garrett hare senior project pp
DESCRIPTION
TRANSCRIPT
![Page 1: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/1.jpg)
Garrett Hare: Senior Project 2011-12
Freestyle BMX Bicycle
![Page 2: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/2.jpg)
Project Facilitator
My Project Facilitator was Jonathan Vejjajiva. He is the manager of Free-Flite Bicycles in Riverstone.
![Page 3: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/3.jpg)
Research Paper
My research paper consisted of the basics of bicycle constructing, riding, and the history of BMX.___________________________________________________________It ties into my project because this background information is needed to understand the logistics of bicycles.
![Page 4: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/4.jpg)
My Career in Bicycles
I plan to open my own bicycle shop in Canton, Ohio.___________________________________________________________I grew up in a little town close to it, and would like to move back, and create my own business doing something that I love.___________________________________________________________Bikes that will be worked on, made, and maintainanced at my shop will consist of Mountain bikes, Cruisers, and all BMX bicycles freestyle, and racing.
![Page 5: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/5.jpg)
Paint Sanding Prep
Everything must be laid out in order to see what needs to be done before sanding, and painting.
![Page 6: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/6.jpg)
Paint Stripping
All paint on the parts of the bike must be sanded off before the finishing paint is added.
![Page 7: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/7.jpg)
Paint Job Prep
Once everything has been sanded down, it is now ready for the finishing paint job.
![Page 8: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/8.jpg)
Removing Spokes
Before hub removal.
After hub removal, the spokes must be removed.
Spokes after removal, ready for sanding.
![Page 9: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/9.jpg)
Spokes Sanded
All spokes are sanded and ready for paint.
![Page 10: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/10.jpg)
Painting Spokes
Spokes sanded. 32 spokes painted yellow.
32 spokes painted black.
![Page 11: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/11.jpg)
Ready For Paint
Everything has been sanded and is ready to paint.
![Page 12: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/12.jpg)
Frame Paint Job
Perfection, patience and hard work pay off.
![Page 13: Garrett hare senior project pp](https://reader035.vdocuments.mx/reader035/viewer/2022062615/54852fe0b47959ec0c8b4de6/html5/thumbnails/13.jpg)
Spokes and Rim Wall
Spokes and Rim Wall
Rim walls, and spokes painted and almost complete.