gas cooled reactor operating history

32
-1- IAEA-ICTP Workshop on Nuclear Reaction Data for Advanced Reactor Technologies ICTP – Trieste, Italy, 18-30 May 2008 Gas-Cooled Reactors –Technology Options, Operating Research Reactors and Demonstration Plant Project Initiatives J. M. Kendall Global Virtual LLC

Upload: kamea

Post on 01-Feb-2016

40 views

Category:

Documents


0 download

DESCRIPTION

IAEA-ICTP Workshop on Nuclear Reaction Data for Advanced Reactor Technologies ICTP – Trieste, Italy, 18-30 May 2008. Gas-Cooled Reactors –Technology Options, Operating Research Reactors and Demonstration Plant Project Initiatives J. M. Kendall Global Virtual LLC. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Gas Cooled Reactor Operating History

-1-

IAEA-ICTP Workshop onNuclear Reaction Data for

Advanced Reactor Technologies

ICTP – Trieste, Italy, 18-30 May 2008

Gas-Cooled Reactors –Technology Options, Operating Research Reactors and

Demonstration Plant Project Initiatives

J. M. KendallGlobal Virtual LLC

Page 2: Gas Cooled Reactor Operating History

-2-

Gas Cooled ReactorOperating History

Dragon Peach Bottom I Fort St. Vrain AVR THTR

UK USA USA Germany Germany

Rods Rods Blocks Pebbles Pebbles

1964-1976 1966-1974 1977-1989 1966-1988 1985-1989

20 MWt 115 MWt 842 MWt 46 MWt 750 MWt

40 MWe 330 MWe 15 MWe 296 MWe

350-750˚C 344-728˚C 406-785˚C 275-950˚C 250-750˚C

Page 3: Gas Cooled Reactor Operating History

-3-

Major Technology Options

Pebble Bed

Prismatic Block

Page 4: Gas Cooled Reactor Operating History

-4-

Fuel Sphere

Half Section

Coated Particle

Fuel Kernel

Dia. 60 mm

Dia. 0,92 mm

Dia.0,5 mm

5mm Graphite layer

Coated particles imbeddedin Graphite Matrix

Pyrolytic Carbon Silicon CarbidePyrolytic Carbon Porous Carbon Buffer

Uranium Dioxide

Technology OptionPebble Bed

PBMR Pty presentations to US Nuclear Regulatory Commission, Meeting on PBMR Safety and Design Familiarization, 28 February – 2 March 2006.

Page 5: Gas Cooled Reactor Operating History

-5-

Technology OptionPebble Bed

PBMR Pty presentations to US Nuclear Regulatory Commission, Meeting on PBMR Safety and Design Familiarization, 28 February – 2 March 2006.

Page 6: Gas Cooled Reactor Operating History

-6-

Technology OptionPebble Bed

PBMR Pty presentations to US Nuclear Regulatory Commission, Meeting on PBMR Safety and Design Familiarization, 28 February – 2 March 2006.

Page 7: Gas Cooled Reactor Operating History

-7-

Technology OptionPrismatic Block

Uranium Oxycarbide

Porous Carbon Buffer

Silicon Carbide

Pyrolytic Carbon

PARTICLES COMPACTS FUEL ELEMENTS

INEEL/EXT-04-02331, Reactor Physics Parametric and Depletion Studies in Support of TRISO Particle Fuel Specification for the Next Generation Nuclear Plant, September,2004.

Page 8: Gas Cooled Reactor Operating History

-8-

Technology OptionPrismatic Block

INEEL/EXT-04-02331, Reactor Physics Parametric and Depletion Studies in Support of TRISO Particle Fuel Specification for the Next Generation Nuclear Plant, September,2004.

Page 9: Gas Cooled Reactor Operating History

-9-

Technology OptionPrismatic Block

INEEL/EXT-03-00870, Rev. 1, NGNP Point Design – Results of the Initial Neutronics and Thermal-Hydraulic Assessments During FY-03, September,2003.

Page 10: Gas Cooled Reactor Operating History

-10-

Operating Research Reactors

HTR-10Pebble Bed

China

HTTRPrismatic Block

Japan

Page 11: Gas Cooled Reactor Operating History

-11-

Operating Research ReactorsHTR-10 (China)

Z. Daxin, Q. Zhenya, INET, Overview of the 10 MW High Temperature Gas-Cooled Reactore Test Module, Seminar on HTGR Application and Development, Beijing, 19-21 March 2001.

Page 12: Gas Cooled Reactor Operating History

-12-

Operating Research ReactorsHTR-10 (China)

IAEA-TECDOC-1382, Evaluation of high temperature gas cooled reactor performance: Benchmark analysis related to initial testing of the HTTR and HTR-10, November 2003.

10 MWt

Page 13: Gas Cooled Reactor Operating History

-13-

Operating Research ReactorsHTR-10 (China)

Z. Zhensheng, H Shuyan, INET, Structural Design Features of Ceramic Internals in HTR-10, Seminar on HTGR Application and Development, Beijing, 19-21 March 2001.

Page 14: Gas Cooled Reactor Operating History

-14-

Operating Research ReactorsHTR-10 (China)

Initial Criticality December 2000

Page 15: Gas Cooled Reactor Operating History

-15-

Operating Research ReactorsHTTR (Japan)

IAEA-TECDOC-1382, Evaluation of high temperature gas cooled reactor performance: Benchmark analysis related to initial testing of the HTTR and HTR-10, November 2003.

30 MWt

Page 16: Gas Cooled Reactor Operating History

-16-

Operating Research ReactorsHTTR (Japan)

IAEA-TECDOC-1382, Evaluation of high temperature gas cooled reactor performance: Benchmark analysis related to initial testing of the HTTR and HTR-10, November 2003.

Page 17: Gas Cooled Reactor Operating History

-17-

Operating Research ReactorsHTTR (Japan)

Page 18: Gas Cooled Reactor Operating History

-18-

Operating Research ReactorsHTTR (Japan)

Initial Criticality November 1998

Page 19: Gas Cooled Reactor Operating History

-19-

Demonstration ProjectsPebble Bed and Prismatic Block

Ongoing Projects• Pebble Bed

• China – HTR-PM• South Africa – PBMR

• Prismatic Block or Pebble Bed• USA - NGNP

Initiatives (Prismatic Block)• US/Russia – GT-MHR Pu• Japan – GTHTR 300

Page 20: Gas Cooled Reactor Operating History

-20-

Demonstration ProjectsHTR-PM (China)

Wu Zongxin, INET, Introduction of HTR-PM Demonstration Project, IAEA Technical Meeting on the Safety of HTGRs, Beijing, October 2007.

Page 21: Gas Cooled Reactor Operating History

-21-

Demonstration ProjectsHTR-PM (China)

Wu Zongxin, INET, Introduction of HTR-PM Demonstration Project, IAEA Technical Meeting on the Safety of HTGRs, Beijing, October 2007.

• Pebble Bed

• 2 Reactor/Steam Generator units at 250 MWt each

• Steam Turbine-Generator output 200 Mwe

• Scheduled Completion ~2013

Page 22: Gas Cooled Reactor Operating History

-22-

Demonstration ProjectsHTR-PM (China)

Wu Zongxin, INET, Introduction of HTR-PM Demonstration Project, IAEA Technical Meeting on the Safety of HTGRs, Beijing, October 2007.

Page 23: Gas Cooled Reactor Operating History

-23-

Demonstration ProjectsPBMR DPP (South Africa)

J. Slabber, Pebble Bed Modular Reactor Project, IAEA TWG-GCR 20, Vienna, January 2007.

Page 24: Gas Cooled Reactor Operating History

-24-

Demonstration ProjectsPBMR DPP (South Africa)

• Pebble Bed

• Annular reactor core 400 MWt

• Direct cycle gas turbine ~175 MWe

• Scheduled Completion ~2013

J. Slabber, Pebble Bed Modular Reactor Project, IAEA TWG-GCR 20, Vienna, January 2007.

Page 25: Gas Cooled Reactor Operating History

-25-

Demonstration ProjectsPBMR DPP (South Africa)

J. Slabber, Pebble Bed Modular Reactor Project, IAEA TWG-GCR 20, Vienna, January 2007.

Page 26: Gas Cooled Reactor Operating History

-26-

Demonstration ProjectsPBMR DPP (South Africa)

Reactivity Control System(RCS)

Reserve Shutdown System(RSS)

Core Unloading Device(CUD)

Core Structures(CS)

Reactor Pressure Vessel(RPV)

Fuel Core

Reactor Pressure Vessel

Gas Riser Channels

Control Rod Channels

SAS Channels

Core Barrel

Side Reflector

Centre Reflector

Core Inlet Pipe connection

Core Outlet Pipe connection

Core Inlet Pipe connection

J. Slabber, Pebble Bed Modular Reactor Project, IAEA TWG-GCR 20, Vienna, January 2007.

Page 27: Gas Cooled Reactor Operating History

-27-

Demonstration ProjectsNGNP (USA)

INL/EXT-07-12967, Next Generation Nuclear Plant Pre-Conceptual Design Report, September 2007

Page 28: Gas Cooled Reactor Operating History

-28-

Demonstration ProjectsNGNP (USA)

INL/EXT-07-12967, Next Generation Nuclear Plant Pre-Conceptual Design Report, September 2007

• Three competing design organizations• Westinghouse• AREVA• General Atomics

• Pebble Bed or Prismatic

• 500-600 MWt

• Combined Electricity and Hydrogen Production

• Scheduled Completion ~2018

Page 29: Gas Cooled Reactor Operating History

-29-

Demonstration ProjectsNGNP (USA)

INL/EXT-07-12967, Next Generation Nuclear Plant Pre-Conceptual Design Report, September 2007

• Westinghouse

• Pebble Bed

• Hydrogen production topping cycle

• Steam turbine bottoming cycle

Page 30: Gas Cooled Reactor Operating History

-30-

Demonstration ProjectsNGNP (USA)

INL/EXT-07-12967, Next Generation Nuclear Plant Pre-Conceptual Design Report, September 2007

• AREVA

• Prismatic

• Parallel Hydrogen production cycle

• Parallel gas turbine with steam turbine bottoming cycle

Page 31: Gas Cooled Reactor Operating History

-31-

Demonstration ProjectsNGNP (USA)

INL/EXT-07-12967, Next Generation Nuclear Plant Pre-Conceptual Design Report, September 2007

• General Atomics - Prismatic

• Direct cycle gas turbine

• Parallel Hydrogen production cycle

Page 32: Gas Cooled Reactor Operating History

-32-

Demonstration ProjectsNGNP (USA)

INL/EXT-07-12967, Next Generation Nuclear Plant Pre-Conceptual Design Report, September 2007

WestinghousePebble Bed

AREVAPrismatic

General AtomicsPrismatic