Gaotha go Rothaí Wind to Wheels Fáilte Róimh Gaotha go Rothaí Wind to Wheels Graham Brennan Sustainable Transport Programme Manager Inis Oírr 01/04/2011 Overview Aran Islands Energy Snap Shot All Electric Wind/Ocean Concept Preliminary Study Results Technology Development and Demonstration: Gaotha go Rothaí – Wind to Whels Rationale & Goals • Components The Cars Energy Snap Shot of Aran Islands 1,500 Tonnes of Oil Equivalent 62% Heat (% coal, kerosene) 25% Electricity 13% Transport (8,400km av) 1.2mEuro Energy Bill for Islands pa Renewable Energy Resources – Wind Max Capacity = 3MW 675kW wind farm on Inis Meain Special Area of Conservation – Wave 17.5MW within 5km (3MW!) – Tidal Current speed <2m/s so tidal energy not viable 3MW Cable TOE per Capita Aran vs Ireland 0.21 0.19 0.35 0.16 0.31 0.18 0.08 0.05 0.49 0.16 0.13 0.06 0.00 0.10 0.20 0.30 0.40 0.50 0.60 Kerosene Diesel Coal Transport Electricity Natural Gas Peat T O E p e r c a p i t a Aran Ireland Average Consumption per Dwelling Aran Island kWh 22,816 4,837 9,446 Heat Transport Electricity Ireland Residential kWh 19,713 19,522 5,591 Heat Transport Electricity

Upload: others

Post on 26-Jun-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gaotha go Rothaí Wind to Wheels - The European Network ...enrd.ec.europa.eu/enrd-static/fms/enrd_assets/... · Gaotha go Rothaí Wind to Wheels ... Residential Combined Primary Energy

Gaotha go RothaíWind to Wheels

Fáilte Róimh

Gaotha go RothaíWind to Wheels

Graham BrennanSustainable Transport Programme Manager

Inis Oírr01/04/2011

Overview

• Aran Islands Energy Snap Shot

• All Electric Wind/Ocean Concept

• Preliminary Study Results

• Technology Development and Demonstration:

Gaotha go Rothaí – Wind to Whels

• Rationale & Goals

• Components

• The Cars

Energy Snap Shot of Aran Islands

• 1,500 Tonnes of Oil Equivalent

– 62% Heat (% coal, kerosene)

– 25% Electricity

– 13% Transport (8,400km av)

• 1.2mEuro Energy Bill for Islands pa

• Renewable Energy Resources

– Wind

• Max Capacity = 3MW

• 675kW wind farm on Inis Meain

• Special Area of Conservation

– Wave

• 17.5MW within 5km (3MW!)

– Tidal

• Current speed <2m/s so tidal energy not viable

3MW Cable

TOE per Capita Aran vs Ireland

0.210.19

0.35

0.16

0.31

0.18

0.08

0.05

0.49

0.160.13

0.06

0.00

0.10

0.20

0.30

0.40

0.50

0.60

Kerosene Diesel Coal Transport Electricity Natural Gas Peat

TOE per capita

Aran Ireland

Average Consumption per Dwelling

Aran Island kWh

22,8164,837

9,446

Heat Transport Electricity

Ireland Residential kWh

19,713

19,522

5,591

Heat Transport Electricity

Page 2: Gaotha go Rothaí Wind to Wheels - The European Network ...enrd.ec.europa.eu/enrd-static/fms/enrd_assets/... · Gaotha go Rothaí Wind to Wheels ... Residential Combined Primary Energy

Aran Islands - Total Primary Energy (tonnes of oil equivalent)

0

200

400

600

800

1000

Electricity Heat Transport

TO

E

Own supply Imports

Wind/Ocean Energy Powered System for

Islands Aran…and Ireland

Control

Unit

Wind

Forecast

Domestic

Electricity

Heat Pump

ElectricVehicle

Smart

Meter

Mainland Electricity

Network

Wind/Ocean Smart Network

Why do we need a “Smart Grid”?

10-G-0001

Smart Hybrid Energy System with Energy

Storage

energy storage

reserve

energy

intermittent renewables

What is “Reserve”?

• Energy Source used when

Wind is Unavailable

• Generated from mainly

imported fuels – oil, gas,

electricity

• Petrol, Diesel used in the

case of a Plugin Hybrid EV

• (Kerosene for Heat)

• Power Station

• Diesel

Gen/CHP

• Electricity

Imports (UK)

• Petrol/Diesel

Pump

• (Kerosene)

Aran Islands Study - Electricity, Heat and

Transport Profiles

Page 3: Gaotha go Rothaí Wind to Wheels - The European Network ...enrd.ec.europa.eu/enrd-static/fms/enrd_assets/... · Gaotha go Rothaí Wind to Wheels ... Residential Combined Primary Energy

Total Island Electricity Consumption

0

50

100

150

200

250

300

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Total MWh

Typical Heat Consumption per House (Coal Fires, Immersion and Central Heating (CH)) in kWh per month

0

500

1000

1500

2000

2500

3000

3500

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Total kWh

Fire

Immersion

CH

Total Island Transport Fuel Consumption

0

5000

10000

15000

20000

25000

30000

Jan

Feb

Mar A

prM

ay Jun

Jul

Aug Se

pO

ctNov

Dec

Lit

res

of

Tra

nsp

ort

Die

sel

Agricultural

Commercial

Residential

Combined Primary Energy Profiles

0

200000

400000

600000

800000

1000000

1200000

1400000

jan feb mar apr may jun jul aug sep oct nov dec

Tota

l kW

h

Heat Electricity Transport

Step 1 – Energy Efficiency

Primary Energy Consumption and

Energy Efficiency Scenario (No 2)

Islands' Energy Consumption

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

Base Case Scenario 2

En

erg

y (

MW

h)

Transport Diesel Import

Coal Import

Oil Import

Kerosene Import

Immersion Heating

Elec Demand Served by RE

Electricity Exports/Imports

Page 4: Gaotha go Rothaí Wind to Wheels - The European Network ...enrd.ec.europa.eu/enrd-static/fms/enrd_assets/... · Gaotha go Rothaí Wind to Wheels ... Residential Combined Primary Energy

Effect on CO2 Emissions

CO2 Emissions

0

1000

2000

3000

4000

5000

6000

Base Case Scenario 2

Em

issi

on

s (k

g)

Transport Diesel

Coal

Oil

Kerosene

Immersion Heating

Electricity Imports

Effect on Annual Energy Cost

Islands' Fuel Costs

0

200000

400000

600000

800000

1000000

1200000

1400000

Base Case Scenario 2

Co

st (

€)

Transport Diesel

Coal

Oil

Kerosene

Immersion Heating

Net Electricity Cost

Step 2 – Smart Grid Wind/Ocean with

Electric Vehicles and Heat Pumps – All Electric System

All Electric System – Primary Energy

Islands' Energy Consumption

-5000

0

5000

10000

15000

20000

Base Case Scenario 3a Scenario 3b Scenario 3c Scenario 3d

En

erg

y (

MW

h)

Electricity Exports/Imports Elec Demand Served by RE Immersion Heating Kerosene Import

Oil Import Coal Import Transport Diesel Import

All Electric System - CO2

CO2 Emissions

0

1000

2000

3000

4000

5000

6000

Base Case Scenario 3a Scenario 3b Scenario 3c Scenario 3d

Em

issi

on

s (k

g)

Transport Diesel

Coal

Oil

Kerosene

Immersion Heating

Electricity Imports

Conclusions of Study

• Conclusion:

– There is sufficient Wind & Wave resource accessible to supply ~70% of Electricity, Heat & Transport.....but intelligent energy storage technology is required

– Irish Government Target is 16% Renewable Supply by 2020

3MW Cable

Page 5: Gaotha go Rothaí Wind to Wheels - The European Network ...enrd.ec.europa.eu/enrd-static/fms/enrd_assets/... · Gaotha go Rothaí Wind to Wheels ... Residential Combined Primary Energy

Development of Smart Grid Technologies –

Electric Vehicle Demonstration

Surplus Wind Exported at

Night...or Shut Down!!

How Can Storage Really Help Minimise Energy Imports for Transport (and Heat)?

Available

Electricity from Wind each year

ElectricityRequired for

EVs each year

“Reserve”

“Reserve”

Wind

EV EV1Wind

=

Case 1 (EV1) = No Intelligent Storage

Case 2 (EV2) = With Intelligent Storage (much higher wind utilisation)

EV2

Gaotha go Rothaí Project Rationale

• Develop an Intelligent Autonomous Control System which

– Maximises Wind in Transport Usage

– Minimises Energy Costs

– Meets Customers consumption

requirements reliably

– Provide Blue Print for a National

System

• Demonstrate benefits of EVs

– Low fuel cost

– High reliability and low maintenance costs

– Increases future sustainability of

life on our islands

The Components

• Smart Charger Unit

– Smart Meter

– Timer Switch

– GSM Transmitter

– 3hr Charge Over-Ride Button

• Remote Receiver – Dublin

– 24hr electricity monitoring

– Programming of Timers

• Optimiser Algorithm – Remote Server

– Data from Wind Turbines & Market

– Consumption Profile for Trial User

– Daily Instructions to each Smart Unit

The Car – Mega ECity

• 220mpg or 1.3Litres/100km

• Annual Elect = 90-180 Euro

• Up to 80% fuel cost saving

• Range = 60km (max length of Inis

Mór = 15km, speed limit 50kph)

• Max speed = 60kph

• Aluminium Chassis and ABS

Panels – low corrosion

• Regenerative Brakes – reduced brake wear, high efficiency

• Minimum parts count

• Charging at home - not

dependent on boat supplies

Irish Project Contractors

1. Charge Point Manufacturers =

2. Electric Vehicle Suppliers =

3. Vehicle Owners and Trial = Managers

Page 6: Gaotha go Rothaí Wind to Wheels - The European Network ...enrd.ec.europa.eu/enrd-static/fms/enrd_assets/... · Gaotha go Rothaí Wind to Wheels ... Residential Combined Primary Energy

Go raibh maith agaibh.

Ceisteanna?

Graham Brennan

Sustainable Transport Programme Manager

t + 353 1 8082025

f + 353 1 8082002

e [email protected]

w www.seai.ie