24590-WTP-SDDR-MS-17-00106 N/A 10/23/2017 X None None X Issued by RPP-WTP PDC 0 10/24/17 JWS 0 Yes fZI No THIS DOCUMENT CONTAINS EXPORT CONTROLLED INFORMATION, SEE BASE DOCUMENT FOR FULL LABEL AND RESTRICTIONS Supplier Deviation Disposition Request Page 1 of4 PROJECT: Hanford Tank Waste Treatment and Immobilization Plant (WTP Project) JOB No.: 24590 FORWTPUSE WTPSDDRNo . Rev. DATE RECEIVED FOR SUPPLIER USE SUPPLIER SDDR No. DATE SUBMITTED 500005.001-SDDR-08 10/4/2017 1. Supplier Name Address City & State Zip Greenberry Inc. 600 SE Maritime Ave, Vancouver, WA 98661 Suite 190 2. Supplier's Order No. 3. WTP P.O. or SC Rev 500005.001 24590-CM-POA-MVSC-00005 4. Deviation Description (Attach extra sheets, photographs, sketches, etc. as necessary and identify quantity and serial numbers as applicable} Per Vessel MDS's 24590-BOF-MVD-DEP-00003 and 24590-BOF-MVD-DEP-00004, internals - piping component call out which is assumed to be all nozzle and internal piping materials states seamless SB-690 material is required. GBI proposes to use welded SB-675 piping material for all nozzles and internal piping. 4a. Supplier's NCR: (See instructions for applicability} Number: NIA 5. Supplier's Proposed Disposition: D Use As-ls D Repair [8] Modify WTP Requirement 6. Supplier's Estimated Cost Impact: I 1. Supplier's Estimated Schedule Impact: 8. Proposed Disposition and Technical Justification (plus Cost/Schedule if applicable): (Attach extra sheets, sketches, etc., as necessary.) Vessels 24590-BOF-MV-DEP-VSL-00002,00003A,00003B,00003C have all been designed using welded SB-675 and meet ASME code requirements. The use of welded SB-675 was necessary due to material availablilty issues related to SB-690. All the SB-675 material to be purchase has 100% radiography inspection per ASME code from the factory. In addition GBI will preform 100 % radiography of the pipe weld seam again using our approved 3 rd party NOE vendor. 9. Supplie~t~orized Rep/esentative Name f' . I )/~--,, 11 '\e ,.,....,.. SignM~ Title f;Vl Date /o I /7/17 10. WTP Engineering Action D Approved D Disapproved D See Below Distribution: Procurement & Subcontracts Construction NOTES: 4. Non-applicable items to be marked "N/A." 1. Complete instructi ons provided at end of form . 5. Attach additional informati on whenever necessary. 2. Items 1 through 9 and 14 to be compl eted by Supplier. 6. WTP must be notified within 5 days after detecti on of deviation. 3. Items 10 through 13 and 15 to be completed by WTP. 7. Select "Yes" if the SDDR contains or references ECI documents. 24590-ENG-F0000I Rev 44 (Revised 7/24/2017) Ref: 24590-WTP-3DP-G04B-00063

Upload: vuongxuyen

Post on 30-Mar-2018

225 views

Category:

Documents


1 download

TRANSCRIPT

24590-WTP-SDDR-MS-17-00106 N/A 10/23/2017

X

None None

X

Issued byRPP-WTP PDC

0

10/24/17 JWS

0 Yes fZI No THIS DOCUMENT CONTAINS EXPORT CONTROLLED INFORMATION, SEE BASE DOCUMENT FOR FULL LABEL AND RESTRICTIONS

Supplier Deviation Disposition Request Page 1 of4

PROJECT: Hanford Tank Waste Treatment and Immobilization Plant (WTP Project) JOB No.: 24590

FORWTPUSE WTPSDDRNo. Rev. DATE RECEIVED

FOR SUPPLIER USE SUPPLIER SDDR No. DATE SUBMITTED

500005.001-SDDR-08 10/4/2017

1. Supplier Name Address City & State Zip

Greenberry Inc. 600 SE Maritime Ave, Vancouver, WA 98661 Suite 190

2. Supplier's Order No. 3. WTP P.O. or SC Rev 500005.001 24590-CM-POA-MVSC-00005 ~

4. Deviation Description (Attach extra sheets, photographs, sketches, etc. as necessary and identify quantity and serial numbers as applicable}

Per Vessel MDS's 24590-BOF-MVD-DEP-00003 and 24590-BOF-MVD-DEP-00004, internals - piping component call out which is assumed to be all nozzle and internal piping materials states seamless SB-690 material is required. GBI proposes to use welded SB-675 piping material for all nozzles and internal piping.

4a. Supplier's NCR: (See instructions for applicability} Number: NIA

5. Supplier's Proposed Disposition: D Use As-ls D Repair [8] Modify WTP Requirement

6. Supplier's Estimated Cost Impact: I 1. Supplier's Estimated Schedule Impact:

8. Proposed Disposition and Technical Justification (plus Cost/Schedule if applicable): (Attach extra sheets, sketches, etc., as necessary.)

Vessels 24590-BOF-MV-DEP-VSL-00002,00003A,00003B,00003C have all been designed using welded SB-675 and meet ASME code requirements. The use of welded SB-675 was necessary due to material availablilty issues related to SB-690. All the SB-675 material to be purchase has 100% radiography inspection per ASME code from the factory.

In addition GBI will preform 100 % radiography of the pipe weld seam again using our approved 3rd party NOE vendor.

9. Supplie~t~orized Rep/esentative Name f' . I )/~--,, 11'\e ,.,....,..

SignM~

Title f;Vl

Date /o I /7/17

10. WTP Engineering Action D Approved D Disapproved D See Below

Distribution: Procurement & Subcontracts Construction

NOTES: 4. Non-applicable items to be marked "N/A." 1. Complete instructions provided at end of form . 5. Attach additional information whenever necessary. 2. Items 1 through 9 and 14 to be completed by Supplier. 6. WTP must be notified within 5 days after detection of deviation. 3. Items 10 through 13 and 15 to be completed by WTP. 7. Select "Yes" if the SDDR contains or references ECI documents.

24590-ENG-F0000 I Rev 44 (Revised 7/24/2017) Ref: 24590-WTP-3DP-G04B-00063

Supplier Deviation Disposition Request

Engineering Disposition Page 2 of 4

PROJECT: Hanford Tank Waste Treatment and Immobilization Plant (WTP Project) JOB NO.: 24590 SDDR: 24590-WTP-SDDR-MS-17-00106 Rev. N/A

NOTES:

1. Complete instructions provided at end of form.

2. Items 1 through 9 and 14 to be completed by Supplier.

3. Items 10 through 13 and 15 to be completed by WTP.

4. Non-applicable items to be marked "N/A."

5. Attach additional information whenever necessary.

6. WTP must be notified within 5 days after detection of deviation.

7. Select “Yes” if the SDDR contains or references ECI documents.

24590-ENG-F00001 Rev 44 (Revised 7/24/2017) Ref: 24590-WTP-3DP-G04B-00063

Title of SDDR: EMF Process Vessels - Substitute Seamless Pipe with Welded Pipe

11. WTP Procurement & Subcontracts Action: Commercial Terms Impact:

Yes This SDDR grants relief from requirements or changes the requirements and; check each (consideration) itemthat applies:

Modifications to governing terms are required and/or;

An increase in price is requested by Seller and/or;

A price credit from the Supplier is due and/or;

An increase/decrease in the Seller promise delivery date is required.

Cost impact, if any is subject to a separate approval process as required by the changes clause.

No This SDDR grants relief from requirements or changes the requirements and all of the following apply:

No commercial impact (No modification of governing commercial terms is required) and;

No increase in price is requested by Seller and;

No decrease in price is anticipated or required by Buyer and;

No extension of promised shipment is required

12. WTP Disposition Statement (Attach extra sheets, sketches, etc., as necessary).

WTP approves the Supplier using SB-675 (welded pipe) for all nozzle and internal piping instead of SB-690 (seamless pipe and tube) as shown on 24590-BOF-MVD-DEP-00003 and 24590-BOF-MVD-DEP-00004 with the following conditions.

1. Internal pipe shall have been hydrostatically tested in accordance with the requirements of ASME SB-675.2. The independent radiographic weld examination proposed by the Supplier will be performed in accordance

with the following provisions:a) Using a procedure meeting the requirements of ASME B&PVC Section V, Article 2, except the

techniques/methods are limited to those that utilize radiographic film.b) Reader sheets are required and shall be included in the quality verification data package.c) The acceptance criteria to evaluate the weld seams shall be the criteria defined in ASME B&PVC Section

VIII, Div. 1, UW-51.d) NDE RT personnel shall be qualified to a written practice meeting the requirements of SNT-TC-1A-2006.

The are no affected submittals associated with this SDDR.

Does SDDR request an exception/deviation from a code or standard Identified in the WTP Code of Record (24590-WTP-COR-MGT-15-00001) Yes No

WTP Justification (Attach extra sheets, sketches, etc., as necessary).

Is the change associated with a Q SSC? Yes No

Although the Supplier incorrectly states that all SB-675 pipe will be purchased with 100% radiographic inspection per the ASME B&PVC, Section II Part B, ASME SB-675 pipe is an equivalent alternative material to ASME SB-690 for internal piping and nozzles and the Supplier is still meeting the requirement for wall thickness. Additionally, the Supplier will perform an independent 100% radiographic examination as outlined in the WTP Disposition Statement above to ensure the integrity of the weld seam; therefore, this deviation is acceptable.

X

• •

• • • • •

• •

Supplier Deviation Disposition Request

Engineering Disposition Page 3 of 4

PROJECT: Hanford Tank Waste Treatment and Immobilization Plant (WTP Project) JOB NO.: 24590 SDDR: 24590-WTP-SDDR-MS-17-00106 Rev. NIA

Title of SDDR: EMF Process Vessels - Substitute Seamless Pipe with Welded Pipe

Specification Incorporation Retroactive? by

Q)

.2> � "' "' "' � Document Number Rev Remarks

Q) 0 Q) .c Q)

z OU a::

24590-BOF-MVD-DEP-00003 1 D D D �

24590-BOF-MVD-DEP-00004 1 D D D �

D D D D D D D D

Affected Supplier Submittals:

Document Number Rev Document Number Rev

NIA

Reference Documents:

Document Number Rev Document Number Rev

N/A

13. WTP Disposition Approval: Originator i. ••• 1..:;,

By: Jung Shin - jv.shin1 Org Name: Bechtel National, Inc.

RE/Originator: Jung Shin Placed: Oct 25, 2017

Print/Type Name B�e.�R����- rzricken �

Date

Checker: Ryan Rickenbach 01g Name: Bechtel

Placed; Oct 26, 2017

Print/Type Name .---- y,gnature Date Procurement & Subcontracts Representative: Paul Brackney 10/26/17

Print/Type Name Reviewed

@ Date

No Comments

Approver( s): By: Mohan A- MA.RU LAMP

Mohan Arulamealam - Org Name:

Print/Type Name Placed: Oct 25. 2017 Date Reviewed

� Approver(s): Jorge Cabello No Comments By:JOfgeCabello-)acabell

Print/Type Name Org Name: MET Date Placed: Oct 26. 2017

Approver(s): Youssef Mohammad-Zadeh --1r�£���.:��oo.,i,] Print/Type Name

Approver(s): Stan Crow Print/Type Name

NOTES: 1. Complete instructions provided at end of form.2. Items 1 through 9 and 14 to be completed by Supplier. 3. Items 1 O through 13 and 15 to be completed by WTP.

24590-ENG-FOOOOJ Rev 44 (Revised 7/24/2017)

gN•�:::2011 �€

�(<(,A� Signature

4. Non-applicable items to be marked "N/A."5. Attach additional information whenever necessary.

Date

10/z 71;7 r-Date

6. WTP must be notified within 5 days after detection of deviation.7. Select "Yes" if the SDDR contains or references ECI documents.

Ref: 24590-WTP-3DP-G04B-00063

I I I I I I

I I u C:

~

>-

'

'

I I I I l --

-

-.

-. -

-

l I I J [

--

u~ /._ ~ ae_ /), • , ----1 -

I 1,-

-_, - I

' - I -- . -

BI ],,

-. - -

-"-"""' . JI

- - -L _ J

Supplier Deviation Disposition Request

Engineering Disposition Page 4 of 4

PROJECT: Hanford Tank Waste Treatment and Immobilization Plant (WTP Project) JOB NO.: 24590 SDDR: 24590-WTP-SDDR-MS-17-00106 Rev. N/A

Title of SDDR: EMF Process Vessels - Substitute Seamless Pipe with Welded Pipe

NOTES:

1. Complete instructions provided at end of form.

2. Items 1 through 9 and 14 to be completed by Supplier.

3. Items 10 through 13 and 15 to be completed by WTP.

4. Non-applicable items to be marked "N/A."

5. Attach additional information whenever necessary.

6. WTP must be notified within 5 days after detection of deviation.

7. Select “Yes” if the SDDR contains or references ECI documents.

24590-ENG-F00001 Rev 44 (Revised 7/24/2017) Ref: 24590-WTP-3DP-G04B-00063

Supplier Acknowledgement:

The Supplier accepts the WTP’s disposition herein and agrees to implement the WTP’s disposition accordingly. Return the signed SDDR to the WTP Project Document Control (PDC).

14. Supplier Print/Type Supplier Representative Name and Position Signature Date

WTP Supplier Quality Representative Release for Shipment:

The SQR confirms through reviewing, observing, or monitoring that the SDDR has been incorporated or implemented for the applicable material or equipment for shipment.

15. SQR Print/Type Supplier Quality Representative Name and Position Signature Date

smurdock
AEA-Rectangle