phase I and II)Cost: $146 millionCompletion: 4Q 2020Comments: Project will usher Industrial development

in eastern part of India by supplying environmentally clean natural gas to fertilizer and power plant, refineries, steel plants and other Industries

Contract: JSIW Infrastructure Pvt. Ltd.Type: Project includes engineering, design,

procurement and construction

Contract: IL&FS Engineering & Construction Co. Ltd.

Type: Project includes pipelaying

GUJARAT STATE PETROLEUM CORP. – (REV 12/16)

Contractor: GSPL India GasnetProject: Mehsana-Bhatinda PipelineType: Project includes the construction of new

pipelineLength: 1,037 milesLocation: Mehsana-BhatindaComments: Pipeline is currently being considered

for cancellation but, if built, will have a transportation capacity of 30 MMcf/d

Contractor: GAILProject: Mallavaram-Bhilwara PipelineType: Project includes the construction of new

pipelineLength: 984 milesLocation: Mallavaram - BhilwaraComments: Pipeline is currently being considered for

cancellation.

IIL&FS ENGINEERING AND CONSTRUCTION CO. LTD. – (REV 2/17)

Owner: Gas Authority of India Ltd.Project: Kochi-Koottanad-Bangalore-Mangalore

PipelineType: Project includes the laying and

construction of 30-inch pipeline along with associated works

Length: 685 milesLocation: KeralaCompletion: 2019Comments: GAIL has won a second extension for

completing the project as it faces unprecedented problems in getting land in Kerala and Tamil Nadu

PETROVIETNAM GAS/MOECO/PTTEP – (REV 6/16)

Project: O Mon Gas PipelineType: Project includes the construction of

risers, subsea pipeline, onshore pipeline and a line break valve

Length: 248 milesLocation: Malay Basin - southern VietnamCompletion: 2023Comments: Pipeline will have a capacity of 20.3

MMcm/y

RELIANCE INDUSTRIES – (REV 11/16)

Owner: China National Petroleum Corp.Project: Shahdol-Phulpur PipelineType: Project includes the construction of new

pipelineLength: 188 milesLocation: Shahdol - Jaysing Nagar - Beohari-Gurh

- PhulpurCompletion: 2023Comments: Pipeline will have a capacity of 4.3

MMcm/d

Project: Dahej Nagothane Ethane Pipeline Project Type: Project includes the construction of new

pipelineLength: 301 milesLocation: Dahej, Gujarat – Nagothane, Maharashtra Comments: Project will transport 1.25 mtpa of liquid

ethane

Page 11: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

3232 Pipeline News | July 2019 | pipeline-news.com

ONGOING PROJECTS Construction Underway

Oil | The AmericasU.S.

ENLINK MIDSTREAM PARTNERS LP — (6/19)Project: Avenger Crude Oil Gathering SystemType: Project includes construction of a

gathering systemLength: 57 milesLocation: Eddy and Lea counties, NMCompletion: 1Q 1220Comments: System is anchored by a 10-year contract

with Devon Energy Corp. and is supported by dedications from Devon’s Todd (Eddy and Lea Counties, NM) and Potato Basin (Eddy County, NM) development areas

EPIC PIPELINE CO. LLC – (REV 4/19)

Project: EPIC Crude Oil PipelineType: Project includes pipeline construction Length: 730 milesDiameter: 16, 20, 24 and 30 inchesLocation: Orla, Pecos, Crane and Midland counties,

TX - Corpus Christi, TX Capacity: 900,000 bpdCompletion: 3Q 2019Status: EPIC has executed definitive agreements

to add Diamondback Energy as a strategic partner and signed other new primary shippers

Comments: Project will link producers’ NGL reserves in the Permian and Eagle Ford Basins to Gulf Coast refiners, petrochemical companies and export markets, and will run side by side with the previously announced EPIC NGL Pipeline

Contractor: Pumpco Inc. Type: Project includes pipeline construction

Contractor: Holloman Corp. Type: Project includes pipeline construction

Contractor: MPG Pipeline Contractors LLCType: Project includes pipeline construction

ENTERPRISE PRODUCTS PARTNERS LP – (2/19)

Project: Seaway 2 Pipeline ExpansionType: Project includes adding drag reducing

agents to boost capacity on the Seaway 2 line by about 100,000 bpd

Capacity: 100,000 bpdCompletion: 2Q 2019

EXXONMOBIL PIPELINE CO. — (6/18)

Project: Delaware Connector PipelineType: Project includes pipeline constructionLength: 48 milesDiameter: 30 inchesLocation: Loving and Winkler counties, TXComments: Pipeline will help the company triple

Permian output by 2025

GIBSON ENERGY INC. – (5/19)Project: Viking PipelineType: Project includes pipeline constructionLength: 75 milesLocation: Viking Basin – Hardisty, ABCapacity: 13.3 Mbpd (initial), 25 Mbpd (maximum)Completion: In Service Marxh 1

JUPITERMLP LLC – (11/18)Project: Jupiter PipelineType: Project includes construction of pipelineLength: 670 milesDiameter: 16, 20 inchesLocation: Orla, TX – Port of Brownsville, TXCapacity: 30,000 bpdCompletion: 2020

NOBLE MIDSTREAM PARTNERS LP – (11/18)

Project: Wink Trunk LineType: Project includes pipeline constructionLength: 95 milesDiameter: 20 inchesLocation: Pecos County, TX - Winkler County, TXCapacity: 200 MbpdCompletion: 2Q 2019

NUSTAR PERMIAN TRANSPORTATION ANDSTORAGE LLC – (6/18)

Project: County Line Lateral Pipeline System/County Line Lateral Loop

Type: Project includes construction of multiple interconnects connecting to the existing system

Location: Howard County, TXLength: 13 milesDiameter: 16 inchesCapacity: 70,000 bpd

ORYX MIDSTREAM SERVICES II LLC – (REV 8/18)

Project: Oryx II PipelineType: Project includes pipeline construction

and loopingLength: 400 milesDiameter: 16, 20 and 24 inchesLocation: Carlsbad, NM - Midland, TXCapacity: 650 MMbbl (transportation), 1.5 MMbbl

(storage)Completion: 4Q 2019

Contractor: Holloman Corp.Type: Contract includes the engineering,

procurement and construction of pipeline

PLAINS ALL AMERICAN PIPELINE LP – (11/18)

Project: Cactus II PipelineType: Project includes construction of two

pipelines that will connect to the existing

Cactus networkLength: 80 milesDiameter: 20 inchesLocation: Odessa, TX – McCamey, TX (first

pipeline), Corpus Christi, TX – Ingleside, TX

(second pipeline)Capacity: 185,000 bpdStatus: Project’s capacity has been fully

committedCompletion: 3Q 2019

SEABROOK LOGISTICS LLC – (3/18)

Owner 1: Magellan Midstream Partners LP, 50%Owner 2: LBC Tank Terminals LLC, 50%Type: Project includes the construction a

bi-directional pipelineLength: 13 milesDiameter: 24 inchesLocation: Seabrook, TX

Contractor: Troy Construction Co.Type: Project includes pipeline construction

TALLGRASS ENERGY/SILVER CREEKMIDSTREAM (6/19)

Project: Powder River Gateway Project Type: Project includes construction of two

pipelinesLength: 52 milesDiameter: 12 inchesLocation: Converse County, WYCapacity: 200,000 bpdCompletion: 4Q 2019

CanadaPEMBINA PIPELINE CORP. – (REV 4/19)Project: Phase IV ExpansionType: Project involves the expansion of the Fox

Creek and Namao Pipeline through two new pump stations

Location: Fox Creek - NamaoLength: 137 milesDiameter: 20 inchesCapacity: 180,000 bpdCompletion: 3Q 2019Comments: Pembina has the ability to further expand

capacity between Fox Creek and Namao by adding additional pump stations

Project: Phase V ExpansionType: Project involves pipeline construction,

installation of a new pump station and upgrading an existing pump station

Location: Lator and Fox Creek, ABLength: 60 milesDiameter: 20 inches

OIL

Page 12: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

33pipeline-news.com | July 2019 | Pipeline News

Capacity: 260,000 bpd (transmission) 40,000 bpd (storage)Status: Clearing of the right-of-way is almost

completeCompletion: 2Q 2019Comments: Project will address capacity constraints

between Lator and Fox Creek by adding capacity, which will support growth in

the prolific Monteny and Deep Basin resource plays

RANGELAND MIDSTREAM CANADA

Project: Marten Hills Pipeline SystemCapacity: Not determinedLocation: Northcentral AlbertaDimensions: 53 miles (85 km) of crude and

condensate pipeline.Completion: 2Q 2020 Summary: The system will gather crude oil

production from the Clearwater formation, described by the company as “emerging as an extremely economic play with low extraction costs using modern multilateral horizontal drilling.”

NGL | The AmericasU.S.

ENERGY TRANSFER PARTNERS LP – (12/18)Project: Lone Star Express Pipeline Expansion

Type: Project includes pipeline construction and an additional fractionation facility

Length: 352 milesDiameter: 24 inchesLocation: West Texas - Mont Belvieu, TXCapacity: 150,000 bpdCompletion: 4Q 2020

ENTERPRISE PRODUCTS PARTNERS LP – (6/17)

Project: Shin Oak NGL PipelineType: Project includes the construction of pipelineLength: 571 milesDiameter: 24 inchesLocation: Gaines County, TX - Mont Belvieu, TXCapacity: 50 Mbpd (initial) 600 Mbpd (maximum)Completion: 2Q 2019

Comments: Project will have an initial design capacity of 250,000 bpd, expandable to 600,000 bpd

ENTERPRISE PRODUCTS PARTNERS LP – (12/18)

Project: Mentone PipelineType: Project includes construction of large-

diameter gathering and residue pipelines and expanding compression capabilities

Length: 66 milesLocation: Loving County, TXCapacity: 40,000 bpdCompletion: 2Q 2019Comments: Project will allow the Mentone natural

gas processing plant to link to the partnership’s NGL system, including the Shin Oak Pipeline scheduled for completion in the second quarter of 2019, as well as Enterprise’s existing Texas Intrastate natural gas pipeline network

EPIC NGL PIPELINE LP – (REV 6/19)

Project: EPIC NGL PipelineType: Project includes construction of pipelineLength: 650 milesDiameter: 16, 20, 24 and 30 inchesLocation: Orla, Pecos, Crane and Midland counties,

TX - Corpus Christi, TX Capacity: 220,000 bpd (initial)

440,000 bpd (maximum)Completion: 1Q 2019Comments: First phase of the project is complete

Project: WPX LateralType: Project includes construction of a

pipeline lateralLength: 6 milesDiameter: 8 inchesLocation: Reeves County, TXCompletion: 3Q 2019Comments: Project is associated with the EPIC

NGL Pipeline

ONEOK INC. – (11/18)Project: Arbuckle II NGL PipelineType: Project includes pipeline constructionLength: 530 milesDiameter: 24 and 30 inchesLocation: Oklahoma - Mont Belvieu, TXCapacity: 500 MMbpd (initial), 1 MMbpd (maximum)Completion: 1Q 2021

PHILLIPS 66 – (8/18)Project: Sweeny PipelineType: Project includes associated pipeline

construction for the Sweeny Hub ExpansionLocation: Old Ocean, TXCompletion: 4Q 2020Comments: Project is part of the Sweeny Hub ExpansionTARGA RESOURCES CORP. – (REV 5/18)

Project: Grand Prix NGL PipelineType: Project includes construction of pipelineLength: 75 milesDiameter: 24, 30 inchesLocation: West Texas - Mont Belvieu, TX North Texas - OklahomaCapacity: 450 Mbpd (initial) 950 Mbpd (maximum)Completion: 2Q 2019Comments: Targa announced the Grand Prix NGL

Pipeline Extension, which will run from North Texas to Oklahoma and have an initial capacity of 300 Mbpd and a maximum capacity of 950 Mbpd

Contractor: WHC Energy Services Inc.Type: Project includes pipeline construction

WEST TEXAS LPG PIPELINE LTD. – (REV 6/18)Project: Delaware Basin ExtensionType: Project includes construction of pipeline, two pump stations and pipeline loopingLength: 120 milesDiameter: 16 inches Location: Midland, TX - Reeves County, TXCapacity: 110,000 bpd (initial)

Contractor: WHC Energy Services LLCType: Project includes pipeline construction

Project: Delaware Basin Extension LoopingType: Project includes construction of pipeline loopingLength: 30 milesDiameter: 16 inches Location: Midland and Howard counties, TXComments: Project is associated with the Delaware Basin Extension on the existing West Texas LPG PipelineContractor: WHC Energy Services LLCType: Project includes pipeline construction

WOOD GROUP – (1/19)

Type: Project includes steel pipeline construction

Location: West TXLength: 80 milesStatus: Contract awardedComments: Wood has been awarded a $43 million

contract by a large-cap midstream company

CanadaSEMCAMS MIDSTREAM AND KEYERA

Project: Canada Liquids Pipeline SystemLocation: Northern Midland BasinCapacity: 100,000 bpd, expandable to 200,000

bpdDimensions: 171 miles (275 km); 16-inch condensate,

12-inch NGL pipelines.Completion: 2022Summary: The pipeline will connect the liquids-

rich Montney and Duvernay production areas of northwestern Alberta to the fractionation and condensate hubs in Fort Saskatchewan, Alberta.

OIL | NGL

Page 13: GAS | The Americas · 24 uly 21 pipelinenewscom ONGOING PROJECTS Construction nerway JACKALOPE GAS GATHERING SERVICES LLC – (9/18) Project: Jackalope Gas Gathering System Expansion

3434 Pipeline News | July 2019 | pipeline-news.com

ONGOING PROJECTS Construction Underway

PRODUCTS The Americas U.S.AIR LIQUIDE AMERICA CORP. – (3/18)

Owner: Air Liquide SAProject: Air Liquide St. James PipelineType: Project includes pipeline constructionLength: 25 milesDiameter: 12 inchesLocation: St. James Parish, LACost: $170 millionCompletion: 4Q 2019

Contractor: Air Liquide Global E&C SolutionsType: Project includes engineering

Contractor: Hollico Inc.Type: Project includes pipeline construction

CENEX PIPELINE LLC – (5/18)

Project: Cenex Pipeline ReplacementType: Project includes 8-inch pipeline

replacementLength: 182 milesDiameter: 10 inchesLocation: Sidney, MT – Minot, NDCompletion: 2Q 2019

ENBRIDGE OFFSHORE FACILITIES LLC – (12/18)

Project: Vito Field Development ProjectType: Project includes development of the Vito

FieldLength: 67 milesDiameter: 10, 18 inchesLocation: offshore New Orleans, LA

Contractor: Subsea 7Type: Contract includes pipeline installation

ONEOK INC. – (11/18)

Project: West Texas LPG System Expansion IIType: Project includes upgrades to two existing

pumps and pipeline looping on the existing West Texas LPG System

Location: Midland County, TX – Loving County, TXCapacity: 80,000 bpdCompletion: 1Q 2020

CanadaHUSKY ENERGY – (10/17)

Owner 2: Suncor Energy (25%)Owner 3: Nalcor Energy (5%)Project: West White Rose Extension ProjectType: Project includes the construction of a

new fixed wellhead platform in the White Rose Field

Location: offshore St. JohnsCapacity: 75,000 bpdCompletion: 1Q 2022

Contractor: TechnipFMC Type: Contract includes engineering,

procurement, construction and installation subsea equipment, including tie-in manifolds, flexible flowlines, and control umbilicals, which will connect the recently announced West White Rose platform to the existing SeaRose FPSO vessel

Caribbean/South & Central AmericaINFRAESTRUCTURA MARINA DEL GOLFO – (4/18)

Owner: TransCanada Corp.Project: Sur de Texas-Tuxpan PipelineType: Project includes pipeline constructionLength: 497 milesDiameter: 42 inchesCapacity: 2.6 MMcf/dLocation: Gulf of Mexico - Tuxpan, VeracruzCompletion: 4Q 2019Comments: The subsea gas pipeline will interconnect

with the Nueces-Brownsville Pipeline and the Tuxpan-Tula Pipeline

Contractor: M2 SubseaType: Project includes pipeline span support

installation for the projectComments: M² Subsea will manage the project

working closely with local partner Frontera Resources using the Mexican flagged multipurpose support vessel Tehuana, as well as installing grout supports along the southern leg of the pipeline to prevent stress during installation and hydrostatic testing

Contractor: AllseasType: Project includes the supply a Ballgrab

Pipeline Recovery Tool (PRT) for a subsea pipeline

Contractor: Nippon Steel & Sumitomo Metal Corp./Mitsui & Co. Ltd.

Type: Project includes the supply of a 600,000 ton steel order consisting of large diameter welded steel pipe and plate as raw material for the pipeline

Contractor: Shawcor Ltd.Type: Project includes the coating of pipe

with the application of concrete weight coating in a variety of thicknesses (2.25, 2.75 and 3.5 inches) and the installation

of 5,000 sacrificial anodesPETROBRAS – (12/18)

Project: Rota 3 Gas Export PipelineType: Project includes construction of the third

subsea pipeline segment of an existing system

Length: 6 milesDiameter: 24 inchesLocation: offshore Rio de Janeiro

Contractor: McDermott International Inc. Type: Contract includes design, engineering,

procurement, construction and installation of a rigid concrete coated pipeline to the shore, including a horizontal directional drill, tie-in spools and pre-commissioning services

MexicoFIELDWOOD ENERGY – (11/18)

Project: Katmai Field DevelopmentType: Project includes the development of the

deepwater Katmai FieldLength: 25 milesDiameter: 12 inchesLocation: US Gulf of Mexico (Green Canyon 40)

Contractor: Subsea Integration AllianceType: Contract includes project management,

engineering, procurement, construction and installation of a flowline and tie-ins

PEMEX EXPLORACIÓN Y PRODUCCIÓN – (6/19)

Project: Ayatsil Field PipelineType: Project includes subsea pipeline flowline

installation in support of its Ayatsil FieldLength: 3 milesDiameter: 8 and 24 inchesLocation: Bay of Campeche, offshore MexicoCompletion: 2Q 2019

Contractor: McDermott International Inc.Type: Contract includes design and detailed

engineering, procurement, construction and installation of two subsea pipelines

TECHNIP FMC – (5/17)Owner: Shell Offshore Inc.Project: Kaikias deep water projectType: Project includes the delivery, integration,

and installation of the subsea production system and subsea riser, jumper and flowline equipment for phase one of the project

Location: Gulf of Mexico