galaxy v series (vm) john goosseff business development, 3 phase power catalog
TRANSCRIPT
![Page 1: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/1.jpg)
Galaxy V Series (VM)
John GoosseffBusiness Development, 3 Phase Power
Catalog
![Page 2: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/2.jpg)
Galaxy VM Product Messaging
Elevator pitch Galaxy VM is Schneider Electric’s latest 3 phase UPS that provides very
high efficiency, is easy to deploy, and seamlessly integrates into the electrical , physical and monitoring environments of customers operating medium data centers, industrial or facilities applications.
![Page 3: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/3.jpg)
A history of leading innovation
First 3-phase UPS
by Merlin Gerin
APC PowerChute®
software revolutionizes
power management
1993 1997 1998
APC revolutionizes cooling market
2002
1989
Industry's first modular UPS & Matrix-UPS® is introduced & MGE™ Galaxy™ line is launched
scalable, redundant UPS introduced
APC purchases Silcon A/S, & enters 3 Phase UPS market
1964 1981
Incorporated
Symmetra®
20082003 2005
APC introduces its first (NCPI) architecture, PowerStruXure ™
Introduced, integrating power, cooling, racks,
Management and service
NetBotz acquired by APC
Symmetra PX5001st Double
Conversion 96% Efficiency UPS
Released to MKT
Science Center created to
advance thought leadership of data center
design & operation
1999
From product leadership…
… to Solution leadership
MGE Introduces first 800kVA UPS to the market
2014
1st Schneider Electric branded V Series UPS.
1st to Market 98% ECOnversion
UPS Module
![Page 4: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/4.jpg)
Galaxy VM Applications
Commercial buildings Facilities Banks Hotels
Small/Medium Datacenters Data storage equipment Network equipment Computer room equipment
Industrial environments Manufacturing equipment Control automation Emergency lighting
Telecom Wireless communication Mobile and fixed telephone
infrastructure Radio and TV broadcasting
180-225kVA 60Hz
160 -200kVA 50Hz
![Page 5: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/5.jpg)
Galaxy VM Customer Profile
Decision makers, Influencers Electrical Contractors, Installers Facilities managers and Chief
Electrical Engineer Specifiers, Consulting Engineering
Companies EPC (Engineering, Procurement &
Construction)
Customers Medium companies linked to
service, manufacturing and process industries
Large international accounts and their branches/regional offices
Telecom operators and equipment manufacturers
![Page 6: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/6.jpg)
Schneider Electric– 3 Phase UPS Portfolio
Changes in the next 3 to 24 months
10kVA 30kVA 200kVA 800+kVA
UPS Ranges91 to 94%Efficiency
UPSRanges 95% to 97% Efficiency
Symmetra PX
10-500 kVA 400-1600 kVA
Symmetra MW 500-1600kVA
MGE Galaxy 3500
Smart-UPS VT
10-30 kVA
10-30 kVA208V 40-75 kVA
480V 50-130 kVA 150-225 kVA 300-1100 kVA
MGE Galaxy 4000
MGE Galaxy 5000 MGE Galaxy PW MGE EPS7000, 8000
ITDatacenters
Non-IT IT &Non-IT
![Page 7: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/7.jpg)
kVA (UL) 50 60 90 110 130 180 225kVA (IEC) 60 80 100 120 160 200
VM
kVA (UL) 40 50 60 80 100 130 kVA (IEC) 20 30 40 60 80 100 120
Galaxy 5000
kVA (UL) 150 180 200 225kVA (IEC) 160 200
Galaxy PW
Galaxy VM– and the range it replaces
Galaxy 7kkVA (IEC) 160 200
150/160
Q3-2014 Q1-2014Q1-2015Q1-2015Q1-2015Q1-2015
Galaxy VM 180kVA and 225kVAEARLY Release to Quote November 5th, 2013
Manual process, local price books, datasheets, and technical collateral.
Pre-Announcement January 3rd, 2014
Full Announcement February 3rd, 2014Shipping February 2014
![Page 8: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/8.jpg)
Galaxy VM DriversVM drivers
PLACE
Features
Multiple battery offers
Redundant fans 96% double conversion
ECOnversion
Full front access
Dedicated I/O(MBC) section
Top / Bottom entry
Compact footprint
Customer values
High availability systems
High efficiency system
Easy to deploy
Safe solution
![Page 9: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/9.jpg)
Target Certification BY EPA by February 2014
Galaxy VM – Energy Star (Pending)
![Page 10: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/10.jpg)
Catalog
Galaxy VM
![Page 11: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/11.jpg)
MBC Narrow
MBC Wide
Power Narrow
SBP BBB CBC Narrow
CBCWide
PowerWide I/O
TransformerCabinet
I/O (IEC) I/O (IEC) I/O (UL)
I/O (UL) with Transformer
I/O (UL) with Transformer
I/O (IEC) with Transformer
I/O (IEC) with Transformer
Remote
UPS
. .
I/O Input/Output MBC Modular Battery CabinetCBC Classic Battery CabinetBBB Battery Breaker BoxSBC System Bypass Cabinet
Note: This is a phased product release These items are part of the initial NAM release
SBC
Catalog
Galaxy VM
![Page 12: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/12.jpg)
UPS
180 - 225 Kva
Battery cabinets
Modular - Classical
Auxiliaries
GVMCBCWUE
GVMCBC2WUF
GVMCBC2WUE
GVMCBC3WUF
GVMSB180KGS
GVMSB225KGS
GVMRB180KGS+GVMSB180KGS
GVMRB225KGS+GVMSB225KGS
GVMPB180KGS
GVMPB225KGS
GVMSBC450KG
GVMSBC675KG
GVMSBCLB675KG
GVMBBB600UL
GVMBBK250UL
GVMBBK400UL
GVMDFW-KIT
GVMCBCWUE
GVMMODBCNS
GVMMODBCWS
GVMMBTU
GVMCBCABNE GVMCBCABWE
Catalog
![Page 13: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/13.jpg)
Catalog
Modular (Min) - Classical (Min)
180 kVA - 225 kVA 180 kVA - 225 kVA
Flexible Battery Offer : 5 SKUS for 22 combinations
1
2
3
4
5
6
7
8
7,4 5,1
19 14
32 24
46 35
61 46
5876
92 70
105 82
GVMCBCWUE
GVMCBC2WUF
GVMCBC2WUF
GVMCBC2WUE
GVMCBC2WUE GVMCBC3WUF
![Page 14: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/14.jpg)
Galaxy VM UPS - Product Design Benefits (1/2)
Power modules
Unique slide in/out concept makes it quick to replace by FSE
Top and bottom cable entry
The design allows cabling from top and bottom and is included at no additional cost
DC fans replaceable from front
Allows very quick fan replacement without going to bypass
Casters
Allows for easy maneuverability
Bus bar connections in front
Allows full diagnostic of the system (current/ voltage measurements) without opening into hazardous voltages
Seismic IBC level 2 compliant
Design elements included (floor anchoring only) to be compliant with stringent seismic standard
![Page 15: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/15.jpg)
Galaxy VM UPS - Product Design Benefits (2/2)
Installation/ maintenance from front
No rear access needed (can level system from front).
No shadow footprint
Separate Power and IO sections
Power cabinet has all the complexity (which can be fully isolated from IO)
IO cabinet has all the customer interfaces & regional specificity
Dust filters
Easy filter replacement (customer replaceable)
Network management
Display is an NMC display. Ethernet and modbus connection included in standard
2 additional NMC cards can be added for enhanced customer connectivity
![Page 16: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/16.jpg)
Efficient solutionMonitoring for right decision.
Remotely : all ranges solution L o c a l l y
Remote monitoring service : fast trouble shooting
Remote UPS ManagementNotification of threatening situations
Operating system shutdown with PowerChute® Network Shutdown software
Integrates into StruxureWare Central or your preferred enterprise management system
Remote monitoring service : fast trouble shooting
Remote UPS ManagementNotification of threatening situations
Operating system shutdown with PowerChute® Network Shutdown software
Integrates into StruxureWare Central or your preferred enterprise management system
7” color tactile display on all UPS
Able to read adjacent parallel UPS data
7” color tactile display on all UPS
Able to read adjacent parallel UPS data
![Page 17: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/17.jpg)
An optimized architecture for all needs
Architectures
![Page 18: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/18.jpg)
IP Parallel System using SBC Architectur
es
Up to 4+1 in parallel
● Parallel for capacity systems are bussed together in a System Bypass Cabinet (a maintenance bypass that permits landing of up to four modules)
● Parallel modules are linked via a control cable
● System Bypass is equipped with system level power monitoring
● All paralleling intelligence is native to each module
● In the event of overload all module static bypasses close at the same time.
● There are no system level controls! Each module is operated independently.
![Page 19: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/19.jpg)
1+1 Redundant System
Only one by-pass breaker
● Parallel for REDUNDANCY ONLY. 1+1 MAX
● Parallel modules are linked via a control cable
● No System Bypass Cabinet required
● All paralleling intelligence is native to each module
● In the event of overload all module static bypasses close at the same time.
● There are no system level controls! Each module is operated independently.
![Page 20: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/20.jpg)
No Sync Box Required !
Load 1
Load 2
Load 3
Load 4
Synchro information
No more synchro box
Architectures
![Page 21: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/21.jpg)
Galaxy VM
Service and safety• Total power down of Power cabinet• Full diagnostic from front with power on• Green Burn in mode SPoT• Advanced self test• Quick swap fan replacement• Service access form front only• Modular battery and CBC drawer• Fully tested power blocks
![Page 22: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/22.jpg)
Galaxy VM – Modular Battery
Value Modular Battery offer
● Quick swappable battery cartridges insuring fast repair time
● Up to 12 Strings within a single cabinet
● Easy replacement
● Redundancy at the string level
● Scalable back-up time
Modular battery cartridge
Narrow and wide modular battery cabinets
![Page 23: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/23.jpg)
Architectures InterfacesElectricalCatalogueVM drivers Mechanical
Safe classical batterie offer – wired from top or bottom – seismic compliant
Classical batteries configuration
Adjacent Only Wave I Remote/Adjacent available as QSKUSee price book (Intrapack)
![Page 24: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/24.jpg)
Three Galaxy VM Battery Solutions• Modular Battery Cabinet (MBC)
• Two different sizes: Narrow and Wide
• Classic Battery Cabinet (CBC)• Supports a classic battery solution• Two different sizes: Narrow and Wide
• Battery Breaker Box (BBB) supporting a rack solution• Provides protection in installations with customer-specific battery solutions
Images are not to scale
![Page 25: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/25.jpg)
480V Nominal
323V to 576V 40Hz to 70Hz
Thdi<3%
(top & bottom)
Generator friendly
480V Nominal
323V to 576V 40Hz to 70Hz
Thdi<3%
(top & bottom)
Generator friendly
Main performances
PF: 0,9
Thdu : 3%
Overload : 125% 10 min 150% 1 min
PF: 0,9
Thdu : 3%
Overload : 125% 10 min 150% 1 min
High Efficiency (Smart Capex and Opex)
4+1 in parallel
40°C and up to 50 °C with a load de-rating at 2,5 % per °C
Eco mode and ECOnversion mode with advanced SBS operation
High Efficiency (Smart Capex and Opex)
4+1 in parallel
40°C and up to 50 °C with a load de-rating at 2,5 % per °C
Eco mode and ECOnversion mode with advanced SBS operation
High Capacity Charging &
Battery charging in bypass operation
High Capacity Charging &
Battery charging in bypass operation
Seismic ready (IBC level 2)
No side access and no rear clearance required => No shadow footprint and Service from front
only
Seismic ready (IBC level 2)
No side access and no rear clearance required => No shadow footprint and Service from front
only
![Page 26: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/26.jpg)
Galaxy PW – Retires after 12 years
●EOL – July 2014
●Service Support thru July 2024
●Over 5000 units sold in NAM
![Page 27: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/27.jpg)
VM vs. PW●Moved from Transformer Based to Transfomer-less Topology
● Increased efficiency from 93% to 96.2%● Reduced weight 3500 lbs to 1500 lbs● THDI improved from 7% to 3%● No de-rating with lead power factor loads from 0.5 leading to 0.7
lagging
●Reduced footprint with MBC by 50% ●MBC external (not internal) but adjacent to UPS
39” with Isolated MBC48” with internal MBC + 24” external MBC (95% of Sales)
![Page 28: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/28.jpg)
VM vs. PW continued
●Graphical display with build-in Network Management●Three Operating Modes:
●Now up to 5 modules in parallel●Modular power assembly for fast repair time (3 minutes per
BLOCK)●Hot Fan replacement (1 minute per fan)●Top and Bottom cable entry without footprint penalty●SPOT – Self Test without load bank
Battery
DC/DC
PFC Recfifier Inverter
LoadAC in
AC in
Bypass Switch
Battery
DC/DC
PFC Recfifier Inverter
LoadAC in
AC in
Bypass Switch
Maybe on to allow battery
recharge
Battery
DC/DC
PFC Recfifier Inverter
LoadAC in
AC in
Bypass Switch
Double conversion ECO mode ECOnversion mode
![Page 29: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/29.jpg)
225kVA with MBC + 5 min battery●PW is 150” Wide @12,500 lbs LIST $110,000
●VM is 68” Wide @4680 lbs LIST $95,450
![Page 30: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/30.jpg)
Galaxy VM – Catalog (Price Book)
Galaxy VM UPS with attached I/O (MBC) 180-225kVA 480V/480VUPS Single Module up to 96% Efficiency - Double Conversion Mode
UPS Redundant Parallel Module 1+1 Configuration
UPS Redundant Parallel up to 4+1 Configurations
System Bypass Cabinet - Integrated Parallel 480V
Schneider Classic VRLA Battery Cabinet Options - Adjacent Cofiguration Only
Schneider Modular Battery Options - Adjacent Configuration Only
INTRAPACK Classic Battery - Adjacent-Remote Battery Cabinets offering larger battery jars up from 500 to type 540
AccessoriesDust Filter
Dry contact I/O Accessory
Temperature Sensor
Service SKU
Spare Part Kits
Service Offerings
![Page 31: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/31.jpg)
Galaxy VM – Catalog & Configuration
●Available today in ES3 LIST PRICE BOOK
ORDER ENTRY PART NUMBER
kVA/kWVOLTAGE IN/OUT
DESCRIPTIONTYPICAL
DIMENSIONS (W" x H" x D")
APPROX WEIGHT
(LBS)DRAWING QTY LIST (US $) LIST (CAD $)
GVMSB180KGS 180 / 162 480/480 Galaxy VM 180kVA, Single 480-480V 39.45x77.56x33.62 1497 Link 1 $58,150.00 CAD 55,913GVMSB225KGS 225 / 202 480/480 Galaxy VM 225kVA, Single 480-480V 39.45x77.56x33.62 1552 Link 1 $68,450.00 CAD 65,817
Figure A: UPS with MBC - Standard
Galaxy VM - Single Module modules can be us ed in two s cenarios : A) Customers who do not plan to increase the load la ter (no expans ion plans in future). B) Can be us ed for 1+1 Redundant Confi guration (the other UPS being the "additional UPS for 1+1 redundant confi guration choose l ine 28 or 29 as the s econd UPS).
Note: The 5*8 start up is included. Ki rk Key Interlocks Standard
Galaxy VM UPS with attached I/O (MBC) 180-225kVA 480V/480V
UPS Single Module up to 96% Efficiency - Double Conversion Mode
![Page 32: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/32.jpg)
GVMRB180KGS 180 / 162 480/480 Galaxy VM 180kVA Additional UPS for 1+1 480-480V 39.45x77.56x33.62 1497 Link 1 $55,243.00 CAD 53,118GVMRB225KGS 225 / 202 480/480 Galaxy VM 225kVA Additional UPS for 1+1 480-480V 39.45x77.56x33.62 1552 Link 1 $65,028.00 CAD 62,527
Figure B: Consist of one single module and one
parallel module. See notes in green.
Galaxy VM - Redundant Para l lel modules can be used for 1+1 Redundant Confi guration (the other UPS being the "Single Module" l ine 16 or 17 as the primary UPS). No External System Bypass Cabinet required. Note: The 5*8 start up is included. Choose combination of Line 16 & 25 for 180kVA or Line 17 & 26 for 225kVA 1+1 Redundant Para l lel Confi guration without SBC. 480V only.
UPS Redundant Parallel Module 1+1 Configuration
GVMPB180KGS 180 / 162 480/480 Galaxy VM 180kVA, Para l lel 480-480V 39.45x77.56x33.62 1497 Link 1 $55,243.00 CAD 53,118GVMPB225KGS 225 / 202 480/480 Galaxy VM 225kVA, Para l lel 480-480V 39.45x77.56x33.62 1552 Link 1 $65,028.00 CAD 62,527
Figure C: Parallel System with External
System Bypass Cabinet
.
Galaxy VM - Redundant Para l lel modules can be expanded up to 4+1 confi gurations . Requries properly s i zed External System Bypass Cabients ei ther 450kVA or 675kVA. 480V only.Note: The 5*8 start up is included
UPS Redundant Parallel up to 4+1 Configurations
![Page 33: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/33.jpg)
ORDER ENTRY PART NUMBER
Batt ery Type
DESCRIPTIONTYPICAL
DIMENSIONS (W" x H" x D")
APPROX WEIGHT
(LBS)Drawing QTY
LIST Price (US $)
LIST Price (CAD $)
180 kVA 0.9
225 kVA 0.9
GVMCBCWUE 400 Galaxy VM Battery Cabinet - Wide E 42.52x77.56x33.62 4004 Link 1 $20,500.00 CAD 19,712 5 -GVMCBC2WUE 400 Galaxy VM Battery Cabinet - 2x Wide E 85.12x77.56x33.62 8014 Link 1 $36,925.00 CAD 35,505 15 10GVMCBC2WUF 300 Galaxy VM Battery Cabinet - 2x Wide F 85.12x77.56x33.62 6391 Link 1 $41,032.00 CAD 39,454 10 5GVMCBC3WUF 300 Galaxy VM Battery Cabinet - 3x Wide F 127.56x77.56x33.62 9599 Link 1 $55,100.00 CAD 52,981 - 15
ORDER ENTRY PART NUMBER
DESCRIPTIONTYPICAL
DIMENSIONS (W" x H" x D")
APPROX WEIGHT
(LBS)Drawing QTY
LIST Price (US $)
LIST Price (CAD $)
180 kVA 0.9
225 kVA 0.9
180kva -5min $23,307 CAD 22,411 5 minGVMMODBCW Galaxy VM UPS Modular Battery Cabinet Wide up to 12 strings 27.48x77.54x33.5 306 Link 1 $4,637 CAD 4,459
GVMMBTU Galaxy VM UPS Modular Battery String 1x1x1 265 10 $1,867 CAD 1,795
225kva -5min $27,041 CAD 26,001 5 minGVMMODBCW Galaxy VM UPS Modular Battery Cabinet Wide up to 12 strings 27.48x77.54x33.5 306 Link 1 $4,637 CAD 4,459
GVMMBTU Galaxy VM UPS Modular Battery String 1x1x1 265 12 $1,867 CAD 1,795
180kva -10min $35,756 CAD 34,381 10 minGVMMODBCW Galaxy VM UPS Modular Battery Cabinet Wide up to 12 strings 27.48x77.54x33.5 306 Link 1 $4,637 CAD 4,459
GVMMODBCN Galaxy VM UPS Modular Battery Cabinet Narrow up to 6 strings 14.49x77.56x33.6 463 Link 1 $3,114 CAD 2,994
GVMMBTU Galaxy VM UPS Modular Battery String 1x1x1 265 15 $1,867 CAD 1,795
225kva -10min $44,747 CAD 43,026 10 minGVMMODBCW Galaxy VM UPS Modular Battery Cabinet Wide up to 12 strings 27.48x77.54x33.5 306 Link 2 $4,637 CAD 4,459
GVMMBTU Galaxy VM UPS Modular Battery String 1x1x1 265 19 $1,867 CAD 1,795
180kva -15min $46,614 CAD 44,821 15 minGVMMODBCW Galaxy VM UPS Modular Battery Cabinet Wide up to 12 strings 27.48x77.54x33.5 306 Link 2 $4,637 CAD 4,459
Schneider Classic VRLA Battery Cabinet Options - Adjacent Cofiguration OnlyNote 1: First release is for att ached matching batt ery cabinet. Shipped without side panels. Re-use UPS left panel and att ach to left batt ery cabinet. DC busbar interconnects between multiple cabinets provided by Schneider. Installed by customer.Note 2: Startup Fee NOT required for Classic Batt ery Cabinets
Note 2: Startup Fee NOT required for Modular Batt ery Cabinets
Schneider Modular Battery Options - Adjacent Configuration OnlyNote: First release is for att ached matching batt ery cabinet. Shipped without side panels. Re-use UPS left panel and att ach to left batt ery cabinet. DC busbar interconnects between multiple cabinets provided by Schneider. Installed by customer. Modular batt ery catridges shipped separately and installed by customer.
![Page 34: Galaxy V Series (VM) John Goosseff Business Development, 3 Phase Power Catalog](https://reader033.vdocuments.mx/reader033/viewer/2022052414/56649d955503460f94a7d0c7/html5/thumbnails/34.jpg)
Galaxy VM – ISX Designer (Feb 3rd)