gaji dg48 time based 2012

2
TG GAJI 2011  2012 2013 2013/JUL 2014 2015 2016 2017 SSM LAMA 0.13 SSMBR KGT 250   KGTB250 (T7) 19 95 38 84.6 7 505. 01 43 89.6 8 4639 .6 8   48 89.6 8 51 59.6 8 5429 .6 8 5699 .6 8 5969 .6 8 6239.6 8 6509 .68 T8(1 994) 40 34.9 5 524.54 45 59.4 9 4809.49  50 59.49 53 29.49 5599.49 5869.4 9 6139.49 6409.4 9 6679.49 (T9) 1993 4185.2 3 544.08 47 29.3 1 4979.31  52 29.31 54 99.31 5769.31 6039.31 6309.31 6579.3 1 6849.31 (T10 )1992 43 35.5 1 563.62 4899.1 3 5149.13  53 99.13 56 69.13 5939.13 6209.1 3 6479.13 6749.1 3 7019.13 (T11 )1991 44 85.7 9 583. 15 50 68.9 4 5318 .9 4  55 68.9 4 58 38.9 4 6108 .9 4 6378 .9 4 6648 .9 4 6918.9 4 7188 .94 (T12 )1990 46 36.0 7 602. 69 52 38.7 6 5488 .7 6   57 38.7 6 60 08.7 6 6278 .7 6 6548 .7 6 6818 .7 6 7088.7 6 7358 .76 (T13 )1989 47 86.3 5 622. 23 54 08.5 8 5658 .5 8   59 08.5 8 61 78.5 8 6448 .5 8 6718 .5 8 6988 .5 8 7258.5 8 7528 .58 (T14 )1988 49 36.6 3 641.76 5578.3 9 5828.39  60 78.39 63 48.39 6618.39 6888.3 9 7158.39 7428.3 9 7698.39 TG GAJI 2011  2012 2013 2013/JUL 2014 2015 2016 2017 SSM LAMA 0.13 SSMBR KGT 250   KGTB250 (T5) 19 97 39 52.8 9 513. 88 44 66.7 7 4716 .7 7   49 66.7 7 52 36.7 7 5506 .7 7 5776 .7 7 6046 .7 7 6316.7 7 6586 .77 (T6) 19 96 41 15.7 0 535. 04 46 50.7 4 4900 .7 4  51 50.7 4 54 20.7 4 5690 .7 4 5960 .7 4 6230 .7 4 6500.7 4 6770 .74 (T7) 1995 42 78.5 1 556.21 48 34.7 2 5084.72   53 34.72 56 04.72 5874.72 6144.7 2 6414.72 6684.7 2 6954.72 (T8) 1994 44 41.3 2 577.37 50 18.6 9 5268.69  55 18.69 57 88.69 6058.69 6328.6 9 6598.69 6868.6 9 7138.69 (T9) 1993 46 04.1 3 598.54 52 02.6 7 5452.67   57 02.67 59 72.67 6242.67 6512.6 7 6782.67 7052.6 7 7322.67 (T10 )1992 47 66.9 4 619. 70 53 86.6 4 5636 .6 4  58 86.6 4 61 56.6 4 6426 .6 4 6696 .6 4 6966 .6 4 7236.6 4 7506 .64 (T11 )1991 49 29.7 5 640. 87 55 70.6 2 5820 .6 2   60 70.6 2 63 40.6 2 6610 .6 2 6880 .6 2 7150 .6 2 7420.6 2 7690 .62 (T12 )1990 50 92.5 6 662. 03 57 54.5 9 6004 .5 9  62 54.5 9 65 24.5 9 6794 .5 9 7064 .5 9 7334 .5 9 7604.5 9 7874 .59 (T13 )1989 5255.3 7 683.20 59 38.5 7 6188.57   64 38.57 67 08.57 6978.57 7248.5 7 7518.57 7788.5 7 8058.57 (T14 )1988 5418.1 8 704.36 61 22.5 4 6372.54  66 22.54 68 92.54 7162.54 7432.5 4 7702.54 7972.5 4 8242.54 Catatan : KGT = kenaikan Gaji Tahunan Elaun Perumahan RM700 KG TB = Kenaikan Gaji Time Based DG 48 250  DG48 Keraian RM550 KGT 270.00 = Kenaikan Gaji Tahunan DG48  COLA RM150 Gaji Minimum DG 48 = RM4922  JUMLAH RM1400 Gaji Maksimun DG48- RM10560.00 KGT270 GRED DG 44(P1)SSM  GRED DG 48 2012(TIME BASED 6 TAHUN ) 2012 SIFIR GAJI GED DG 48 TIMED BASED 2012 PINDAAN NOVEMBER 2013 KGT270 GRED DG 44(P2)SSM GRED DG 48 2012(TIME BASED 6 TAHUN ) 2012 

Upload: abdullah-abdullah

Post on 04-Jun-2018

233 views

Category:

Documents


0 download

TRANSCRIPT

8/13/2019 Gaji Dg48 Time Based 2012

http://slidepdf.com/reader/full/gaji-dg48-time-based-2012 1/1

TG GAJI 2011   2012 2013 2013/JUL 2014 2015 2016 2017

SSM LAMA 0.13 SSMBR KGT 250    KGTB250

(T7)1995 3884.67 505.01 4389.68 4639.68    4889.68 5159.68 5429.68 5699.68 5969.68 6239.68 6509.68

T8(1994) 4034.95 524.54 4559.49 4809.49   5059.49 5329.49 5599.49 5869.49 6139.49 6409.49 6679.49

(T9)1993 4185.23 544.08 4729.31 4979.31   5229.31 5499.31 5769.31 6039.31 6309.31 6579.31 6849.31

(T10)1992 4335.51 563.62 4899.13 5149.13   5399.13 5669.13 5939.13 6209.13 6479.13 6749.13 7019.13

(T11)1991 4485.79 583.15 5068.94 5318.94   5568.94 5838.94 6108.94 6378.94 6648.94 6918.94 7188.94

(T12)1990 4636.07 602.69 5238.76 5488.76    5738.76 6008.76 6278.76 6548.76 6818.76 7088.76 7358.76

(T13)1989 4786.35 622.23 5408.58 5658.58    5908.58 6178.58 6448.58 6718.58 6988.58 7258.58 7528.58

(T14)1988 4936.63 641.76 5578.39 5828.39   6078.39 6348.39 6618.39 6888.39 7158.39 7428.39 7698.39

TG GAJI 2011   2012 2013 2013/JUL 2014 2015 2016 2017

SSM LAMA 0.13 SSMBR KGT 250    KGTB250

(T5)1997 3952.89 513.88 4466.77 4716.77    4966.77 5236.77 5506.77 5776.77 6046.77 6316.77 6586.77

(T6)1996 4115.70 535.04 4650.74 4900.74   5150.74 5420.74 5690.74 5960.74 6230.74 6500.74 6770.74

(T7)1995 4278.51 556.21 4834.72 5084.72    5334.72 5604.72 5874.72 6144.72 6414.72 6684.72 6954.72

(T8)1994 4441.32 577.37 5018.69 5268.69   5518.69 5788.69 6058.69 6328.69 6598.69 6868.69 7138.69

(T9)1993 4604.13 598.54 5202.67 5452.67    5702.67 5972.67 6242.67 6512.67 6782.67 7052.67 7322.67

(T10)1992 4766.94 619.70 5386.64 5636.64   5886.64 6156.64 6426.64 6696.64 6966.64 7236.64 7506.64

(T11)1991 4929.75 640.87 5570.62 5820.62    6070.62 6340.62 6610.62 6880.62 7150.62 7420.62 7690.62

(T12)1990 5092.56 662.03 5754.59 6004.59   6254.59 6524.59 6794.59 7064.59 7334.59 7604.59 7874.59

(T13)1989 5255.37 683.20 5938.57 6188.57    6438.57 6708.57 6978.57 7248.57 7518.57 7788.57 8058.57(T14)1988 5418.18 704.36 6122.54 6372.54   6622.54 6892.54 7162.54 7432.54 7702.54 7972.54 8242.54

Catatan :

KGT = kenaikan Gaji Tahunan Elaun Perumahan RM700

KG TB = Kenaikan Gaji Time Based DG 48 250   DG48 Keraian RM550

KGT 270.00 = Kenaikan Gaji Tahunan DG48   COLA RM150

Gaji Minimum DG 48 = RM4922   JUMLAH RM1400

Gaji Maksimun DG48- RM10560.00

KGT270

GRED DG 44(P1)SSM    GRED DG 48 2012(TIME BASED 6 TAHUN )

2012 

SIFIR GAJI GED DG 48 TIMED BASED 2012 PINDAAN NOVEMBER 2013

KGT270

GRED DG 44(P2)SSM GRED DG 48 2012(TIME BASED 6 TAHUN )

2012