fy14 final: hampton roads district pdf report - vdot six-year
TRANSCRIPT
THE VIRGINIA TRANSPORTATION
Commonwealth Transportation BoardVirginia Department of Transportation
Virginia Department of Rail and Public Transportation
2014 – 2019
Final
Hampton roaDS DiStrict
FY14 FINAL
FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICT
FY2018 FY2019FY2017FY2016FY2015FY2014Fund Source Name
Funding Allocation Summary (000's)
HAMPTON ROADS DISTRICT
System Totals
Interstate
CTB Formula
$0$0$0$0$0$3,731Bridge - Federal $3,731
0 0 0 0 0 933Bridge - Soft Match 933
16,113 21,587 15,957 3,125 175 0Bridge - State 56,957
0 0 0 0 0 418High Priority - Federal 418
0 0 0 0 0 104High Priority - Soft Match 104
0 0 3,067 0 1,830 0High Priority - State 4,897
0 717 18,124 0 6,910 2,800Paving - Federal 28,550
0 80 2,014 0 768 311Paving - Soft Match 3,172
0 0 4,765 50,726 30,569 0Paving - State 86,059
34,896 7,193 13,068 0 0 299PPTA - Federal 55,455
8,724 1,798 3,267 0 0 75PPTA - Soft Match 13,864
2,074 11,957 2,699 13,951 0 0PPTA - State 30,681
GARVEE
752 748 753 747 751 746Debt Service - Federal 4,497
188 187 188 187 188 187Debt Service - Soft Match 1,124
Highway Safety Improvements
0 0 0 0 405 81Federal 486
0 0 0 0 45 9Soft Match 54
NHPP
0 0 7,019 5,883 6,389 4,860Statewide - Federal 24,151
0 0 780 654 710 615Statewide - Soft Match 2,758
Operating Revenue
0 0 0 1,003 2,006 1,003Other Funds 4,012
TIFIA/PAB
0 0 0 340 634 255PAB & Private Equity 1,229
$62,747$44,266$71,700$76,615$51,380$16,427Total $323,136
Primary
Bond Proceeds
$0$0$0$0$0$3,964CPR Bonds $3,964
0 0 0 0 0 33,704GARVEE Bonds 33,704
CMAQ
1,049 1,147 550 134 1,393 835MPO - Federal 5,109
262 287 138 33 348 209MPO - State Match 1,277
CTB Formula
0 0 0 0 0 393Bridge - Federal 393
0 0 0 0 0 98Bridge - Soft Match 98
0 0 622 0 375 0Bridge - State 997
0 0 0 0 0 100High Priority - Federal 100
0 0 0 0 0 25High Priority - Soft Match 25
0 0 264 300 850 0High Priority - State 1,414
139 1,104 1,890 3,916 4,245 0Paving - Federal 11,294
35 276 472 979 1,061 0Paving - Soft Match 2,823
0 0 1,192 0 3,958 0PPTA - State 5,151
GARVEE
26,569 26,455 26,601 26,412 26,525 25,289Debt Service - Federal 157,851
6,642 6,614 6,650 6,603 6,631 6,322Debt Service - Soft Match 39,463
Highway Safety Improvements
0 0 0 1,665 0 2,913Federal 4,578
0 0 0 185 0 324Soft Match 509
06/19/2013 247
FY14 FINAL
FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICT
FY2018 FY2019FY2017FY2016FY2015FY2014Fund Source Name
Funding Allocation Summary (000's)
HAMPTON ROADS DISTRICT - cont.
System Totals
Local Project Contributions
0 0 0 71,322 83,185 80,217Local 234,724
NHPP
783 0 192 2,000 2,000 1,899Bridge - Federal 6,875
196 0 48 500 500 475Bridge - Soft Match 1,719
0 0 0 0 0 1,954Statewide - Federal 1,954
0 0 0 0 0 488Statewide - Soft Match 488
Operating Revenue
0 0 0 61,642 123,284 61,642Other Funds 246,569
Residue Parcel Revenue
0 0 0 0 0 65State 65
Revenue Sharing Funds
0 0 0 0 0 1,398Local Match 1,398
0 0 0 0 0 1,398State Match 1,398
RSTP (STP Regional)
6,935 5,440 0 9,858 2,080 2,547MPO - Federal 26,861
1,734 1,360 0 2,465 520 637MPO - State Match 6,715
State Formula
3,636 3,006 2,407 0 0 0Primary - State 9,049
STP
922 646 3,186 4,328 4,486 5,504Bridge - Federal 19,072
230 162 797 1,082 1,121 1,376Bridge - Soft Match 4,768
0 6,584 15,086 4,000 4,000 0Statewide - Federal 29,670
0 1,646 3,772 1,000 1,000 0Statewide - Soft Match 7,417
TIFIA/PAB
0 0 0 10,992 20,501 8,258PAB & Private Equity 39,751
$49,131$54,727$63,867$209,417$288,064$242,035Total $907,241
Secondary
Bond Proceeds
$0$0$0$0$0$3,008CPR Bonds $3,008
CTB Formula
3,505 2,275 2,000 362 138 0Bridge - State 8,280
3,189 1,990 0 0 0 0High Priority - State 5,180
698 698 698 609 402 48Unpaved - State 3,154
Revenue Sharing Funds
0 0 0 0 0 3,631Local Match 3,631
0 0 0 0 0 3,631State Match 3,631
RSTP (STP Regional)
1,600 640 0 0 0 0MPO - Federal 2,240
400 160 0 0 0 0MPO - State Match 560
State Formula
1,818 1,503 1,203 0 0 0Secondary - State 4,524
129 106 85 0 0 0Secondary - Unpaved 320
STP
3,134 3,090 1,218 0 0 1,206Bridge - Federal 8,649
784 773 304 0 0 302Bridge - Soft Match 2,162
1,004 779 940 1,161 1,008 594BROS - Federal 5,485
251 195 235 290 252 149BROS - Soft Match 1,371
0 0 0 1,292 1,000 996Statewide - Federal 3,288
0 0 0 323 250 249Statewide - Soft Match 822
248 06/19/2013
FY14 FINAL
FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICT
FY2018 FY2019FY2017FY2016FY2015FY2014Fund Source Name
Funding Allocation Summary (000's)
HAMPTON ROADS DISTRICT - cont.
System Totals
Telecommunications
780 780 780 780 780 747State 4,646
$17,291$12,989$7,463$4,817$3,829$14,561Total $60,951
Urban
Bond Proceeds
$0$0$0$0$0$14,140CPR Bonds $14,140
CMAQ
4,830 2,249 3,742 2,960 4,494 2,063MPO - Federal 20,338
1,208 562 935 740 1,124 516MPO - State Match 5,084
CTB Formula
0 14,220 13,000 1,238 0 0Bridge - State 28,458
21,999 18,750 12,500 750 0 0High Priority - State 53,999
Highway Safety Improvements
0 0 0 0 0 2,536Federal 2,536
0 0 0 0 0 282Soft Match 282
Local Project Contributions
0 10,000 11,572 8,000 6,000 13,866Local 49,438
NHPP
0 0 0 0 0 3,101Bridge - Federal 3,101
0 0 0 0 0 775Bridge - Soft Match 775
0 0 0 0 8,363 4,973Statewide - Federal 13,335
0 0 0 0 2,091 1,243Statewide - Soft Match 3,334
Residue Parcel Revenue
0 0 0 0 0 101State 101
Revenue Sharing Funds
0 0 0 0 0 22,010Local Match 22,010
0 0 0 0 0 22,010State Match 22,010
RSTP (STP Regional)
10,578 10,893 21,667 11,580 11,164 9,207MPO - Federal 75,089
2,645 2,723 5,417 2,895 2,791 2,302MPO - State Match 18,772
State Formula
114 94 76 0 0 0Urban - Local Match 284
17,126 14,160 11,336 0 0 0Urban - State 42,622
STP
0 0 0 0 321 408BROS - Federal 729
0 0 0 0 80 102BROS - Soft Match 182
0 0 1,225 2,400 444 3,213Statewide - Federal 7,282
0 0 306 600 111 803Statewide - Soft Match 1,821
$58,501$73,652$81,775$31,163$36,983$103,651Total $385,724
Enhancement
Local Project Contributions
$0$0$0$0$0$1,606Local $1,606
TAP
1,689 1,689 1,689 1,689 1,689 1,074MPO - Federal 9,519
0 0 0 0 0 1,090Statewide - Federal 1,090
$1,689$1,689$1,689$1,689$1,689$3,769Total $12,215
Transit
CMAQ
$0$3,651$4,922$7,420$3,135$3,465MPO - Federal $22,593
0 913 1,230 1,855 784 866MPO - State Match 5,648
06/19/2013 249
FY14 FINAL
FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICT
FY2018 FY2019FY2017FY2016FY2015FY2014Fund Source Name
Funding Allocation Summary (000's)
HAMPTON ROADS DISTRICT - cont.
System Totals
Local Project Contributions
0 0 0 0 0 449Local 449
RSTP (STP Regional)
0 0 278 507 8,700 7,650MPO - Federal 17,136
0 0 70 127 2,175 1,913MPO - State Match 4,284
$0$4,564$6,500$9,908$14,795$14,344Total $50,110
Rail
Local Project Contributions
$0$0$0$0$0$16Local $16
$0$0$0$0$0$16Total $16
Other
CMAQ
$1,600$1,600$1,600$400$1,891$1,491MPO - Federal $8,582
400 400 400 100 473 373MPO - State Match 2,146
Highway Safety Improvements
0 0 0 0 0 154Federal 154
0 0 0 0 0 17Soft Match 17
Prescoping Funds
2,715 2,628 2,546 2,464 2,389 2,314State 15,055
RSTP (STP Regional)
431 960 0 0 0 0MPO - Federal 1,391
108 240 0 0 0 0MPO - State Match 348
$5,254$5,828$4,546$2,964$4,753$4,349Total $27,693
Grand Total $194,614$197,716$237,541$336,573$401,492$399,152 $1,767,087
250 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
I-264/LYNNHAVEN INTERCHANGE
IMPROVEMENTS (PHASE II)
PROJECT
UPC NO.:
ROUTE:
19005
FO0044
Partial PE only. MPO Project. Revised schedule required based on available funding.REPORT NOTE:
Underway
SCHEDULE
11,862
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEVirginia Beach
FY2020 101,146CN
FY2018LYNNHAVENDESCRIPTION: 11,744RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 124,751
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400CMAQ: Federal
0 0 0 0 0 0 2,066Interstate: Federal
0 0 0 0 0 0 263Interstate: State Match
0 0 0 0 0 0 132Non-Formula: Statewide
0 0 0 0 0 0 4,343Priority Transportation Funds: State
0 0 0 0 0 0 528RSTP (STP Regional): Federal
0 0 0 0 0 0 100Urban Formula: State Match
116,919 0 0 0 0 0 0 7,832Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
HAMPTON ROADS THIRD CROSSING - (PE
ONLY)
PROJECT
UPC NO.:
ROUTE:
12834
FO0064
Partial PE only. Includes Patriot's Crossing.REPORT NOTE:
Underway
SCHEDULE
791,991
ESTIMATED COST (000's)
JURISDICTION:
THIRD CROSSINGSTREET NAME:
PENorfolk
FY2021 3,983,237CN
FY2017FROM: I-64 (HAMPTON COLISEUM) TO: I-564DESCRIPTION: 75,128RW
PROJECT LENGTH: 0.0000 KMSCOPE OF WORK: New Construction Roadway TO 4,850,356
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,748Demonstration Funds: Federal
0 0 0 0 0 0 3,392Interstate: Federal
0 0 0 0 0 0 848Interstate: State Match
4,841,368 0 0 0 0 0 0 8,988Total
06/19/2013 251
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
I- 64/NORVIEW AVENUE - RAMP
IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
17824
FO0064
Complete
SCHEDULE
970
ESTIMATED COST (000's)
JURISDICTION:
I-64 EBSTREET NAME:
PENorfolk
Underway 4,511CN
CompleteFROM: 0.309 MI. WEST OF NORVIEW AVENUE TO:
0.128 MI. EAST OF NORVIEW AVENUE (0.4370 MI)
DESCRIPTION: 1,538RW
PROJECT LENGTH: 0.4370 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 7,019
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,019Interstate: Federal
0 0 0 0 0 0 531Interstate: State Match
0 0 0 0 0 0 15(X) Maintenance Funds: Statewide
0 0 0 0 0 0 187NHPP: State Match
0 0 0 0 0 0 2,175NHPP: Statewide - Federal
0 0 0 0 0 0 123NHPP: Statewide - Soft Match
0 0 0 0 0 0 40Non-Formula: Statewide
0 0 0 0 0 0 347Residue Parcel Revenue: State
0 0 0 0 0 0 605RSTP (STP Regional): Federal
0 0 0 0 0 0 111RSTP (STP Regional): State Match
0 0 0 0 0 0 117Soft Match: Federal
-251 0 0 0 0 0 0 7,270Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
ROUTE 64 - VARIABLE MESSAGE SIGNS
PROJECT
UPC NO.:
ROUTE:
62854
FO0064
Complete
SCHEDULE
98
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesapeake
Complete 1,212CN
FROM: ROUTE 464 TO: ROUTE 17DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 1,310
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,145Interstate: Federal
0 0 0 0 0 0 286Interstate: State Match
0 0 0 0 0 0 200(X) Maintenance Funds: Statewide
-322 0 0 0 0 0 0 1,632Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
RTE 64 - LIGHTING AND ELECTRICAL
UPGRADES
PROJECT
UPC NO.:
ROUTE:
71598
FO0064
Complete
SCHEDULE
482
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
Complete 9,974CN
HAMPTON ROADS BRIDGE TUNNELDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Restoration and Rehabilitation TO 10,456
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 9,411Interstate: Federal
0 0 0 0 0 0 1,046Interstate: State Match
0 0 0 0 0 0 0 10,456Total
252 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
RTE 64 - CONSTRUCT NEW INTERCHANGE
(CITY LINE ROAD)
PROJECT
UPC NO.:
ROUTE:
80029
FO0064
Partial PE only. Revised schedule and estimate
required.
REPORT NOTE:
FY2016
SCHEDULE
15,558
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Hampton Roads MPO
FY2018 89,344CN
AT CITY LINE ROADDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 104,902
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 9,703SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 1,168SAFETEA-LU Earmarks: State Bond Match
0 0 0 0 0 0 1,258SAFETEA-LU Earmarks: State Match
92,774 0 0 0 0 0 0 12,129Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
ARRA CHESAPEAKE I64
PATCHING/OVERLAY/GUARDRAIL UPGRADES
PROJECT
UPC NO.: 92557
FOARRA09
FROM: Milepost 20.1 E & W TO: Milepost 27.9 E & W
(15.6000 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 14,377American Recovery and Reinvestment Act:
Flexible
0 0 0 0 0 0 1,244(X) Maintenance Funds: Statewide
0 0 0 0 0 0 15,621Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
REPLACE DENBIGH BLVD BRIDGE OVER I-64
AND CSX RAILROAD
PROJECT
UPC NO.:
ROUTE:
93077
FO0064
Underway
SCHEDULE
4,100
ESTIMATED COST (000's)
JURISDICTION:
Denbigh BoulevardSTREET NAME:
PENewport News
FY2017 33,000CN
FY2016FROM: 0.5 Mile South of I-64 TO: 0.5 Mile North of I-64
(1.0000 MI)
DESCRIPTION: 2,900RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 40,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 9,466 14,334 11,500 600 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 2,160Interstate: Federal
0 0 0 0 0 0 262Interstate: State Match
790 0 0 0 0 720 0NHPP: Statewide - Federal
88 0 0 0 0 80 0NHPP: Statewide - Soft Match
0 9,466 14,334 11,500 600 878 800 2,422Total
06/19/2013 253
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
INSTALL VMS AND LENGTHEN RAMP AND
WEAVE ON I-64 WB
PROJECT
UPC NO.:
ROUTE:
98098
NFO0064
Underway
SCHEDULE
429
ESTIMATED COST (000's)
JURISDICTION:
Interstate 64 WBSTREET NAME:
PEYork County
FY2016 0CN
FY2014FROM: Interstate 64 WB TO: Near Mile Post 242DESCRIPTION: 0RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 429
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 386Highway Safety Improvements: Federal
0 0 0 0 0 0 43Highway Safety Improvements: State Match
0 0 0 0 0 0 0 429Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
HRBT SWITCHGEAR INSTALLATION
PROJECT
UPC NO.:
ROUTE:
103344
FO0064
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
HRBT-Interstate 64STREET NAME:
PEHampton
Underway 16,728CNFROM: HRBT South Shore Norfolk TO: HRBT North
Shore-Hampton (5.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 5.0000 MISCOPE OF WORK: Other TO 16,728
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 261(X) Maintenance Funds: Statewide
5,599 0 0 0 5,621 3,600 0NHPP: Statewide - Federal
622 0 0 0 625 400 0NHPP: Statewide - Soft Match
0 0 0 0 6,245 6,221 4,000 261Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
I-64 & I-264 PAVEMENT REHABILITATION - D/B
PROJECT # 1
PROJECT
UPC NO.:
ROUTE:
104329
FO0064
New Project
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
I-64 and I-264STREET NAME:
PENorfolk
FY2014 50,400CNFROM: VARIOUS LOCATIONS TO: VARIOUS
LOCATIONS (10.1900 MI)
DESCRIPTION: RW
PROJECT LENGTH: 10.1900 MISCOPE OF WORK: Restoration and Rehabilitation TO 50,400
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
6,910 0 0 8,727 0 744 0CTB Formula: Paving - Federal
768 0 0 970 0 83 0CTB Formula: Paving - Soft Match
6,435 0 0 4,765 21,000 0 0CTB Formula: Paving - State
0 0 0 14,461 21,000 14,112 827 0Total
254 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
I-64 & I-264 PAVEMENT REHABILITATION - D/B
PROJECT # 2
PROJECT
UPC NO.:
ROUTE:
104330
FO0064
New Project
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
I-64STREET NAME:
PENorfolk
FY2014 15,700CNFROM: Hampton Roads Bridge Tunnel (East Abutment)
TO: Little Creek Road (4.9500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 4.9500 MISCOPE OF WORK: Restoration and Rehabilitation TO 15,700
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 245 0CTB Formula: Paving - Federal
0 0 0 0 0 27 0CTB Formula: Paving - Soft Match
7,730 0 0 0 7,698 0 0CTB Formula: Paving - State
0 0 0 0 7,698 7,730 273 0Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
I-64/LASALLE- RECONSTRUCT OFF RAMP
PROJECT
UPC NO.:
ROUTE:
104363
NFO0064
New Project
FY2014
SCHEDULE
90
ESTIMATED COST (000's)
JURISDICTION:
I-64STREET NAME:
PEHampton
FY2015 450CN
FROM: I-64 EB Off Ramp TO: LaSalle Ave (0.1000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 540
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
405 0 0 0 0 81 0Highway Safety Improvements: Federal
45 0 0 0 0 9 0Highway Safety Improvements: Soft Match
0 0 0 0 0 450 90 0Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
I 64 ENVIRONMENTAL STUDY FROM I-464 TO
I-664/264
PROJECT
UPC NO.:
ROUTE:
104366
NFO0064
New Project
Revised schedule required.REPORT NOTE:
FY2016
SCHEDULE
5,000
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesapeake
CN
FROM: I464 TO: I-664/264DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 5,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 3,460 0CTB Formula: Bridge - Federal
0 0 0 0 0 865 0CTB Formula: Bridge - Soft Match
0 0 0 0 0 540 0NHPP: Statewide - Federal
0 0 0 0 0 135 0NHPP: Statewide - Soft Match
0 0 0 0 0 0 5,000 0Total
06/19/2013 255
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
NonMPOInterstate
PROGRAM/SYSTEM
I-64 CAPACITY IMPROVEMENTS FROM
NEWPORT NEWS TO WILLIAMSBURG
PROJECT
UPC NO.:
ROUTE:
104905
NFO0064
New Project
FY2014
SCHEDULE
10,000
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
FY2018 65,000CN
FY2016FROM: Newport News TO: WilliamsburgDESCRIPTION: 25,000RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 100,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 34,896 7,193 13,068 0 299 0CTB Formula: PPTA - Federal
0 8,724 1,798 3,267 0 75 0CTB Formula: PPTA - Soft Match
0 2,074 11,957 2,699 13,951 0 0CTB Formula: PPTA - State
0 45,695 20,948 19,033 13,951 0 374 0Total
MPO Area
NonMPOInterstate
PROGRAM/SYSTEM
REPLACE BRIDGES
PROJECT
UPC NO.:
ROUTE:
83164
FO0095
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
2,780
ESTIMATED COST (000's)
JURISDICTION:
I-95 Southbound & I-95 NorthboundSTREET NAME:
PEEmporia
FY2015 21,115CN
FY2014FROM: 0.3 Mile South of the Meherrin River TO: 0.3 Mile
North of the Meherrin River (0.6000 MI)
DESCRIPTION: 301RW
PROJECT LENGTH: 0.6000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 24,196
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,811Bonus OA: Federal
0 0 0 0 0 0 453Bonus OA: State Match
0 0 0 0 0 271 0CTB Formula: Bridge - Federal
0 0 0 0 0 68 0CTB Formula: Bridge - Soft Match
175 6,647 7,253 4,457 2,525 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 72Interstate: State Match
0 0 0 0 0 0 46NHPP: State Match
0 0 0 0 0 0 418NHPP: Statewide - Federal
0 6,647 7,253 4,457 2,525 175 339 2,800Total
256 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
NonMPOInterstate
PROGRAM/SYSTEM
I-95 SHOULDER IMPROVEMENTS AND
RUMBLE STRIPS
PROJECT
UPC NO.:
ROUTE:
98905
FO0095
Complete
SCHEDULE
151
ESTIMATED COST (000's)
JURISDICTION:
I-95STREET NAME:
PEGreensville County
Underway 4,006CN
FROM: MP 0 TO: MP 17.1 Sussex CLDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 4,157
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 250Discretionary Grants: State Match
0 0 0 0 0 0 4,212Highway Safety Improvements: Federal
0 0 0 0 0 0 218Highway Safety Improvements: State Match
-523 0 0 0 0 0 0 4,680Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
DT/MT/MLK - INTERSTATE CONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
T11488
FO0264
Complete
SCHEDULE
7,044
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
Underway 53,915CN
UnderwayFROM: Downtown and Midtown Tunnels; extension of
MLK to I-264 TO: Downtown and Midtown Tunnels;
extension of MLK to I-264 (3.9000 MI)
DESCRIPTION: 1,476RW
PROJECT LENGTH: 3.9000 MISCOPE OF WORK: Bridge, New Construction TO 62,435
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 12,000Bond Proceeds: GARVEE Bonds
0 0 0 0 0 0 360(X) Maintenance Funds: Statewide
2,006 0 0 0 1,003 1,003 0Operating Revenue: Other Funds
634 0 0 0 340 255 44,560TIFIA/PAB: PAB & Private Equity
0 0 0 0 0 0 273Toll Facilities: Toll Facilities Revolving
0 0 0 0 1,343 2,640 1,258 57,193Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
RTE 264 - INTERCHANGE IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
17630
FO0264
PE only.REPORT NOTE:
Underway
SCHEDULE
11,603
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEVirginia Beach
FY2020 107,969CN
FY2018FROM: 0.426 MILE EAST OF WBL I-64 TO: 0.473 MILE
EAST OF WITCHDUCK RD (2.2800 MI)
DESCRIPTION: 54,393RW
22219,28992,28993 -2,74PROJECT LENGTH: 2.2800 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/ Added Capacity TO 173,964
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,250FRAN Bond Proceeds: FRAN
0 0 0 0 0 0 6,392Interstate: Federal
0 0 0 0 0 0 682Interstate: State Match
0 0 0 0 0 0 473Non-Formula: Statewide
0 0 0 0 0 0 815Priority Transportation Funds: State
0 0 0 0 0 0 1,892RSTP (STP Regional): Federal
0 0 0 0 0 0 99Soft Match: Federal
162,361 0 0 0 0 0 0 11,603Total
06/19/2013 257
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
I-264 CONCRETE PAVEMENT REPAIR
PROJECT
UPC NO.:
ROUTE:
52305
FO0264
Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
175
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEVirginia Beach
Underway 17,538CNFROM: 0.2MI West of Witchduck Rd. at RR Bridge TO:
West Abutment of Rosemont Road (7.3000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 3.8000 MISCOPE OF WORK: Restoration and Rehabilitation TO 17,713
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 418 0CTB Formula: High Priority - Federal
0 0 0 0 0 104 0CTB Formula: High Priority - Soft Match
1,250 0 0 0 0 0 0CTB Formula: High Priority - State
0 0 0 0 0 0 3,881Interstate: Federal
0 0 0 0 0 0 431Interstate: State Match
0 0 0 0 0 0 2,073(X) Maintenance Funds: Statewide
0 0 0 0 0 0 2,413NHPP: Statewide - Federal
0 0 0 0 0 0 603NHPP: Statewide - Soft Match
6,540 0 0 0 0 1,250 522 9,401Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
RTE 264 - INTERCHANGE IMPROVEMENTS - 64
WB RAMP TO 264 EB
PROJECT
UPC NO.:
ROUTE:
57048
FO0264
PE only.REPORT NOTE:
Underway
SCHEDULE
5,048
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorfolk
FY2020 116,848CN
FY2018FROM: 0.4 MILE SOUTH OF CURLEW DRIVE TO: 0.426
MILE EAST OF WBL I-64 (1.5200 MI)
DESCRIPTION: 11,571RW
28988,28989,28990,28991 -2PROJECT LENGTH: 1.5200 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/o Added Capacity TO 133,466
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,238Interstate: Federal
0 0 0 0 0 0 809Interstate: State Match
0 0 0 0 0 0 1,000Priority Transportation Funds: State
128,419 0 0 0 0 0 0 5,048Total
258 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
I-264/LYNNHAVEN INTERCHANGE
IMPROVEMENTS - PHASE II (PART 1)
PROJECT
UPC NO.:
ROUTE:
80157
FO0264
CN on ARRA project UPC 94544REPORT NOTE:
Complete
SCHEDULE
2,300
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEVirginia Beach
CN
CompleteFROM: 0.33 Mi. east of Lynnhaven Parkway (Rte. 414)
along I-264 TO: 0.15 Mi. south of I-264 along London
Bridge Road (Rte. 279) (1.4000 MI)
DESCRIPTION: 2,676RW
PROJECT LENGTH: 1.4000 MISCOPE OF WORK: New Construction Roadway TO 4,976
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,937SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 1,234SAFETEA-LU Earmarks: State Match
-1,195 0 0 0 0 0 0 6,171Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
ARRA PORTSMOUTH/CHESAPEAKE I264
RESURF./SHOULDERS/GUARDRAILS
PROJECT
UPC NO.: 92555
NFOARRA09
FROM: Milepost 0 E & W TO: Milepost 6.43 E & W
(12.8300 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 7,048American Recovery and Reinvestment Act:
Flexible
0 0 0 0 0 0 429NHPP: Statewide - Federal
0 0 0 0 0 0 107NHPP: Statewide - Soft Match
0 0 0 0 0 0 7,585Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
ARRA VA BEACH 264 LYNNHAVEN
INTERCHANGE IMPROVEMENTS/RAMPS
PROJECT
UPC NO.: 94544
FOARRA09
Revised estimate required. PE and RW on UPC 80157. ARRA parent UPC 94544. ARRA child
UPC 95554.
REPORT NOTE:
FROM: 0.33 Mi. east of Lynnhaven Parkway (Rte. 414)
along I-264 TO: 0.15 Mi. south of I-264 along London
Bridge Road (Rte. 279) (1.4000 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,031American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 5,518Interstate: Federal
0 0 0 0 0 0 1,379Interstate: State Match
0 0 0 0 0 0 5,272SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 232SAFETEA-LU Earmarks: State Bond Match
0 0 0 0 0 0 1,086SAFETEA-LU Earmarks: State Match
0 0 0 0 0 0 15,518Total
06/19/2013 259
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
I-264 DOWNTOWN TUNNEL PPTA DEV. &
MGNT. OVERSIGHT DT/MT/MLK
PROJECT
UPC NO.:
ROUTE:
97175
NFO0264
Complete
SCHEDULE
1,960
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Hampton Roads MPO
CN
UnderwayDOWNTOWN TUNNEL PROJECTDESCRIPTION: 203RW
PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 2,163
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 197Interstate: Federal
0 0 0 0 0 0 22Interstate: State Match
0 0 0 0 0 0 1,568NHPP: Statewide - Federal
0 0 0 0 0 0 392NHPP: Statewide - Soft Match
-16 0 0 0 0 0 0 2,180Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
DT/MT/MLK INTERSTATE DEBT SERVICE
PROJECT
UPC NO.:
ROUTE:
103037
FO0264
Underway
SCHEDULE
1,001
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
Underway 13,469CNFROM: Downtown and Midtown Tunnels; extension of
MLK to I-264 TO: Downtown and Midtown Tunnels;
extension of MLK to I-264 (3.9000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 3.9000 MISCOPE OF WORK: Bridge, New Construction TO 14,470
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
751 752 748 753 747 746 703GARVEE: Debt Service - Federal
188 188 187 188 187 187 176GARVEE: Debt Service - Soft Match
7,970 940 935 941 934 939 933 879Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
I-64 & I-264 PAVEMENT REHABILITATION - D/B
PROJECT # 3
PROJECT
UPC NO.:
ROUTE:
104331
FO0264
New Project
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
I-264STREET NAME:
PEVirginia Beach
FY2014 54,100CNFROM: Railroad Bridge West of Witchduck Road TO:
Parks Avenue (10.4100 MI)
DESCRIPTION: RW
PROJECT LENGTH: 10.4100 MISCOPE OF WORK: Restoration and Rehabilitation TO 54,100
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 9,398 0 799 0CTB Formula: Paving - Federal
0 0 0 1,044 0 89 0CTB Formula: Paving - Soft Match
15,278 0 0 0 19,402 0 0CTB Formula: Paving - State
0 0 0 7,019 263 0 0NHPP: Statewide - Federal
0 0 0 780 29 0 0NHPP: Statewide - Soft Match
0 0 0 18,240 19,694 15,278 888 0Total
260 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
ARRA CHESAPEAKE/NORFOLK I464
RESURFACING/GUARDRAIL UPGRADES
PROJECT
UPC NO.: 92556
NFOARRA09
FROM: Milepost 0.82 N & S TO: Milepost 5.61 N & S
(9.5800 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,990American Recovery and Reinvestment Act:
Flexible
0 0 0 0 0 0 94Interstate: Federal
0 0 0 0 0 0 10Interstate: State Match
0 0 0 0 0 0 79NHPP: Statewide - Federal
0 0 0 0 0 0 20NHPP: Statewide - Soft Match
0 0 0 0 0 0 5,193Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
AIR TERMINAL INTERCHANGE - INTERMODAL
CONNECTOR
PROJECT
UPC NO.:
ROUTE:
59175
FO0564
PE and RW only. Accruing funds for CN.REPORT NOTE:
FY2014
SCHEDULE
3,067
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorfolk
FY2017 57,257CN
FY2016AT CHAMBERS FIELD AIR STATIONDESCRIPTION: 592RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 60,916
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
580 0 0 3,067 0 0 0CTB Formula: High Priority - State
0 0 0 0 0 0 5,082SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 1,271SAFETEA-LU Earmarks: State Bond Match
50,916 0 0 3,067 0 580 0 6,353Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
ARRA CHESAPEAKE/SUFFOLK I664
PAVING/DRAINS/GUARDRAIL
PROJECT
UPC NO.: 93861
FOARRA09
Revised estimate requiredREPORT NOTE:
FROM: .5 MI North of JCT with Rte 58 TO: South
Abutment of the MMBT (7.5000 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 14,098American Recovery and Reinvestment Act:
Flexible
0 0 0 0 0 0 2,069NHPP: Statewide - Federal
0 0 0 0 0 0 517NHPP: Statewide - Soft Match
0 0 0 0 0 0 16,685Total
06/19/2013 261
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
I-664 - INSTAL MEDIAN GUARDRAIL AND
SHOULDER RUMBLE STRIPS
PROJECT
UPC NO.:
ROUTE:
98454
NFO0664
Complete
SCHEDULE
114
ESTIMATED COST (000's)
JURISDICTION:
I-664STREET NAME:
PEChesapeake
Underway 1,086CN
FROM: M.P. 10.87 TO: M.P. 19.55 (8.6800 MI)DESCRIPTION: RW
PROJECT LENGTH: 8.6800 MISCOPE OF WORK: Safety TO 1,200
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 120Discretionary Grants: State Match
0 0 0 0 0 0 1,080Highway Safety Improvements: Federal
0 0 0 0 0 0 0 1,200Total
MPO Area
NonMPOInterstate
PROGRAM/SYSTEM
HAMPTON ROADS INTERSTATE PAVING
BALANCE ENTRY
PROJECT
UPC NO.: T13509
NFOBalance Entry
New Project
FROM: Various TO: VariousDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 717 0 0 1,012 0CTB Formula: Paving - Federal
0 0 80 0 0 112 0CTB Formula: Paving - Soft Match
1,126 0 0 0 2,626 0 0CTB Formula: Paving - State
0 796 0 2,626 1,126 1,124 0Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
ARRA - JAMES CITY 60/64/143/321
RESURFACING
PROJECT
UPC NO.: 92553
NFOARRA09
FROM: Various TO: VariousDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5,891American Recovery and Reinvestment Act:
Flexible
0 0 0 0 0 0 1,109(X) Maintenance Funds: Statewide
0 0 0 0 0 0 265Minimum Guarantee: Federal
0 0 0 0 0 0 836Primary Formula: State
0 0 0 0 0 0 8,102Total
262 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Interstate
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
R000 - I-564 INTERMODAL CONNECTOR
PROJECT
UPC NO.:
ROUTE:
18968
FOR000
Complete
SCHEDULE
15,086
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorfolk
FY2015 157,343CN
UnderwayFROM: I-564 TO: NORFOLK NAVAL BASE/N.I.T. (1.6000
MI)
DESCRIPTION: 16,709RW
11111,26419,26420,26493,27567,27568 -2,95,100PROJECT LENGTH: 1.6000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: New Construction Roadway TO 189,138
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 105,301Bond Proceeds: CPR Bonds
0 0 0 0 0 0 166Demonstration Funds: Federal
0 0 0 0 0 0 3,404FRAN Bond Proceeds: FRAN
0 0 0 0 0 0 13,586Interstate: Federal
0 0 0 0 0 0 3,396Interstate: State Match
0 0 0 0 0 0 1,459Priority Transportation Funds: State
0 0 0 0 0 0 30,431SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 3,905SAFETEA-LU Earmarks: State Bond Match
0 0 0 0 0 0 3,703SAFETEA-LU Earmarks: State Match
0 0 0 0 0 0 3,787TEA-21 High Priority Funds: Statewide
20,000 0 0 0 0 0 0 169,138Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
UPGRADE SIGN PANELS TO CLEARVIEW
FONT
PROJECT
UPC NO.:
ROUTE:
99402
NFOTS05
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEHampton Roads District-wide
Complete 861CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 861
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 900Highway Safety Improvements: Federal
0 0 0 0 0 0 100Highway Safety Improvements: State Match
-139 0 0 0 0 0 0 1,000Total
MPO Area
Hampton RoadsInterstate
PROGRAM/SYSTEM
UPGRADE SIGN PANELS TO CLEARVIEW
FONT
PROJECT
UPC NO.:
ROUTE:
103433
NFOTS05
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
Underway 764CN
FROM: Various TO: VaroiusDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 764
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 142 63(X) Maintenance Funds: Statewide
0 0 0 0 0 0 399Safety Funds: Hazard Elimination
159 0 0 0 0 0 142 462Total
06/19/2013 263
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
DT/MT/MLK PPTA - (MIDTOWN TUNNEL AND
MLK) - ERC
PROJECT
UPC NO.:
ROUTE:
95149
NFO0000
Underway
SCHEDULE
10,000
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: New Construction Roadway TO 10,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,000Bond Match: State Bond Match
0 0 0 0 0 0 5,787Minimum Guarantee: Federal
0 0 0 0 0 0 2,213Minimum Guarantee Funds: Federal
0 0 0 0 0 0 0 10,000Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
UPGRADE SIGNAL AT INTERSECTION RTE 5
AND RTE 199
PROJECT
UPC NO.:
ROUTE:
98435
NFO0005
Complete
SCHEDULE
30
ESTIMATED COST (000's)
JURISDICTION:
SR 5STREET NAME:
PEWilliamsburg
Complete 210CN
FROM: SR 31 TO: SR 199DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 240
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 315Highway Safety Improvements: Federal
0 0 0 0 0 0 35Highway Safety Improvements: State Match
-110 0 0 0 0 0 0 350Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
UPGRADE EXISTING SIGNAL ON MILITARY
HIGHWAY
PROJECT
UPC NO.:
ROUTE:
93600
NFO0013
Complete
SCHEDULE
54
ESTIMATED COST (000's)
JURISDICTION:
Military HighwaySTREET NAME:
PEChesapeake
Complete 238CNFROM: 205 ft. south of Rt. 13 Military Highway & Old
Greenbrier Rd TO: To: 220 ft. north of Rt. 13 Military
Highway & Old Greenbrie
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 292
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 263Highway Safety Improvements: Federal
0 0 0 0 0 0 29Highway Safety Improvements: State Match
0 0 0 0 0 0 0 292Total
264 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
HRRR INTERSECTION RELATED WARNING
LANKFORD HWY
PROJECT
UPC NO.:
ROUTE:
95411
NFO0013
Complete
SCHEDULE
51
ESTIMATED COST (000's)
JURISDICTION:
Lankford HighwaySTREET NAME:
PEAccomack County
Complete 75CN
FROM: Route 13 TO: Route 648DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 126
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 115High Risk Rural: Federal
0 0 0 0 0 0 13High Risk Rural: State Match
-2 0 0 0 0 0 0 128Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
HRRR SIGNAL UPGRADE LANKFORD HWY
PROJECT
UPC NO.:
ROUTE:
95419
NFO0013
Complete
SCHEDULE
52
ESTIMATED COST (000's)
JURISDICTION:
Lankford HighwaySTREET NAME:
PEAccomack County
Complete 192CN
FROM: US 13 TO: SR 176DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 245
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 224High Risk Rural: Federal
0 0 0 0 0 0 25High Risk Rural: State Match
-4 0 0 0 0 0 0 249Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
HRRR SIGNAL UPGRADE ON LANKFORD HWY
AND W. MAIN ST
PROJECT
UPC NO.:
ROUTE:
95421
NFO0013
Complete
SCHEDULE
56
ESTIMATED COST (000's)
JURISDICTION:
Lankford HighwaySTREET NAME:
PEAccomack County
Complete 232CN
FROM: US 13 TO: SR 179DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 288
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 260High Risk Rural: Federal
0 0 0 0 0 0 29High Risk Rural: State Match
-1 0 0 0 0 0 0 289Total
06/19/2013 265
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE 17 - WIDEN FROM 2 TO 4 LANES &
REPLACE RIVER XING BRIDGE
PROJECT
UPC NO.:
ROUTE:
56187
FO0017
Steel Bridge; Local contributions include VTIB loan and toll bond proceeds from City; State
funds - AC for future federal conversion. Administered by the City as a toll project.
REPORT NOTE:
Complete
SCHEDULE
16,089
ESTIMATED COST (000's)
JURISDICTION:
Dominion BlvdSTREET NAME:
PEChesapeake
Underway 327,188CN
CompleteFROM: 0.75 Mile South of Cedar Road TO: 0.52 Mile
North of Great Bridge Blvd (3.8000 MI)
DESCRIPTION: 68,592RW
26479,28792,28793,28794,28795,28796,28797,28798,28799-2PROJECT LENGTH: 3.8000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/ Added Capacity TO 411,869
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,200Bond Match: State Bond Match
0 0 0 0 0 0 6,486Demonstration Funds: Federal
83,185 0 0 0 71,322 79,501 91,918Local Project Contributions: Local
0 0 0 0 0 0 8,800Minimum Guarantee: Federal
0 0 0 0 0 0 369Non-Formula: State Match
0 0 0 0 0 0 1,169Primary Formula: Federal
0 0 0 0 0 0 1,054Primary Formula: State
0 0 0 0 0 0 292Primary Formula: State Match
0 0 0 0 0 0 198Priority Transportation Funds: State
0 0 0 0 0 0 29,031RSTP (STP Regional): Federal
0 0 0 0 9,858 387 4,258RSTP (STP Regional): MPO - Federal
0 0 0 0 2,465 97 1,065RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 6,889RSTP (STP Regional): State Match
0 0 0 0 0 0 12,896SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 929SAFETEA-LU Earmarks: State Bond Match
0 0 0 0 0 0 2,295SAFETEA-LU Earmarks: State Match
0 0 0 0 0 0 222Special Grant Projects: Federal
-5,018 0 0 0 83,645 83,185 79,985 170,072Total
266 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE 17 - WIDEN FROM 4 TO 6 LANES
PROJECT
UPC NO.:
ROUTE:
60843
FO0017
Complete
SCHEDULE
4,230
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEYork County
Underway 33,092CN
CompleteFROM: 1.267 MILE SOUTH ROUTE 620 (LAKESIDE
DRIVE) TO: 1.517 MILE NORTH ROUTE 620 (LAKESIDE
DRIVE) (2.7840 MI)
DESCRIPTION: 20,343RW
27508 -2PROJECT LENGTH: 2.7840 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/ Added Capacity TO 57,665
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 2,098 15,151Bond Proceeds: CPR Bonds
750 0 0 0 0 0 0CTB Formula: High Priority - State
0 0 0 0 0 0 5,083Minimum Guarantee: Federal
0 0 0 0 0 0 11,237National Highway System Allocations:
Federal
0 0 0 0 0 0 2,708National Highway System Allocations: State
Match
0 0 0 0 0 0 675NHPP: Statewide - Federal
0 0 0 0 0 0 169NHPP: Statewide - Soft Match
0 0 0 0 0 0 6Non-Formula: State Match
0 0 0 0 0 0 614Primary Formula: Federal
0 0 0 0 0 0 2,016Primary Formula: State
0 0 0 0 0 0 169Primary Formula: State Match
0 0 0 0 0 0 1,476Priority Transportation Funds: State
0 0 0 0 0 0 449Residue Parcel Revenue: State
0 0 0 0 0 0 770Revenue Sharing Funds: Local Match
0 0 0 0 0 0 770Revenue Sharing Funds: State Match
0 0 0 0 0 0 4,345RSTP (STP Regional): Federal
2,080 0 0 0 0 2,160 2,160RSTP (STP Regional): MPO - Federal
520 0 0 0 0 540 540RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 1,080RSTP (STP Regional): State Match
0 0 0 0 0 0 101Soft Match: Federal
0 0 0 0 0 3,350 4,798 49,516Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE 17 - DOMINION BOULEVARD CORRIDOR
STUDY
PROJECT
UPC NO.:
ROUTE:
77382
NFO0017
PE Only.REPORT NOTE:
Underway
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesapeake
CNFROM: NORTH CAROLINA LINE TO: DOMINION
BOULEVARD - CEDAR ROAD
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Preliminary Engineering TO 150
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 150Primary Formula: State 0
06/19/2013 267
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
ELECTRONIC TOLL COLLECTION & VIOL
ENFORCE SYSTEM
PROJECT
UPC NO.: 80382
NFOProject Report Req'd
GEORGE P. COLEMAN BRIDGEDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 486IFRO: State
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
INSTALL RIGHT / LEFT TURN LANES AND
SUPPLEMENTAL SIGNING
PROJECT
UPC NO.:
ROUTE:
98095
NFO0017
Underway
SCHEDULE
101
ESTIMATED COST (000's)
JURISDICTION:
Carrollton Blvd (US 17)STREET NAME:
PEIsle of Wight County
FY2016 212CN
FY2014FROM: Carrollton Blvd (US 17) TO: Kings Cove Way
(Route 659)
DESCRIPTION: 61RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 374
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 298Highway Safety Improvements: Federal
0 0 0 0 0 0 33Highway Safety Improvements: State Match
43 0 0 0 0 0 0 331Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
EXTEND NB LTL AND INTERSECTION
LIGHTING
PROJECT
UPC NO.:
ROUTE:
98096
NFO0017
Underway
SCHEDULE
126
ESTIMATED COST (000's)
JURISDICTION:
Carrollton Blvd (US 17)STREET NAME:
PEIsle of Wight County
FY2016 162CN
FY2014FROM: Carrollton Blvd (US 17) TO: Smiths Neck Road
(Route 669)
DESCRIPTION: 60RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 348
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 171Highway Safety Improvements: Federal
0 0 0 0 0 0 13Highway Safety Improvements: State Match
165 0 0 0 0 0 0 183Total
268 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
CONSTRUCT PHASE II PARKING LOT OF THE
BUS TRANSFER CENTER
PROJECT
UPC NO.:
ROUTE:
100609
NFO0017
MPO project, Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
J CLYDE MORRIS BLVDSTREET NAME:
PENewport News
Underway 250CNFROM: RIVERSIDE REGIONAL MEDICAL CENTER TO:
PENINSULA HEALTH CENTER
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 300
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 240CMAQ: Federal
0 0 0 0 0 0 60CMAQ: State Match
0 0 0 0 0 0 0 300Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
BRIDGE REPL- RTE 31 OVER POWHATAN
CREEK (FED ID 10476)
PROJECT
UPC NO.:
ROUTE:
T13949
NFO0031
New Project
FY2018
SCHEDULE
360
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEJames City County
FY2020 1,100CN
FY2019DESCRIPTION: 800RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 2,260
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 922 366 0 0 0 0STP: Bridge - Federal
0 230 92 0 0 0 0STP: Bridge - Soft Match
650 1,152 458 0 0 0 0 0Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 31 - WIDEN & RESTRIPE PAVEMENT
PROJECT
UPC NO.:
ROUTE:
77564
NFO0031
State funds - AC for future federal conversion.REPORT NOTE:
Complete
SCHEDULE
291
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESurry County
Complete 1,456CN
CompleteFROM: 0.586 MI SOUTH OF FERRY PIER TO: FERRY
PIER (0.5860 MI)
DESCRIPTION: 209RW
PROJECT LENGTH: 0.5860 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,956
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 52Primary Formula: State
0 0 0 0 0 0 651Revenue Sharing Funds: Local Match
0 0 0 0 0 0 651Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,254SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 115SAFETEA-LU Earmarks: State Bond Match
0 0 0 0 0 0 197SAFETEA-LU Earmarks: State Match
-963 0 0 0 0 0 0 2,920Total
06/19/2013 269
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
JAMESTOWN FERRY BOAT
PROJECT
UPC NO.:
ROUTE:
100947
NFO0031
Revised schedule requiredREPORT NOTE:
Underway
SCHEDULE
2,500
ESTIMATED COST (000's)
JURISDICTION:
Rolfe Highway (Rte 31)STREET NAME:
PESurry County
FY2014 25,087CN
FROM: Jamestown Ferry TO: Jamestown FerryDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Ferry boats TO 27,587
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,000CMAQ TERMS: Federal
0 0 0 0 0 0 500CMAQ TERMS: State Match
0 0 6,584 13,486 0 0 0STP: Statewide - Federal
0 0 1,646 3,372 0 0 0STP: Statewide - Soft Match
0 0 8,230 16,858 0 0 0 2,500Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
JAMESTOWN SCOTLAND FERRY SECURITY
STATIONS
PROJECT
UPC NO.:
ROUTE:
102110
NFO0031
Complete
SCHEDULE
595
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESurry County
FY2014 1,792CN
UnderwayFROM: Surry Co line TO: James City Co line (1.0000 MI)DESCRIPTION: 153RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Ferry boats TO 2,540
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,950Ferry Boat Discretionary Funds: Federal
200 0 0 0 0 290 100(X) Maintenance Funds: Statewide
0 0 0 0 0 200 290 2,050Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 35 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
81457
NFO0035
Complete
SCHEDULE
1,494
ESTIMATED COST (000's)
JURISDICTION:
Meherrin RdSTREET NAME:
PESouthampton County
FY2015 11,340CN
UnderwayFROM: 0.072 mi W. Southampton County Line TO: 0.364
mi. W. Southmapton County Line (0.2920 MI)
DESCRIPTION: 248RW
29902 -1PROJECT LENGTH: 0.2920 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 13,082
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 300Bond Match: State Bond Match
0 0 0 0 0 0 1,200Bridge Replacement: Federal
0 0 0 622 0 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 1,858Federal STP: Federal
0 0 0 0 0 0 956Minimum Guarantee: Federal
0 0 0 0 0 0 704Soft Match: Federal
958 0 0 0 391 2,503 0STP: Bridge - Federal
239 0 0 0 98 626 0STP: Bridge - Soft Match
0 0 0 0 0 0 2,102STP: Statewide - Federal
0 0 0 0 0 0 525STP: Statewide - Soft Match
0 0 0 622 489 1,197 3,129 7,645Total
270 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
ROUTE 35 OVER TARRARA CREEK (VA STR
1017)
PROJECT
UPC NO.:
ROUTE:
101493
NFO0035
Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESouthampton County
FY2017 1,500CN
UnderwayFROM: Route 35 over Tarrara Creek Structure 1017 TO:
Route 35 over Tarrara Creek
DESCRIPTION: 100RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 30Bond Match: State Bond Match
0 0 0 0 0 0 120Bridge Replacement: Federal
0 0 280 500 500 0 200STP: Bridge - Federal
0 0 70 125 125 0 50STP: Bridge - Soft Match
0 0 350 625 625 0 0 400Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
BRIDGE REPL- RTE 58 OVER MEHERRIN (FED
ID 9028)
PROJECT
UPC NO.:
ROUTE:
T13956
NFO0058
New Project
Revised schedule required.REPORT NOTE:
FY2015
SCHEDULE
440
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEGreensville County
FY2017 1,310CN
FY2016DESCRIPTION: 520RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 2,270
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
500 0 0 0 1,316 0 0NHPP: Bridge - Federal
125 0 0 0 329 0 0NHPP: Bridge - Soft Match
0 0 0 0 1,645 625 0 0Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
MLK/MT/MLK - PRIMARY CONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
T11487
FO0058
Complete
SCHEDULE
178,930
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
Underway 1,813,697CN
UnderwayFROM: Downtown and Midtown Tunnels; extension of
MLK to I-264 TO: Downtown and Midtown Tunnels;
extension of MLK to I-264 (3.9000 MI)
DESCRIPTION: 26,265RW
PROJECT LENGTH: 3.9000 MISCOPE OF WORK: Bridge, New Construction TO 2,018,892
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 388,000Bond Proceeds: GARVEE Bonds
0 0 0 0 0 245 11,795(X) Maintenance Funds: Statewide
123,284 0 0 0 61,642 61,642 0Operating Revenue: Other Funds
20,501 0 0 0 10,992 8,258 1,323,946TIFIA/PAB: PAB & Private Equity
0 0 0 0 0 0 8,832Toll Facilities: Toll Facilities Revolving
-245 0 0 0 72,634 143,785 70,145 1,732,573Total
06/19/2013 271
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 58 - CONSTRUCT INTERCHANGE
PROJECT
UPC NO.:
ROUTE:
17728
NFO0058
State funds - AC for future federal conversion.REPORT NOTE:
Complete
SCHEDULE
3,067
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESouthampton County
FY2014 24,305CN
UnderwayFROM: ROUTE 58 BUSINESS INTERCHANGE TO:
(EAST END COURTLAND BYPASS) (1.4685 KM)
DESCRIPTION: 1,245RW
PROJECT LENGTH: 1.4685 KMSCOPE OF WORK: Relocation TO 28,617
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,866 10,000Bond Proceeds: CPR Bonds
0 0 0 0 0 0 709Bond Proceeds: Rt 58 Bond CDP Funds
0 0 0 0 0 100 0CTB Formula: High Priority - Federal
0 0 0 0 0 25 0CTB Formula: High Priority - Soft Match
100 0 0 264 300 0 0CTB Formula: High Priority - State
0 0 0 0 0 0 896Primary Formula: State
0 0 0 0 0 0 2,016Priority Transportation Funds: State
0 0 0 0 0 0 171Revenue Sharing Funds: Local Match
0 0 0 0 0 0 171Revenue Sharing Funds: State Match
4,000 0 0 1,600 4,000 0 0STP: Statewide - Federal
1,000 0 0 400 1,000 0 0STP: Statewide - Soft Match
0 0 0 2,264 5,300 5,100 1,991 13,963Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE 58 - PPTA PROJECT DEV. & MGMT.
OVERSIGHT (DT/MT/MLK)
PROJECT
UPC NO.:
ROUTE:
76642
NFO0058
Complete
SCHEDULE
63,387
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
CN
N/AMIDTOWN TUNNEL CORRIDORDESCRIPTION: 6,563RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Preliminary Engineering TO 69,950
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,976Bond Match: State Bond Match
0 0 0 0 0 33,704 0Bond Proceeds: GARVEE Bonds
3,958 0 0 1,192 0 0 0CTB Formula: PPTA - State
0 0 0 0 0 0 5,075Federal STP: Federal
0 0 0 0 0 0 7,593Minimum Guarantee: Federal
0 0 0 0 0 0 4,313Minimum Guarantee Funds: Federal
0 0 0 0 0 1,954 5,621NHPP: Statewide - Federal
0 0 0 0 0 488 1,405NHPP: Statewide - Soft Match
0 0 0 0 0 0 400Primary Formula: State
0 0 0 0 0 0 1,269Soft Match: Federal
0 0 0 1,192 0 3,958 36,146 28,653Total
272 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE 58 BUSINESS BRIDGE (CARRSVILLE)
OVER RTE. 632 AND CSX
PROJECT
UPC NO.:
ROUTE:
81435
NFO0058
Underway
SCHEDULE
650
ESTIMATED COST (000's)
JURISDICTION:
Carrsville HwySTREET NAME:
PEIsle of Wight County
FY2015 3,394CN
FY2014FROM: 0.12 Miles East of route 641 TO: 0.46 Miles East
of Route 641 (0.3500 MI)
DESCRIPTION: 737RW
29863 -1PROJECT LENGTH: 0.3500 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,781
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 520Bridge Replacement: Federal
0 0 0 0 0 0 130Soft Match: Federal
700 0 0 307 462 900 936STP: Bridge - Federal
175 0 0 77 115 225 234STP: Bridge - Soft Match
0 0 0 384 577 875 1,125 1,820Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
ARRA - ISLE OF WIGHT 58 PAVEMENT
OVERLAY
PROJECT
UPC NO.: 95032
NFOARRA09
FROM: MP 6.65, City of Suffolk CL TO: MP 3.70, 2.16 mI.
East of Route 258 (1.8100 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 306American Recovery and Reinvestment Act:
Urbanized Area > 200K
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE. 58 - LANE REVERSAL
PROJECT
UPC NO.:
ROUTE:
95050
FO0058
MPO projectREPORT NOTE:
Complete
SCHEDULE
950
ESTIMATED COST (000's)
JURISDICTION:
RTE. 58STREET NAME:
PEHampton Roads District-wide
CNFROM: RTE 58 & RTE 13 Interchange TO: I-264 & I-64
Interchange (15.5000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 15.5000 MISCOPE OF WORK: Safety TO 950
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 600Bond Proceeds: CPR Bonds
0 0 0 0 0 0 800RSTP (STP Regional): Federal
0 0 0 0 0 0 200RSTP (STP Regional): State Match
-650 0 0 0 0 0 0 1,600Total
06/19/2013 273
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
DT/MT/MLK PRIMARY DEBT SERVICE
PROJECT
UPC NO.:
ROUTE:
103036
FO0058
Underway
SCHEDULE
32,373
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
Underway 477,228CNFROM: Downtown and Midtown Tunnels; extension of
MLK to I-264 TO: Downtown and Midtown Tunnels;
extension of MLK to I-264 (3.9000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 3.9000 MISCOPE OF WORK: Bridge, New Construction TO 509,601
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
26,525 26,569 26,455 26,601 26,412 25,289 22,725GARVEE: Debt Service - Federal
6,631 6,642 6,614 6,650 6,603 6,322 5,681GARVEE: Debt Service - Soft Match
283,881 33,211 33,069 33,252 33,016 33,156 31,611 28,407Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE 60 - RELOCATION & UPGRADING
PROJECT
UPC NO.:
ROUTE:
13496
FO0060
MPO Project. In conjunction with other systems project UPC 14598. Revised schedule
required. PE only - accrual for RW.
REPORT NOTE:
Underway
SCHEDULE
2,321
ESTIMATED COST (000's)
JURISDICTION:
Pocahontas TrailSTREET NAME:
PEJames City County
FY2019 23,233CN
FY2016FROM: WEST APPROACH OF SKIFFES CREEK
BRIDGE TO: 1.9 MILE WEST OF WCL CITY OF
NEWPORT NEWS (1.5600 MI)
DESCRIPTION: 11,439RW
PROJECT LENGTH: 1.5600 MISCOPE OF WORK: New Construction Roadway TO 36,994
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 304Non-Formula: State Match
0 0 0 0 0 0 200Primary Formula: Federal
0 0 0 0 0 0 50Primary Formula: State Match
0 0 0 0 0 0 2,400RSTP (STP Regional): Federal
0 0 0 0 0 0 296RSTP (STP Regional): State Match
33,744 0 0 0 0 0 0 3,250Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
UPGRADE SIGNAL, ADD PAVEMENT
MARKINGS, AND PEDESTRIAN ACCESS
PROJECT
UPC NO.:
ROUTE:
97010
NFO0060
Complete
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
Richmond RoadSTREET NAME:
PEJames City County
Complete 384CN
FROM: US 60 Richmond Road TO: Rte 645 Airport RoadDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 434
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 422Highway Safety Improvements: Federal
0 0 0 0 0 0 47Highway Safety Improvements: State Match
-36 0 0 0 0 0 0 469Total
274 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
SKIFFES CREEK CONNECTOR
PROJECT
UPC NO.:
ROUTE:
100200
FO0060
MPO project, Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
3,000
ESTIMATED COST (000's)
JURISDICTION:
Skiffes Creek ConnectorSTREET NAME:
PEJames City County
FY2017 25,000CN
FY2016FROM: Route 60 TO: Route 143DESCRIPTION: 7,000RW
PROJECT LENGTH: _SCOPE OF WORK: New Construction Roadway TO 35,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,000Non-Formula: State Match
0 0 0 0 0 0 8,000RSTP (STP Regional): Federal
0 5,895 4,800 0 0 0 0RSTP (STP Regional): MPO - Federal
0 1,474 1,200 0 0 0 0RSTP (STP Regional): MPO - State Match
11,631 7,369 6,000 0 0 0 0 10,000Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RICHMOND ROAD INTERSECTION
IMPROVEMENTS @ RTE 199 WEST RAMP
PROJECT
UPC NO.:
ROUTE:
102947
NFO0060
MPO project; Revised schedule required.REPORT NOTE:
FY2016
SCHEDULE
80
ESTIMATED COST (000's)
JURISDICTION:
Richmond RoadSTREET NAME:
PEJames City County
FY2018 545CN
FY2017FROM: Route 199 West Ramp TO: West Ramp onto
Richmond Road
DESCRIPTION: 25RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 650
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 280 51 33 0 0 0CMAQ: MPO - Federal
0 70 13 8 0 0 0CMAQ: MPO - State Match
195 350 64 41 0 0 0 0Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
POCAHONTAS TRAIL RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
102980
NFO0060
MPO projectREPORT NOTE:
FY2018
SCHEDULE
700
ESTIMATED COST (000's)
JURISDICTION:
Pocahontas TrailSTREET NAME:
PEJames City County
FY2020 5,000CN
FY2019FROM: James City County Fire Station #2 (8429
Pocahontas Trail) TO: James City County Elementary
School (8901 Pocahontas Trail) (1.8000 MI)
DESCRIPTION: 400RW
PROJECT LENGTH: 1.8000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 6,100
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,040 640 0 0 0 0RSTP (STP Regional): MPO - Federal
0 260 160 0 0 0 0RSTP (STP Regional): MPO - State Match
4,000 1,300 800 0 0 0 0 0Total
06/19/2013 275
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE 105 - CONSTRUCTION OF PARALLEL
LANES (WESTBOUND)
PROJECT
UPC NO.:
ROUTE:
13497
FO0105
PE and RW only - CN on ARRA UPC 92992 and inplan utilities on UPC 93243REPORT NOTE:
Complete
SCHEDULE
2,515
ESTIMATED COST (000's)
JURISDICTION:
FT. EUSTIS BOULEVARDSTREET NAME:
PEHampton Roads District-wide
CN
CompleteFROM: 0.721 KILOMETER EAST OF ROUTE 143 TO:
0.024 KILOMETER WEST OF ROUTE 17 (5.0850 KM)
DESCRIPTION: 571RW
11111 95PROJECT LENGTH: 5.0850 KM STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/ Added Capacity TO 3,086
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,469National Highway System Allocations:
Federal
0 0 0 0 0 0 617National Highway System Allocations: State
Match
-1 0 0 0 0 0 0 3,087Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
ARRA BRAC NEWPORT NEWS/YORK 105 WB
PARALLEL LANES CONST.
PROJECT
UPC NO.: 92992
FOARRA09
PE and RW on UPC 13497 and Inplan utilities on UPC 93243REPORT NOTE:
FROM: 0.721 KILOMETER EAST OF ROUTE 143 TO:
0.024 KILOMETER WEST OF ROUTE 17 (3.1597 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 18,724American Recovery and Reinvestment Act:
Flexible
0 0 0 0 0 0 18,724Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
IN-PLAN UTILITY WORK ON ROUTE 105
WIDENING
PROJECT
UPC NO.:
ROUTE:
93243
FO0105
CN on ARRA UPC 92992 - PE and RW on UPC 13497REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Fort Eustis BoulevardSTREET NAME:
PEHampton Roads District-wide
Underway 763CNFROM: 1.250 KILOMETER EAST OF ROUTE 143 TO:
0.250 KILOMETER WEST OF ROUTE 17 (4.3100 KM)
DESCRIPTION: RW
PROJECT LENGTH: 4.3100 KMSCOPE OF WORK: Reconstruction w/ Added Capacity TO 763
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 961Local Project Contributions: Local
0 0 0 0 0 0 320National Highway System Allocations:
Federal
0 0 0 0 0 0 80National Highway System Allocations: State
Match
-599 0 0 0 0 0 0 1,361Total
276 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
BRIDGE REPL-RTE 134 OVER KILN CREEK
(FED ID 19855/19856)
PROJECT
UPC NO.:
ROUTE:
T13955
NFO0134
New Project
Revised schedule required.REPORT NOTE:
FY2014
SCHEDULE
870
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEYork County
FY2016 2,600CN
FY2015DESCRIPTION: 1,050RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 4,520
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 783 0 192 467 0 0NHPP: Bridge - Federal
0 196 0 48 117 0 0NHPP: Bridge - Soft Match
2,717 979 0 241 584 0 0 0Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
ARRA - YORK 134 EXTEND TURN LANE AT
TABB SMITH TRAIL
PROJECT
UPC NO.: 94459
NFOARRA09
FROM: Median break East of Tabb Smith Trail TO: 400 ft
west of median break (0.0800 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 111American Recovery and Reinvestment Act:
Urbanized Area > 200K
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
CAPITOL LANDING RD BICYCLE
ACCOMODATION
PROJECT
UPC NO.:
ROUTE:
84484
NFO0143
MPO Project.REPORT NOTE:
Complete
SCHEDULE
89
ESTIMATED COST (000's)
JURISDICTION:
Route 143 (Capitol Landing Rd)STREET NAME:
PEYork County
Complete 361CNFROM: Queens Creek Br (York/Wmbg CL) TO: East
Rochambeau Drive (0.7000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.7000 MISCOPE OF WORK: Safety TO 449
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 298CMAQ: Federal
0 0 0 0 0 0 94CMAQ: MPO - Federal
0 0 0 0 0 0 24CMAQ: MPO - State Match
0 0 0 0 0 0 75CMAQ: State Match
-41 0 0 0 0 0 0 491Total
06/19/2013 277
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
REBUILD EXISTING TRAFFIC SIGNAL, RTE 143
@ RTE 132
PROJECT
UPC NO.:
ROUTE:
94127
NFO0143
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
INTERSECTION OF RTE 143 @ RTE 132STREET NAME:
PEYork County
Complete 161CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 161
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 140Highway Safety Improvements: Federal
0 0 0 0 0 0 16Highway Safety Improvements: State Match
6 0 0 0 0 0 0 155Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RECONSTRUCT INTERSECTION AS
ROUNDABOUT
PROJECT
UPC NO.:
ROUTE:
104337
NFO0143
New Project
FY2014
SCHEDULE
370
ESTIMATED COST (000's)
JURISDICTION:
Route 143STREET NAME:
PEYork County
FY2016 1,850CN
FROM: Route 143 TO: I-64 (0.2000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,220
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 1,665 333 0Highway Safety Improvements: Federal
0 0 0 0 185 37 0Highway Safety Improvements: Soft Match
0 0 0 0 1,850 0 370 0Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
TRAFFIC SIGNAL MAST ARM CONVERSION
PROJECT
UPC NO.:
ROUTE:
104377
NFO0143
New Project
FY2014
SCHEDULE
40
ESTIMATED COST (000's)
JURISDICTION:
Jefferson AvenueSTREET NAME:
PENewport News
FY2015 180CN
FY2014FROM: Jefferson Avenue TO: Center Avenue (0.0500 MI)DESCRIPTION: 75RW
PROJECT LENGTH: 0.0500 MISCOPE OF WORK: Traffic Management/Engineering TO 295
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 148 0Revenue Sharing Funds: Local Match
0 0 0 0 0 148 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 295 0Total
278 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE 164 - RAIL RELOCATION
PROJECT
UPC NO.:
ROUTE:
80478
FO0164
Previous SAFETEA-LU earmark funding transferred to VPAREPORT NOTE:
Complete
SCHEDULE
4,803
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEPortsmouth
Complete 54,596CN
RAIL RELOCATION ALONG ROUTE 164 CORRIDORDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 59,398
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 282Bond Match: State Bond Match
0 0 0 0 0 0 1,129Minimum Guarantee Funds: Federal
57,987 0 0 0 0 0 0 1,412Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
OVERPASS RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
101247
NFO0168
Underway
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
Tidewater Drive/E. Little Creek RoadSTREET NAME:
PENorfolk
FY2014 5,091CN
FROM: Gregory Drive TO: Bancker Road (0.3200 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.3200 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 5,591
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 716 0Local Project Contributions: Local
0 0 0 0 0 0 2,438Revenue Sharing Funds: Local Match
0 0 0 0 0 0 2,438Revenue Sharing Funds: State Match
0 0 0 0 0 0 716 4,875Total
06/19/2013 279
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 175 - REPLACE 1 BRIDGE ON NEW
LOCATION
PROJECT
UPC NO.:
ROUTE:
1896
FO0175
State funds - AC for future federal conversion.REPORT NOTE:
Complete
SCHEDULE
7,500
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAccomack County
Complete 84,893CN
CompleteFROM: APPROACHES & BRIDGE OVER BLACK
NARROWS, CHINCOTEAGUE AND TO: LEWIS CREEK
CHANNELS (1.1000 MI)
DESCRIPTION: 5,352RW
27534 94PROJECT LENGTH: 1.1000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 97,745
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5,500Bond Match: State Bond Match
0 0 0 0 0 0 1,785Bonus OA: Federal
0 0 0 0 0 0 36,055Bridge Replacement: Federal
0 0 0 0 0 0 1,501Demonstration Funds: Federal
0 0 0 0 0 0 2,000FRAN Bond Proceeds: FRAN
0 0 0 0 0 0 18,399Minimum Guarantee: Federal
0 0 0 0 0 0 13,353Primary Formula: Federal
0 0 0 0 0 0 10,890Primary Formula: State
0 0 0 0 0 0 3,173Primary Formula: State Match
0 0 0 0 0 0 5,089Priority Transportation Funds: State
0 0 0 0 0 0 0 97,745Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
BRIDGE RTE. 189 (SOUTHQUAY ROAD) OVER
BLACKWATER RIVER
PROJECT
UPC NO.:
ROUTE:
98813
NFO0189
Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
816
ESTIMATED COST (000's)
JURISDICTION:
Southquay RoadSTREET NAME:
PEMulti-jurisdictional: Hampton Roads MPO
Underway 6,874CN
CompleteFROM: 0.0 Mile to Suffolk C.L. TO: 0.06 Mile from Suffolk
C.L.
DESCRIPTION: 591RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 8,281
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 573Bridge Replacement: Federal
0 0 0 0 0 393 0CTB Formula: Bridge - Federal
0 0 0 0 0 98 0CTB Formula: Bridge - Soft Match
375 0 0 0 0 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 143Soft Match: Federal
1,381 0 0 1,613 1,160 0 1,205STP: Bridge - Federal
345 0 0 403 290 0 301STP: Bridge - Soft Match
0 0 0 2,016 1,450 2,101 491 2,222Total
280 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
BRIDGE REPL- RTE 199 OVER TOUR ROAD
(FED ID 10511/10513)
PROJECT
UPC NO.:
ROUTE:
T13957
NFO0199
New Project
Revised schedule requiredREPORT NOTE:
FY2016
SCHEDULE
1,000
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEJames City County
FY2018 3,560CN
FY2017DESCRIPTION: 2,600RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 7,160
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,500 0 0 0 217 1,899 0NHPP: Bridge - Federal
375 0 0 0 54 475 0NHPP: Bridge - Soft Match
2,640 0 0 0 271 1,875 2,374 0Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
ARRA - JAMES CITY 199/5 INTERSECTION
IMPROVEMENTS/TURN LANES
PROJECT
UPC NO.: 94541
NFOARRA09
PE on UPC 82681;REPORT NOTE:
FROM: Intersection Rt 5 TO: Intersection Improvements
(0.4000 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 850American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 55RSTP (STP Regional): Federal
0 0 0 0 0 0 14RSTP (STP Regional): State Match
0 0 0 0 0 0 919Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE 199 - OVERLAY - QUIET PAVEMENT
STUDY
PROJECT
UPC NO.:
ROUTE:
99408
NFO0199
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
RTE 199 - Hummelsine BlvdSTREET NAME:
PEJames City County
Complete 8,060CNFROM: Rte 199 @ I-64 Exit 234 TO: SR 321 Monticello
Avenue (6.3300 MI)
DESCRIPTION: RW
PROJECT LENGTH: 6.3300 MISCOPE OF WORK: Resurfacing TO 8,060
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 7,593(X) Maintenance Funds: Federal
0 0 0 0 0 0 113(X) Maintenance Funds: Statewide
0 0 0 0 0 0 364Research Incentive & Implementation Funds:
State
-11 0 0 0 0 0 0 8,071Total
06/19/2013 281
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
ROUTE 199 INTERSECTION IMPROVEMENTS
AT BROOKWOOD DRIVE
PROJECT
UPC NO.:
ROUTE:
102948
NFO0199
MPO projectREPORT NOTE:
FY2016
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
Route 199STREET NAME:
PEJames City County
FY2018 200CN
FY2017FROM: Brookwood Drive TO: Route 199 (Intersection)DESCRIPTION: 25RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 275
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 60 100 20 40 0 0CMAQ: MPO - Federal
0 15 25 5 10 0 0CMAQ: MPO - State Match
0 75 125 25 50 0 0 0Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
SHOULDER RUMBLE STRIPS- DISTRICTWIDE
PROJECT
UPC NO.:
ROUTE:
104364
NFO0199
New Project
FY2014
SCHEDULE
2,363
ESTIMATED COST (000's)
JURISDICTION:
Multiple LocationsSTREET NAME:
PEMulti-jurisdictional: Hampton Roads MPO
CN
FROM: Multiple Locations TO: Multiple LocationsDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 2,363
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 2,127 0Highway Safety Improvements: Federal
0 0 0 0 0 236 0Highway Safety Improvements: Soft Match
0 0 0 0 0 0 2,363 0Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
RTE 258 - ADD LEFT AND RIGHT TURN LANES
AT RTE. 620
PROJECT
UPC NO.:
ROUTE:
58297
NFO0258
MPO Project. PE & RW only, accrual for CN. Balance to be provided by MPO. Revised
schedule required.
REPORT NOTE:
Underway
SCHEDULE
463
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEIsle of Wight County
FY2015 1,723CN
FY2014FROM: 0.19 MILE WEST OF ROUTE 620 TO: 0.19 MILE
EAST OF ROUTE 620 (0.3800 MI)
DESCRIPTION: 796RW
PROJECT LENGTH: 0.3800 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,982
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 87Non-Formula: State Match
0 0 0 0 0 0 748RSTP (STP Regional): Federal
0 0 0 0 0 0 720RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 180RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 100RSTP (STP Regional): State Match
1,147 0 0 0 0 0 0 1,835Total
282 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
ARRA&PED & BIKE STUDY FOR WINDSOR
MIDDLE SCHOOL AND WESTSIDE
PROJECT
UPC NO.: 95025
NFOARRA09
FROM: Twin Ponds Drive TO: Route 460DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 70American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 5Districtwide: Federal
0 0 0 0 0 0 75Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
WINDSOR SIDEWALK IMPROVEMENT ALONG
ROUTE 258 & N. COURT ST
PROJECT
UPC NO.:
ROUTE:
100541
NFO0258
Complete
SCHEDULE
152
ESTIMATED COST (000's)
JURISDICTION:
US 258 & N. Court StreetSTREET NAME:
PEIsle of Wight County
Underway 723CNFROM: Five Forks Rd (Route 606) TO: 550' South of
Joyner Town Lane (1.6000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.6000 MISCOPE OF WORK: Safety TO 875
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 300 0CMAQ: MPO - Federal
0 0 0 0 0 75 0CMAQ: MPO - State Match
0 0 0 0 0 0 11Discretionary Grants: State Match
0 0 0 0 0 0 788Highway Safety Improvements: Federal
0 0 0 0 0 0 77Highway Safety Improvements: State Match
-375 0 0 0 0 0 375 875Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
MAIN STREET PEDESTRIAN IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
102951
NFO0258
Revised schedule required. MPO project.REPORT NOTE:
FY2015
SCHEDULE
17
ESTIMATED COST (000's)
JURISDICTION:
Main StreetSTREET NAME:
PEIsle of Wight County
FY2016 149CN
FROM: Route 10 TO: Route 10 (Intersection)DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 165
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 132 0 0 0CMAQ: MPO - Federal
0 0 0 33 0 0 0CMAQ: MPO - State Match
0 0 0 165 0 0 0 0Total
06/19/2013 283
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 301 - BRIDGE REPLACEMENT OVER CSX
RAILROAD
PROJECT
UPC NO.:
ROUTE:
77359
NFO0301
Complete
SCHEDULE
901
ESTIMATED COST (000's)
JURISDICTION:
Sussex DriveSTREET NAME:
PEGreensville County
FY2015 6,298CN
UnderwayFROM: 0.15 MILE SOUTH OF CSX RAILROAD TO: 0.15
MILE NORTH OF CSX RAILROAD (0.3000 MI)
DESCRIPTION: 121RW
29883 -1PROJECT LENGTH: 0.3000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 7,320
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 90Bond Match: State Bond Match
0 0 0 0 0 0 658Bridge Replacement: Federal
0 0 0 0 0 0 153Primary Formula: Federal
0 0 0 0 0 0 38Primary Formula: State Match
0 0 0 0 0 0 86Priority Transportation Funds: State
0 0 0 0 0 0 74Soft Match: Federal
500 0 0 0 676 2,000 1,800STP: Bridge - Federal
125 0 0 0 169 500 450STP: Bridge - Soft Match
0 0 0 0 845 625 2,500 3,349Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
BRIDGE REPLACEMENT RTE 301 OVER
NOTTOWAY RIVER (VA STR 1014)
PROJECT
UPC NO.:
ROUTE:
101232
NFO0301
Underway
SCHEDULE
892
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESussex County
FY2016 3,430CN
FY2015FROM: beginning of bridge TO: end of bridgeDESCRIPTION: 135RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,457
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
947 0 0 766 1,139 101 613STP: Bridge - Federal
237 0 0 191 285 25 153STP: Bridge - Soft Match
0 0 0 957 1,424 1,183 126 766Total
284 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
RTE 316 - INTERSECTION IMPROVEMENT
W/ROUNDABOUT DESIGN
PROJECT
UPC NO.:
ROUTE:
12331
NFO0316
REPORT NOTE:
Complete
SCHEDULE
480
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAccomack County
Underway 1,552CN
CompleteAT ROUTES 316, 126, 13 BUSINESS (0.1210 MI)DESCRIPTION: 351RW
PROJECT LENGTH: 0.1210 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 2,384
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 453 0Highway Safety Improvements: Federal
0 0 0 0 0 50 0Highway Safety Improvements: Soft Match
0 0 0 0 0 0 988Minimum Guarantee: Federal
0 0 0 0 0 0 657Primary Formula: Federal
0 0 0 0 0 0 247Primary Formula: State
0 0 0 0 0 0 164Primary Formula: State Match
-176 0 0 0 0 0 504 2,056Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
ADD L&R TURN LANES ON MONTICELLO AVE
IRONBOUND RD
PROJECT
UPC NO.:
ROUTE:
82961
NFO0321
MPO Project. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
520
ESTIMATED COST (000's)
JURISDICTION:
MONTICELLO AVENUESTREET NAME:
PEJames City County
FY2014 1,650CN
UnderwayFROM: NEWS ROAD TO: OLD NEWS ROAD (0.5000 MI)DESCRIPTION: 1,036RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 3,205
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,323CMAQ: Federal
622 0 0 0 94 535 0CMAQ: MPO - Federal
156 0 0 0 23 134 0CMAQ: MPO - State Match
0 0 0 0 0 0 172CMAQ: State Match
0 0 0 0 0 0 159(S) Telecommunications: State
-13 0 0 0 117 778 669 1,654Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
HAMPTON ROADS PRIMARY PAVING
BALANCE ENTRY
PROJECT
UPC NO.: T13919
NFOBalance Entry
New Project
FROM: various TO: variousDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
4,245 139 1,104 1,890 3,916 0 0CTB Formula: Paving - Federal
1,061 35 276 472 979 0 0CTB Formula: Paving - Soft Match
0 3,636 3,006 2,407 0 0 0State Formula: Primary - State
3,810 4,387 4,769 4,895 5,306 0 0Total
06/19/2013 285
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
IMPROVE PRINCE DREW RD. WITH CURB,
GUTTER AND SIDEWALK
PROJECT
UPC NO.:
ROUTE:
104373
NFO9999
New Project
FY2014
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
Prince Drew RoadSTREET NAME:
PENewport News
FY2015 1,950CN
FY2014FROM: Warwick Boulevard TO: Moores Lane North
(0.5000 MI)
DESCRIPTION: 50RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Traffic Management/Engineering TO 2,200
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,100 0Revenue Sharing Funds: Local Match
0 0 0 0 0 1,100 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 2,200 0Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
NEW CITYWIDE SIDEWALK INSTALLATION
PROJECT
UPC NO.:
ROUTE:
104376
NFO9999
New Project
FY2014
SCHEDULE
45
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PENewport News
FY2015 255CN
FROM: Various TO: Various (1.0000 MI)DESCRIPTION: RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 300
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 150 0Revenue Sharing Funds: Local Match
0 0 0 0 0 150 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 300 0Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
CLASS I BIKEWAY/PEDESTRIAN ROUTE 60 &
CROAKER ROAD
PROJECT
UPC NO.:
ROUTE:
17633
NFOBW00
MPO Project. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
515
ESTIMATED COST (000's)
JURISDICTION:
Richmond Road and Croaker RoadSTREET NAME:
PEJames City County
FY2015 2,010CN
FY2014FROM: Croaker Rd: Norge Library to Richmond Rd TO:
Richmond Rd: Croaker Rd to Old Church Rd (1.5000 MI)
DESCRIPTION: 150RW
10523 94PROJECT LENGTH: 1.5000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 2,675
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,936CMAQ: Federal
0 0 0 0 0 0 388CMAQ: State Match
0 0 0 0 0 0 1Non-Formula: State Match
0 0 0 0 0 0 7Primary Formula: State
0 0 0 0 0 0 234RSTP (STP Regional): Federal
0 0 0 0 0 0 58RSTP (STP Regional): State Match
0 0 0 0 0 0 50(S) Telecommunications: State
0 0 0 0 0 0 0 2,675Total
286 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
BUS SHELTER EXPANSION FOR TICKET
BOOTH
PROJECT
UPC NO.:
ROUTE:
76475
NFOCPL0
REPORT NOTE:
Complete
SCHEDULE
92
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEVirginia Beach
Complete 201CN
AT INDIAN RIVER ROAD COMMUTER LOTDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 293
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 217Minimum Guarantee: Federal
0 0 0 0 0 0 17Primary Formula: Federal
0 0 0 0 0 0 54Primary Formula: State
0 0 0 0 0 0 4Primary Formula: State Match
0 0 0 0 0 0 0 293Total
MPO Area
NonMPOPrimary
PROGRAM/SYSTEM
TRAFFIC OPERATIONS & SAFETY
IMPROVEMENT PROGRAM
PROJECT
UPC NO.: 5620
NFODistrict-wide
FROM: VARIOUS LOCATIONS TO: HAMPTON ROADS
DISTRICT
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 151Primary Formula: State
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
HAMPTON ROADS PRIMARY DISTRICTWIDE
PAVEMENT MARKERS
PROJECT
UPC NO.: 70620
NFODistrict-wide
VARIOUS ROUTESDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 16Primary Formula: State
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
HAMPTON ROADS PRIMARY DISTRICTWIDE
SIGNS
PROJECT
UPC NO.: 70622
NFODistrict-wide
VARIOUS ROUTESDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 362Primary Formula: State
06/19/2013 287
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Primary
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
HAMPTON ROADS PRIMARY DISTRICTWIDE
SIGNALS
PROJECT
UPC NO.: 70621
NFODistrict-wide
VARIOUS ROUTESDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 28Primary Formula: State
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
GENERAL R/W EXPENSES, VARIOUS
LOCATIONS DISTRICTWIDE
PROJECT
UPC NO.: 63840
NFOProject Report Req'd
DISTRICTWIDEDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 536Primary Formula: State
0 0 0 0 0 65 6Residue Parcel Revenue: State
0 0 0 0 0 65 542Total
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
SMART TRAFFIC CENTER
PROJECT
UPC NO.:
ROUTE:
52324
NFOST00
MPO Project. PE Only. Balance to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
190
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
CNFROM: REGIONAL ROADWAY INFORMATION SYSTEM
TO: (COMPUTER SYSTEM)
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Preliminary Engineering TO 190
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 260CMAQ: Federal -70
MPO Area
Hampton RoadsPrimary
PROGRAM/SYSTEM
HAMPTON ROADS PRIMARY DISTRICTWIDE
TECHNOLOGY
PROJECT
UPC NO.: 70666
NFODistrict-wide
VARIOUS ROUTESDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 157Primary Formula: State
288 06/19/2013
FY14 FINAL
FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICTSecondary
PROJECT PROGRAM/SYSTEM
SecondaryHAMPTON ROADS DISTRICT SSYP
DESCRIPTION:
REQUIRED ALLOCATIONS (000's)
Total available secondary allocations by locality and fund source.
Fund Source NameCounty FY2015 FY2017 FY2018 FY2019FY2016 TotalFY2014
Accomack County
CTB Formula
72 72 72 62 41 5Unpaved - State 323
State Formula
234 194 155 0 0 0Secondary - State 583
8 6 5 0 0 0Secondary - Unpaved 20
Telecommunications
93 93 93 93 93 89State 554
94 134 155 325 365 407Accomack County Total 1,479
Greensville County
State Formula
115 95 76 0 0 0Secondary - State 286
Telecommunications
37 37 37 37 37 36State 221
36 37 37 113 132 152Greensville County Total 507
Isle of Wight County
CTB Formula
215 215 215 187 124 15Unpaved - State 969
State Formula
195 161 129 0 0 0Secondary - State 485
32 27 21 0 0 0Secondary - Unpaved 80
Telecommunications
84 84 84 84 84 80State 499
95 207 271 448 486 525Isle of Wight County Total 2,032
James City County
State Formula
378 313 250 0 0 0Secondary - State 941
1 1 1 0 0 0Secondary - Unpaved 4
Telecommunications
211 211 211 211 211 202State 1,255
202 211 211 462 525 590James City County Total 2,200
Northampton County
State Formula
101 84 67 0 0 0Secondary - State 253
Telecommunications
38 38 38 38 38 36State 227
37 38 38 105 122 140Northampton County Total 479
Southampton County
CTB Formula
412 412 412 360 237 28Unpaved - State 1,862
State Formula
203 168 134 0 0 0Secondary - State 505
69 57 46 0 0 0Secondary - Unpaved 172
Telecommunications
57 57 57 57 57 55State 341
83 295 417 649 694 741Southampton County Total 2,879
06/19/2013 289
FY14 FINAL
FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICTSecondary
PROJECT PROGRAM/SYSTEM
SecondaryHAMPTON ROADS DISTRICT SSYP
DESCRIPTION:
REQUIRED ALLOCATIONS (000's)
Total available secondary allocations by locality and fund source.
Fund Source NameCounty FY2015 FY2017 FY2018 FY2019FY2016 TotalFY2014
Surry County
State Formula
86 71 57 0 0 0Secondary - State 213
1 1 1 0 0 0Secondary - Unpaved 3
Telecommunications
21 21 21 21 21 20State 127
20 21 21 79 93 108Surry County Total 342
Sussex County
State Formula
149 123 99 0 0 0Secondary - State 372
16 14 11 0 0 0Secondary - Unpaved 41
Telecommunications
37 37 37 37 37 35State 220
35 37 37 147 174 203Sussex County Total 632
York County
State Formula
357 295 236 0 0 0Secondary - State 888
1 1 0 0 0 0Secondary - Unpaved 2
Telecommunications
202 202 202 202 202 193State 1,203
193 202 202 438 497 559York County Total 2,092
Grand Total 3,424 3,087 2,766 1,389 1,182 795 12,644
290 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 609 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
8300
NFO0609
County portion UPC 8300. Will be let with Town portion UPC 8301.REPORT NOTE:
Complete
SCHEDULE
825
ESTIMATED COST (000's)
JURISDICTION:
CHURCH RDSTREET NAME:
PEAccomack County
FY2014 3,780CN
UnderwayFROM: EAST CORPORATE LIMITS ONLEY TO: ROUTE
13 BUSINESS (2.4700 MI)
DESCRIPTION: 3,125RW
PROJECT LENGTH: 2.4700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 7,730
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,464 4,724Bond Proceeds: CPR Bonds
0 0 0 0 0 0 1,542(S) Secondary Formula: Federal/State
0 0 0 0 0 0 1,464 6,266Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 709 - IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
8312
NFO0709
Complete
SCHEDULE
1,703
ESTIMATED COST (000's)
JURISDICTION:
HORNTOWN ROADSTREET NAME:
PEAccomack County
FY2014 8,794CN
UnderwayFROM: ROUTE 13 TO: ROUTE 679 (3.9900 MI)DESCRIPTION: 4,815RW
PROJECT LENGTH: 3.9900 MISCOPE OF WORK: Restoration and Rehabilitation TO 15,312
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,500 5,337Bond Proceeds: CPR Bonds
0 0 0 0 0 0 1,515(S) Federal Formula STP: Federal
0 0 0 0 0 0 379(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 290(S) Secondary Formula: Federal
0 0 0 0 0 0 818(S) Secondary Formula: Federal/State
0 0 0 0 0 0 401(S) Secondary Formula: State
0 0 0 0 0 0 72(S) Secondary Formula: State Match
1,000 0 0 0 1,292 996 0STP: Statewide - Federal
250 0 0 0 323 249 0STP: Statewide - Soft Match
93 0 0 47 93 89 569(S) Telecommunications: State
0 0 0 47 1,708 1,343 2,834 9,380Total
06/19/2013 291
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
BRIDGE REPLACEMENT ROUTE T-1304 OVER
WEST RIDGE CK @ TANGIER
PROJECT
UPC NO.:
ROUTE:
98822
NFO1304
Revised schedule required.REPORT NOTE:
FY2015
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAccomack County
FY2016 500CN
FY2015DESCRIPTION: 25RW
PROJECT LENGTH: _SCOPE OF WORK: TO 625
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
138 0 0 0 362 0 0CTB Formula: Bridge - State
0 0 100 0 0 0 0STP: BROS - Federal
0 0 25 0 0 0 0STP: BROS - Soft Match
0 0 125 0 362 138 0 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
BRIDGE REPLACEMENT RTE 1306 OVER WEST
RIDGE CK @ TANGIER
PROJECT
UPC NO.:
ROUTE:
98821
NFO1306
Revised schedule required.REPORT NOTE:
FY2015
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEAccomack County
FY2016 500CN
FY2015DESCRIPTION: 25RW
PROJECT LENGTH: _SCOPE OF WORK: TO 625
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 500 0 0 0CTB Formula: Bridge - State
0 0 100 0 0 0 0STP: BROS - Federal
0 0 25 0 0 0 0STP: BROS - Soft Match
0 0 125 500 0 0 0 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
OTTERDAM ROAD IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
104362
NFO0614
New Project
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Otterdam RoadSTREET NAME:
PEGreensville County
FY2015 6,202CN
FY2014FROM: Exit 13 I-95 TO: 4.2 mi north of I-95 (4.2000 MI)DESCRIPTION: 550RW
PROJECT LENGTH: 4.2000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 6,752
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 3,376 0Revenue Sharing Funds: Local Match
0 0 0 0 0 3,376 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 6,752 0Total
292 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 633 RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
84027
NFO0633
State funds - AC for future federal conversion. PE only, accruing for RW. Revised schedule
required.
REPORT NOTE:
Underway
SCHEDULE
573
ESTIMATED COST (000's)
JURISDICTION:
Independence Church RoadSTREET NAME:
PEGreensville County
FY2016 2,901CN
FY2015FROM: Intersection Route 627 TO: 1.3 Miles North of
Intersection Route 627 (1.3000 MI)
DESCRIPTION: 432RW
PROJECT LENGTH: 1.3000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 3,906
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 59Bond Match: State Bond Match
0 0 0 0 0 0 237Federal STP: Federal
0 0 0 0 0 0 213(S) Secondary Formula: Federal/State
0 0 0 0 0 0 323(S) Secondary Formula: State
0 115 95 76 0 0 0(S) State Formula: Secondary - State
37 37 37 37 37 36 275(S) Telecommunications: State
2,291 152 132 113 37 37 36 1,107Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
BRIDGE REPL-LOW GROUND RD OVER
MEHERRIN (FED ID 9139)
PROJECT
UPC NO.:
ROUTE:
T13950
NFO0730
New Project
FY2018
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEGreensville County
FY2020 1,810CN
FY2019DESCRIPTION: 720RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 3,130
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 722 600 0 0 0 0STP: Bridge - Federal
0 180 150 0 0 0 0STP: Bridge - Soft Match
1,478 902 750 0 0 0 0 0Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
RTE 602 OVER PAGAN CREEK VA STR. 6008
PROJECT
UPC NO.:
ROUTE:
100952
NFO0602
Revised estimate required.REPORT NOTE:
Underway
SCHEDULE
255
ESTIMATED COST (000's)
JURISDICTION:
Longview DriveSTREET NAME:
PEIsle of Wight County
FY2014 718CN
FY2014FROM: 1.0 Mile from Int. Rte. 644 TO: 1.0 MI from INt.
Rte. 644
DESCRIPTION: 160RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,133
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 126Bridge Replacement: Federal
0 0 0 0 0 0 31Soft Match: Federal
0 0 0 0 0 931 0STP: Bridge - Federal
0 0 0 0 0 233 0STP: Bridge - Soft Match
-189 0 0 0 0 0 1,164 157Total
06/19/2013 293
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
RTE 620 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
14994
NFO0620
Complete
SCHEDULE
402
ESTIMATED COST (000's)
JURISDICTION:
BROADWATER ROADSTREET NAME:
PEIsle of Wight County
Complete 2,466CN
CompleteFROM: 0.031 MI. W. INT. ROUTE 681 TO: 0.061 MI. E.
INT. ROUTE 637 (1.3900 MI)
DESCRIPTION: 498RW
PROJECT LENGTH: 1.3900 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 3,365
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 44 753Bond Proceeds: CPR Bonds
0 0 0 0 0 0 984(S) Federal Formula STP: Federal
0 0 0 0 0 0 246(S) Federal Formula STP: State Bond Match
0 0 0 0 0 0 369Revenue Sharing Funds: Local Match
0 0 0 0 0 0 369Revenue Sharing Funds: State Match
0 0 0 0 0 0 230(S) Secondary Formula: Federal
0 0 0 0 0 0 9(S) Secondary Formula: Federal/State
0 0 0 0 0 0 212(S) Secondary Formula: State
0 0 0 0 0 0 58(S) Secondary Formula: State Match
0 0 0 0 0 0 92(S) Telecommunications: State
0 0 0 0 0 0 44 3,321Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
RTE 621 OVER PASSENGER SWAMP VA STR.
6031
PROJECT
UPC NO.:
ROUTE:
100951
NFO0621
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
250
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEIsle of Wight County
FY2016 650CN
FY2015FROM: 1.10 Mi From Int. Rte. 635 TO: 1.11Mi From Int.
Rte. 635
DESCRIPTION: 133RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,033
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 150Bridge Replacement: Federal
0 0 0 0 0 0 38Soft Match: Federal
0 0 0 0 0 0 676STP: Bridge - Federal
0 0 0 0 0 0 169STP: Bridge - Soft Match
0 0 0 0 0 0 0 1,033Total
294 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
RTE 637 OVER NUBY RUN VA STR. 6045
PROJECT
UPC NO.:
ROUTE:
91168
NFO0637
Complete
SCHEDULE
230
ESTIMATED COST (000's)
JURISDICTION:
Orbit RoadSTREET NAME:
PEIsle of Wight County
FY2014 1,019CN
UnderwayFROM: 0.016 MI. SOUTH OF NUBY RUN TO: 0.017 MI.
NORTH OF NUBY RUN
DESCRIPTION: 374RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,622
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 24Bond Match: State Bond Match
0 0 0 0 0 0 95Bridge Replacement: Federal
0 0 0 0 0 0 129(S) Secondary Formula: Federal
0 0 0 0 0 0 32(S) Secondary Formula: State Match
0 0 0 0 0 4 0STP: Bridge - Federal
0 0 0 0 0 1 0STP: Bridge - Soft Match
325 0 0 0 0 594 150STP: BROS - Federal
81 0 0 0 0 149 38STP: BROS - Soft Match
0 0 0 0 0 407 748 468Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
TURNER DRIVE INTERSECTION
IMPROVEMENTS AT BENNS CHURCH BLVD
PROJECT
UPC NO.:
ROUTE:
103021
NFO0644
MPO projectREPORT NOTE:
FY2018
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
Turner DriveSTREET NAME:
PEIsle of Wight County
FY2018 220CN
FY2018FROM: Benns Church (Route 10/32) TO: Benns Church
(Entersection)
DESCRIPTION: 30RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 300
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 240 0 0 0 0RSTP (STP Regional): MPO - Federal
0 0 60 0 0 0 0RSTP (STP Regional): MPO - State Match
0 0 300 0 0 0 0 0Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
RTE 680 OVER STALLINGS CREEK VA STR.
6075
PROJECT
UPC NO.:
ROUTE:
93080
NFO0680
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEIsle of Wight County
FY2016 851CN
FY2015FROM: 1.0 Mi. from Int. Rte. 683 TO: 1.0 Mi. from Int. Rte.
683
DESCRIPTION: 100RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,101
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 250 266 0 365STP: BROS - Federal
0 0 0 63 66 0 91STP: BROS - Soft Match
0 0 0 313 332 0 0 456Total
06/19/2013 295
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
CAPITAL TRAIL ACCESS OFF JOHN TYLER
HWY & MONTICELLO AVE
PROJECT
UPC NO.:
ROUTE:
104327
NFO0005
New Project
FY2014
SCHEDULE
10
ESTIMATED COST (000's)
JURISDICTION:
John Tyler Highway/Monticello AveSTREET NAME:
PEJames City County
FY2015 40CNFROM: 600' W and 400' E of Rte 321/Rt 5 Intersection TO:
Capital Trail (0.0100 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.0100 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 50
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 25 0Revenue Sharing Funds: Local Match
0 0 0 0 0 25 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 50 0Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
BRIDGE REPLACEMENT RTE 601 OVER
DIASCUND CREEK, FED ID 10516
PROJECT
UPC NO.:
ROUTE:
98823
NFO0601
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
175
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEJames City County
FY2019 1,029CN
FY2018FROM: 0.87 Mi to Int Rte. 603 TO: 0.87 Mi to Rte. 603DESCRIPTION: 150RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,354
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 225(S) Secondary Formula: Federal
0 0 0 0 0 0 56(S) Secondary Formula: State Match
0 474 0 0 0 0 0STP: Bridge - Federal
0 119 0 0 0 0 0STP: Bridge - Soft Match
0 94 290 0 0 0 0STP: BROS - Federal
0 24 73 0 0 0 0STP: BROS - Soft Match
0 711 363 0 0 0 0 281Total
296 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
FOUR LANE WIDENING FRM LIBRARY TO RT
60
PROJECT
UPC NO.:
ROUTE:
100920
NFO0607
Underway
SCHEDULE
1,452
ESTIMATED COST (000's)
JURISDICTION:
CROAKER ROADSTREET NAME:
PEJames City County
FY2018 11,208CN
FY2015FROM: RTE 60 TO: LIBRARY (1.0000 MI)DESCRIPTION: 337RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 12,998
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 616(S) Federal Formula STP: Federal
0 0 0 0 0 0 154(S) Federal Formula STP: State Bond Match
0 1,600 400 0 0 0 0RSTP (STP Regional): MPO - Federal
0 400 100 0 0 0 0RSTP (STP Regional): MPO - State Match
10 211 211 10 10 10 214(S) Telecommunications: State
9,054 2,211 711 10 10 10 10 984Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
RTE 612 - TRAIL
PROJECT
UPC NO.:
ROUTE:
13719
NFO0612
MPO Project. Balance to be provided by MPO. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
299
ESTIMATED COST (000's)
JURISDICTION:
LONGHILL ROADSTREET NAME:
PEJames City County
FY2015 1,437CN
UnderwayFROM: ROUTE 614 (CENTERVILLE RD) TO: ROUTE 199
(2.8000 MI)
DESCRIPTION: 1,835RW
PROJECT LENGTH: 2.8000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 3,570
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 285CMAQ: Federal 3,285
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
RTE 612 - PAVED SHOULDER ALONG
LONGHILL ROAD
PROJECT
UPC NO.:
ROUTE:
71617
NFO0612
Project cancelled. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
16
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEJames City County
FY2016 0CN
FY2015FROM: ROUTE 614 (CENTERVILLE ROAD) TO: ROUTE
199 (2.8000 MI)
DESCRIPTION: 0RW
PROJECT LENGTH: 2.8000 MISCOPE OF WORK: Safety TO 16
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 48CMAQ: Federal
0 0 0 0 0 0 16(S) Secondary Formula: Federal/State
-49 0 0 0 0 0 0 64Total
06/19/2013 297
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
SIGNAL UPGRADE AND INSTALL MEDIAN
BARRIER
PROJECT
UPC NO.:
ROUTE:
98279
NFO0612
Complete
SCHEDULE
73
ESTIMATED COST (000's)
JURISDICTION:
Longhill RoadSTREET NAME:
PEJames City County
Underway 242CNFROM: Longhill Road (Route 612) TO: Olde Towne Road
(Route 658)
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 315
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 361Highway Safety Improvements: Federal
0 0 0 0 0 0 40Highway Safety Improvements: State Match
-86 0 0 0 0 0 0 401Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
LONGHILL ROAD - ACCESS MANAGEMENT IN
FRONT OF THE 7-11
PROJECT
UPC NO.:
ROUTE:
104360
NFO0612
New Project
FY2014
SCHEDULE
12
ESTIMATED COST (000's)
JURISDICTION:
Longhill RoadSTREET NAME:
PEJames City County
FY2015 48CNFROM: 80' SE from Olde Town Road TO: 124' SE from
Olde Town Road (0.0100 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.0100 MISCOPE OF WORK: Other TO 60
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 30 0Revenue Sharing Funds: Local Match
0 0 0 0 0 30 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 60 0Total
298 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
RTE 615 - RECONSTRUCT TO 4 LANES
PROJECT
UPC NO.:
ROUTE:
50057
NFO0615
State funds - AC for future federal conversion. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
1,854
ESTIMATED COST (000's)
JURISDICTION:
IRONBOUND ROADSTREET NAME:
PEJames City County
Complete 8,072CN
CompleteFROM: 0.067 MILE SOUTH OF INTERSECTION ROUTE
616 TO: 0.005 MILES SOUTH OF ROUTE 747 (1.1200 MI)
DESCRIPTION: 4,153RW
PROJECT LENGTH: 1.1200 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 14,079
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 316Bond Match: State Bond Match
0 0 0 0 0 0 289(S) Federal Formula STP: Federal
0 0 0 0 0 0 100Local Project Contributions: Local
0 0 0 0 0 0 1,265Minimum Guarantee: Federal
0 0 0 0 0 0 737Non-Formula: State Match
0 0 0 0 0 0 950Revenue Sharing Funds: Local Match
0 0 0 0 0 0 950Revenue Sharing Funds: State Match
0 0 0 0 0 0 4,480RSTP (STP Regional): Federal
0 0 0 0 0 0 383RSTP (STP Regional): State Match
0 0 0 0 0 0 400(S) Secondary Formula: Federal
0 0 0 0 0 0 3,776(S) Secondary Formula: Federal/State
0 0 0 0 0 0 260(S) Secondary Formula: State
0 0 0 0 0 0 172(S) Secondary Formula: State Match
0 0 0 0 0 0 0 14,079Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
RTE 615 - PAVED SHOULDER ALONG ROUTE
615 & ROUTE 681
PROJECT
UPC NO.:
ROUTE:
71616
NFO0615
MPO Project. Balance to be provided by MPO. Required matching funds not shown. Revised
schedule required.
REPORT NOTE:
Underway
SCHEDULE
323
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEJames City County
FY2015 2,365CN
FY2014FROM: ROUTE 31 (JAMESTOWN ROAD) TO: ROUTE
613 (NEWS ROAD) (2.2000 MI)
DESCRIPTION: 849RW
PROJECT LENGTH: 2.2000 MISCOPE OF WORK: Safety TO 3,537
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,114CMAQ: Federal 423
06/19/2013 299
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
CONSTRUCT SHOULDER BIKEWAY ALONG
AIRPORT RD
PROJECT
UPC NO.:
ROUTE:
83462
NFO0645
MPO Project. PE only, Revised schedule required. Balance to be provided by MPO.REPORT NOTE:
Underway
SCHEDULE
31
ESTIMATED COST (000's)
JURISDICTION:
AIRPORT RDSTREET NAME:
PEJames City County
FY2015 79CNFROM: RICHMOND RD (RTE 60) TO: MOORETOWN RD
(RTE 603)
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 110
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 24CMAQ: Federal
0 0 0 0 0 0 6CMAQ: State Match
80 0 0 0 0 0 0 30Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
ARRA COUNTY WIDE - PAVEMENT OVERLAY
VARIOUS ROADS
PROJECT
UPC NO.: 95044
NFOARRA09
ARRA UPC 95044, ARRA-C UPC 98870.REPORT NOTE:
FROM: TBD - VARIOUS TO: TBD - VARIOUS (10.0000
MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 748American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 43RSTP (STP Regional): Federal
0 0 0 0 0 0 11RSTP (STP Regional): State Match
0 0 0 0 0 0 40(S) Secondary Formula: Federal/State
0 0 0 0 0 0 842Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
COUNTRY CLUB COURT, COUNTRY CLUB DR.,
AND LEXINGTON DR.
PROJECT
UPC NO.:
ROUTE:
104356
NFO9999
New Project
Underway
SCHEDULE
80
ESTIMATED COST (000's)
JURISDICTION:
Country Club Ct., Country Club Dr., & Lexington DrSTREET NAME:
PEJames City County
FY2015 320CNFROM: Longhill Road TO: 153 Country Club Drive (0.8500
MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.8500 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 400
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 200 0Revenue Sharing Funds: Local Match
0 0 0 0 0 200 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 400 0Total
300 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 642- RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
103391
NFO0642
Underway
SCHEDULE
910
ESTIMATED COST (000's)
JURISDICTION:
Old Cape Charles RoadSTREET NAME:
PENorthampton County
FY2022 4,212CN
FY2020FROM: 0.03 miles West of Route 1117 TO: 0.61 miles
West of Route 641 on Route 184 (1.6600 MI)
DESCRIPTION: 1,330RW
PROJECT LENGTH: 1.6600 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 6,452
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 3,189 1,990 0 0 0 0CTB Formula: High Priority - State
0 0 0 0 0 0 0(S) Residue Parcel Revenue: State
0 0 0 0 0 0 750(S) Secondary Formula: Federal/State
0 0 0 0 0 0 43(S) Secondary Formula: State
0 101 84 67 0 0 0(S) State Formula: Secondary - State
38 0 38 38 38 36 38(S) Telecommunications: State
0 3,291 2,112 105 38 38 37 831Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 609 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
8301
NFO0609
Town portion UPC 8301. Will be let with County portion UPC 8300. Revised Schedule
Required.
REPORT NOTE:
Complete
SCHEDULE
360
ESTIMATED COST (000's)
JURISDICTION:
PENNSYLVANIA AVESTREET NAME:
PEOnley
FY2014 1,137CN
UnderwayFROM: ROUTE 789, ONLEY TO: EAST CORPORATE
LIMITS ONLEY (0.4000 MI)
DESCRIPTION: 820RW
PROJECT LENGTH: 0.4000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,317
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,330Bond Proceeds: CPR Bonds
0 0 0 0 0 0 987(S) Secondary Formula: Federal/State
0 0 0 0 0 0 0 2,317Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
BRIDGE (FED ID 17757) RTE 308 OVER THREE
CREEK
PROJECT
UPC NO.:
ROUTE:
104965
NFO0308
FY2017
SCHEDULE
411
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESouthampton County
FY2019 2,843CN
FY2018FROM: 1000' beyond begining of bridge TO: 1000' beyond
end of bridge
DESCRIPTION: 100RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 3,354
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 758 1,307 618 0 0 0STP: Bridge - Federal
0 190 327 154 0 0 0STP: Bridge - Soft Match
0 948 1,634 772 0 0 0 0Total
06/19/2013 301
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 635 OVER N&W RAILROAD VA STR. 6042
PROJECT
UPC NO.:
ROUTE:
93078
NFO0635
Revised schedule required.REPORT NOTE:
FY2015
SCHEDULE
343
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESouthampton County
FY2016 1,372CN
FY2016DESCRIPTION: 5RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,720
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
137 614 289 194 142 0 0STP: BROS - Federal
34 154 72 48 36 0 0STP: BROS - Soft Match
0 768 361 242 178 172 0 0Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 659 OVER FLAT SWAMP VA STR. 6069
PROJECT
UPC NO.:
ROUTE:
93079
NFO0659
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESouthampton County
FY2015 575CN
FY2014FROM: 1.90 Mi to Int Rte. 665 TO: 1.90 MIle to Int. Rte.
665
DESCRIPTION: 100RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 825
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 60Bond Match: State Bond Match
0 0 0 0 0 0 242Bridge Replacement: Federal
0 0 0 222 196 0 0STP: BROS - Federal
0 0 0 56 49 0 0STP: BROS - Soft Match
0 0 0 278 245 0 0 302Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
ROUTE 671 OVER NOTTOWAY RIVER AND
NOTTOWAY RIVER ( TWO STRUC
PROJECT
UPC NO.:
ROUTE:
101495
NFO0671
Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
900
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESouthampton County
FY2020 9,240CN
FY2019FROM: Route 671 over Nottoway River and Nottoway River
TO: Route 671 over Nottoway River
DESCRIPTION: 150RW
29675,29676 -1PROJECT LENGTH: _ STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 10,290
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 130Bond Match: State Bond Match
0 0 0 0 0 0 520Bridge Replacement: Federal
0 3,069 1,800 1,500 0 0 0CTB Formula: Bridge - State
0 713 1,183 600 0 0 120STP: Bridge - Federal
0 178 296 150 0 0 30STP: Bridge - Soft Match
0 3,961 3,279 2,250 0 0 0 800Total
302 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
LOAFERS OAK RD OVER CYPRESS SWAMP
VA STRUC 6018
PROJECT
UPC NO.:
ROUTE:
85947
NFO0630
Complete
SCHEDULE
155
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESurry County
FY2014 493CN
UnderwayFROM: 1 mi to Int Rte 618 TO: 1.9 mi to Int Rte 616DESCRIPTION: 40RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 689
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 90Bond Match: State Bond Match
0 0 0 0 0 0 358Bridge Replacement: Federal
0 0 0 0 0 0 58(S) Secondary Formula: Federal
0 0 0 0 0 0 15(S) Secondary Formula: State Match
0 0 0 0 0 81 0STP: Bridge - Federal
0 0 0 0 0 20 0STP: Bridge - Soft Match
0 0 0 0 0 0 54STP: BROS - Federal
0 0 0 0 0 0 13STP: BROS - Soft Match
0 0 0 0 0 0 101 588Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
RTE 602 - WIDEN APPROACHES
PROJECT
UPC NO.:
ROUTE:
60499
NFO0602
Repeat Offender SafetyREPORT NOTE:
Complete
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESussex County
Complete 104CN
AT ROUTE 613DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 110
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6Open Container Funds: Statewide
0 0 0 0 0 0 94Repeat Offender: Federal
10 0 0 0 0 0 0 100Total
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
BRIDGES ( FED ID 18304 18305, 18306) OVER
BLACKWATER RIVER
PROJECT
UPC NO.:
ROUTE:
104009
NFO0603
Underway
SCHEDULE
676
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESussex County
FY2018 3,862CN
FY2018DESCRIPTION: 75RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 4,613
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 436 475 0 0 0 0CTB Formula: Bridge - State
0 466 0 0 0 65 0STP: Bridge - Federal
0 117 0 0 0 16 0STP: Bridge - Soft Match
545 296 0 0 357 0 1,233STP: BROS - Federal
136 74 0 0 89 0 308STP: BROS - Soft Match
0 1,388 475 0 446 681 82 1,541Total
06/19/2013 303
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
NonMPOSecondary
PROGRAM/SYSTEM
STOKES RD OVER MAGUS MILL POND VA
STRUC 6054
PROJECT
UPC NO.:
ROUTE:
85946
NFO0635
Underway
SCHEDULE
160
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESussex County
FY2017 628CN
FY2015DESCRIPTION: 90RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 878
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 103(S) Secondary Formula: Federal
0 0 0 0 0 0 26(S) Secondary Formula: State Match
0 0 0 0 0 125 0STP: Bridge - Federal
0 0 0 0 0 31 0STP: Bridge - Soft Match
0 0 0 274 200 0 0STP: BROS - Federal
0 0 0 68 50 0 0STP: BROS - Soft Match
0 0 0 342 250 0 156 129Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
HRRR INTESECTION IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
95423
NFO0137
Underway
SCHEDULE
83
ESTIMATED COST (000's)
JURISDICTION:
Rochambeau DriveSTREET NAME:
PEYork County
FY2016 420CN
FY2016FROM: F-137 TO: Route 645DESCRIPTION: 15RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 518
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 463High Risk Rural: Federal
0 0 0 0 0 0 51High Risk Rural: State Match
4 0 0 0 0 0 0 514Total
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
ARRA - YORK 646/630/622/782 PAVEMENT
REHAB/OVERLAY
PROJECT
UPC NO.: 94460
NFOARRA09
FROM: VDOT PROVIDED WITH LIST FROM YORK TO:
VDOT PROVIDED WITH PRIORITY LIST FROM YORK
(7.8000 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,101American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 71RSTP (STP Regional): Federal
0 0 0 0 0 0 18RSTP (STP Regional): State Match
0 0 0 0 0 0 1,189Total
304 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Secondary
MPO Area
Hampton RoadsSecondary
PROGRAM/SYSTEM
ARRA - YORK 134/716/ 690 CONSTRUCT
SIDEWALKS
PROJECT
UPC NO.: 94543
NFOARRA09
FROM: HAMPTON HWY, HUBBARD LANE, COMMONS
WAY TO: HAMPTON HWY, HUBBARD LANE,
COMMONS WAY (1.6000 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 351American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 23RSTP (STP Regional): Federal
0 0 0 0 0 0 6RSTP (STP Regional): State Match
0 0 0 0 0 0 380Total
06/19/2013 305
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 13 - BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
1904
FO0013
State funds - AC for future federal conversion.REPORT NOTE:
Complete
SCHEDULE
7,500
ESTIMATED COST (000's)
JURISDICTION:
SOUTH MILITARY HSTREET NAME:
PEChesapeake
Underway 166,272CN
CompleteFROM: 0.417 MILE WEST OF GILMERTON BRIDGE TO:
0.356 MILE EAST OF GILMERTON BRIDGE (0.7730 MI)
DESCRIPTION: 1,250RW
27144 84PROJECT LENGTH: 0.7730 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 175,022
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 11,724Bond Match: State Bond Match
0 0 0 0 0 0 17,104Bonus OA: Federal
0 0 0 0 0 0 45,780Bridge Replacement: Federal
0 0 0 0 0 0 5,989Demonstration Funds: Federal
0 0 0 0 0 0 1,381Federal Formula STP: Federal
0 0 0 0 0 0 221Federal Formula STP: State Bond Match
0 0 0 0 0 0 629Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 16,620Minimum Guarantee: Federal
0 0 0 0 0 3,101 11,462NHPP: Bridge - Federal
0 0 0 0 0 775 2,865NHPP: Bridge - Soft Match
0 0 0 0 0 0 1,362NHPP: Statewide - Federal
0 0 0 0 0 0 340NHPP: Statewide - Soft Match
0 0 0 0 0 0 977Non-Formula: State
0 0 0 0 0 0 12Non-Formula: Statewide
0 0 0 0 0 0 3,154Priority Transportation Funds: State
0 0 0 0 0 0 1Residue Parcel Revenue: State
0 0 0 0 0 0 3,660RSTP (STP Regional): Federal
0 0 0 0 0 0 47RSTP (STP Regional): Statewide
0 0 0 0 0 0 4,377Soft Match: Federal
0 0 0 0 0 0 222Special Grant Projects: Federal
0 0 0 0 0 0 173State Formula: Urban - Local Match
0 0 0 0 0 0 5,000TEA-21 High Priority Funds: Statewide
0 0 0 0 0 0 18,573Urban Formula: Federal
0 0 0 0 0 0 1,347Urban Formula: Federal/State
0 0 0 0 0 0 9,226Urban Formula: State
0 0 0 0 0 0 9,268Urban Formula: State Match
-369 0 0 0 0 0 3,876 171,515Total
306 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
MOUNT PLEASANT RD - WIDEN TO 4-LANES
PROJECT
UPC NO.:
ROUTE:
84359
NFO0165
PE only. Accruing funds for RW. MPO Project. Revised schedule required. Balance to be
provided by MPO.
REPORT NOTE:
Underway
SCHEDULE
1,495
ESTIMATED COST (000's)
JURISDICTION:
Mount Pleasant RdSTREET NAME:
PEChesapeake
FY2019 14,159CN
FY2016FROM: Chesapeake Expressway (RT 168) TO: Etheridge
Rd (0.8000 MI)
DESCRIPTION: 14,392RW
PROJECT LENGTH: 0.8000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 30,046
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,230RSTP (STP Regional): Federal
0 0 0 0 0 0 308RSTP (STP Regional): State Match
28,509 0 0 0 0 0 0 1,538Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 337 - WIDEN TO 4 LANES
PROJECT
UPC NO.:
ROUTE:
18591
NFO0337
MPO Project - Locally Administered.REPORT NOTE:
Underway
SCHEDULE
938
ESTIMATED COST (000's)
JURISDICTION:
Portsmouth BoulevardSTREET NAME:
PEChesapeake
FY2017 9,229CN
FY2015FROM: Suffolk/Chesapeake City Line TO: Westbound
Ramp to I-664 Southbound (1.0200 MI)
DESCRIPTION: 3,342RW
PROJECT LENGTH: 1.0200 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 13,509
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Federal Formula STP: Federal
0 0 0 0 0 0 2General Fund: State
0 0 0 0 0 0 3Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 800Non-Formula: State
0 0 0 0 0 0 400Non-Formula: Statewide
0 0 0 0 0 0 10,565RSTP (STP Regional): Federal
0 0 0 0 0 0 1,841RSTP (STP Regional): State Match
0 0 0 0 0 0 1,600RSTP (STP Regional): Statewide
0 0 0 0 0 0 2State Formula: Urban - Local Match
0 0 0 0 0 0 103Urban Formula: Federal
0 0 0 0 0 0 87Urban Formula: Federal/State
0 0 0 0 0 0 339Urban Formula: State
0 0 0 0 0 0 38Urban Formula: State Match
-2,270 0 0 0 0 0 0 15,779Total
06/19/2013 307
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
SOUTHEASTERN EXPRESSWAY - 4 LANE (PE
ONLY IN SYIP)
PROJECT
UPC NO.:
ROUTE:
64058
FOU000
Corridor Preservation. Linked to UPC 16556. Partial RW only.REPORT NOTE:
Underway
SCHEDULE
20
ESTIMATED COST (000's)
JURISDICTION:
SOUTHEAST P&GSTREET NAME:
PEChesapeake
CN
N/AFROM: OAK GROVE CONNECTOR TO: ECLDESCRIPTION: 2,992RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 3,012
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 11Federal Formula STP: Federal
0 0 0 0 0 0 7Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 400Minimum Guarantee: Federal
0 0 0 0 0 0 0Non-Formula: State
0 0 0 0 0 0 1RSTP (STP Regional): Federal
0 0 0 0 0 0 0State Formula: Urban - Local Match
0 0 0 0 0 0 194Urban Formula: Federal
0 0 0 0 0 0 3Urban Formula: State
0 0 0 0 0 0 147Urban Formula: State Match
2,250 0 0 0 0 0 0 762Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
REDESIGN INTERSECTION
PROJECT
UPC NO.:
ROUTE:
86607
NFOU000
Complete
SCHEDULE
370
ESTIMATED COST (000's)
JURISDICTION:
Oak GroveSTREET NAME:
PEChesapeake
Underway 1,443CN
CompleteFROM: 0.27 Miles East of Knells Ridge Road TO: 0.44
Miles East of Knells Ridge Road
DESCRIPTION: 195RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 2,009
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,827Highway Safety Improvements: Federal
0 0 0 0 0 0 203Highway Safety Improvements: State Match
-22 0 0 0 0 0 0 2,030Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HSIP PROACTIVE SAFETY PROJECTS CITY OF
CHESAPEAKE
PROJECT
UPC NO.: 86614
NFODistrict-wide
City of Chesapeake Safety ImprovementsDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 797Highway Safety Improvements: Federal
0 0 0 0 0 0 89Highway Safety Improvements: State Match
0 0 0 0 0 0 886Total
308 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CHESAPEAKE EMERGENCY VEHICLE
PREEMPTION
PROJECT
UPC NO.:
ROUTE:
100537
NFOU000
MPO project. Locally administered.REPORT NOTE:
Complete
SCHEDULE
5
ESTIMATED COST (000's)
JURISDICTION:
Various Locations CitywideSTREET NAME:
PEChesapeake
Complete 498CN
FROM: Various Locations TO: Various LocationsDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 502
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400CMAQ: Federal
0 0 0 0 0 0 100CMAQ: State Match
0 0 0 0 0 0 2Local Project Contributions: Local
0 0 0 0 0 0 0 502Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CHESAPEAKE TRAFFIC MANAGEMENT
CENTER & SYSTEM ADDITIONS
PROJECT
UPC NO.:
ROUTE:
100538
NFOU000
MPO project. Locally administered.REPORT NOTE:
Underway
SCHEDULE
300
ESTIMATED COST (000's)
JURISDICTION:
Various Locations CitywideSTREET NAME:
PEChesapeake
FY2014 1,700CN
FROM: Various Locations TO: Various LocationsDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 2,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
560 0 0 0 0 800 240CMAQ: MPO - Federal
140 0 0 0 0 200 60CMAQ: MPO - State Match
0 0 0 0 0 700 1,000 300Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITY OF CHESAPEAKE - FORMULA CITY
PAYMENT
PROJECT
UPC NO.: T13591
NFOProject Report Req'd
New Project
FROM: City of Chesapeake TO: City of ChesapeakeDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 2,643 2,185 1,749 0 0State Formula: Urban - State
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
CHINCOTEAGUE BALANCE ENTRY ACCOUNT
PROJECT
UPC NO.: 70495
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1 1 0 0 0 0State Formula: Urban - Local Match
0 35 29 23 0 0 0State Formula: Urban - State
35 29 23 0 0 0 0Total
06/19/2013 309
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
IMPROVEMENT OF THE HALIFAX STREET
BRIDGE
PROJECT
UPC NO.:
ROUTE:
93304
NFO0610
Revised estimate requiredREPORT NOTE:
Complete
SCHEDULE
301
ESTIMATED COST (000's)
JURISDICTION:
Halifax StreetSTREET NAME:
PEEmporia
Underway 516CN
CompleteFROM: 126 ft (north) of the CL of the Halifax Street Bridge
TO: 129 ft (south) of the CL of the Halifax Street Bridge
(0.0480 MI)
DESCRIPTION: 93RW
29673 -1PROJECT LENGTH: 0.0480 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 910
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 327Federal Formula STP: Federal
0 0 0 0 0 0 63Federal Formula STP: State Bond Match
0 0 0 0 0 0 8Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 5State Formula: Urban - Local Match
0 0 0 0 0 0 253Urban Formula: Federal
0 0 0 0 0 0 247Urban Formula: State
0 0 0 0 0 0 74Urban Formula: State Match
-66 0 0 0 0 0 0 976Total
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
EMPORIA BALANCE ENTRY ACCOUNT
PROJECT
UPC NO.: 70507
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1 1 1 0 0 0State Formula: Urban - Local Match
0 70 58 46 0 0 0State Formula: Urban - State
71 59 47 0 0 0 0Total
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
EAST ATLANTIC STREET RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
93307
NFOU000
Underway
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
East Atlantic StreetSTREET NAME:
PEEmporia
FY2014 633CNFROM: US 58 TO: West of Georgia Pacific Entrance
(0.8500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.8500 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 683
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3Bond Match: State Bond Match
0 0 0 0 0 0 11Minimum Guarantee: Federal
0 0 0 0 0 215 0Revenue Sharing Funds: Local Match
0 0 0 0 0 215 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 5State Formula: Urban - Local Match
0 0 0 0 0 0 20Urban Formula: Federal
0 0 0 0 0 0 169Urban Formula: Federal/State
0 0 0 0 0 0 41Urban Formula: State
0 0 0 0 0 0 5Urban Formula: State Match
0 0 0 0 0 0 430 253Total
310 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
HUNTERDALE ROAD RESTORATION AND
SHOULDER IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
94325
NFO0641
Split from UPC 52057 07/31/09REPORT NOTE:
Complete
SCHEDULE
445
ESTIMATED COST (000's)
JURISDICTION:
HUNTERDALE RDSTREET NAME:
PEFranklin
FY2014 1,775CN
UnderwayFROM: ROUTE 58 (CLAY STREET) TO: NORFOLK
SOUTHERN RAILROAD (0.4290 MI)
DESCRIPTION: 403RW
PROJECT LENGTH: 0.4290 MISCOPE OF WORK: Restoration and Rehabilitation TO 2,623
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 631Federal Formula STP: Federal
0 0 0 0 0 0 93Federal Formula STP: State Bond Match
0 0 0 0 0 0 399Local Project Contributions: Local
0 0 0 0 0 0 28Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 9State Formula: Urban - Local Match
0 0 0 0 0 0 631Urban Formula: Federal
0 0 0 0 0 0 720Urban Formula: State
0 0 0 0 0 0 195Urban Formula: State Match
-84 0 0 0 0 0 0 2,706Total
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
FRANKLIN BALANCE ENTRY ACCOUNT
PROJECT
UPC NO.: 70511
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 2 2 1 0 0 0State Formula: Urban - Local Match
0 102 84 67 0 0 0State Formula: Urban - State
104 86 69 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE TRAFFIC SIGNAL HRBT DIVERSION
SIGNAL TIMINGS
PROJECT
UPC NO.:
ROUTE:
97716
NFO0000
MPO project. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
160
ESTIMATED COST (000's)
JURISDICTION:
32 Signals in SE area of CitySTREET NAME:
PEHampton
CNFROM: CITYWIDE - AREA AROUND HRBT TO:
CITYWIDE 32 INTERSECTIONS
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 160
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 128CMAQ: Federal
0 0 0 0 0 0 32CMAQ: State Match
0 0 0 0 0 0 0 160Total
06/19/2013 311
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE TRAFFIC SIGNAL SYSTEM
RETIMING
PROJECT
UPC NO.:
ROUTE:
97717
NFO0000
MPO project. Locally Administered.REPORT NOTE:
Underway
SCHEDULE
392
ESTIMATED COST (000's)
JURISDICTION:
Retime 10 Arterial StreetsSTREET NAME:
PEHampton
CN
FROM: Citywide TO: CitywideDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 392
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 314CMAQ: Federal
0 0 0 0 0 0 78CMAQ: State Match
0 0 0 0 0 0 0 392Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE TRAFFIC SIGNAL UPGRADE
PROJECT
UPC NO.:
ROUTE:
97718
NFO0000
MPO project. Locally Administered. Balance redistributed by the MPO.REPORT NOTE:
Underway
SCHEDULE
20
ESTIMATED COST (000's)
JURISDICTION:
Citywide Signal System UpgradeSTREET NAME:
PEHampton
FY2014 1,949CN
FY2014FROM: CITYWIDE TO: CITYWIDEDESCRIPTION: 0RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,969
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,919CMAQ: Federal
0 0 0 0 0 0 60CMAQ: MPO - Federal
0 0 0 0 0 0 15CMAQ: MPO - State Match
0 0 0 0 0 0 45CMAQ: State Match
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 8Urban Formula: State
-79 0 0 0 0 0 0 2,048Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INSTALL NEW TRAFFIC SIGNAL AT
KECOUGHTAN RD AND POWHATAN PWY
PROJECT
UPC NO.:
ROUTE:
89900
NFO0060
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
38
ESTIMATED COST (000's)
JURISDICTION:
Kecoughtan RdSTREET NAME:
PEHampton
Complete 214CN
Intersection of Kecoughtan Rd and Powhatan PkwyDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 252
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 190Highway Safety Improvements: Federal
0 0 0 0 0 0 21Highway Safety Improvements: State Match
0 0 0 0 0 7 35Local Project Contributions: Local
0 0 0 0 0 0 7 246Total
312 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
MAGRUDER BOULEVARD - CONSTRUCT RIGHT
TURN ACCELERATION LANE
PROJECT
UPC NO.:
ROUTE:
86678
NFO0134
Locally Administered.REPORT NOTE:
Underway
SCHEDULE
15
ESTIMATED COST (000's)
JURISDICTION:
Magruder BoulevardSTREET NAME:
PEHampton
FY2014 147CNFROM: At Intersection of Butler Farm Road TO: 300 Ft.
North of Intersection (0.0600 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.0600 MISCOPE OF WORK: Safety TO 162
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 106Highway Safety Improvements: Federal
0 0 0 0 0 0 12Highway Safety Improvements: State Match
0 0 0 0 0 15 29Local Project Contributions: Local
0 0 0 0 0 0 15 147Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
MAGRUDER BLVD @ SEMPLE FARM RD.-
IMPROVE DRAINAGE & LTL
PROJECT
UPC NO.:
ROUTE:
89904
NFO0134
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
25
ESTIMATED COST (000's)
JURISDICTION:
Magruder BoulevardSTREET NAME:
PEHampton
Underway 142CNFROM: Magruder Boulevard at Intersection of TO: Semple
Farm Road
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 167
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 145Highway Safety Improvements: Federal
0 0 0 0 0 0 16Highway Safety Improvements: State Match
0 0 0 0 0 0 6Local Project Contributions: Local
0 0 0 0 0 0 0 167Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ARMISTEAD AVE. - SIGNAL TIMING
COORDINATION/OPTIMIZATION
PROJECT
UPC NO.:
ROUTE:
89905
NFO0134
Locally Administered. PE only.REPORT NOTE:
Complete
SCHEDULE
65
ESTIMATED COST (000's)
JURISDICTION:
Armistead AvenueSTREET NAME:
PEHampton
CN
FROM: Pembroke Avenue TO: Settlers Landing RoadDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 65
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 41Highway Safety Improvements: Federal
0 0 0 0 0 0 5Highway Safety Improvements: State Match
0 0 0 0 0 0 20Local Project Contributions: Local
0 0 0 0 0 0 0 65Total
06/19/2013 313
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
MERCURY BLVD. - SIGNAL TIMING
COORDINATION/OPTIMIZATION
PROJECT
UPC NO.:
ROUTE:
89908
NFO0143
Locally Administered. PE only.REPORT NOTE:
Complete
SCHEDULE
58
ESTIMATED COST (000's)
JURISDICTION:
Mercury BoulevardSTREET NAME:
PEHampton
CN
Mercury Boulevard at Intersection of Woodland Rd.DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 58
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 30Highway Safety Improvements: Federal
0 0 0 0 0 0 3Highway Safety Improvements: State Match
0 0 0 0 0 0 25Local Project Contributions: Local
0 0 0 0 0 0 0 58Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WIDEN TODDS LN -ADDITION RIGHT TURN LA
LEFT TURN BIG BETHEL
PROJECT
UPC NO.:
ROUTE:
83454
NFO0152
MPO project, Locally Administered;REPORT NOTE:
Complete
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
Todds LaneSTREET NAME:
PEHampton
FY2015 2,928CN
Underway Todds La/Big Bethel Rd Intersection ImprovementsDESCRIPTION: 1,235RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 4,663
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,182CMAQ: Federal
0 0 0 0 0 0 546CMAQ: State Match
0 0 0 0 0 163 1,772Local Project Contributions: Local
0 0 0 0 0 0 163 4,500Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INSTALL NEW TRAFFIC SIGNAL AT TODDS LN
AND WINCHESTER DR
PROJECT
UPC NO.:
ROUTE:
89899
NFO0152
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
4
ESTIMATED COST (000's)
JURISDICTION:
Todds LaneSTREET NAME:
PEHampton
Complete 203CN
Intersection of Todds Lane and Winchester DriveDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 208
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 177Highway Safety Improvements: Federal
0 0 0 0 0 0 20Highway Safety Improvements: State Match
0 0 0 0 0 0 7Local Project Contributions: Local
0 0 0 0 0 0 4Safety Funds: Hazard Elimination
0 0 0 0 0 0 0 208Total
314 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE SIGNAL TO MAST ARM DESIGN AT
TODDS LN AND WHEALTON
PROJECT
UPC NO.:
ROUTE:
89901
NFO0152
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
7
ESTIMATED COST (000's)
JURISDICTION:
Todds LaneSTREET NAME:
PEHampton
Complete 216CN
Intersection of Todds Lane and Whealton RoadDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 223
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 200Highway Safety Improvements: Federal
0 0 0 0 0 0 22Highway Safety Improvements: State Match
0 0 0 0 0 0 0Local Project Contributions: Local
0 0 0 0 0 0 0 223Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
TODD'S LANE MODIFY EXISTING SIGNAL
PROJECT
UPC NO.:
ROUTE:
93601
NFO0152
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
8
ESTIMATED COST (000's)
JURISDICTION:
Todd's LaneSTREET NAME:
PEHampton
Underway 270CN
FROM: Todd's Lane TO: Farmington Blvd/Orcutt AveDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 278
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 149Highway Safety Improvements: Federal
0 0 0 0 0 0 17Highway Safety Improvements: State Match
0 0 0 0 0 0 0Local Project Contributions: Local
0 0 0 0 0 0 46Safety Funds: Bike/Ped
0 0 0 0 0 0 66Safety Funds: Hazard Elimination
0 0 0 0 0 0 0 278Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE SIGNAL TO MAST ARM DESIGN AT
LASALLE AND VICTORIA
PROJECT
UPC NO.:
ROUTE:
89903
NFO0167
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
4
ESTIMATED COST (000's)
JURISDICTION:
LaSalle AvenueSTREET NAME:
PEHampton
Complete 264CN
Intersection of LaSalle Avenue & Victoria BoulevardDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 268
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 200Highway Safety Improvements: Federal
0 0 0 0 0 0 22Highway Safety Improvements: State Match
0 0 0 0 0 0 6Local Project Contributions: Local
0 0 0 0 0 0 41Safety Funds: Bike/Ped
0 0 0 0 0 0 0 268Total
06/19/2013 315
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
PEMBROKE AVE. - SIGNAL TIMING
COORDINATION/OPTIMIZATION
PROJECT
UPC NO.:
ROUTE:
89907
NFO0167
Locally Administered. PE only.REPORT NOTE:
Complete
SCHEDULE
58
ESTIMATED COST (000's)
JURISDICTION:
Pembroke AvenueSTREET NAME:
PEHampton
CN
FROM: Settlers Landing Road TO: LaSalle AvenueDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 58
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 30Highway Safety Improvements: Federal
0 0 0 0 0 0 3Highway Safety Improvements: State Match
0 0 0 0 0 0 25Local Project Contributions: Local
0 0 0 0 0 0 0 58Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CONSTRUCT LEFT TURN LANES ON FOX HILL
ROAD
PROJECT
UPC NO.:
ROUTE:
86488
NFO0169
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
105
ESTIMATED COST (000's)
JURISDICTION:
Fox Hill RoadSTREET NAME:
PEHampton
FY2014 648CN
UnderwayFoxhill Road at Clemwood ParkwayDESCRIPTION: 105RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 858
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 315Highway Safety Improvements: Federal
0 0 0 0 0 0 35Highway Safety Improvements: State Match
0 0 0 0 0 87 421Local Project Contributions: Local
0 0 0 0 0 0 87 771Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RECONSTRUCTION OF C&G, SIDEWALKS,
CROSSWALKS & LIGHTING
PROJECT
UPC NO.:
ROUTE:
102973
NFO0169
Complete
SCHEDULE
70
ESTIMATED COST (000's)
JURISDICTION:
Mallory StreetSTREET NAME:
PEHampton
FY2014 490CN
UnderwayFROM: Mercury Boulevard (Route 258) TO: West Sewell
Street (0.1200 MI)
DESCRIPTION: 140RW
PROJECT LENGTH: 0.1200 MISCOPE OF WORK: New Construction Roadway TO 700
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 198Local Project Contributions: Local
0 0 0 0 0 0 251Revenue Sharing Funds: Local Match
0 0 0 0 0 0 251Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 700Total
316 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WYTHE CREEK ROAD - WIDEN TO 4 LANES
PROJECT
UPC NO.:
ROUTE:
97715
NFO0172
MPO project. Balance provided by MPO.REPORT NOTE:
Underway
SCHEDULE
3,114
ESTIMATED COST (000's)
JURISDICTION:
Wythe Creek RoadSTREET NAME:
PEHampton
FY2019 16,417CN
FY2015FROM: Commander Shepard Blvd TO: NCL (Poquoson
CL) (1.0000 MI)
DESCRIPTION: 3,869RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 23,400
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,440RSTP (STP Regional): Federal
3,561 0 0 3,121 3,580 1,518 0RSTP (STP Regional): MPO - Federal
890 0 0 780 895 379 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 360RSTP (STP Regional): State Match
6,876 0 0 3,902 4,475 4,451 1,897 1,800Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 258 - MERCURY BOULEVARD -
LANDSCAPING INTERCHANGE
PROJECT
UPC NO.:
ROUTE:
76680
FO0258
Urban Construction Initiative - matching funds provided in quarterly payment. No Local Match
per FY 2005 Budget Amendment. MG formula funding will be matched 50/50 with city funds.
REPORT NOTE:
Complete
SCHEDULE
65
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton
Complete 1,683CN
AT ROUTE 64 INTERCHANGEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Landscaping/Beautification TO 1,748
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 870Local Project Contributions: Local
0 0 0 0 0 0 5NHPP: Statewide - Federal
0 0 0 0 0 0 1NHPP: Statewide - Soft Match
0 0 0 0 0 0 14Non-Formula: State
0 0 0 0 0 0 58RSTP (STP Regional): Federal
0 0 0 0 0 0 800Urban Formula: Federal
0 0 0 0 0 0 0 1,748Total
06/19/2013 317
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENTS AT MERCURY
BLVD & FOX HILL RD
PROJECT
UPC NO.:
ROUTE:
83370
NFO0258
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
11
ESTIMATED COST (000's)
JURISDICTION:
Mercury BlvdSTREET NAME:
PEHampton
Complete 451CN
FROM: Intersection of Mercury Blvd TO: at Fox Hill RoadDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 462
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 369CMAQ: Federal
0 0 0 0 0 0 92CMAQ: State Match
0 0 0 0 0 0 65Local Project Contributions: Local
-64 0 0 0 0 0 0 526Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE SIGNAL TO MAST ARM DESIGN AT
MERCURY BLD AND MALLORY
PROJECT
UPC NO.:
ROUTE:
89902
NFO0258
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
3
ESTIMATED COST (000's)
JURISDICTION:
Mercury BoulevardSTREET NAME:
PEHampton
Underway 222CN
Intersection of Mercury Blvd. and Mallory StreetDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 225
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 202Highway Safety Improvements: Federal
0 0 0 0 0 0 22Highway Safety Improvements: State Match
0 0 0 0 0 0 0Local Project Contributions: Local
0 0 0 0 0 0 0 225Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ARRA MERCURY BOULEVARD RESURFACING
PROJECT
UPC NO.: 93535
NFOARRA09
FROM: West City Limits to Big Bethel Road (Segment 2)
TO: Coliseum Drive to King Street (Segment 1) (3.4300
MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,829American Recovery and Reinvestment Act:
Flexible
318 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
MERCURY BLVD - INSTALL NEW SIDEWALKS
AND PEDESTRIAN LIGHTING
PROJECT
UPC NO.:
ROUTE:
104368
NFO0258
New Project
FY2014
SCHEDULE
115
ESTIMATED COST (000's)
JURISDICTION:
Mercury BoulevardSTREET NAME:
PEHampton
FY2016 960CN
FY2015FROM: 750' West of Coliseum Dr. TO: Armistead Avenue
(0.8000 MI)
DESCRIPTION: 100RW
PROJECT LENGTH: 0.8000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,175
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 588 0Revenue Sharing Funds: Local Match
0 0 0 0 0 588 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,175 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 351 - ADD TURN LANE
PROJECT
UPC NO.:
ROUTE:
81441
NFO0351
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
15
ESTIMATED COST (000's)
JURISDICTION:
Pembroke AvenueSTREET NAME:
PEHampton
Underway 591CN
CompleteAT ROUTE 134DESCRIPTION: 52RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 658
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 630Highway Safety Improvements: Federal
0 0 0 0 0 0 70Highway Safety Improvements: State Match
-42 0 0 0 0 0 0 700Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
PEMBROKE AVENUE - CONSTRUCT LEFT
TURN LANE
PROJECT
UPC NO.:
ROUTE:
86480
NFO0351
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
105
ESTIMATED COST (000's)
JURISDICTION:
Pembroke AvenueSTREET NAME:
PEHampton
FY2014 544CN
UnderwayE. Pembroke Ave & Grimes Rd Intersec Turn La ImprvDESCRIPTION: 35RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 684
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 428Highway Safety Improvements: Federal
0 0 0 0 0 0 48Highway Safety Improvements: State Match
0 0 0 0 0 209 0Local Project Contributions: Local
0 0 0 0 0 0 209 475Total
06/19/2013 319
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
BIG BETHEL ROAD - SIGNAL TIMING
COORDINATION/OPTIMIZATION
PROJECT
UPC NO.:
ROUTE:
89910
NFO0600
Locally Administered. PE only.REPORT NOTE:
Complete
SCHEDULE
75
ESTIMATED COST (000's)
JURISDICTION:
Big Bethel RoadSTREET NAME:
PEHampton
CN
FROM: Burton Street TO: North Park LaneDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 75
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 41Highway Safety Improvements: Federal
0 0 0 0 0 0 5Highway Safety Improvements: State Match
0 0 0 0 0 0 30Local Project Contributions: Local
0 0 0 0 0 0 0 75Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
BIG BETHEL ROAD UPGRADE EXISTING
SIGNAL
PROJECT
UPC NO.:
ROUTE:
93626
NFO0600
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
35
ESTIMATED COST (000's)
JURISDICTION:
Big Bethel RoadSTREET NAME:
PEHampton
Underway 251CN
FROM: Intersection of Big Bethel Road TO: Burton StreetDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 286
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 170Highway Safety Improvements: Federal
0 0 0 0 0 0 19Highway Safety Improvements: State Match
0 0 0 0 0 95 2Local Project Contributions: Local
0 0 0 0 0 0 95 191Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
FRANKLIN STREET - CONSTRUCTION OF NEW
ROADWAY SECTION
PROJECT
UPC NO.:
ROUTE:
104367
NFO9999
New Project
FY2014
SCHEDULE
80
ESTIMATED COST (000's)
JURISDICTION:
Franklin StreetSTREET NAME:
PEHampton
FY2015 445CN
FROM: Lincoln Street TO: Pembroke Avenue (0.1500 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.1500 MISCOPE OF WORK: New Construction Roadway TO 525
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 263 0Revenue Sharing Funds: Local Match
0 0 0 0 0 263 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 525 0Total
320 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
NORTH CAMPUS PARKWAY - FINAL OVERLAY
PROJECT
UPC NO.:
ROUTE:
104369
NFO9999
New Project
FY2014
SCHEDULE
10
ESTIMATED COST (000's)
JURISDICTION:
North Campus ParkwaySTREET NAME:
PEHampton
FY2014 295CNFROM: Magruder Boulevard TO: Commander Shepherd
Boulevard (0.7500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.7500 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 305
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 140 0Revenue Sharing Funds: Local Match
0 0 0 0 0 140 0Revenue Sharing Funds: State Match
25 0 0 0 0 0 280 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
FREEMAN DR. RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
104372
NFO9999
New Project
FY2014
SCHEDULE
115
ESTIMATED COST (000's)
JURISDICTION:
Freeman DriveSTREET NAME:
PEHampton
FY2016 760CN
FY2015FROM: Armistead Avenue TO: 1800' West of Armistead
Avenue (0.3500 MI)
DESCRIPTION: 300RW
PROJECT LENGTH: 0.3500 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,175
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 588 0Revenue Sharing Funds: Local Match
0 0 0 0 0 588 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,175 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITY OF HAMPTON - 4 LANE SAUNDERS ROAD
PROJECT
UPC NO.:
ROUTE:
57047
NFOU000
MPO Project - Locally Administered.REPORT NOTE:
Complete
SCHEDULE
1,500
ESTIMATED COST (000's)
JURISDICTION:
SAUNDERS ROADSTREET NAME:
PEHampton
FY2014 13,450CN
UnderwayFROM: BIG BETHEL ROAD TO: CITY OF HAMPTON
WCL (0.7500 MI)
DESCRIPTION: 4,335RW
PROJECT LENGTH: 0.7500 MISCOPE OF WORK: New Construction Roadway TO 19,285
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 3,034 0Local Project Contributions: Local
0 0 0 0 0 0 1,610Non-Formula: State
0 0 0 0 0 0 13,001RSTP (STP Regional): Federal
0 0 0 0 0 0 1,640RSTP (STP Regional): State Match
0 0 0 0 0 0 3,034 16,251Total
06/19/2013 321
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
COMMANDER SHEPARD BOULEVARD PHASE
II 4 LANE DIVIDED
PROJECT
UPC NO.:
ROUTE:
60970
NFOU000
ARRA funds for RW on UPC 94440 - Urban Construction Initiative Project - matching funds
provided in quarterly payment. Phase II - RW & CN Only. PE funded in Phase I.
REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
COMMANDER SHEPARD BLVD.STREET NAME:
PEHampton
Underway 12,907CNFROM: INT. SAUNDERS RD. & BIG BETHEL RD. TO:
0.019 MI. W. INT. NORTH CAMPUS PKWY. (1.3100 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.3100 MISCOPE OF WORK: New Construction Roadway TO 12,907
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 14Federal Formula STP: Federal
0 0 0 0 0 0 64Local Project Contributions: Local
0 0 0 0 0 0 735(X) Local Project Contributions: State Match
0 0 0 0 0 0 534Minimum Guarantee: Federal
0 0 0 0 0 0 9,600RSTP (STP Regional): Federal
0 0 0 0 0 0 2,400RSTP (STP Regional): State Match
0 0 0 0 0 0 2,748Urban Formula: Federal
-3,188 0 0 0 0 0 0 16,096Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INT. IMPROVEMENTS- HAMPTON ROADS
CENTER PKWY AT BIG BETHEL
PROJECT
UPC NO.:
ROUTE:
83199
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
15
ESTIMATED COST (000's)
JURISDICTION:
HRCP BIG BETHELSTREET NAME:
PEHampton
Complete 270CNFROM: NORTHBOUND BIG BETHEL TO: EASTBOUND
HAMPTON RDS CENTER PARKWAY
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 285
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 204CMAQ: Federal
0 0 0 0 0 0 51CMAQ: State Match
0 0 0 0 0 0 30Local Project Contributions: Local
0 0 0 0 0 0 0 285Total
322 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENTS- BIG BETHEL
ROAD @ RADFORD DR
PROJECT
UPC NO.:
ROUTE:
83200
NFOU000
Locally Administered. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
15
ESTIMATED COST (000's)
JURISDICTION:
BIG BETHEL RD.STREET NAME:
PEHampton
Underway 271CN
CompleteFROM: BIG BETHEL RD TO: AT RADFORD DRDESCRIPTION: 0RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 286
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 216CMAQ: Federal
0 0 0 0 0 0 14CMAQ: State Match
0 0 0 0 0 0 56Local Project Contributions: Local
0 0 0 0 0 0 0 286Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WAYFINDER SIGNS
PROJECT
UPC NO.:
ROUTE:
84331
NFOU000
Locally Administered. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
110
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton
Complete 348CN
CitywideDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 458
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 280CMAQ: Federal
0 0 0 0 0 0 70CMAQ: State Match
0 0 0 0 0 53 55Local Project Contributions: Local
0 0 0 0 0 0 53 405Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE CCTV CAMERA LOCATIONS -
PHASE 2 (10 LOCATIONS)
PROJECT
UPC NO.:
ROUTE:
84364
NFOU000
Locally Administered. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
10
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PEHampton
Complete 545CN
CitywideDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 555
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 500CMAQ: Federal
0 0 0 0 0 0 55Local Project Contributions: Local
0 0 0 0 0 0 0 555Total
06/19/2013 323
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ANDREWS BLVD. AT WOODLAND RD. - ADD
LEFT TURN LANE
PROJECT
UPC NO.:
ROUTE:
86489
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
Andrews BoulevardSTREET NAME:
PEHampton
FY2014 632CN
UnderwayWoodland Rd. / Andrews Blvd. Intersection Improvements
(0.1000 MI)
DESCRIPTION: 65RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Safety TO 797
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 432Highway Safety Improvements: Federal
0 0 0 0 0 0 48Highway Safety Improvements: State Match
0 0 0 0 0 317 0Local Project Contributions: Local
0 0 0 0 0 0 317 480Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
LASALLE AVENUE - CONSTRUCT LEFT TURN
LANE
PROJECT
UPC NO.:
ROUTE:
86490
NFOU000
Locally Administered. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
95
ESTIMATED COST (000's)
JURISDICTION:
LaSalle AvenueSTREET NAME:
PEHampton
Complete 401CN
CompleteAt Intersection of Queen StreetDESCRIPTION: 0RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 496
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 306Highway Safety Improvements: Federal
0 0 0 0 0 0 34Highway Safety Improvements: State Match
0 0 0 0 0 0 156Local Project Contributions: Local
0 0 0 0 0 0 0 496Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
SIGNAL IMPROVEMENTS - NEW MAST ARM
-MEDIAN CLOSURE 500'
PROJECT
UPC NO.:
ROUTE:
86494
NFOU000
Locally Administered. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
53
ESTIMATED COST (000's)
JURISDICTION:
Big Bethel RoadSTREET NAME:
PEHampton
Underway 99CN
At Intersection of Thomas Nelson Drive & Westpark LaneDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 151
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 236Highway Safety Improvements: Federal
0 0 0 0 0 0 26Highway Safety Improvements: State Match
-111 0 0 0 0 0 0 262Total
324 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENTS-EXECUTIVE
DRIVE/MARCELLA ROAD
PROJECT
UPC NO.:
ROUTE:
86500
NFOU000
Locally Administered. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
45
ESTIMATED COST (000's)
JURISDICTION:
Executive DriveSTREET NAME:
PEHampton
Underway 184CN
At Intersection of Marcella RoadDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 229
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 399Highway Safety Improvements: Federal
0 0 0 0 0 0 44Highway Safety Improvements: State Match
-215 0 0 0 0 0 0 443Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
COLISEUM DRIVE - INSTALL TRAFFIC SIGNAL
PROJECT
UPC NO.:
ROUTE:
86501
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
49
ESTIMATED COST (000's)
JURISDICTION:
Coliseum DriveSTREET NAME:
PEHampton
Underway 234CN
At North Coliseum Crossing EntranceDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 283
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 198Highway Safety Improvements: Federal
0 0 0 0 0 0 22Highway Safety Improvements: State Match
0 0 0 0 0 26 37Local Project Contributions: Local
0 0 0 0 0 0 26 257Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
NORTH KING STREET IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
91688
NFOU000
Complete
SCHEDULE
449
ESTIMATED COST (000's)
JURISDICTION:
NORTH KING STREETSTREET NAME:
PEHampton
Complete 3,762CN
CompleteFROM: MERCURY BOULEVARD TO: LITTLE BLACK
RIVER ROAD (0.5700 MI)
DESCRIPTION: 0RW
PROJECT LENGTH: 0.5700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 4,211
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,211Local Project Contributions: Local
0 0 0 0 0 0 1,000Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,000Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 4,211Total
06/19/2013 325
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
BRIDGE STREET OVER SALTERS CREEK VA
STR. 8009
PROJECT
UPC NO.:
ROUTE:
93081
NFOU000
Locally Administered.REPORT NOTE:
Underway
SCHEDULE
15
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton
FY2015 3,772CNFROM: Bridge street over Salters Creek VA Str. 8009 TO:
Bridge street over Salters Creek Str 8009
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 3,787
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 99Bond Match: State Bond Match
0 0 0 0 0 0 814Bridge Replacement: Federal
0 0 0 0 1,238 0 0CTB Formula: Bridge - State
0 0 0 0 0 850 0Local Project Contributions: Local
0 0 0 0 0 0 105Soft Match: Federal
84 0 0 0 0 298 163STP: BROS - Federal
21 0 0 0 0 74 41STP: BROS - Soft Match
0 0 0 0 1,238 105 1,222 1,222Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ARMISTEAD AVE OPTIMIZE SIGNAL TIMING
PROJECT
UPC NO.:
ROUTE:
93611
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
62
ESTIMATED COST (000's)
JURISDICTION:
Armistead AveSTREET NAME:
PEHampton
CN
FROM: Armistead Ave TO: LaSalle AveDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 62
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 28Highway Safety Improvements: Federal
0 0 0 0 0 0 3Highway Safety Improvements: State Match
0 0 0 0 0 0 30Local Project Contributions: Local
0 0 0 0 0 0 0 62Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
FOX HILL ROAD OPTIMIZE SIGNAL TIMING
PROJECT
UPC NO.:
ROUTE:
93612
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
18
ESTIMATED COST (000's)
JURISDICTION:
Fox Hill RoadSTREET NAME:
PEHampton
CN
FROM: Fox Hill Road TO: Clemwood PkwyDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 18
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 16Highway Safety Improvements: Federal
0 0 0 0 0 0 2Highway Safety Improvements: State Match
0 0 0 0 0 0 0 18Total
326 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
TODD'S LANE OPTIMIZE SIGNAL TIMING
PROJECT
UPC NO.:
ROUTE:
93613
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
61
ESTIMATED COST (000's)
JURISDICTION:
Todd's LaneSTREET NAME:
PEHampton
CN
FROM: Intersection of Todd's Lane TO: Cunningham DriveDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 61
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 36Highway Safety Improvements: Federal
0 0 0 0 0 0 4Highway Safety Improvements: State Match
0 0 0 0 0 0 20Local Project Contributions: Local
0 0 0 0 0 0 0 61Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
LASALLE AVE UPGRADE EXISTING SIGNAL
PROJECT
UPC NO.:
ROUTE:
93614
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
6
ESTIMATED COST (000's)
JURISDICTION:
LaSalle AveSTREET NAME:
PEHampton
Underway 238CN
FROM: Intersection of LaSalle Ave TO: Tide Mill LaneDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 244
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 220Highway Safety Improvements: Federal
0 0 0 0 0 0 24Highway Safety Improvements: State Match
0 0 0 0 0 0 0 244Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ARRA COMMANDER SHEPARD BOULEVARD,
PHASE II (R/W PHASE)
PROJECT
UPC NO.: 94440
NFOARRA09
CN on UPC 60970REPORT NOTE:
FROM: INT. SAUNDERS RD & BIG BETHEL RD TO:
0.019 MI. WEST INT. OF NORTH CAMPUS PKWY
(1.3100 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,587American Recovery and Reinvestment Act:
Urbanized Area > 200K
06/19/2013 327
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE TRAFFIC SIGNAL UPGRADES
PHASE IV
PROJECT
UPC NO.:
ROUTE:
102865
NFOU000
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2015
SCHEDULE
553
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEHampton
CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 553
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 442 0 0 0CMAQ: MPO - Federal
0 0 0 111 0 0 0CMAQ: MPO - State Match
0 0 0 553 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
TRAFFIC SIGNAL SYSTEM RETIMING
PROJECT
UPC NO.:
ROUTE:
102867
NFOU000
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2016
SCHEDULE
698
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEHampton
CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 698
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 181 378 0 0 0CMAQ: MPO - Federal
0 0 45 94 0 0 0CMAQ: MPO - State Match
0 0 226 472 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITY OF HAMPTON - FORMULA CITY
PAYMENT
PROJECT
UPC NO.: 71789
NFOTown/City-wide
Urban Construction Initiative - matching funds to be distributed in quarterly payments. State
funds do not include 2% Match or Local Partnership Funds.
REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0Bond Match: State Bond Match
0 0 0 0 0 0Federal Formula STP: State Bond Match
0 0 0 0 0 0Residue Parcel Revenue: State
0 1,607 1,329 1,064 0 0State Formula: Urban - State
0 0 0 0 0 0Urban Formula: State
0 0 0 0 0 0Urban Formula: State Match
1,607 1,329 1,064 0 0 0Total
328 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ATLANTIC AVENUE TROLLEY, ITS, SPECIAL
EVENT SIGNALS
PROJECT
UPC NO.: 52378
NFOProject Report Req'd
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 484CMAQ: Federal
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
REGIONAL TRAFFIC SIGNAL UPGRADES
PROJECT
UPC NO.:
ROUTE:
103004
NFO0000
MPO project. Locally Administered.REPORT NOTE:
FY2018
SCHEDULE
133
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEMulti-jurisdictional: Hampton Roads MPO
CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 133
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 106 0 0 0 0RSTP (STP Regional): MPO - Federal
0 0 27 0 0 0 0RSTP (STP Regional): MPO - State Match
0 0 133 0 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HAMPTON RDS REGIONAL OPTICOM
PREEMPTION STRATEGIC PLAN & DEV
PROJECT
UPC NO.:
ROUTE:
100606
NFOU000
MPO project, PE only. Locally Administered.REPORT NOTE:
FY2014
SCHEDULE
1,650
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEMulti-jurisdictional: Hampton Roads MPO
CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,650
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
400 0 0 400 400 120 0CMAQ: MPO - Federal
100 0 0 100 100 30 0CMAQ: MPO - State Match
0 0 0 500 500 500 150 0Total
06/19/2013 329
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE WAYFINDING SIGN PROJECT -
PHASE 3
PROJECT
UPC NO.:
ROUTE:
97719
NFO0000
Revised schedule required from City. MPO project. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
50
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PENewport News
Underway 829CNFROM: Various locations throughout City TO: Various
locations throughout City
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 879
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 703CMAQ: Federal
0 0 0 0 0 0 176CMAQ: State Match
0 0 0 0 0 0 0 879Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE SIGNAL SYSTEM RETIMING (2009)
PROJECT
UPC NO.:
ROUTE:
98830
NFO0000
Locally Administered. MPO project, PE onlyREPORT NOTE:
FY2014
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PENewport News
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
200 0 0 0 0 200 0CMAQ: MPO - Federal
50 0 0 0 0 50 0CMAQ: MPO - State Match
0 0 0 0 0 250 250 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
NEWPORT NEWS SIGNAL TIMING
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
103016
NFO0000
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2015
SCHEDULE
900
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PENewport News
CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 900
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 432 48 240 0 0 0CMAQ: MPO - Federal
0 108 12 60 0 0 0CMAQ: MPO - State Match
0 540 60 300 0 0 0 0Total
330 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 17 - INTERSECTION IMPROVEMENT
PROJECT
UPC NO.:
ROUTE:
19022
NFO0017
MPO Project - Locally Administered. Revised schedule required from City. Balance to be
provided by the MPO.
REPORT NOTE:
Complete
SCHEDULE
52
ESTIMATED COST (000's)
JURISDICTION:
J. CLYDE MORRISSTREET NAME:
PENewport News
Underway 73CN
CompleteAT DILIGENCE DRIVEDESCRIPTION: 0RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 125
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 28CMAQ: Federal
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 6Urban Formula: State Match
91 0 0 0 0 0 0 34Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 60 - 6 LANES
PROJECT
UPC NO.:
ROUTE:
10797
NFO0060
Project linked with UPC 71690 (RW), 71691(RW), 77428 (CN), 77430 (CN), and 77432 (CN).
State funds - AC for future federal conversion.
REPORT NOTE:
Complete
SCHEDULE
7,048
ESTIMATED COST (000's)
JURISDICTION:
WARWICK BOULEVARDSTREET NAME:
PENewport News
N/A 33,704CN
CompleteFROM: 0.304 KM SOUTH OF ROUTE 312 TO: 0.319 KM
NORTH OF NETTLES DRIVE (3.4550 KM)
DESCRIPTION: 45,261RW
PROJECT LENGTH: 3.4550 KMSCOPE OF WORK: Reconstruction w/ Added Capacity TO 86,013
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,097Accounts Receivable: Local
0 0 0 0 0 0 2,494Bond Match: State Bond Match
0 0 0 0 0 0 13Federal Formula STP: Federal
0 0 0 0 0 0 1Federal Formula STP: State Bond Match
0 0 0 0 0 0 1,006Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 9,977Minimum Guarantee: Federal
0 0 0 0 0 0 2,926Non-Formula: State
0 0 0 0 0 0 11,704RSTP (STP Regional): Federal
0 0 0 0 0 0 228State Formula: Urban - Local Match
0 0 0 0 0 0 39,636Urban Formula: Federal
0 0 0 0 0 0 2,000Urban Formula: Federal/State
0 0 0 0 0 0 5,710Urban Formula: State
0 0 0 0 0 0 8,921Urban Formula: State Match
300 0 0 0 0 0 0 85,713Total
06/19/2013 331
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 60 RELOCATION - 4 LANE (PE ONLY IN
SYP)
PROJECT
UPC NO.:
ROUTE:
14598
NFO0060
MPO Project. PE only - accrual for RW. In conjunction with other systems project UPC
13496. Complete schedule required. Project administered by James City County.
REPORT NOTE:
Underway
SCHEDULE
1,563
ESTIMATED COST (000's)
JURISDICTION:
WARWICK BLVDSTREET NAME:
PENewport News
CN
FY2016FROM: ROUTE 105 (FORT EUSTIS BOULEVARD) TO:
EAST END OF BRIDGE OVER SKIFFES CREEK (1.4200
MI)
DESCRIPTION: 4,390RW
PROJECT LENGTH: 1.4200 MISCOPE OF WORK: New Construction Roadway TO 5,953
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 320Non-Formula: State
0 0 0 0 0 0 1,280RSTP (STP Regional): Federal
4,353 0 0 0 0 0 0 1,600Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INSTALL ROUNDABOUT AT US 60 AND
MADISON AVE
PROJECT
UPC NO.:
ROUTE:
89911
NFO0060
Locally Administered. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
30
ESTIMATED COST (000's)
JURISDICTION:
25th StreetSTREET NAME:
PENewport News
Complete 475CN
CompleteFROM: 25th Street TO: Madison AveDESCRIPTION: 61RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 566
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 230Highway Safety Improvements: Federal
0 0 0 0 0 0 26Highway Safety Improvements: State Match
0 0 0 0 0 0 311Local Project Contributions: Local
0 0 0 0 0 0 0 566Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HUNTINGTON AVENUE BRIDGE REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
94832
NFO0060
Complete
SCHEDULE
235
ESTIMATED COST (000's)
JURISDICTION:
Huntington AvenueSTREET NAME:
PENewport News
Complete 965CN
FROM: 41st Street TO: 39th StreetDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,200
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 942 0Local Project Contributions: Local
0 0 0 0 0 0 1,674Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,674Revenue Sharing Funds: State Match
-3,090 0 0 0 0 0 942 3,349Total
332 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE SIGNAL HARDWARE ON WARWICK
BLVD
PROJECT
UPC NO.:
ROUTE:
100542
NFO0060
Locally Administered.REPORT NOTE:
Underway
SCHEDULE
10
ESTIMATED COST (000's)
JURISDICTION:
Warwick BoulevardSTREET NAME:
PENewport News
FY2014 340CN
FROM: Tabbs Lane TO: Beechmont DriveDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 350
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 324Highway Safety Improvements: Federal
0 0 0 0 0 0 36Highway Safety Improvements: State Match
-10 0 0 0 0 0 0 360Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE ITS UPGRADES - MULTI
LOCATIONS
PROJECT
UPC NO.:
ROUTE:
100608
NFO0060
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2015
SCHEDULE
60
ESTIMATED COST (000's)
JURISDICTION:
Intersection on Various Routes (see proj purpose)STREET NAME:
PENewport News
FY2017 240CNFROM: Warwick, Jefferson, Denbigh, Huntington, 25th St.
TO: various intersecting Rds
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 300
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 192 48 0 0 0CMAQ: MPO - Federal
0 0 48 12 0 0 0CMAQ: MPO - State Match
0 0 240 60 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
REPLACEMENT OF BRIDGE OVER LAKE
MAURY
PROJECT
UPC NO.:
ROUTE:
101279
NFO0060
Underway
SCHEDULE
564
ESTIMATED COST (000's)
JURISDICTION:
Warwick BoulevardSTREET NAME:
PENewport News
FY2014 4,836CNFROM: .32 miles south of route 312 TO: .29 miles south
of route 312 (0.0300 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.0300 MISCOPE OF WORK: New Construction Roadway TO 5,400
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 134 0Local Project Contributions: Local
0 0 0 0 0 375 1,860Revenue Sharing Funds: Local Match
0 0 0 0 0 375 1,860Revenue Sharing Funds: State Match
796 0 0 0 0 0 884 3,719Total
06/19/2013 333
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
LOWER JEFFERSON AVE CORRIDOR
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
98829
NFO0143
MPO project. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
Jefferson AveSTREET NAME:
PENewport News
CN
FROM: 25th St TO: 36th St (0.6000 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.6000 MISCOPE OF WORK: Safety TO 150
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 120CMAQ: Federal
0 0 0 0 0 0 30CMAQ: State Match
0 0 0 0 0 0 0 150Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
IMPROVE THE DRAINAGE AND RAISE THE
STREET ELEVATION
PROJECT
UPC NO.:
ROUTE:
104375
NFO9999
New Project
FY2014
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
Gwynn CircleSTREET NAME:
PENewport News
FY2015 650CNFROM: East of Linbrook Drivet TO: Cul-de-Sac (0.1000
MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 750
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 375 0Revenue Sharing Funds: Local Match
0 0 0 0 0 375 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 750 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HOOPS ROAD - WIDEN RD & ADD PED SAFETY
PROJECT
UPC NO.:
ROUTE:
104378
NFO9999
New Project
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Hoopes RoadSTREET NAME:
PENewport News
FY2014 2,000CN
FY2014FROM: Denbigh Blvd TO: Old Courthouse Way (0.3000
MI)
DESCRIPTION: 300RW
PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,300
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,150 0Revenue Sharing Funds: Local Match
0 0 0 0 0 1,150 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 2,300 0Total
334 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ATKINSON BLVD - 4 LANES (PE ONLY IN SYIP)
PROJECT
UPC NO.:
ROUTE:
4483
NFOU000
Locally Administered. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
4,225
ESTIMATED COST (000's)
JURISDICTION:
ATKINSON BLVD.STREET NAME:
PENewport News
FY2016 46,957CN
FY2015FROM: WARWICK BOULEVARD (ROUTE 60) TO:
JEFFERSON AVENUE (ROUTE 143) (1.2000 MI)
DESCRIPTION: 1,572RW
PROJECT LENGTH: 1.2000 MISCOPE OF WORK: New Construction Roadway TO 52,754
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 1,572 0 0 0Local Project Contributions: Local
0 0 0 0 0 0 400Non-Formula: State Match
0 0 0 0 0 0 1,600RSTP (STP Regional): Federal
0 5,481 7,575 16,709 8,000 0 765RSTP (STP Regional): MPO - Federal
0 1,370 1,894 4,177 2,000 0 191RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 20State Formula: Urban - Local Match
0 0 0 0 0 0 800Urban Formula: Federal
0 0 0 0 0 0 200Urban Formula: State Match
0 6,852 9,468 22,457 10,000 0 0 3,976Total
06/19/2013 335
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
MIDDLEGROUND BLVD - 4-LANE DIVIDED
WITH CURB,GUTTER,SIDEWALK
PROJECT
UPC NO.:
ROUTE:
11816
NFOU000
Complete
SCHEDULE
2,870
ESTIMATED COST (000's)
JURISDICTION:
MIDDLE GROUND BDSTREET NAME:
PENewport News
Underway 40,090CN
CompleteFROM: 0.143 MI. EAST OF JEFFERSON AVENUE TO:
0.102 MI. WEST OF WARWICK BOULEVARD (1.2210
MI)
DESCRIPTION: 27,028RW
PROJECT LENGTH: 1.2210 MISCOPE OF WORK: New Construction Roadway TO 69,988
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5,226Accounts Receivable: Local
0 0 0 0 0 0 4,182Bond Match: State Bond Match
0 0 0 0 0 0 5,980Bonus OA: Federal
0 0 0 0 0 0 1,495Bonus OA: State Match
0 0 0 0 0 0 0Federal Formula STP: Federal
0 0 0 0 0 0 13,517Federal STP: Federal
0 0 0 0 0 0 24Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 5,637Minimum Guarantee: Federal
0 0 0 0 0 0 900Non-Formula: State
0 0 0 0 0 0 20Residue Parcel Revenue: State
0 0 0 0 0 0 5,200RSTP (STP Regional): Federal
0 0 0 0 0 0 400RSTP (STP Regional): State Match
0 0 0 0 0 0 445Soft Match: Federal
0 0 0 0 0 0 0State Formula: Urban - Local Match
444 0 0 0 2,400 3,213 14,556STP: Statewide - Federal
111 0 0 0 600 803 3,639STP: Statewide - Soft Match
0 0 0 0 0 0 936Urban Formula: Federal
0 0 0 0 0 0 17Urban Formula: Federal/State
0 0 0 0 0 0 0Urban Formula: State
0 0 0 0 0 0 239Urban Formula: State Match
0 0 0 0 3,000 555 4,016 62,416Total
336 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
J. CLYDE MORRIS BOULEVARD CORRIDOR -
SIDEWALK IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
13478
NFOU000
MPO Project - Locally Administered.REPORT NOTE:
Complete
SCHEDULE
160
ESTIMATED COST (000's)
JURISDICTION:
J CLYDE MORRISSTREET NAME:
PENewport News
Complete 822CNFROM: JEFFERSON AVENUE TO: MARINERS
MUSEUM
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 982
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 15Anticipated Local Constr Funds: Local
0 0 0 0 0 0 360CMAQ: Federal
0 0 0 0 0 0 400CMAQ: MPO - Federal
0 0 0 0 0 0 100CMAQ: MPO - State Match
0 0 0 0 0 0 2Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 25Urban Formula: Federal
0 0 0 0 0 0 94Urban Formula: State Match
-15 0 0 0 0 0 0 997Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
J CLYDE MORRIS BOULEVARD CORRIDOR
(BIKEWAY PHASE IV)
PROJECT
UPC NO.:
ROUTE:
16103
NFOU000
MPO project; Locally Administered.REPORT NOTE:
Complete
SCHEDULE
153
ESTIMATED COST (000's)
JURISDICTION:
J. CLYDE MORRISSTREET NAME:
PENewport News
Underway 297CNFROM: CANON BOULEVARD TO: OYSTER POINT
ROAD
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 450
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,256CMAQ: Federal
0 0 0 0 0 0 253CMAQ: State Match
0 0 0 0 0 0 6Local Project Contributions: Local
0 0 0 0 0 0 1Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 61Urban Formula: State Match
0 0 0 0 0 0 1,577Total
06/19/2013 337
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CHESTNUT AVENUE - SHIFT ALIGNMENT AND
ADD MAST ARM
PROJECT
UPC NO.:
ROUTE:
17522
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
62
ESTIMATED COST (000's)
JURISDICTION:
CHESTNUT AVENUESTREET NAME:
PENewport News
Complete 1,040CNAT INTERSECTION WITH BRIARFIELD ROAD (0.3000
MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Safety TO 1,102
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 144Local Project Contributions: Local
0 0 0 0 0 0 2Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 339Safety Funds: Hazard Elimination
0 0 0 0 0 0 11State Formula: Urban - Local Match
0 0 0 0 0 0 563Urban Formula: Federal/State
0 0 0 0 0 0 44Urban Formula: State Match
0 0 0 0 0 0 0 1,102Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RIVERMONT BIKE TRAIL
PROJECT
UPC NO.:
ROUTE:
52343
NFOU000
MPO Project - Locally Administered. Partial PE only. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
168
ESTIMATED COST (000's)
JURISDICTION:
RIVERMONT TRAILSTREET NAME:
PENewport News
Complete 4,652CNDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 4,820
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 25CMAQ: Federal
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 6Urban Formula: State Match
4,789 0 0 0 0 0 0 31Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITY OF NEWPORT NEWS - ITS FIBER LINK
PROJECT
UPC NO.:
ROUTE:
52346
NFOU000
MPO Project. Linked to UPC 94431. Balance to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
56
ESTIMATED COST (000's)
JURISDICTION:
TRAFFIC CENTERSTREET NAME:
PENewport News
Complete 52CNFROM: TRAFFIC OPERATIONS CENTER TO: I-64 AT
JEFFERSON AVENUE
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 108
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 235CMAQ: Federal
0 0 0 0 0 0 41Non-Formula: State
0 0 0 0 0 0 164RSTP (STP Regional): Federal
-332 0 0 0 0 0 0 440Total
338 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITY OF NEWPORT NEWS - SIGNAL SYSTEM
UPGRADE
PROJECT
UPC NO.:
ROUTE:
52350
NFOU000
MPO Project - VDOT Administered. Linked to UPC 94431. Balance to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
1,750
ESTIMATED COST (000's)
JURISDICTION:
CITYWIDESTREET NAME:
PENewport News
Complete 9,504CN
225 INTERSECTIONSDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 11,254
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 13,613CMAQ: Federal
0 0 0 0 0 0 540CMAQ: State Match
0 0 0 0 0 0 1Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 215RSTP (STP Regional): Federal
0 0 0 0 0 0 54RSTP (STP Regional): State Match
0 0 0 0 0 0 63Urban Formula: State Match
-3,232 0 0 0 0 0 0 14,486Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITY OF NEWPORT NEWS - OYSTER PT
SUBAREA CCTV & STATIC SIGNS
PROJECT
UPC NO.:
ROUTE:
73002
NFOU000
MPO Project - VDOT Administered. Linked to UPC 94431. Balance to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
39
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENewport News
Complete 99CNFROM: AT OYSTER POINT ROAD, J CLYDE MORRIS
BOULEVARD, TO: AND JEFFERSON AVENUE
CORRIDORS
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 138
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 225RSTP (STP Regional): Federal
0 0 0 0 0 0 56RSTP (STP Regional): State Match
-143 0 0 0 0 0 0 281Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
JEFFERSON AVE SIDEWALK PROJECT
PROJECT
UPC NO.:
ROUTE:
83252
NFOU000
Locally Administered. Revised schedule required.REPORT NOTE:
Complete
SCHEDULE
125
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENewport News
Underway 710CN
CompleteDESCRIPTION: 165RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 538CMAQ: Federal
0 0 0 0 0 0 462CMAQ: State Match
0 0 0 0 0 0 1,000Total
06/19/2013 339
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
MARINER'S MUSEUM MULTI-PURPOSE TRAIL
PROJECT
UPC NO.:
ROUTE:
83254
NFOU000
Revised schedule required from City. Locally Administered. MPO project.REPORT NOTE:
Complete
SCHEDULE
245
ESTIMATED COST (000's)
JURISDICTION:
Warwick BoulevareSTREET NAME:
PENewport News
Complete 1,505CNFROM: Int. of Warwick Blvd. & Avenue of the Arts TO:
North of the Int. of Warwick Blvd. & Harpersville Rd.
(1.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,750
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,400CMAQ: Federal
0 0 0 0 0 0 350CMAQ: State Match
0 0 0 0 0 0 0 1,750Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
J CLYDE MORRIS BLVD CORRIDOR BIKE
TRAIL PHASE V
PROJECT
UPC NO.:
ROUTE:
83435
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
120
ESTIMATED COST (000's)
JURISDICTION:
J. Clyde Morris BoulevardSTREET NAME:
PENewport News
Underway 820CN
CompleteDESCRIPTION: 60RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 800CMAQ: Federal
0 0 0 0 0 0 200CMAQ: State Match
0 0 0 0 0 0 1,000Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
PERIODIC CITYWIDE SIGNAL SYSTEM
RETIMING
PROJECT
UPC NO.:
ROUTE:
83436
NFOU000
This project is linked to ARRA UPC 94432. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
450
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENewport News
CNDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 450
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 450CMAQ: Federal 0
340 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WARWICK BLVD SIDEWALK WIDENING
PROJECT
UPC NO.:
ROUTE:
83437
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
110
ESTIMATED COST (000's)
JURISDICTION:
Warwick BoulevardSTREET NAME:
PENewport News
FY2014 910CN
UnderwayFROM: ALONG WARWICK BLVD FROM J CLYDE
MORRIS TO: LUCAS CREEK (3.0000 MI)
DESCRIPTION: 280RW
PROJECT LENGTH: 3.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,300
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,040CMAQ: Federal
0 0 0 0 0 0 260CMAQ: State Match
0 0 0 0 0 0 1,300Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WAYFINDING SIGNS, PHASE 2
PROJECT
UPC NO.:
ROUTE:
84365
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
17
ESTIMATED COST (000's)
JURISDICTION:
Jefferson Ave /J.Clyde Morris Blvd/Oyster Point RdSTREET NAME:
PENewport News
Underway 483CNFROM: Oyster Point Road/Warwick Blvd./Jefferson
Avenue TO: J. Clyde Morris Blvd/I-64/I-64
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400CMAQ: Federal
0 0 0 0 0 0 100CMAQ: State Match
0 0 0 0 0 0 0 500Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WASHINGTON AVE OVER NNS AND DD RWY
VA STRUC 8009
PROJECT
UPC NO.:
ROUTE:
85955
NFOU000
Revised schedule required from City. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
315
ESTIMATED COST (000's)
JURISDICTION:
Washington AvenueSTREET NAME:
PENewport News
FY2014 1,136CN
UnderwayFROM: 0.04 Mi to Rte. 351 TO: 0.04 Mi 41st Street
(0.5000 MI)
DESCRIPTION: 35RW
8009 95PROJECT LENGTH: 0.5000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,486
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 97Bond Match: State Bond Match
0 0 0 0 0 0 691Bridge Replacement: Federal
0 0 0 0 0 0 76Soft Match: Federal
237 0 0 0 0 111 150STP: BROS - Federal
59 0 0 0 0 28 37STP: BROS - Soft Match
0 0 0 0 0 296 138 1,052Total
06/19/2013 341
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HSIP PROACTIVE SAFETY PROJECTS CITY OF
NEWPORT NEWS
PROJECT
UPC NO.: 86615
NFOProject Report Req'd
City-WideDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 904Highway Safety Improvements: Federal
0 0 0 0 0 0 100Highway Safety Improvements: State Match
0 0 0 0 0 0 22Local Project Contributions: Local
0 0 0 0 0 0 1,026Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ARRA - NEWPORT NEWS 143/60 PAVEMENT
MILLING/RESURFACING
PROJECT
UPC NO.: 94430
FOARRA09
Various Locations (6.5200 MI)DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,161American Recovery and Reinvestment Act:
Urbanized Area > 200K
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ARRA - NEWPORT NEWS SIGNAL SYSTEM
UPGRADE INTEGRATION
PROJECT
UPC NO.: 94431
NFOARRA09
Linked to UPCs 52350, 52346 and 73002.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 637American Recovery and Reinvestment Act:
Urbanized Area > 200K
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ARRA NEWPORT NEWS CITYWIDE SIGNAL
SYSTEM RETIMING
PROJECT
UPC NO.: 94432
NFOARRA09
Project linked to UPC 83436. Locally administered.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 350American Recovery and Reinvestment Act:
Urbanized Area > 200K
342 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
OAKLAND INDUSTRIAL PARK SIDEWALK,
PHASE 2
PROJECT
UPC NO.:
ROUTE:
100856
NFOU000
Locally Administered. Revised schedule required from City.REPORT NOTE:
Complete
SCHEDULE
90
ESTIMATED COST (000's)
JURISDICTION:
Harwood Drive & Pickett's LaneSTREET NAME:
PENewport News
FY2015 726CN
UnderwayFROM: ON: Hardwood Dr FRM Enterprise Dr to Enterprise
Dr TO: ON: Pickett's Lane FRM: Enterprise Dr to Warwick
Blvd (1.5500 MI)
DESCRIPTION: 100RW
PROJECT LENGTH: 1.5500 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 916
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 72CMAQ: Federal
0 0 0 0 0 826 0Local Project Contributions: Local
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 18Urban Formula: State Match
0 0 0 0 0 0 826 90Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
NEWPORT NEWS PEDESTRIAN
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
103059
NFOU000
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2016
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PENewport News
FY2016 900CN
FROM: Various locations TO: Various locationsDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 200 200 0 0 0 0CMAQ: MPO - Federal
0 50 50 0 0 0 0CMAQ: MPO - State Match
500 250 250 0 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITY OF NEWPORT NEWS - FORMULA CITY
PAYMENT
PROJECT
UPC NO.: T9403
NFOProject Report Req'd
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 41Residue Parcel Revenue: State
0 2,118 1,751 1,402 0 0State Formula: Urban - State
0 0 0 0 0 0Urban Formula: State
2,118 1,751 1,402 0 0 41Total
06/19/2013 343
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
NORFOLK ATMS PHASE IV
PROJECT
UPC NO.:
ROUTE:
98828
NFO0000
MPO project. Locally Administered. Balance to be provided by the MPO.REPORT NOTE:
Underway
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PENorfolk
FY2015 3,700CN
FY2014FROM: Citywide TO: CitywideDESCRIPTION: 300RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 4,500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 800CMAQ: Federal
912 0 0 1,168 800 0 0CMAQ: MPO - Federal
228 0 0 292 200 0 0CMAQ: MPO - State Match
0 0 0 0 0 0 100CMAQ: State Match
0 0 0 1,460 1,000 1,140 0 900Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 13 - 8 LANES
PROJECT
UPC NO.:
ROUTE:
9783
NFO0013
State funds - AC for future federal conversion. Lowery Road Section. Balance to be redistributed
by MPO.
REPORT NOTE:
Complete
SCHEDULE
3,600
ESTIMATED COST (000's)
JURISDICTION:
MILITARY HIGHWAYSTREET NAME:
PENorfolk
FY2014 13,756CN
UnderwayFROM: 0.023 MILE SOUTH OF LOWERY ROAD TO:
0.012 MILE SOUTH OF NORTHAMPTON BOULEVARD
(0.8190 MI)
DESCRIPTION: 8,799RW
PROJECT LENGTH: 0.8190 MISCOPE OF WORK: New Construction Roadway TO 26,156
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Local Project Contributions: Local
0 0 0 0 0 0 103Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 2,400RSTP (STP Regional): Federal
2,803 0 0 0 0 3,426 2,400RSTP (STP Regional): MPO - Federal
701 0 0 0 0 856 600RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 600RSTP (STP Regional): State Match
0 0 0 0 0 0 161State Formula: Urban - Local Match
0 0 0 0 0 0 2,771Urban Formula: Federal
0 0 0 0 0 0 611Urban Formula: Federal/State
0 0 0 0 0 0 8,877Urban Formula: State
0 0 0 0 0 0 682Urban Formula: State Match
-835 0 0 0 0 3,504 4,282 19,204Total
344 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
EAST OCEAN VIEW SIGNAL UPGRADES AND
CORRIDOR INTEGRATION
PROJECT
UPC NO.:
ROUTE:
92748
NFO0060
Locally Administered. MPO Project. Balance to be redistributed by MPO.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
East Ocean View AvenueSTREET NAME:
PENorfolk
Complete 557CN
FROM: 4th View Street TO: Shore Drive/ Little Creek RoadDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 557
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 800CMAQ: Federal -243
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 165 - 6 & 8 LANES
PROJECT
UPC NO.:
ROUTE:
1765
NFO0165
Intersection Project. Project linked to UPC 84243. Includes PE for UPC 84243.REPORT NOTE:
Underway
SCHEDULE
10,350
ESTIMATED COST (000's)
JURISDICTION:
MILITARY HIGHWAYSTREET NAME:
PENorfolk
FY2014 28,719CN
FY2014FROM: 0.307 MILES SOUTH OF NORTHAMPTON
BOULEVARD TO: 0.289 MILES NORTH OF
NORTHAMPTON (0.5960 MI)
DESCRIPTION: 26,131RW
PROJECT LENGTH: 0.5960 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 65,200
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,452Bond Proceeds: CPR Bonds
0 21,999 18,750 12,500 750 0 0CTB Formula: High Priority - State
0 0 0 0 0 0 138Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 1Residue Parcel Revenue: State
0 0 0 0 0 0 18State Formula: Urban - Local Match
0 0 0 681 0 0 0STP: Statewide - Federal
0 0 0 170 0 0 0STP: Statewide - Soft Match
0 0 0 0 0 0 1,105Urban Formula: Federal
0 0 0 0 0 0 3,838Urban Formula: Federal/State
0 0 0 0 0 0 532Urban Formula: State
0 0 0 0 0 0 266Urban Formula: State Match
0 21,999 18,750 13,351 750 0 0 10,350Total
06/19/2013 345
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ROBIN HOOD RD & MILITARY HWY PHASE 1,
LINK W/ UPC 1765 &9783
PROJECT
UPC NO.:
ROUTE:
84243
NFO0165
Project linked to UPC 1765. PE for UPC 84243 included on UPC 1765. State funds - AC for
future federal conversion. Balance to be redistributed by the MPO.
REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Military HighwaySTREET NAME:
PENorfolk
FY2014 16,914CN
UnderwayDESCRIPTION: 4,500RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 21,414
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 103Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 2,400RSTP (STP Regional): Federal
0 0 0 0 0 2,155 1,600RSTP (STP Regional): MPO - Federal
0 0 0 0 0 539 400RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 600RSTP (STP Regional): State Match
0 0 0 0 0 0 181State Formula: Urban - Local Match
0 0 0 0 0 0 3,597Urban Formula: Federal
0 0 0 0 0 0 6,860Urban Formula: Federal/State
0 0 0 0 0 0 2,642Urban Formula: State
0 0 0 0 0 0 811Urban Formula: State Match
-473 0 0 0 0 0 2,693 19,194Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
MODIFY EXISTING TRAFFIC SIGNAL
PROJECT
UPC NO.:
ROUTE:
86499
NFO0165
REPORT NOTE:
Complete
SCHEDULE
116
ESTIMATED COST (000's)
JURISDICTION:
Military HighwaySTREET NAME:
PENorfolk
Complete 231CNFROM: 0.033 Mi S. intersection Route 192 TO: 0.017 Mi
N. intersection Rte 192 (0.0500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.0500 MISCOPE OF WORK: Safety TO 347
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 215Highway Safety Improvements: Federal
0 0 0 0 0 0 24Highway Safety Improvements: State Match
0 0 0 0 0 0 2State Formula: Urban - Local Match
0 0 0 0 0 0 108Urban Formula: Federal/State
-3 0 0 0 0 0 0 350Total
346 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE EXISTING TRAFFIC SIGNAL
PROJECT
UPC NO.:
ROUTE:
86491
NFO0247
Complete
SCHEDULE
205
ESTIMATED COST (000's)
JURISDICTION:
Norview AvenueSTREET NAME:
PENorfolk
Complete 626CN
CompleteFROM: 0.060 Miles West Int. Military HWY. & Norview
Avenue TO: 0.024 Miles East Int. Military HWY & Norview
Avenue (0.0840 MI)
DESCRIPTION: 61RW
PROJECT LENGTH: 0.0840 MISCOPE OF WORK: Safety TO 892
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 675Highway Safety Improvements: Federal
0 0 0 0 0 0 75Highway Safety Improvements: State Match
0 0 0 0 0 0 24Local Project Contributions: Local
0 0 0 0 0 0 5State Formula: Urban - Local Match
0 0 0 0 0 0 237Urban Formula: Federal/State
-124 0 0 0 0 0 0 1,016Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 337 - RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
14672
FO0337
Complete
SCHEDULE
8,563
ESTIMATED COST (000's)
JURISDICTION:
HAMPTON BLVDSTREET NAME:
PENorfolk
Underway 50,093CN
CompleteFROM: 0.005 KILOMETER NORTH OF ROGERS
AVENUE TO: 0.011 KILOMETER SOUTH OF "B"
AVENUE (0.7500 KM)
DESCRIPTION: 30,061RW
26493,27579 -2,0PROJECT LENGTH: 0.7500 KM STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/o Added Capacity TO 88,718
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 27,068FRAN Bond Proceeds: FRAN
0 0 0 0 0 0 46,395National Highway System Allocations:
Federal
0 0 0 0 0 0 8,243National Highway System Allocations: State
Match
0 0 0 0 0 0 2,686NHPP: Statewide - Federal
0 0 0 0 0 0 672NHPP: Statewide - Soft Match
0 0 0 0 0 0 298Priority Transportation Funds: State
0 0 0 0 0 0 3,356Soft Match: Federal
0 0 0 0 0 0 0 88,718Total
06/19/2013 347
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
ADD ROADWAY WIDTH FOR INSTALLATION
MULTI-USE PATH
PROJECT
UPC NO.:
ROUTE:
104381
NFO0407
New Project
FY2014
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
East Indian River RoadSTREET NAME:
PENorfolk
FY2014 398CNFROM: Approx. 500 ft east of Pescara Creek TO: Approx.
500 ft west of Pescara Creek (0.1000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 400
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 200 0Revenue Sharing Funds: Local Match
0 0 0 0 0 200 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 400 0Total
MPO Area
NonMPOUrban
PROGRAM/SYSTEM
ADD ROADWAY WIDTH FOR INSTALLATION
OF MULTI-USE PATH
PROJECT
UPC NO.:
ROUTE:
104382
NFO0407
New Project
FY2014
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
West Indian River RoadSTREET NAME:
PENorfolk
FY2014 398CNFROM: Approx. 500ft east of Spotico Creek TO: Approx.
500ft west of Spotico Creek (0.1000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 400
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 200 0Revenue Sharing Funds: Local Match
0 0 0 0 0 200 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 400 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE EXISTING SIGNAL AND PAVEMENT
MARKINGS
PROJECT
UPC NO.:
ROUTE:
86496
NFO0460
Locally administered.REPORT NOTE:
Complete
SCHEDULE
90
ESTIMATED COST (000's)
JURISDICTION:
Monticello AvenueSTREET NAME:
PENorfolk
Complete 194CN
FROM: 26th Street TO: IntersectionDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 284
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 397Highway Safety Improvements: Federal
0 0 0 0 0 0 44Highway Safety Improvements: State Match
-158 0 0 0 0 0 0 441Total
348 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WESTMINSTER AVENUE OVERLAY
PROJECT
UPC NO.:
ROUTE:
104383
NFO9999
New Project
FY2014
SCHEDULE
3
ESTIMATED COST (000's)
JURISDICTION:
Westiminster AvenueSTREET NAME:
PENorfolk
FY2015 697CNFROM: Ballentine Boulevard TO: Stapleton Street (0.7000
MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.7000 MISCOPE OF WORK: Resurfacing TO 700
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 108 0Revenue Sharing Funds: Local Match
0 0 0 0 0 108 0Revenue Sharing Funds: State Match
483 0 0 0 0 0 217 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
NORFOLK BALANCE ENTRY ACCOUNT
PROJECT
UPC NO.: 70533
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 27Accounts Receivable: Local
0 0 0 0 0 0 15Local Project Contributions: Urban - Local
Match
0 58 48 39 0 0 14State Formula: Urban - Local Match
0 2,855 2,360 1,890 0 0 0State Formula: Urban - State
0 0 0 0 0 0 2,156Urban Formula: Federal
0 0 0 0 0 0 365Urban Formula: Federal/State
0 0 0 0 0 0 327Urban Formula: State
0 0 0 0 0 0 485Urban Formula: State Match
2,913 2,408 1,928 0 0 0 3,390Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
PHASE III EXPANSION OF COMPUTERIZED
SIGNAL SYSTEM
PROJECT
UPC NO.:
ROUTE:
79114
NFOU000
MPO project - Locally Administered. Balance to be redistributed by the MPO.REPORT NOTE:
Complete
SCHEDULE
1,570
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorfolk
CN
CITYWIDEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 1,570
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,168CMAQ: Federal
-598 0 0 0 0 0 0 2,168Total
06/19/2013 349
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
LOWERY ROAD - INTERSECTION
SIGNALIZATION
PROJECT
UPC NO.:
ROUTE:
87288
NFOU000
Complete
SCHEDULE
30
ESTIMATED COST (000's)
JURISDICTION:
Lowery RoadSTREET NAME:
PENorfolk
Complete 300CN
Lowery Road at Wal-Mart EntranceDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 330
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 30Local Project Contributions: Local
0 0 0 0 0 0 150Revenue Sharing Funds: Local Match
0 0 0 0 0 0 150Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 330Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
TRAFFIC SIGNAL UPGRADES - HAMPTON
BLVD
PROJECT
UPC NO.:
ROUTE:
92750
NFOU000
Locally Administered. MPO Project. Balance to be redistributed by MPO.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Hampton BoulevardSTREET NAME:
PENorfolk
Complete 109CNFROM: Hampton Blvd at43rd street TO: Hampton Blvd
at49th street
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 109
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 200CMAQ: Federal -91
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ARRA - NORFOLK CITYWIDE REPAVING
PROJECT
PROJECT
UPC NO.: 94434
NFOARRA09
Locally Administered.REPORT NOTE:
FROM: Citywide TO: CitywideDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5,217American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 849Local Project Contributions: Local
0 0 0 0 0 0 6,065Total
350 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE SIGNAL RETIMING (NORFOLK)
PHASE 2
PROJECT
UPC NO.:
ROUTE:
97721
NFOU000
MPO project. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PENorfolk
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 400CMAQ: Federal
0 0 0 0 0 0 100CMAQ: State Match
0 0 0 0 0 0 0 500Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ATMS CONTROLLER MIGRATION &
INTERCONNECT - DESIGN PLANS II
PROJECT
UPC NO.:
ROUTE:
97722
NFOU000
Locally Administered. Balance to be redistributed by the MPO.REPORT NOTE:
Complete
SCHEDULE
42
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PENorfolk
Underway 136CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 178
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 240CMAQ: Federal
0 0 0 0 0 0 60CMAQ: State Match
-122 0 0 0 0 0 0 300Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE CITYWIDE TRAFFIC SIGNALS TO
LED FOR NORFOLK
PROJECT
UPC NO.:
ROUTE:
100544
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
11
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PENorfolk
Underway 80CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 91
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 270Highway Safety Improvements: Federal
0 0 0 0 0 0 30Highway Safety Improvements: State Match
-209 0 0 0 0 0 0 300Total
06/19/2013 351
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE INTERSECTION SAFETY
IMPROVEMENTS - CITY OF NORFOLK
PROJECT
UPC NO.:
ROUTE:
100546
NFOU000
Locally Administered.REPORT NOTE:
Underway
SCHEDULE
595
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PENorfolk
FY2014 2,806CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 3,401
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 2,536 755Highway Safety Improvements: Federal
0 0 0 0 0 282 0Highway Safety Improvements: Soft Match
0 0 0 0 0 0 84Highway Safety Improvements: State Match
-257 0 0 0 0 0 2,818 839Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
NORFOLK - CITYWIDE INTERSECT SAFETY
IMPROVEMENTS - GROUP 1
PROJECT
UPC NO.:
ROUTE:
102524
NFOU000
Locally Administered.REPORT NOTE:
Underway
SCHEDULE
426
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PENorfolk
FY2014 2,031CN
FROM: Various TO: Various (0.2800 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.2800 MISCOPE OF WORK: Safety TO 2,457
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 69Discretionary Grants: State Match
0 0 0 0 0 0 1,980Highway Safety Improvements: Federal
0 0 0 0 0 0 151Highway Safety Improvements: State Match
0 0 0 0 0 0 257Local Project Contributions: Local
0 0 0 0 0 0 0 2,457Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
NORFOLK - CITYWIDE INTERSECT SAFETY
IMPROVEMENTS - GROUP 2
PROJECT
UPC NO.:
ROUTE:
102526
NFOU000
Locally Administered.REPORT NOTE:
Underway
SCHEDULE
477
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PENorfolk
FY2014 2,474CN
FROM: Various TO: Various (0.2800 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.2800 MISCOPE OF WORK: Safety TO 2,951
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,656Highway Safety Improvements: Federal
0 0 0 0 0 0 295Highway Safety Improvements: State Match
0 0 0 0 0 0 0 2,951Total
352 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
NORFOLK SIGNAL TIMING IMPROVEMENTS -
PHASE III
PROJECT
UPC NO.:
ROUTE:
102950
NFOU000
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2015
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
Tidewater/ Little Creek/ Chesapeake/ MilitarySTREET NAME:
PENorfolk
CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 600
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 160 160 160 0 0CMAQ: MPO - Federal
0 0 40 40 40 0 0CMAQ: MPO - State Match
0 0 200 200 200 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CONVERT EX. SPAN WIRE TRAFFIC SIGNAL
TO MAST ARM
PROJECT
UPC NO.:
ROUTE:
104379
NFOU000
New Project
FY2014
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
21 StreetSTREET NAME:
PENorfolk
FY2014 398CN
FROM: 21 Street TO: Llewellyn Avenue (0.0500 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.0500 MISCOPE OF WORK: Traffic Management/Engineering TO 400
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 200 0Revenue Sharing Funds: Local Match
0 0 0 0 0 200 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 400 0Total
06/19/2013 353
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 172 - CITY OF POQUOSON - PHASE I
PROJECT
UPC NO.:
ROUTE:
13427
NFO0172
State funds - AC for future federal conversion. Revised schedule requested. MPO project.REPORT NOTE:
Underway
SCHEDULE
1,448
ESTIMATED COST (000's)
JURISDICTION:
WYTHE CREEK RD.STREET NAME:
PEPoquoson
FY2019 12,959CN
FY2015FROM: ALPHUS STREET TO: SCL POQUOSON (1.0000
MI)
DESCRIPTION: 4,808RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 19,215
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 32Federal Formula STP: Federal
0 0 0 0 0 0 6Federal Formula STP: State Bond Match
0 0 0 0 0 0 46Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 3,807RSTP (STP Regional): Federal
4,800 0 0 1,837 0 1,167 1,317RSTP (STP Regional): MPO - Federal
1,200 0 0 459 0 292 329RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 952RSTP (STP Regional): State Match
0 0 0 0 0 0 14State Formula: Urban - Local Match
0 0 0 12 0 0 0State Formula: Urban - State
0 0 0 0 0 0 1,303Urban Formula: Federal
0 0 0 0 0 0 21Urban Formula: Federal/State
0 0 0 0 0 0 1,327Urban Formula: State
0 0 0 0 0 0 295Urban Formula: State Match
0 0 0 2,308 0 6,000 1,458 9,449Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
POQUOSON BALANCE ENTRY ACCOUNT
PROJECT
UPC NO.: 70539
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 3 2 2 0 0 0State Formula: Urban - Local Match
0 143 118 83 0 0 0State Formula: Urban - State
146 121 84 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WYTHE CREEK ROAD TRAFFIC SIGNAL
UPGRADE
PROJECT
UPC NO.:
ROUTE:
102999
NFOU000
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2017
SCHEDULE
60
ESTIMATED COST (000's)
JURISDICTION:
Wythe CreekSTREET NAME:
PEPoquoson
FY2017 200CN
FROM: Hampton City Line TO: Yorktown RoadDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 260
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 208 0 0 0 0CMAQ: MPO - Federal
0 0 52 0 0 0 0CMAQ: MPO - State Match
0 0 260 0 0 0 0 0Total
354 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE SIGNAL TIMING - PHASE 4
PROJECT
UPC NO.:
ROUTE:
98824
NFO0000
Locally Administered. MPO project. Revised schedule required.REPORT NOTE:
FY2015
SCHEDULE
132
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PEPortsmouth
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 132
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 106 0 0 0CMAQ: MPO - Federal
0 0 0 26 0 0 0CMAQ: MPO - State Match
0 0 0 132 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE SIGNAL TIMING - PHASE 3
PROJECT
UPC NO.:
ROUTE:
98825
NFO0000
Locally Administered. MPO projectREPORT NOTE:
FY2014
SCHEDULE
120
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PEPortsmouth
CNFROM: VARIOUS LOCATIONS TO: VARIOUS
LOCATIONS
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 120
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 120CMAQ: Federal 0
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
PORTSMOUTH TRAFFIC SIGNAL UPGRADES
PROJECT
UPC NO.:
ROUTE:
103025
NFO0000
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2017
SCHEDULE
720
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEPortsmouth
FY2018 2,280CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 3,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,600 800 0 0 0 0CMAQ: MPO - Federal
0 400 200 0 0 0 0CMAQ: MPO - State Match
0 2,000 1,000 0 0 0 0 0Total
06/19/2013 355
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE SIGNAL AND MARKINGS ON US 17
AND GREENWOOD DRIVE
PROJECT
UPC NO.:
ROUTE:
96901
NFO0017
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
26
ESTIMATED COST (000's)
JURISDICTION:
George Washington HighwaySTREET NAME:
PEPortsmouth
Complete 167CNFROM: US 17 George Washington Highway TO:
Greenwood Drive
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 193
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 188Highway Safety Improvements: Federal
0 0 0 0 0 0 21Highway Safety Improvements: State Match
-16 0 0 0 0 0 0 209Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE EXIST SIGNAL, ADD PED FACILTIES
AND SIDEWALK ON US17
PROJECT
UPC NO.:
ROUTE:
96906
NFO0017
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
56
ESTIMATED COST (000's)
JURISDICTION:
US 17 Frederick BlvdSTREET NAME:
PEPortsmouth
Complete 245CNFROM: US 17 Frederick Blvd TO: Rte 919 (Deep Creek
Blvd)
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 301
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 286Highway Safety Improvements: Federal
0 0 0 0 0 0 32Highway Safety Improvements: State Match
-17 0 0 0 0 0 0 318Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE SIGNAL, RECONFIGURE
INTERSECTION, ADD LTL ON US 17
PROJECT
UPC NO.:
ROUTE:
96908
NFO0017
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
63
ESTIMATED COST (000's)
JURISDICTION:
George Washington HighwaySTREET NAME:
PEPortsmouth
Complete 488CN
FROM: George Washington Highway TO: Frederick BlvdDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 551
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 533Highway Safety Improvements: Federal
0 0 0 0 0 0 59Highway Safety Improvements: State Match
-41 0 0 0 0 0 0 592Total
356 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE SIGNAL, CONSTR NB TURN LANE
ON US17
PROJECT
UPC NO.:
ROUTE:
97054
NFO0017
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
59
ESTIMATED COST (000's)
JURISDICTION:
US 17 Frederick BlvdSTREET NAME:
PEPortsmouth
Complete 325CN
FROM: US 17 Frederick Blvd TO: Portsmouth BlvdDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 383
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 372Highway Safety Improvements: Federal
0 0 0 0 0 0 41Highway Safety Improvements: State Match
-29 0 0 0 0 0 0 413Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
BRIDGE REPLACEMENT - CHURCHLAND
BRIDGE
PROJECT
UPC NO.:
ROUTE:
102715
NFO0017
Underway
SCHEDULE
2,500
ESTIMATED COST (000's)
JURISDICTION:
High Street (Churchland Bridge)STREET NAME:
PEPortsmouth
FY2014 25,000CN
FY2014FROM: Grayson Street TO: Seagrove Road/Craney Street
(1.0000 MI)
DESCRIPTION: 2,000RW
21199 48PROJECT LENGTH: 1.0000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 29,500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 27,000Local Project Contributions: Local
0 0 0 0 0 1,000 1,250Revenue Sharing Funds: Local Match
0 0 0 0 0 1,000 1,250Revenue Sharing Funds: State Match
-2,000 0 0 0 0 0 2,000 29,500Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
BRIDGE MAINTENANCE - CHURCHLAND
BRIDGE (SBL)
PROJECT
UPC NO.:
ROUTE:
104385
NFO0017
New Project
FY2014
SCHEDULE
3
ESTIMATED COST (000's)
JURISDICTION:
High StreetSTREET NAME:
PEPortsmouth
FY2015 497CNFROM: Grayson Street TO: Seagrove Road/ Carney
Street (1.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Restoration and Rehabilitation TO 500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 77 0Revenue Sharing Funds: Local Match
0 0 0 0 0 77 0Revenue Sharing Funds: State Match
345 0 0 0 0 0 155 0Total
06/19/2013 357
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
MODIFY SIGNAL AND MARKINGS AT
EFFINGHAM AND PORTSMOUTH BLVD
PROJECT
UPC NO.:
ROUTE:
96902
NFO0141
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
29
ESTIMATED COST (000's)
JURISDICTION:
Effingham StreetSTREET NAME:
PEPortsmouth
Complete 285CNFROM: Rte 141 Effingham Street TO: Rte 337 Portsmouth
Boulevard
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 315
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 307Highway Safety Improvements: Federal
0 0 0 0 0 0 34Highway Safety Improvements: State Match
-26 0 0 0 0 0 0 341Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 164 - REIMBURSEMENT OF TOLL
FACILITIES REVOLVING
PROJECT
UPC NO.: 70564
NFOTown/City-wide
FUNDS FOR PROJECT UPC 11750DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 25Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 3Residue Parcel Revenue: State
0 23 19 15 0 0 115State Formula: Urban - Local Match
0 1,128 932 746 0 0 0State Formula: Urban - State
0 0 0 0 0 0 6,875Urban Formula: State
1,151 951 762 0 0 0 7,018Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CONSTRUCT SOUND WALLS ON ROUTE 164
AT AND NEAR MAERSK INTER
PROJECT
UPC NO.:
ROUTE:
81559
NFO0164
Locally Administered. Complete schedule required.REPORT NOTE:
Complete
SCHEDULE
125
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEPortsmouth
Underway 1,495CN
CompleteAT MAERSK TERMINAL IN PORTSMOUTHDESCRIPTION: 75RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 1,695
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,433SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 358SAFETEA-LU Earmarks: State Match
-96 0 0 0 0 0 0 1,791Total
358 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
MODIFY SIGNAL AND MARKINGS AT VICTORY
AND AIRLINE BLVD
PROJECT
UPC NO.:
ROUTE:
96904
NFO0239
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
6
ESTIMATED COST (000's)
JURISDICTION:
Victory BoulevardSTREET NAME:
PEPortsmouth
Complete 245CN
FROM: Rte 239 Victory Boulevard TO: Airline BoulevardDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 251
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 241Highway Safety Improvements: Federal
0 0 0 0 0 0 27Highway Safety Improvements: State Match
-17 0 0 0 0 0 0 268Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
BRIDGE MAINTENANCE - PARADISE CREEK
BRIDGE
PROJECT
UPC NO.:
ROUTE:
104384
NFO0239
New Project
FY2014
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
Victory BoulevardSTREET NAME:
PEPortsmouth
FY2015 198CNFROM: Driveway entrance south of Bridge TO: Entrance
north of the Bridge (0.5000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Restoration and Rehabilitation TO 200
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 31 0Revenue Sharing Funds: Local Match
0 0 0 0 0 31 0Revenue Sharing Funds: State Match
138 0 0 0 0 0 62 0Total
06/19/2013 359
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 337 - 4 LANES
PROJECT
UPC NO.:
ROUTE:
3950
NFO0337
PE and RW only. Project linked to UPC 65655.REPORT NOTE:
Complete
SCHEDULE
3,845
ESTIMATED COST (000's)
JURISDICTION:
TURNPIKE ROADSTREET NAME:
PEPortsmouth
CN
CompleteFROM: PORTSMOUTH BOULEVARD TO:
CONSTITUTION AVENUE (INCLUDING OUTFALL) (2.0700
MI)
DESCRIPTION: 9,513RW
PROJECT LENGTH: 2.0700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 13,358
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 37Federal Formula STP: Federal
0 0 0 0 0 0 224Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 1State Formula: Urban - Local Match
0 0 0 0 0 0 8,792Urban Formula: Federal
0 0 0 0 0 0 237Urban Formula: Federal/State
0 0 0 0 0 0 2,177Urban Formula: State
0 0 0 0 0 0 2,182Urban Formula: State Match
-291 0 0 0 0 0 0 13,649Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 337 - 4 LANE
PROJECT
UPC NO.:
ROUTE:
65655
NFO0337
Project linked to UPC 3950 for PE and RW. State funds - AC for future federal conversion.
Revised schedule required by City.
REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
TURNPIKE ROADSTREET NAME:
PEPortsmouth
FY2014 22,453CNFROM: 0.154 MILES EAST OF FREDERICK
BOULEVARD TO: CONSTITUTION AVENUE (1.0800 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.0800 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 22,453
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,001Accounts Receivable: Local
0 0 0 0 0 0 1,501Federal Formula STP: Federal
0 0 0 0 0 0 0Local Project Contributions: Local
0 0 0 0 0 0 143Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 1,100Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,100Revenue Sharing Funds: State Match
0 0 0 0 0 0 2,000RSTP (STP Regional): Federal
0 0 0 0 0 0 500RSTP (STP Regional): State Match
0 0 0 0 0 0 80State Formula: Urban - Local Match
0 0 0 0 0 0 4,828Urban Formula: Federal
0 0 0 0 0 0 2,954Urban Formula: Federal/State
0 0 0 0 0 0 1,501Urban Formula: State Match
3,747 0 0 0 0 0 0 18,706Total
360 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE SIGNAL & MARKINGS AT
PORTSMOUTH BLVD AND DEEP CREEK
PROJECT
UPC NO.:
ROUTE:
96900
NFO0337
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
41
ESTIMATED COST (000's)
JURISDICTION:
Portsmouth BoulevardSTREET NAME:
PEPortsmouth
Complete 185CNFROM: Rte 337 Portsmouth Boulevard TO: Deep Creek
Boulevard
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 226
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 220Highway Safety Improvements: Federal
0 0 0 0 0 0 24Highway Safety Improvements: State Match
-18 0 0 0 0 0 0 244Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE SIGNAL AND RE-STRIPE
INTERSECTION ON PORTSMOUTH BLVD
PROJECT
UPC NO.:
ROUTE:
96905
NFO0337
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
31
ESTIMATED COST (000's)
JURISDICTION:
Portsmouth BlvdSTREET NAME:
PEPortsmouth
Complete 176CN
FROM: Rte 337 Portsmouth Blvd TO: City Park AvenueDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 207
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 201Highway Safety Improvements: Federal
0 0 0 0 0 0 22Highway Safety Improvements: State Match
-17 0 0 0 0 0 0 223Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE SIGNAL AND EXTEND LEFT TURN
LANE
PROJECT
UPC NO.:
ROUTE:
97011
NFO0337
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
58
ESTIMATED COST (000's)
JURISDICTION:
Portsmouth BlvdSTREET NAME:
PEPortsmouth
Complete 415CN
FROM: Rte 337 Portsmouth Blvd TO: Elmhurst LaneDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 473
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 457Highway Safety Improvements: Federal
0 0 0 0 0 0 51Highway Safety Improvements: State Match
-35 0 0 0 0 0 0 508Total
06/19/2013 361
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INT. GEOMETERIC - PORTSMOUTH BLVD. RTE
337 & ELMHURST LANE
PROJECT
UPC NO.:
ROUTE:
100602
NFO0337
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2015
SCHEDULE
75
ESTIMATED COST (000's)
JURISDICTION:
Elmhurst LaneSTREET NAME:
PEPortsmouth
FY2016 425CNFROM: Portsmouth Blvd TO: 100' North of Portsmouth
Blvd on Elmhurst
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 340 60 0 0 0CMAQ: MPO - Federal
0 0 85 15 0 0 0CMAQ: MPO - State Match
0 0 425 75 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
US 58 - AIRLINE BLVD INTERSECTION
IMPROVEMENTS:
PROJECT
UPC NO.:
ROUTE:
82858
NFOU000
Locally Administered. MPO project. Balance to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
AIRLINE BLVDSTREET NAME:
PEPortsmouth
Underway 811CN
FROM: Elmhurst Lane TO: Kings Highway (1.7500 MI)DESCRIPTION: RW
PROJECT LENGTH: 1.7500 MISCOPE OF WORK: Safety TO 1,011
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 12CMAQ: Federal
0 0 0 0 0 0 1,088CMAQ: State Match
-89 0 0 0 0 0 0 1,100Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ALEXANDER'S CORNER INTERSECTION
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
83438
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
252
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEPortsmouth
Underway 1,226CN
FROM: PORTSMOUTH BLVD TO: AIRLINE BLVDDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,478
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 900CMAQ: Federal
0 0 0 0 0 0 400CMAQ: State Match
0 0 0 0 0 0 178Local Project Contributions: Local
0 0 0 0 0 0 0 1,478Total
362 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HSIP PROACTIVE SAFETY PROJECTS CITY OF
PORTSMOUTH
PROJECT
UPC NO.: 86612
NFODistrict-wide
City of Portsmouth Safety ImprovementsDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 10Discretionary Grants: State Match
0 0 0 0 0 0 895Highway Safety Improvements: Federal
0 0 0 0 0 0 89Highway Safety Improvements: State Match
0 0 0 0 0 0 995Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HIGH STREET UPGRADE EXISTING SIGNAL
PROJECT
UPC NO.:
ROUTE:
93665
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
40
ESTIMATED COST (000's)
JURISDICTION:
High StreetSTREET NAME:
PEPortsmouth
Underway 275CN
FROM: High Street TO: Court StreetDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 315
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 311Highway Safety Improvements: Federal
0 0 0 0 0 0 35Highway Safety Improvements: State Match
-31 0 0 0 0 0 0 346Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
SIGNAL UPGRADE AT TOWNE POINT AND
TWIN PINES RD
PROJECT
UPC NO.:
ROUTE:
96907
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
33
ESTIMATED COST (000's)
JURISDICTION:
Towne Point RoadSTREET NAME:
PEPortsmouth
Complete 230CN
FROM: Towne Point Road TO: Twin Pines RoadDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 263
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 256Highway Safety Improvements: Federal
0 0 0 0 0 0 28Highway Safety Improvements: State Match
-22 0 0 0 0 0 0 285Total
06/19/2013 363
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
SIGNAL SYSTEM UPGRADE - PHASES 2, 3, 4
PROJECT
UPC NO.:
ROUTE:
97720
NFOU000
MPO project. Locally Administered.REPORT NOTE:
Underway
SCHEDULE
750
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PEPortsmouth
FY2014 5,850CN
FROM: Citywide TO: Citywide (5.5000 MI)DESCRIPTION: RW
PROJECT LENGTH: 5.5000 MISCOPE OF WORK: Safety TO 6,600
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,921CMAQ: Federal
0 0 0 0 0 0 2,359CMAQ: MPO - Federal
0 0 0 0 0 0 590CMAQ: MPO - State Match
0 0 0 0 0 0 730CMAQ: State Match
0 0 0 0 0 0 0 6,600Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE SIGNAL TIMING - PHASE 2
PROJECT
UPC NO.:
ROUTE:
98826
NFOU000
MPO project. Locally Administered.REPORT NOTE:
Underway
SCHEDULE
112
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEPortsmouth
CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 112
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 90CMAQ: MPO - Federal
0 0 0 0 0 0 22CMAQ: MPO - State Match
0 0 0 0 0 0 0 112Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE SIGNAL TIMING - PHASE 1
PROJECT
UPC NO.:
ROUTE:
98827
NFOU000
MPO project. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
120
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PEPortsmouth
CN
FROM: Citywide TO: CitywideDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 120
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 96CMAQ: Federal
0 0 0 0 0 0 24CMAQ: State Match
0 0 0 0 0 0 0 120Total
364 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WESTHAVEN BICYCLE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
102985
NFOU000
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2018
SCHEDULE
60
ESTIMATED COST (000's)
JURISDICTION:
South StreetSTREET NAME:
PEPortsmouth
FY2019 440CNFROM: Intersection of Clifford St and Powhatan Avenue
TO: Intersection of Bart Street and Airline Blvd (1.1500 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.1500 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 400 0 0 0 0 0CMAQ: MPO - Federal
0 100 0 0 0 0 0CMAQ: MPO - State Match
0 500 0 0 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
PROVIDE KEY ROADWAY CONNECTION WITH
PORTSMOUTH TCC
PROJECT
UPC NO.:
ROUTE:
104390
NFOU000
New Project
FY2014
SCHEDULE
100
ESTIMATED COST (000's)
JURISDICTION:
Elliot AvenueSTREET NAME:
PEPortsmouth
FY2014 1,340CN
FROM: Freedom Avenue TO: Elliot Street (0.2500 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.2500 MISCOPE OF WORK: New Construction Roadway TO 1,440
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 720 0Revenue Sharing Funds: Local Match
0 0 0 0 0 720 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,440 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
TOWN OF SMITHFIELD BALANCE ENTRY
ACCOUNT
PROJECT
UPC NO.: 70553
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 2 2 1 0 0 0State Formula: Urban - Local Match
0 95 78 63 0 0 0State Formula: Urban - State
97 80 64 0 0 0 0Total
06/19/2013 365
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
GODWIN BLVD & KINGS HWY INTERSECTION
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
104332
NFO0010
New Project
FY2014
SCHEDULE
200
ESTIMATED COST (000's)
JURISDICTION:
Godwin Blvd (Route 10)STREET NAME:
PESuffolk
FY2015 1,100CN
FY2014DESCRIPTION: 200RW
PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 750 0Revenue Sharing Funds: Local Match
0 0 0 0 0 750 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,500 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
BRIDGE ROAD AND BENNETTS PASTURE
ROAD INT. IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
100604
NFO0017
MPO project. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
123
ESTIMATED COST (000's)
JURISDICTION:
Bridge RoadSTREET NAME:
PESuffolk
Underway 717CN
FROM: Bennetts Pasture Road TO: IntersectionDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 840
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 60CMAQ: Federal
0 0 0 0 0 0 540CMAQ: MPO - Federal
0 0 0 0 0 0 135CMAQ: MPO - State Match
0 0 0 0 0 0 15CMAQ: State Match
0 0 0 0 0 100 0Local Project Contributions: Local
-10 0 0 0 0 0 100 750Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
BRIDGE ROAD AND LEE FARM LANE
INTERSECTION IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
100605
NFO0017
MPO project. Locally Administered. Balance to be redistributed by the MPO.REPORT NOTE:
Complete
SCHEDULE
113
ESTIMATED COST (000's)
JURISDICTION:
Bridge RoadSTREET NAME:
PESuffolk
Underway 548CN
FROM: Lee Farm Lane TO: IntersectionDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 661
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 60CMAQ: Federal
0 0 0 0 0 0 540CMAQ: MPO - Federal
0 0 0 0 0 0 135CMAQ: MPO - State Match
0 0 0 0 0 0 15CMAQ: State Match
-89 0 0 0 0 0 0 750Total
366 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
BRIDGE ROAD TRAFFIC SIGNAL UPGRADES
PROJECT
UPC NO.:
ROUTE:
102991
NFO0017
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2017
SCHEDULE
150
ESTIMATED COST (000's)
JURISDICTION:
Bridge RoadSTREET NAME:
PESuffolk
FY2018 1,107CN
FROM: College Drive TO: Eclipse Drive (6.8000 MI)DESCRIPTION: RW
PROJECT LENGTH: 6.8000 MISCOPE OF WORK: Traffic Management/Engineering TO 1,257
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 886 120 0 0 0 0CMAQ: MPO - Federal
0 221 30 0 0 0 0CMAQ: MPO - State Match
0 1,107 150 0 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ROUTE 58/ HOLLAND ROAD CORRIDOR
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
100937
FO0058
Locally Administered. Revised schedule required.REPORT NOTE:
Underway
SCHEDULE
33
ESTIMATED COST (000's)
JURISDICTION:
Holland RoadSTREET NAME:
PESuffolk
FY2022 55,000CN
FY2015FROM: Rte 58/13/32 bypass TO: .7 miles west of
Manning Bridge Road (3.1000 MI)
DESCRIPTION: 14,000RW
PROJECT LENGTH: 3.1000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 69,033
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 24Federal Formula STP: Federal
0 0 0 0 0 0 6Federal Formula STP: State Bond Match
6,000 0 10,000 10,000 8,000 4,000 4,000Local Project Contributions: Local
0 0 0 0 0 60 0Residue Parcel Revenue: State
0 0 0 0 0 0 12,000Revenue Sharing Funds: Local Match
0 0 0 0 0 0 12,000Revenue Sharing Funds: State Match
0 0 0 0 0 0 5(S) Secondary Formula: Federal/State
0 20 17 14 0 0 0State Formula: Urban - Local Match
0 1,003 829 664 0 0 0State Formula: Urban - State
391 1,023 10,846 10,677 8,000 6,000 4,060 28,035Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
SUFFOLK BYPASS ITS IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
102994
NFO0058
MPO projectREPORT NOTE:
FY2018
SCHEDULE
135
ESTIMATED COST (000's)
JURISDICTION:
Suffolk BypassSTREET NAME:
PESuffolk
FY2019 1,515CNFROM: City of Chesapeake limits TO: Holland Road
(11.6000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 11.6000 MISCOPE OF WORK: Traffic Management/Engineering TO 1,650
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,212 108 0 0 0 0RSTP (STP Regional): MPO - Federal
0 303 27 0 0 0 0RSTP (STP Regional): MPO - State Match
0 1,515 135 0 0 0 0 0Total
06/19/2013 367
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
SUFFOLK BYPASS INTERSECTION
IMPROVEMENTS AT GODWIN BOULEVARD
PROJECT
UPC NO.:
ROUTE:
102998
FO0058
MPO project; Locally AdministeredREPORT NOTE:
FY2018
SCHEDULE
120
ESTIMATED COST (000's)
JURISDICTION:
Suffolk BypassSTREET NAME:
PESuffolk
FY2019 880CN
FROM: Godwin Boulevard TO: Suffolk BypassDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 1,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 500 0Revenue Sharing Funds: Local Match
0 0 0 0 0 500 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,000 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 337 - DEVELOP TO 4 LANE DIVIDED
FACILITY
PROJECT
UPC NO.:
ROUTE:
17568
NFO0337
Intersection of Nansemond Pkwy and Shoulders Hill Road.. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
2,428
ESTIMATED COST (000's)
JURISDICTION:
NANSEMOND PKWYSTREET NAME:
PESuffolk
Complete 10,900CN
CompleteFROM: 0.3147 Mile W. of Shoulder Hill Road (Rte. 626)
TO: 0.3984 Mile E. of Shoulder Hill Road (Rte. 626)
(0.7131 MI)
DESCRIPTION: 5,390RW
PROJECT LENGTH: 0.7131 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 18,718
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5,292Local Project Contributions: Local
0 0 0 0 0 0 21Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 3,014Revenue Sharing Funds: Local Match
0 0 0 0 0 0 3,014Revenue Sharing Funds: State Match
0 0 0 0 0 0 499(S) Secondary Formula: Federal/State
0 0 0 0 0 0 184(S) State Formula: Secondary - Unpaved
0 0 0 0 0 0 116State Formula: Urban - Local Match
0 0 0 0 0 0 6,705Urban Formula: State
-127 0 0 0 0 0 0 18,846Total
368 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 337 - WIDEN TO 4 LANES
PROJECT
UPC NO.:
ROUTE:
61407
NFO0337
Locally Administered. Project is for Roadway Widening. State funds - AC for future federal
conversion.
REPORT NOTE:
Underway
SCHEDULE
539
ESTIMATED COST (000's)
JURISDICTION:
NANSEMOND PKWYSTREET NAME:
PESuffolk
FY2017 4,586CN
FY2015FROM: 0.37 Mile E. of Shoulder Hill Road (Rte. 626) TO:
0.748 Mile E. of Shoulder Hill Road (Rte. 626) (0.3780 MI)
DESCRIPTION: 3,807RW
PROJECT LENGTH: 0.3780 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 8,932
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,730Federal Formula STP: Federal
0 0 0 0 0 0 422Federal Formula STP: State Bond Match
0 0 0 0 0 0 50Local Project Contributions: Urban - Local
Match
0 0 0 0 0 800 0RSTP (STP Regional): MPO - Federal
0 0 0 0 0 200 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 3,092(S) Secondary Formula: Federal/State
0 0 0 0 0 0 8State Formula: Urban - Local Match
0 0 0 0 0 0 976Urban Formula: Federal
0 0 0 0 0 0 294Urban Formula: Federal/State
0 0 0 0 0 0 93Urban Formula: State
0 0 0 0 0 0 454Urban Formula: State Match
-189 0 0 0 0 0 1,000 8,120Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CONTINUE TO EXTEND SIDEWALK ALONG
RTE 460 (N. MAIN ST).
PROJECT
UPC NO.:
ROUTE:
99172
NFO0460
Locally Administered.REPORT NOTE:
Underway
SCHEDULE
139
ESTIMATED COST (000's)
JURISDICTION:
North Main StreetSTREET NAME:
PESuffolk
FY2014 300CN
FY2014FROM: Walmart TO: VDOT Property Line (0.3000 MI)DESCRIPTION: 90RW
PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 529
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 423CMAQ: Federal
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 2State Formula: Urban - Local Match
0 0 0 0 0 0 86Urban Formula: Federal/State
0 0 0 0 0 0 17Urban Formula: State Match
0 0 0 0 0 0 0 529Total
06/19/2013 369
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
PRUDEN BLVD DRAINAGE IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
104333
NFO0460
New Project
FY2014
SCHEDULE
8
ESTIMATED COST (000's)
JURISDICTION:
Pruden BoulevardSTREET NAME:
PESuffolk
FY2014 842CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 850
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 425 0Revenue Sharing Funds: Local Match
0 0 0 0 0 425 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 850 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
NANSEMOND PKWY INTERSECTION
IMPROVEMENTS AT WILROY ROAD
PROJECT
UPC NO.:
ROUTE:
102995
NFO0614
MPO project.REPORT NOTE:
FY2018
SCHEDULE
300
ESTIMATED COST (000's)
JURISDICTION:
Nansemond ParkwaySTREET NAME:
PESuffolk
FY2019 1,000CN
FY2019FROM: Wilroy Road TO: Wilroy RoadDESCRIPTION: 300RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 1,600
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 800 0Revenue Sharing Funds: Local Match
0 0 0 0 0 800 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 1,600 0Total
370 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 626 - RECONSTRUCTION (PE & RW ONLY
IN SSYP)
PROJECT
UPC NO.:
ROUTE:
69050
NFO0626
Locally Administered; PE only. Revised schedule required based upon available funding. City of
Suffolk - Urban Project in FY07. State funds - AC for future federal conversion.
REPORT NOTE:
Underway
SCHEDULE
3,177
ESTIMATED COST (000's)
JURISDICTION:
SHOULDERS HILLSTREET NAME:
PESuffolk
FY2017 33,414CN
FY2016FROM: ROUTE 337 TO: ROUTE 17 (3.0700 MI)DESCRIPTION: 4,489RW
PROJECT LENGTH: 3.0700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 41,080
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 445Federal Formula STP: Federal
0 0 0 0 0 0 111Federal Formula STP: State Bond Match
0 0 0 0 0 0 18Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 6(S) Secondary Formula: Federal/State
0 0 0 0 0 0 1,364STP: Statewide - Federal
0 0 0 0 0 0 341STP: Statewide - Soft Match
0 0 0 0 0 0 727Urban Formula: Federal
0 0 0 0 0 0 164Urban Formula: State Match
37,903 0 0 0 0 0 0 3,177Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HARBOUR VIEW AREA TRAFFIC SIGNAL
COORDINATION
PROJECT
UPC NO.:
ROUTE:
100603
NFO0658
MPO project. Locally Administered.REPORT NOTE:
FY2014
SCHEDULE
75
ESTIMATED COST (000's)
JURISDICTION:
Harbour View, College Dr, Townpoint Rd, Bridge RdSTREET NAME:
PESuffolk
FY2015 3,425CNFROM: Int. Harbour View, College Dr, Townpoint Rd,
Bridge Rd. TO: Intersection
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 3,500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
1,200 0 0 740 800 60 0CMAQ: MPO - Federal
300 0 0 185 200 15 0CMAQ: MPO - State Match
0 0 0 925 1,000 1,500 75 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITY OF SUFFOLK BALANCE ENTRY ACCOUNT
PROJECT
UPC NO.: 70560
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 24Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 952Urban Formula: Federal
0 0 0 0 0 0 214Urban Formula: State Match
0 0 0 0 0 0 1,191Total
06/19/2013 371
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HSIP PROACTIVE SAFETY PROJECTS CITY OF
SUFFOLK
PROJECT
UPC NO.: 86610
NFODistrict-wide
Revised schedule required from City.REPORT NOTE:
City of Suffolk Safety ImprovementsDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 393Highway Safety Improvements: Federal
0 0 0 0 0 0 44Highway Safety Improvements: State Match
0 0 0 0 0 0 437Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE TRAFFIC MANAGEMENT SYSTEM
PLAN
PROJECT
UPC NO.:
ROUTE:
97726
NFOU000
MPO project. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PESuffolk
CN
FROM: Citywide TO: CitywideDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 400
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 320RSTP (STP Regional): Federal
0 0 0 0 0 0 80RSTP (STP Regional): State Match
0 0 0 0 0 0 0 400Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
PORTSMOUTH BOULEVARD PARK AND RIDE
LOT
PROJECT
UPC NO.:
ROUTE:
100607
NFOU000
MPO project. Locally Administered. Balance to be redistributed by MPO.REPORT NOTE:
Complete
SCHEDULE
120
ESTIMATED COST (000's)
JURISDICTION:
Portsmouth BoulevardSTREET NAME:
PESuffolk
Underway 590CN
FROM: B Street TO: B StreetDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 710
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 60CMAQ: Federal
0 0 0 0 0 0 540CMAQ: MPO - Federal
0 0 0 0 0 0 135CMAQ: MPO - State Match
0 0 0 0 0 0 15CMAQ: State Match
-40 0 0 0 0 0 0 750Total
372 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
NASEMOND PARKWAY TRAFFIC SIGNAL
UPGRADES
PROJECT
UPC NO.:
ROUTE:
102990
NFOU000
MPO project. Locally Administered. Revised schedule required.REPORT NOTE:
FY2018
SCHEDULE
294
ESTIMATED COST (000's)
JURISDICTION:
Nansemond ParkwaySTREET NAME:
PESuffolk
FY2019 2,454CNFROM: Intersection of Bridge Road and Shoulders Hill
Road TO: Intersection of Wilroy Road and Route 58
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 2,748
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,313 0 0 0 0 0CMAQ: MPO - Federal
0 328 0 0 0 0 0CMAQ: MPO - State Match
1,107 1,641 0 0 0 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
KENYON ROAD CONNECTOR
PROJECT
UPC NO.:
ROUTE:
104359
NFOU000
New Project
FY2014
SCHEDULE
450
ESTIMATED COST (000's)
JURISDICTION:
Kenyon Road ConnectorSTREET NAME:
PESuffolk
FY2015 6,235CN
FY2014FROM: Terminus of Kenyon Court TO: Route 58DESCRIPTION: 1,025RW
PROJECT LENGTH: _SCOPE OF WORK: New Construction Roadway TO 7,710
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 2,000 0Revenue Sharing Funds: Local Match
0 0 0 0 0 2,000 0Revenue Sharing Funds: State Match
3,710 0 0 0 0 0 4,000 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
COLLEGE DR & HARBOUR VIEW BLVD
INTERSECTION IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
104361
NFOU000
New Project
FY2014
SCHEDULE
250
ESTIMATED COST (000's)
JURISDICTION:
College DriveSTREET NAME:
PESuffolk
FY2015 1,550CN
FY2014FROM: College Drive TO: Harbour View Blvd (0.0100 MI)DESCRIPTION: 200RW
PROJECT LENGTH: 0.0100 MISCOPE OF WORK: Safety TO 2,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 1,000 0Revenue Sharing Funds: Local Match
0 0 0 0 0 1,000 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 2,000 0Total
06/19/2013 373
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CENTERVILLE TURNPIKE WIDENING
PROJECT
UPC NO.:
ROUTE:
103005
NFO0000
PE only. Accruing for RW. MPO project. Revised schedule required.. Locally Administered.REPORT NOTE:
FY2014
SCHEDULE
1,550
ESTIMATED COST (000's)
JURISDICTION:
Centerville TurnpikeSTREET NAME:
PEVirginia Beach
FY2019 20,820CN
FY2018FROM: Kempsville Road TO: Indian River Road (1.8300
MI)
DESCRIPTION: 8,630RW
PROJECT LENGTH: 1.8300 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 31,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 2,263 0Local Project Contributions: Local
0 0 0 0 0 10,000 0Revenue Sharing Funds: Local Match
0 0 0 0 0 10,000 0Revenue Sharing Funds: State Match
0 3,885 3,104 0 0 0 0RSTP (STP Regional): MPO - Federal
0 971 776 0 0 0 0RSTP (STP Regional): MPO - State Match
0 4,857 3,880 0 0 0 22,263 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 58 - WIDEN TO 6-LANE DIVIDED FACILITY
PROJECT
UPC NO.:
ROUTE:
12546
NFO0058
PE and RW only. Revised schedule required based upon available funding.REPORT NOTE:
Complete
SCHEDULE
6,131
ESTIMATED COST (000's)
JURISDICTION:
LASKIN ROADSTREET NAME:
PEVirginia Beach
FY2014 57,910CN
UnderwayFROM: 0.449 KILOMETER WEST OF FIRST COLONIAL
ROAD TO: 0.515 KILOMETER EAST OF BIRDNECK
ROAD (3.3900 KM)
DESCRIPTION: 29,295RW
PROJECT LENGTH: 3.3900 KMSCOPE OF WORK: Reconstruction w/o Added Capacity TO 93,336
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,667Accounts Receivable: Local
0 0 0 0 0 0 1,522Bond Match: State Bond Match
0 0 0 0 0 0 345Federal Formula STP: Federal
0 0 0 0 0 0 6,089Federal STP: Federal
0 0 0 0 0 0 400Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 3,985NHPP: Statewide - Federal
0 0 0 0 0 0 996NHPP: Statewide - Soft Match
0 0 0 0 0 0 15,240Urban Formula: Federal
0 0 0 0 0 0 3,991Urban Formula: State Match
57,100 0 0 0 0 0 0 36,236Total
374 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 58 - WIDEN TO 6 LANES PHASE III
PROJECT
UPC NO.:
ROUTE:
14601
NFO0058
Urban Construction Initiative Project - matching funds provided as part of quarterly payment.
Revised schedule required from City of Virginia Beach. Phase II - PE only. Accruing for RW.
REPORT NOTE:
Underway
SCHEDULE
850
ESTIMATED COST (000's)
JURISDICTION:
LASKIN ROADSTREET NAME:
PEVirginia Beach
FY2022 22,472CN
FY2021FROM: 0.32 MILES EAST OF BIRDNECK ROAD TO:
0.247 MILES WEST OF PACIFIC AVENUE (0.4200 MI)
DESCRIPTION: 3,178RW
PROJECT LENGTH: 0.4200 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 26,500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 32Local Project Contributions: Local
0 0 0 0 0 0 964Urban Formula: Federal
25,504 0 0 0 0 0 0 996Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CONSTRUCT SIDEWALK TO EXISTING
SIDEWALK ALONG VA BEACH BLVD
PROJECT
UPC NO.:
ROUTE:
86504
NFO0058
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
183
ESTIMATED COST (000's)
JURISDICTION:
Virginia Beach Blvd.STREET NAME:
PEVirginia Beach
Complete 1,466CN
CompleteFROM: North Oceana boulevard TO: Birdneck Rd (1.4200
MI)
DESCRIPTION: 39RW
PROJECT LENGTH: 1.4200 MISCOPE OF WORK: Safety TO 1,688
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,480Highway Safety Improvements: Federal
0 0 0 0 0 0 164Highway Safety Improvements: State Match
0 0 0 0 0 0 32Local Project Contributions: Local
0 0 0 0 0 0 12Safety Funds: Hazard Elimination
0 0 0 0 0 0 0 1,688Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE EXISTING SIGNAL AT VA BEACH
BLVD WITH MEDITERRANEAN
PROJECT
UPC NO.:
ROUTE:
93631
NFO0058
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
62
ESTIMATED COST (000's)
JURISDICTION:
Virginia Beach BlvdSTREET NAME:
PEVirginia Beach
Underway 210CN
FROM: 1600' Route 60 Pacific Ave TO: Mediterranean AveDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 272
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 235Highway Safety Improvements: Federal
0 0 0 0 0 0 26Highway Safety Improvements: State Match
0 0 0 0 0 0 11Local Project Contributions: Local
0 0 0 0 0 0 0 272Total
06/19/2013 375
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UTILITY BORE UNDER LYNNHAVEN INLET
PROJECT
UPC NO.:
ROUTE:
102781
NFO0058
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Laskin RoadSTREET NAME:
PEVirginia Beach
Underway 5,624CNFROM: Gay Drive TO: 0.104 Miles West of Red Robin
Road (0.2460 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.2460 MISCOPE OF WORK: Utilities TO 5,624
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,333Accounts Receivable: Local
0 0 0 0 0 0 8Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 3,112NHPP: Statewide - Federal
0 0 0 0 0 0 778NHPP: Statewide - Soft Match
0 0 0 0 0 0 320Urban Formula: Federal
0 0 0 0 0 0 72Urban Formula: State Match
0 0 0 0 0 0 0 5,624Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
LESNER BRIDGE REPLACEMENT PROJECT, VA
BEACH
PROJECT
UPC NO.:
ROUTE:
97737
FO0060
Locally Administered. PE funded by City.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Shore DriveSTREET NAME:
PEVirginia Beach
FY2014 82,839CN
UnderwayFROM: E Stratford Rd TO: Vista Circle (0.5900 MI)DESCRIPTION: 4,638RW
PROJECT LENGTH: 0.5900 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 87,478
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 14,140 28,699Bond Proceeds: CPR Bonds
0 0 14,220 13,000 0 0 0CTB Formula: Bridge - State
0 0 0 0 0 0 750Demonstration Funds: Federal
8,363 0 0 0 0 4,973 0NHPP: Statewide - Federal
2,091 0 0 0 0 1,243 0NHPP: Statewide - Soft Match
0 0 14,220 13,000 0 10,453 20,356 29,449Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
SHORE DRIVE- SAFETY/PED IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
102739
NFO0060
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Shore DriveSTREET NAME:
PEVirginia Beach
FY2014 10,813CN
FROM: Vista Circle TO: Croix Dr. (1.3000 MI)DESCRIPTION: RW
PROJECT LENGTH: 1.3000 MISCOPE OF WORK: TO 10,813
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 813Local Project Contributions: Local
0 0 0 0 0 0 5,000Revenue Sharing Funds: Local Match
0 0 0 0 0 0 5,000Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 10,813Total
376 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 165 - 4 LANES ON 8-LANE RIGHT OF WAY
PROJECT
UPC NO.:
ROUTE:
13482
NFO0165
CN on ARRA UPC 93522. Project linked to UPC 52048. PE is included in this project for UPC
52058.
REPORT NOTE:
Complete
SCHEDULE
7,887
ESTIMATED COST (000's)
JURISDICTION:
PRINCESS ANNE RDSTREET NAME:
PEVirginia Beach
CN
CompleteFROM: 0.122 MILES EAST OF DAM NECK ROAD TO:
0.108 MILES EAST OF NIMMO PARKWAY (2.1440 MI)
DESCRIPTION: 21,048RW
PROJECT LENGTH: 2.1440 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 28,935
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5,260Accounts Receivable: Local
0 0 0 0 0 0 445Federal Formula STP: Federal
0 0 0 0 0 0 352Federal STP: Federal
0 0 0 0 0 0 465Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 88Soft Match: Federal
0 0 0 0 0 0 17,877Urban Formula: Federal
0 0 0 0 0 0 4,448Urban Formula: State Match
0 0 0 0 0 0 0 28,935Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 165 - INTERSECTION IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
51866
NFO0165
Urban Construction Initiative Project - matching funds provided as part of the quarterly payment.REPORT NOTE:
Complete
SCHEDULE
4,500
ESTIMATED COST (000's)
JURISDICTION:
PRINCESS ANNE RDSTREET NAME:
PEVirginia Beach
Complete 26,908CN
CompleteFROM: 0.389 MILES WEST OF KEMPSVILLE ROAD TO:
0.275 MILES EAST OF KEMPSVILLE ROAD (0.6640 MI)
DESCRIPTION: 52,194RW
22270,29394 -1,82PROJECT LENGTH: 0.6640 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: Reconstruction w/o Added Capacity TO 83,602
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 75Federal Formula STP: Federal
0 0 0 0 0 0 38,338Local Project Contributions: Local
0 0 0 0 0 0 5,288(X) Local Project Contributions: State Match
0 0 0 0 0 0 1,461Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,461Revenue Sharing Funds: State Match
0 0 0 0 0 0 36,979Urban Formula: Federal
0 0 0 0 0 0 0 83,602Total
06/19/2013 377
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 165 - NIMMO PARKWAY - 4 LANE ON 6
LANE RW (RW & CN ONLY)
PROJECT
UPC NO.:
ROUTE:
52058
NFO0165
Project linked to UPC 13482. PE included in UPC 13482.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
NIMMO PARKWAYSTREET NAME:
PEVirginia Beach
Underway 53,797CN
CompleteFROM: 0.02 Miles East of Holland Road TO: 0.43 Miles
West of General Booth Boulevard (1.7200 MI)
DESCRIPTION: 4,677RW
27513 100PROJECT LENGTH: 1.7200 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: New Construction Roadway TO 58,474
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 5,061Accounts Receivable: Local
0 0 0 0 0 0 81Federal Formula STP: Federal
0 0 0 0 0 600 35,783Local Project Contributions: Local
0 0 0 0 0 0 300Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 1,000Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,000Revenue Sharing Funds: State Match
0 0 0 0 0 0 11,943Urban Formula: Federal
0 0 0 0 0 0 2,705Urban Formula: State Match
0 0 0 0 0 0 600 57,874Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ARRA VIRGINIA BEACH 165 (PRINCESS ANNE
ROAD) 4 LANE WIDENING
PROJECT
UPC NO.: 93522
NFOARRA09
PE and RW on UPC 13482; ARRA parent UPC 93522; ARRA child UPC 96137, Additive UPC
95555
REPORT NOTE:
FROM: 0.124 MILES EAST OF DAM NECK ROAD TO:
0.108 MILE EAST OF NIMMO PARKWAY (2.1420 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 18,518American Recovery and Reinvestment Act:
Flexible
0 0 0 0 0 0 8,619American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 2,589Local Project Contributions: Local
0 0 0 0 0 0 15Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 1,000Revenue Sharing Funds: Local Match
0 0 0 0 0 0 1,000Revenue Sharing Funds: State Match
0 0 0 0 0 0 585Urban Formula: Federal
0 0 0 0 0 0 132Urban Formula: State Match
0 0 0 0 0 0 32,457Total
378 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CONSTR LTL FOR SOUTH INDEPENDENCE
BLVD
PROJECT
UPC NO.:
ROUTE:
93661
NFO0410
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
86
ESTIMATED COST (000's)
JURISDICTION:
South Independence BlvdSTREET NAME:
PEVirginia Beach
Complete 306CNFROM: 130 feet east of Buckner Blvd TO: 610 feet north
on Independence
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 392
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 350Highway Safety Improvements: Federal
0 0 0 0 0 0 39Highway Safety Improvements: State Match
0 0 0 0 0 0 4Local Project Contributions: Local
0 0 0 0 0 0 0 392Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENTS AT GENERAL
BOOTH BLVD AND NIMMO PK
PROJECT
UPC NO.:
ROUTE:
93662
NFO0615
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
87
ESTIMATED COST (000's)
JURISDICTION:
General Booth BlvdSTREET NAME:
PEVirginia Beach
Complete 410CNFROM: 100 FT EAST OF GENERAL BOOTH BLVD TO:
600 FT WEST OF GENERAL BOOTH BLVD
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 497
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 360Highway Safety Improvements: Federal
0 0 0 0 0 0 40Highway Safety Improvements: State Match
0 0 0 0 0 0 97Local Project Contributions: Local
0 0 0 0 0 0 0 497Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HSIP - CONSTRUCT SIDEWALK ALONG 1.5 MI
OF N. LYNNHAVEN ROAD
PROJECT
UPC NO.:
ROUTE:
93664
NFO8711
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
72
ESTIMATED COST (000's)
JURISDICTION:
North Lynnhaven RoadSTREET NAME:
PEVirginia Beach
Complete 293CN
FROM: Virginia Beach Blvd TO: Kings Grant RoadDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 365
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 318Highway Safety Improvements: Federal
0 0 0 0 0 0 35Highway Safety Improvements: State Match
0 0 0 0 0 0 12Local Project Contributions: Local
0 0 0 0 0 0 0 365Total
06/19/2013 379
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
LYNNHAVEN PARKWAY - WIDENING TO 4
LANES
PROJECT
UPC NO.:
ROUTE:
14603
NFOU000
Complete
SCHEDULE
3,491
ESTIMATED COST (000's)
JURISDICTION:
LYNNHAVEN PKWYSTREET NAME:
PEVirginia Beach
FY2014 20,483CN
UnderwayFROM: 0.4571 Miles East of Centerville Turnpike TO:
0.1627 Miles West of Indian River Road (1.4340 MI)
DESCRIPTION: 9,141RW
PROJECT LENGTH: 1.4340 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 33,114
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 17,489Bond Proceeds: CPR Bonds
0 0 0 0 0 0 63Federal Formula STP: Federal
0 0 0 0 0 0 1,611Local Project Contributions: Local
0 0 0 0 0 0 223Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 121RSTP (STP Regional): Federal
0 0 0 0 0 142 2,044RSTP (STP Regional): MPO - Federal
0 0 0 0 0 36 511RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 30RSTP (STP Regional): State Match
0 0 0 0 0 0 8,840Urban Formula: Federal
0 0 0 0 0 0 2,003Urban Formula: State Match
0 0 0 0 0 0 178 32,937Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HOLLAND ROAD - UPGRADE TO 4 LANES
PROJECT
UPC NO.:
ROUTE:
15827
NFOU000
Complete
SCHEDULE
3,834
ESTIMATED COST (000's)
JURISDICTION:
HOLLAND ROADSTREET NAME:
PEVirginia Beach
FY2014 24,353CN
UnderwayFROM: 0.207 MILE NORTH OF DAM NECK ROAD TO:
0.152 MILE SOUTH OF NIMMO PARKWAY (2.7200 MI)
DESCRIPTION: 18,700RW
PROJECT LENGTH: 2.7200 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 46,887
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 22,308Bond Proceeds: CPR Bonds
0 0 0 0 0 0 142Federal Formula STP: Federal
0 0 0 0 0 0 817Local Project Contributions: Local
0 0 0 0 0 0 462Local Project Contributions: Urban - Local
Match
0 0 0 544 0 0 0STP: Statewide - Federal
0 0 0 136 0 0 0STP: Statewide - Soft Match
0 0 0 0 0 0 18,324Urban Formula: Federal
0 0 0 0 0 0 4,155Urban Formula: State Match
0 0 0 681 0 0 0 46,207Total
380 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
ELBOW RD - UPGRADE TO 4 LANES &
EXTENSION (PE ONLY IN SYIP)
PROJECT
UPC NO.:
ROUTE:
15828
NFOU000
Urban Construction Initiative Project - matching funds provided as part of quarterly payment. PE
and RW only. Revised schedule required based upon available funding.
REPORT NOTE:
Complete
SCHEDULE
4,495
ESTIMATED COST (000's)
JURISDICTION:
ELBOW ROADSTREET NAME:
PEVirginia Beach
FY2014 53,046CN
UnderwayFROM: INDIAN RIVER ROAD TO: 0.5 MILE WEST OF
PRINCESS ANN ROAD (3.1000 MI)
DESCRIPTION: 11,385RW
11111 95PROJECT LENGTH: 3.1000 MI STRUCTURE NO.: SUFFICIENCY RATING:
SCOPE OF WORK: New Construction Roadway TO 68,926
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,390Local Project Contributions: Local
0 0 0 0 0 0 148(X) Local Project Contributions: State Match
0 0 0 0 0 0 592Minimum Guarantee: Federal
0 0 0 0 0 0 5,000Revenue Sharing Funds: Local Match
0 0 0 0 0 0 5,000Revenue Sharing Funds: State Match
0 0 0 0 0 0 3,052Urban Formula: Federal
52,744 0 0 0 0 0 0 16,182Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INDIAN RIVER ROAD - UPGRADE TO 4 LANES
(PE ONLY IN SYIP)
PROJECT
UPC NO.:
ROUTE:
15829
NFOU000
Urban Construction Initiative Project - matching funds provided as part of quarterly payment. PE
and partial RW only. Revised estimate and schedule required from City of Virginia Beach.
REPORT NOTE:
Complete
SCHEDULE
4,154
ESTIMATED COST (000's)
JURISDICTION:
INDIAN RIVER ROASTREET NAME:
PEVirginia Beach
FY2022 55,362CN
UnderwayFROM: LYNNHAVEN PARKWAY TO: ELBOW ROAD
(3.5000 KM)
DESCRIPTION: 29,450RW
PROJECT LENGTH: 3.5000 KMSCOPE OF WORK: Reconstruction w/ Added Capacity TO 88,966
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,738Local Project Contributions: Local
0 0 0 0 0 0 3,610Urban Formula: Federal
82,618 0 0 0 0 0 0 6,348Total
06/19/2013 381
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
SOUTHEASTERN PKWY & GREENBELT - 4
LANES/PHASE I (PE ONLY)
PROJECT
UPC NO.:
ROUTE:
16556
FOU000
Partial PE only.REPORT NOTE:
Underway
SCHEDULE
76,919
ESTIMATED COST (000's)
JURISDICTION:
SOUTHEASTERN PKWSTREET NAME:
PEVirginia Beach
CNFROM: I-64 (AT OAK GROVE CONNECTOR) TO: I-264
(7.9800 KM)
DESCRIPTION: RW
PROJECT LENGTH: 7.9800 KMSCOPE OF WORK: New Construction Roadway TO 76,919
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 19Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 7,067TEA-21 High Priority Funds: Statewide
0 0 0 0 0 0 736Urban Formula: State
0 0 0 0 0 0 184Urban Formula: State Match
68,913 0 0 0 0 0 0 8,006Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WESLEYAN DRIVE - 4 LANE
PROJECT
UPC NO.:
ROUTE:
52148
NFOU000
MPO Project - Locally Administered. Balance to be redistributed by the MPO.REPORT NOTE:
Complete
SCHEDULE
1,435
ESTIMATED COST (000's)
JURISDICTION:
WESLEYAN DRIVESTREET NAME:
PEVirginia Beach
Complete 8,508CN
CompleteFROM: NORTHAMPTON BOULEVARD TO: BAKER
ROAD (0.4500 MI)
DESCRIPTION: 2,360RW
PROJECT LENGTH: 0.4500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 12,303
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,059Non-Formula: State
0 0 0 0 0 0 11,640RSTP (STP Regional): Federal
0 0 0 0 0 0 1,851RSTP (STP Regional): State Match
-2,247 0 0 0 0 0 0 14,550Total
382 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WITCH DUCK ROAD - 6 LANES
PROJECT
UPC NO.:
ROUTE:
55202
NFOU000
Revised schedule required. Urban Construction Initiative Project - matching funds provided as
part of quarterly payment. PE & RW only. Accruing for CN.
REPORT NOTE:
Complete
SCHEDULE
2,234
ESTIMATED COST (000's)
JURISDICTION:
WITCH DUCK ROADSTREET NAME:
PEVirginia Beach
FY2014 25,175CN
UnderwayFROM: I-264 TO: VIRGINIA BEACH BLVD (0.7000 MI)DESCRIPTION: 26,977RW
PROJECT LENGTH: 0.7000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 54,386
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 32,143Bond Proceeds: CPR Bonds
0 0 0 0 0 0 811Local Project Contributions: Local
0 0 0 0 0 0 5,000Revenue Sharing Funds: Local Match
0 0 0 0 0 0 5,000Revenue Sharing Funds: State Match
0 0 0 0 0 0 732Urban Formula: Federal
10,700 0 0 0 0 0 0 43,686Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE SIGNAL SYSTEM UPGRADE PHASE
II
PROJECT
UPC NO.:
ROUTE:
77277
NFOU000
MPO Project - Locally Administered. Revised estimate required from City.REPORT NOTE:
Complete
SCHEDULE
2,700
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEVirginia Beach
Complete 6,281CN
VARIOUS LOCATIONSDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 8,981
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 11,316CMAQ: Federal
0 0 0 0 0 0 200CMAQ: State Match
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 120Non-Formula: State
0 0 0 0 0 0 480RSTP (STP Regional): Federal
-3,136 0 0 0 0 0 0 12,116Total
06/19/2013 383
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENTS - ROSEMONT
RD & LYNNHAVEN PKWY
PROJECT
UPC NO.:
ROUTE:
84335
NFOU000
Locally AdministeredREPORT NOTE:
Complete
SCHEDULE
139
ESTIMATED COST (000's)
JURISDICTION:
Rosemont RdSTREET NAME:
PEVirginia Beach
Complete 601CN
CompleteFROM: 579.5 Ft South of Intersection TO: 357.82 Ft West
of Intersection (0.1780 MI)
DESCRIPTION: 29RW
PROJECT LENGTH: 0.1780 MISCOPE OF WORK: Resurfacing TO 770
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 560CMAQ: Federal
0 0 0 0 0 0 140CMAQ: State Match
0 0 0 0 0 0 70Local Project Contributions: Local
0 0 0 0 0 0 0 770Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INTERSECTION IMPROVEMENTS - INDIAN
RIVER RD & KEMPSVILLE RD
PROJECT
UPC NO.:
ROUTE:
84366
NFOU000
PE and RW only. Revised schedule required based on available funding. MPO project, Locally
Administered. Balance to be provided by MPO
REPORT NOTE:
Complete
SCHEDULE
984
ESTIMATED COST (000's)
JURISDICTION:
Indian River RdSTREET NAME:
PEVirginia Beach
FY2014 6,450CN
UnderwayFROM: Indian River Rd and Kempsville Rd Intersection
Improvements TO: Indian River Rd and Kempsville Rd
Intersection Improvements
DESCRIPTION: 6,350RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 13,784
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,789CMAQ: Federal
1,222 0 0 0 800 883 2,636CMAQ: MPO - Federal
306 0 0 0 200 221 659CMAQ: MPO - State Match
0 0 0 0 0 0 697CMAQ: State Match
0 0 0 0 0 0 6Federal Formula STP: Federal
0 0 0 0 0 0 22Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 1,098Urban Formula: State
2,246 0 0 0 1,000 1,528 1,104 7,906Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
HSIP PROACTIVE SAFETY PROJECTS CITY OF
VA BEACH
PROJECT
UPC NO.: 86617
NFODistrict-wide
VA Beach Safety ImprovementsDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,384Highway Safety Improvements: Federal
0 0 0 0 0 0 154Highway Safety Improvements: State Match
0 0 0 0 0 0 78Local Project Contributions: Local
0 0 0 0 0 0 1,616Total
384 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
DESIGN AND BUILD THE NIMMO PKWY
WETLAND MITIGATION SITE
PROJECT
UPC NO.:
ROUTE:
91334
NFOU000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
West Neck RoadSTREET NAME:
PEVirginia Beach
Underway 1,587CNFROM: East Bank of West Neck Creek TO: West Neck
Road
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Environmental Only TO 1,587
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 32Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 1,270Urban Formula: Federal
0 0 0 0 0 0 286Urban Formula: State Match
0 0 0 0 0 0 0 1,587Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
VIRGINIA BEACH DYNAMIC MESSAGE SIGN
AND SYSTEM DETECTORS
PROJECT
UPC NO.:
ROUTE:
95983
NFOU000
MPO project. Locally Administered. Balance to be redistributed by MPOREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Various LocationsSTREET NAME:
PEVirginia Beach
Complete 1,963CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,963
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,650CMAQ: Federal -687
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INSTALL SIDEWALK, ADA RAMPS AND
PEDESTRIAN SIGNALS
PROJECT
UPC NO.:
ROUTE:
96784
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
61
ESTIMATED COST (000's)
JURISDICTION:
Independence BlvdSTREET NAME:
PEVirginia Beach
Complete 481CN
FROM: Holland Road TO: Indian River RoadDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 542
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 288Highway Safety Improvements: Federal
0 0 0 0 0 0 32Highway Safety Improvements: State Match
0 0 0 0 0 144 77Local Project Contributions: Local
0 0 0 0 0 0 144 397Total
06/19/2013 385
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
UPGRADE SIGNAL, INSTALL ADA RAMPS AND
PED ACCOMODATIONS
PROJECT
UPC NO.:
ROUTE:
97012
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
74
ESTIMATED COST (000's)
JURISDICTION:
First Colonial RoadSTREET NAME:
PEVirginia Beach
Complete 340CN
FROM: First Colonial Road TO: Donna BlvdDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 414
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 363Highway Safety Improvements: Federal
0 0 0 0 0 0 40Highway Safety Improvements: State Match
0 0 0 0 0 0 11Local Project Contributions: Local
0 0 0 0 0 0 0 414Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE SIGNAL RETIMING - PHASE 3
PROJECT
UPC NO.:
ROUTE:
97768
NFOU000
MPO project. Locally Administered.REPORT NOTE:
Complete
SCHEDULE
2,255
ESTIMATED COST (000's)
JURISDICTION:
CitywideSTREET NAME:
PEVirginia Beach
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 2,255
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,933CMAQ: Federal
0 0 0 0 0 0 293CMAQ: State Match
0 0 0 0 0 0 0Local Project Contributions: Local
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 28Urban Formula: State Match
0 0 0 0 0 0 0 2,255Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
INSTALL PED SIGNALS AND ADA RAMPS AT
PROVIDENCE RD
PROJECT
UPC NO.:
ROUTE:
100539
NFOU000
Locally Administered.REPORT NOTE:
Underway
SCHEDULE
65
ESTIMATED COST (000's)
JURISDICTION:
Providence RoadSTREET NAME:
PEVirginia Beach
FY2013 430CNFROM: Matyiko Drive Intersection TO: Whitehurst
Landing Road Intersection
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 495
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 450Highway Safety Improvements: Federal
0 0 0 0 0 0 50Highway Safety Improvements: State Match
-5 0 0 0 0 0 0 500Total
386 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
OFFSET LEFT TURN LANES TWO LOCATIONS
VA BEACH
PROJECT
UPC NO.:
ROUTE:
100540
NFOU000
Locally Administered.REPORT NOTE:
Complete
SCHEDULE
218
ESTIMATED COST (000's)
JURISDICTION:
Shore Drive and Dam NeckSTREET NAME:
PEVirginia Beach
Underway 1,121CN
FROM: Lake Shores Road TO: Gate 3DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,339
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,178Highway Safety Improvements: Federal
0 0 0 0 0 0 131Highway Safety Improvements: State Match
0 0 0 0 0 0 30Local Project Contributions: Local
0 0 0 0 0 0 0 1,339Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITY OF VA BEACH - FORMULA CITY
PAYMENT
PROJECT
UPC NO.: 71787
NFOTown/City-wide
Urban Construction Initiative - matching funds provided in quarterly payment.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0Bond Match: State Bond Match
0 0 0 0 0 0Federal Formula STP: State Bond Match
0 0 0 0 0 0Residue Parcel Revenue: State
0 5,163 4,268 3,417 0 0State Formula: Urban - State
0 0 0 0 0 0Urban Formula: State
0 0 0 0 0 0Urban Formula: State Match
5,163 4,268 3,417 0 0 0Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
YORK STREET IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
104334
NFO0060
New Project
FY2014
SCHEDULE
44
ESTIMATED COST (000's)
JURISDICTION:
York StreetSTREET NAME:
PEWilliamsburg
FY2015 567CN
FROM: Page Street TO: Quarterpath Road (0.4900 MI)DESCRIPTION: RW
PROJECT LENGTH: 0.4900 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 612
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 306 0Revenue Sharing Funds: Local Match
0 0 0 0 0 306 0Revenue Sharing Funds: State Match
0 0 0 0 0 0 612 0Total
06/19/2013 387
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
RTE 615 - IRONBOUND ROAD IMPROVEMENTS
PHASE 1 - WILLIAMSBURG
PROJECT
UPC NO.:
ROUTE:
89062
NFO0615
PE and RW only. Accruing funds for CN. State funds - AC for future federal conversion. Revised
schedule required.
REPORT NOTE:
Underway
SCHEDULE
334
ESTIMATED COST (000's)
JURISDICTION:
Ironbound RoadSTREET NAME:
PEWilliamsburg
FY2021 1,553CN
FY2016FROM: Treyburn Drive TO: Richmond Road - Rte 60
(0.3000 MI)
DESCRIPTION: 626RW
PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 2,513
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2Bond Match: State Bond Match
0 0 0 0 0 0 10Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 7Minimum Guarantee: Federal
0 3 3 2 0 0 1State Formula: Urban - Local Match
0 167 138 110 0 0 0State Formula: Urban - State
0 0 0 0 0 0 254Urban Formula: Federal
0 0 0 0 0 0 208Urban Formula: State
0 0 0 0 0 0 58Urban Formula: State Match
1,552 170 141 113 0 0 0 538Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
WAT-DRPT ACQUISITION & INSTALLATION OF
1 BUS STOP SHELTER
PROJECT
UPC NO.:
ROUTE:
72697
NFOBS00
MPO Project. Complete schedule to be established at Project Scoping.REPORT NOTE:
N/A
SCHEDULE
1
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEWilliamsburg
N/A 14CN
WILLIAMSBURG SHOPPING CENTERDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 15
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3Non-Formula: State
0 0 0 0 0 0 13RSTP (STP Regional): Federal
-1 0 0 0 0 0 0 16Total
388 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Urban
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
CITYWIDE SIDEWALK IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
91689
NFOU000
Complete
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
VARIOUS LOCATIONSSTREET NAME:
PEWilliamsburg
Complete 102CN
VARIOUS LOCATIONSDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 104
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 50Local Project Contributions: Local
0 0 0 0 0 0 250Revenue Sharing Funds: Local Match
0 0 0 0 0 0 250Revenue Sharing Funds: State Match
-446 0 0 0 0 0 0 550Total
MPO Area
Hampton RoadsUrban
PROGRAM/SYSTEM
PRINCE GEORGE STREET AND ARMISTEAD
AVENUE RECONSTRUCTION
PROJECT
UPC NO.:
ROUTE:
102778
NFOU000
Underway
SCHEDULE
49
ESTIMATED COST (000's)
JURISDICTION:
Prince George StreetSTREET NAME:
PEWilliamsburg
FY2014 546CNFROM: Prince George Street TO: Armistead Avenue
(0.1230 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1230 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 595
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 44Local Project Contributions: Local
0 0 0 0 0 0 276Revenue Sharing Funds: Local Match
0 0 0 0 0 0 276Revenue Sharing Funds: State Match
0 0 0 0 0 0 0 595Total
06/19/2013 389
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Enhancement
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
BARRIER ISLANDS CENTER, INC.
PROJECT
UPC NO.:
ROUTE:
56428
NFOEN00
REPORT NOTE:
Complete
SCHEDULE
26
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorthampton County
Complete 667CNFROM: DEVELOPMENT OF TRANSPORTATION
MUSEUM FOR ARTIFACTS ON MARI- TO: TIME,
CULTURAL & NATURAL HISTORY OF EASTERN
SHORE
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Acqusition of Scenic Easement or Sites TO 693
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 138Project Contributions: Various Sources
0 0 0 0 0 0 566Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 142(X) Transportation Enhancement Funds:
Local
-153 0 0 0 0 0 0 846Total
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
CONSTRUCT A PEDESTRIAN/BICYCLE PATH
PROJECT
UPC NO.:
ROUTE:
56430
NFOEN00
REPORT NOTE:
Underway
SCHEDULE
143
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorfolk
Underway 2,840CN
N/AFROM: ALONG THE UNUSED RAILROAD RIGHT OF
WAY IN THE ATLANTIC CITY TO: SECTION OF
SOUTHWEST NORFOLK
DESCRIPTION: 1,152RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 4,135
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 20Project Contributions: Various Sources
0 0 0 0 0 107 203TAP: MPO - Federal
0 0 0 0 0 160 0TAP: Statewide - Federal
0 0 0 0 0 0 2,039Transportation Enhancement Funds:
Federal
0 0 0 0 0 67 661(X) Transportation Enhancement Funds:
Local
877 0 0 0 0 0 334 2,924Total
390 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Enhancement
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
DESIGN AND CONSTRUCTION OF
LANDSCAPING, UTILITY AND GENERAL
PROJECT
UPC NO.:
ROUTE:
56432
NFOEN00
Complete
SCHEDULE
349
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesapeake
Complete 5,512CNFROM: STREET AND SIDEWALK IMPROVEMENTS
AND OTHER ENHANCEMENTS FROM TO: I-464 TO
LIBERTY STREET
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Landscaping/Beautification TO 5,862
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,971Project Contributions: Various Sources
0 0 0 0 0 0 1,490Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 373(X) Transportation Enhancement Funds:
Local
1,029 0 0 0 0 0 0 4,833Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
CAPE CHARLES HISTORICAL SOCIETY
PROJECT
UPC NO.:
ROUTE:
56439
NFOEN00
Underway
SCHEDULE
2
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PECape Charles
Underway 346CNFROM: PURCHASE OF MATERIALS FOR THE BLOXOM
PASSENGER TO: STATION RECONSTRUCTION
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Landscaping/Beautification TO 348
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Project Contributions: Various Sources
0 0 0 0 0 0 183Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 46(X) Transportation Enhancement Funds:
Local
119 0 0 0 0 0 0 229Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
CONSTRUCT PEDESTRIAN/BICYCLE TRAIL
ALONG MADDOX BLVD.
PROJECT
UPC NO.: 59766
NFOCTB Reporting Req'd
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 274 417TAP: Statewide - Federal
0 0 0 0 0 0 1,435Transportation Enhancement Funds:
Federal
0 0 0 0 0 69 463(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 343 2,316Total
06/19/2013 391
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Enhancement
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
RELOCATE AND RESTORATE NORGE DEPOT
FOR USE AS COMMUNITY CNTR
PROJECT
UPC NO.:
ROUTE:
59767
NFOEN01
REPORT NOTE:
Complete
SCHEDULE
12
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEJames City County
N/A 1,134CN
UnderwayDESCRIPTION: 26RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rehabilitation of Historic Bldgs/Facilities TO 1,172
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 22Project Contributions: Various Sources
0 0 0 0 0 0 755Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 189(X) Transportation Enhancement Funds:
Local
207 0 0 0 0 0 0 965Total
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
CONSTRUCTION OF NEW FOUNDATION AND
RENOVATION OF DEPOT
PROJECT
UPC NO.:
ROUTE:
59769
NFOEN01
REPORT NOTE:
Complete
SCHEDULE
93
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENewport News
Complete 3,220CN
CompleteLEE HALL DEPOTDESCRIPTION: 236RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rehabilitation of Historic Bldgs/Facilities TO 3,549
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 111Project Contributions: Various Sources
0 0 0 0 0 0 500TAP: MPO - Federal
0 0 0 0 0 0 1,499Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 500(X) Transportation Enhancement Funds:
Local
939 0 0 0 0 0 0 2,610Total
392 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Enhancement
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
SUFFOLK SEABOARD COASTLINE TRAIL
PROJECT
UPC NO.:
ROUTE:
59771
NFOEN01
$746,446 from cancelled project UPC 87011 was transferred to this projectREPORT NOTE:
Complete
SCHEDULE
649
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESuffolk
Complete 1,897CN
FROM: Trail at Train Station TO: Chesapeake City LineDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 2,546
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 647Demonstration Funds: Federal
0 0 0 0 0 0 1,076Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 215(X) Transportation Enhancement Funds:
Local
608 0 0 0 0 0 0 1,938Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
TOWN OF CAPE CHARLES - MULTI-USE
TRAILS
PROJECT
UPC NO.:
ROUTE:
63563
NFOEN02
$195,067 from T4971 as per CTB 6/19/08. $14,000 from #T4970.REPORT NOTE:
Complete
SCHEDULE
120
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PECape Charles
Complete 1,582CN
Circumnavigates Town of Cape CharlesDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,702
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 175 62TAP: Statewide - Federal
0 0 0 0 0 0 1,969Transportation Enhancement Funds:
Federal
0 0 0 0 0 44 508(X) Transportation Enhancement Funds:
Local
-1,056 0 0 0 0 0 219 2,539Total
06/19/2013 393
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Enhancement
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
GREENSVILLE COUNTY -
EMPORIA/GREENSVILLE SIDEWALK
EXTENSION
PROJECT
UPC NO.:
ROUTE:
63565
NFOEN02
Bicycle/Pedestrian ImprovementREPORT NOTE:
Complete
SCHEDULE
24
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEGreensville County
Complete 238CNCONSTRUCTION OF A SIDEWALK ALONG THE EAST
SIDE OF ROUTE 301
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 262
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 176Open Container Funds: Bike/Ped
0 0 0 0 0 0 69Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 17(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 0 262Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
GREENSVILLE COUNTY - WASHINGTON PARK
COMMUNITY SIDEWALK
PROJECT
UPC NO.:
ROUTE:
63566
NFOEN02
Bicycle/Pedestrian ImprovementREPORT NOTE:
Complete
SCHEDULE
1
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEGreensville County
Complete 150CN
CONSTRUCTION OF A SIDEWALKDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 152
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 63Open Container Funds: Bike/Ped
0 0 0 0 0 0 0Project Contributions: Various Sources
0 0 0 0 0 0 71Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 18(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 0 152Total
394 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Enhancement
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
FERRY PLANTATION HOUSE RESTORATION
PROJECT
UPC NO.:
ROUTE:
70305
NFOEN03
Complete
SCHEDULE
23
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEVirginia Beach
Complete 535CNDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rehabilitation of Historic Bldgs/Facilities TO 559
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 285Project Contributions: Various Sources
0 0 0 0 0 0 200Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 50(X) Transportation Enhancement Funds:
Local
24 0 0 0 0 0 0 535Total
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
REPLICA SHIPS - LIVING MUSEUMS
PROJECT
UPC NO.:
ROUTE:
70322
NFOEN03
Complete
SCHEDULE
1
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEJames City County
Complete 1,124CNFROM: REPLICA OF GODSPEED AND THE
DISCOVERY FOR USE AS LIVING TO: MUSEUMS AT
THE JAMESTOWN SETTLEMENTS
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Historic Preservation TO 1,125
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 54Project Contributions: Various Sources
0 0 0 0 0 0 857Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 214(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 0 1,125Total
06/19/2013 395
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Enhancement
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
ARRASMITHFIELD DOWNTOWN
REVITALIZATION-STREETSCAPING PHASE V
PROJECT
UPC NO.: 93722
NFOARRA09
ARRA parent UPC 93722; ARRA child UPC 95571REPORT NOTE:
FROM: Luter Drive TO: 1300' east of Jericho Road
(0.4720 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 165American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 374Federal Formula STP: Federal
0 0 0 0 0 0 70Federal Formula STP: State Bond Match
0 0 0 0 0 0 6Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 46State Formula: Urban - Local Match
0 0 0 0 0 0 706Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 177(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 147Urban Formula: Federal
0 0 0 0 0 0 22Urban Formula: Federal/State
0 0 0 0 0 0 2,239Urban Formula: State
0 0 0 0 0 0 54Urban Formula: State Match
0 0 0 0 0 0 4,007Total
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
DISMAL SWAMP CREEK TRAIL
PROJECT
UPC NO.:
ROUTE:
77403
NFOEN05
Complete
SCHEDULE
524
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesapeake
Complete 1,532CNDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 2,056
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,736Demonstration Funds: Federal
0 0 0 0 0 175 90TAP: MPO - Federal
0 0 0 0 0 0 425Transportation Enhancement Funds:
Federal
0 0 0 0 0 44 129(X) Transportation Enhancement Funds:
Local
-542 0 0 0 0 0 219 2,380Total
396 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Enhancement
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
MARINER'S MUSEUM "USS MONITOR"-PHASE
I - LANDSCAPING/PARKING
PROJECT
UPC NO.:
ROUTE:
78243
NFOEN05
Complete
SCHEDULE
394
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENewport News
Complete 3,138CNFROM: Route 60 TO: Mariners Museum/USS Monitor
Center
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Landscaping/Beautification TO 3,532
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 896SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 116SAFETEA-LU Earmarks: State Bond Match
0 0 0 0 0 0 108SAFETEA-LU Earmarks: State Match
0 0 0 0 0 0 450Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 113(X) Transportation Enhancement Funds:
Local
1,850 0 0 0 0 0 0 1,682Total
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
ARRA- CITY OF CHESAPEAKE, DISMAL
SWAMP CANAL TRAIL
PROJECT
UPC NO.: 93203
NFOARRA09
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,300American Recovery and Reinvestment Act:
Enhancement
0 0 0 0 0 0 44Project Contributions: Various Sources
0 0 0 0 0 0 35Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 9(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 1,387Total
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
CITY OF HAMPTON - PINE CHAPEL ROAD
PEDESTRIAN/BICYCLE TRAIL
PROJECT
UPC NO.:
ROUTE:
87010
NFOEN07
Complete
SCHEDULE
10
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton
Complete 1,203CNFROM: Design and construction of the TO: Pine Chapel
Road Pedestrian/Bicycle Trail
DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,213
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 382 192TAP: MPO - Federal
0 0 0 0 0 320 0TAP: Statewide - Federal
0 0 0 0 0 0 400Transportation Enhancement Funds:
Federal
0 0 0 0 0 176 148(X) Transportation Enhancement Funds:
Local
-405 0 0 0 0 0 878 740Total
06/19/2013 397
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Enhancement
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
CONSTRUCTION OF A PEDESTRIAN/BICYCLE
TRAIL
PROJECT
UPC NO.:
ROUTE:
91219
NFOEN08
$71,000 transfer from #T4970 as per CTB (6/11).REPORT NOTE:
Underway
SCHEDULE
122
ESTIMATED COST (000's)
JURISDICTION:
S. Church StreetSTREET NAME:
PEIsle of Wight County
FY2014 465CN
FY2014FROM: Cypress Creek Bridge TO: Battery Park Rd.
(0.9000 MI)
DESCRIPTION: 491RW
PROJECT LENGTH: 0.9000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,079
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 409 211TAP: MPO - Federal
0 0 0 0 0 0 1,772Transportation Enhancement Funds:
Federal
0 0 0 0 0 102 496(X) Transportation Enhancement Funds:
Local
-1,912 0 0 0 0 0 512 2,479Total
MPO Area
NonMPOEnhancement
PROGRAM/SYSTEM
"CAPT. JOHN SMITH" FERRYBOAT
DECKHOUSE RESTORATION
PROJECT
UPC NO.:
ROUTE:
94277
NFOEN09
Complete
SCHEDULE
13
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PESurry County
Underway 212CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Historic Preservation TO 225
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 25Project Contributions: Various Sources
0 0 0 0 0 0 160Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 40(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 0 225Total
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
PHASE I:CONSTR BIKEWAYS & INST.BIKE
LOCKERS-WALLER MILL TR.
PROJECT
UPC NO.:
ROUTE:
13765
NFOEN93
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
Complete 1,927CNFROM: BARLOW ROAD - MOORETOWN ROAD TO:
ROUTE 143 - ROCHAMBEAU DRIVE (4.4000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 4.4000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,927
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 376CMAQ: Federal
0 0 0 0 0 0 960Transportation Enhancement Funds:
Federal
591 0 0 0 0 0 0 1,336Total
398 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Enhancement
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
CITY OF CHESAPEAKE - 5' PAVED BIKE LANES
WITH STRIPE ON
PROJECT
UPC NO.:
ROUTE:
15148
NFOEN94
REPORT NOTE:
Complete
SCHEDULE
3
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesapeake
Complete 390CNFROM: DOCK LANDING RD FROM PORTSMOUTH
BLVD TO NEAR DEVON DRIVE; TO: JOLIFF RD FROM
DAVID'S MILL DRIVE TO PORTSMOUTH BOULEVARD
(3.7000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 3.7000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 393
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 160CMAQ: Federal
0 0 0 0 0 0 1Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 220Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 55(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 39Urban Formula: State Match
-82 0 0 0 0 0 0 475Total
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
CITY OF VA BEACH - RESTORATION OF CAPE
HENRY LIGHTHOUSE
PROJECT
UPC NO.:
ROUTE:
15149
NFOEN94
REPORT NOTE:
Complete
SCHEDULE
36
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEVirginia Beach
Complete 567CNFROM: REPAIR & MAINTENANCE OF THE STRUCTURE
AND THE IMPROVEMENTS TO: NECESSARY FOR
PUBLIC ACCESS.
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Historic Preservation TO 603
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Project Contributions: Various Sources
0 0 0 0 0 160 0TAP: Statewide - Federal
0 0 0 0 0 0 355Transportation Enhancement Funds:
Federal
0 0 0 0 0 40 89(X) Transportation Enhancement Funds:
Local
-41 0 0 0 0 0 200 444Total
06/19/2013 399
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Enhancement
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
CONSTRUCTION OF PEDESTRIAN
IMPROVEMENTS
PROJECT
UPC NO.:
ROUTE:
50119
NFOEN98
REPORT NOTE:
Complete
SCHEDULE
325
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENewport News
CN
WARWICK BOULEVARDDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 325
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6Project Contributions: Various Sources
0 0 0 0 0 0 250Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 63(X) Transportation Enhancement Funds:
Local
6 0 0 0 0 0 0 319Total
MPO Area
Hampton RoadsEnhancement
PROGRAM/SYSTEM
CITY OF CHESAPEAKE - CONSTRUCTION
MULTI-USE PATH
PROJECT
UPC NO.:
ROUTE:
52005
NFOEN99
REPORT NOTE:
Complete
SCHEDULE
165
ESTIMATED COST (000's)
JURISDICTION:
Gum RoadSTREET NAME:
PEChesapeake
Complete 271CN
CompleteFROM: Portsmouth Boulevard (Rte 337) TO: 0.1000 mi
west of Portsmouth Boulevard (0.1000 MI)
DESCRIPTION: 302RW
PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 737
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 112Local Project Contributions: Local
0 0 0 0 0 0 500Transportation Enhancement Funds:
Federal
0 0 0 0 0 0 125(X) Transportation Enhancement Funds:
Local
0 0 0 0 0 0 0 737Total
400 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
INCREASE SERVICE FREQUENCY AND ADD
SUNDAY SERVICE, PHASE 2
PROJECT
UPC NO.:
ROUTE:
T4225
NFO
MPO Project - Administered by DRPT. Complete estimate and schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEWAT - DRPT
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,228CMAQ: Federal
0 0 0 0 0 0 307CMAQ: State Match
-1,535 0 0 0 0 0 0 1,535Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
COMMUTER ROUTE 62, PHASE 1
PROJECT
UPC NO.: T4179
NFOProject Report Req'd
MPO Project - Administered by DRPT.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,742CMAQ: Federal
0 0 0 0 0 0 435CMAQ: State Match
0 0 0 0 0 0 2,177Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
DOUBLE STACK CLEARANCE OF TUNNELS ON
THE NORFOLK WESTERN MAI
PROJECT
UPC NO.:
ROUTE:
T3890
NFO
Complete estimate and schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorfolk
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,335SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 1,084SAFETEA-LU Earmarks: State Match
-5,418 0 0 0 0 0 0 5,418Total
06/19/2013 401
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
WILLIAMSBURG TRANSIT AUTHORITY (WATA)
NEW ROUTE
PROJECT
UPC NO.:
ROUTE:
T10862
FO0000
MPO projectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
Mounts Bay RouteSTREET NAME:
PEWAT - DRPT
FY2014 677CN
FROM: New Town TO: Mounts BayDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 677
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
262 0 0 0 0 280 0CMAQ: MPO - Federal
65 0 0 0 0 70 0CMAQ: MPO - State Match
0 0 0 0 0 327 350 0Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
NEW SERVICE - JAMESTOWN ROUTE
PROJECT
UPC NO.:
ROUTE:
T9150
FO0000
MPO projectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEWAT - DRPT
Underway 823CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 823
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 435CMAQ: Federal
0 0 0 0 0 0 224CMAQ: MPO - Federal
0 0 0 0 0 0 56CMAQ: MPO - State Match
0 0 0 0 0 0 109CMAQ: State Match
0 0 0 0 0 0 0 823Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE 1 REPLACEMENT TROLLEY
(CLEAN DIESEL MEDIUM BUS)
PROJECT
UPC NO.:
ROUTE:
T9149
FO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEWAT - DRPT
FY2015 315CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 315
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 252CMAQ: Federal
0 0 0 0 0 0 63CMAQ: State Match
0 0 0 0 0 0 0 315Total
402 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE 12 REPLACEMENT BUSES
PROJECT
UPC NO.:
ROUTE:
T9148
FO0000
MPO projectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEWAT - DRPT
Underway 6,103CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 6,103
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,909CMAQ: Federal
823 0 0 0 1,188 963 0CMAQ: MPO - Federal
206 0 0 0 297 241 0CMAQ: MPO - State Match
0 0 0 0 0 0 477CMAQ: State Match
0 0 0 0 1,485 1,028 1,204 2,386Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
CITYWIDE BUS SHELTER PROGRAM: VIRGINIA
BEACH
PROJECT
UPC NO.:
ROUTE:
T9145
FO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
Complete 100CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 100
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 80CMAQ: Federal
0 0 0 0 0 0 20CMAQ: State Match
0 0 0 0 0 0 0 100Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
CITYWIDE BUS SHELTER PROGRAM:
NEWPORT NEWS (PHASES 2-4)
PROJECT
UPC NO.:
ROUTE:
T9131
FO0000
MPO projectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
Underway 632CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 632
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 250CMAQ: Federal
0 0 0 0 0 0 256CMAQ: MPO - Federal
0 0 0 0 0 0 64CMAQ: MPO - State Match
0 0 0 0 0 0 62CMAQ: State Match
0 0 0 0 0 0 0 632Total
06/19/2013 403
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
TRANSIT VEHICLES- BUS REPLACEMENT AND
REBUILD
PROJECT
UPC NO.:
ROUTE:
T9126
FO0000
MPO projectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
Underway 17,600CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 17,600
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,847CMAQ: Federal
1,931 0 0 0 1,190 1,922 803CMAQ: MPO - Federal
483 0 0 0 297 480 201CMAQ: MPO - State Match
0 0 0 0 0 0 962CMAQ: State Match
0 0 0 0 0 0 1,014RSTP (STP Regional): Federal
221 0 0 0 0 817 2,335RSTP (STP Regional): MPO - Federal
55 0 0 0 0 204 584RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 254RSTP (STP Regional): State Match
0 0 0 0 1,487 2,689 3,424 9,999Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
ENVIRONMENTAL MANAGEMENT SYSTEM
PROJECT
UPC NO.:
ROUTE:
T9125
FO0000
MPO projectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
Underway 600CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Environmental Only TO 600
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 120CMAQ: Federal
120 0 0 0 0 120 120CMAQ: MPO - Federal
30 0 0 0 0 30 30CMAQ: MPO - State Match
0 0 0 0 0 0 30CMAQ: State Match
0 0 0 0 0 150 150 300Total
404 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
FEEDER BUS SERVICE FOR THE TIDE LRT
PROJECT
UPC NO.:
ROUTE:
T9123
FO0000
MPO projectREPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
Underway 3,600CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 3,600
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,920CMAQ: Federal
0 0 0 0 0 0 960CMAQ: MPO - Federal
0 0 0 0 0 0 240CMAQ: MPO - State Match
0 0 0 0 0 0 480CMAQ: State Match
0 0 0 0 0 0 0 3,600Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
LIBERTY STREET TRANSFER STATION -
CHESAPEAKE
PROJECT
UPC NO.:
ROUTE:
T9111
FO0000
MPO projectREPORT NOTE:
Underway
SCHEDULE
25
ESTIMATED COST (000's)
JURISDICTION:
Liberty StSTREET NAME:
PEHRT - DRPT
FY2014 239CN
FROM: 20th St TO: 16th StDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 264
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 12CMAQ: Federal
0 0 0 0 0 180 20CMAQ: MPO - Federal
0 0 0 0 0 45 5CMAQ: MPO - State Match
0 0 0 0 0 0 3CMAQ: State Match
0 0 0 0 0 0 225 39Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
CHESAPEAKE BUS SHELTERS
PROJECT
UPC NO.:
ROUTE:
T9110
FO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
Complete 187CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 187
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 150CMAQ: Federal
0 0 0 0 0 0 37CMAQ: State Match
0 0 0 0 0 0 0 187Total
06/19/2013 405
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
VIRGINIA BEACH TRANSIT EXT STUDY
(AA/SDEIS PE FE)
PROJECT
UPC NO.:
ROUTE:
T9108
FO0000
Underway
SCHEDULE
6,241
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 6,241
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
2,080 0 0 0 0 2,033 880RSTP (STP Regional): MPO - Federal
520 0 0 0 0 508 220RSTP (STP Regional): MPO - State Match
0 0 0 0 0 2,600 2,541 1,100Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
LRT EXT TO NORFOLK NAVAL BASE & VB
OCEANFRONT: STUDIES & ROW
PROJECT
UPC NO.:
ROUTE:
T9093
FO0000
Underway
SCHEDULE
29,000
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 29,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 7,809RSTP (STP Regional): Federal
6,400 0 0 0 0 4,800 4,191RSTP (STP Regional): MPO - Federal
1,600 0 0 0 0 1,200 1,048RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 1,952RSTP (STP Regional): State Match
0 0 0 0 0 8,000 6,000 15,000Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HRT FACILITY UPGRADES
PROJECT
UPC NO.:
ROUTE:
T9092
FO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
Underway 4,102CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 4,102
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 575RSTP (STP Regional): Federal
0 0 0 0 0 0 2,706RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 677RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 144RSTP (STP Regional): State Match
0 0 0 0 0 0 0 4,102Total
406 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
SYSTEMWIDE BUS STOP SIGN PROGRAM
PROJECT
UPC NO.:
ROUTE:
T9091
FO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
Complete 2,138CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 2,138
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,711RSTP (STP Regional): Federal
0 0 0 0 0 0 428RSTP (STP Regional): State Match
0 0 0 0 0 0 0 2,138Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
ARRA - GPS/AVL TRACKING SYSTEM - WAT
PROJECT
UPC NO.: T8480
NFOARRA09
Greater Williamsburg RegionDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 350American Recovery and Reinvestment Act:
Urbanized Area > 200K
0 0 0 0 0 0 104RSTP (STP Regional): Federal
0 0 0 0 0 0 26RSTP (STP Regional): State Match
0 0 0 0 0 0 480Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
FIXED GUIDEWAY STUDY BT VA BEACH &
NAVAL STATION NORFOLK
PROJECT
UPC NO.:
ROUTE:
T7547
NFO0000
Complete
SCHEDULE
2,300
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 2,300
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,840RSTP (STP Regional): Federal
0 0 0 0 0 0 460RSTP (STP Regional): State Match
0 0 0 0 0 0 0 2,300Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HRT - PURCHASE OF 20 TRANSIT BUSES
PROJECT
UPC NO.: T4313
NFOProject Report Req'd
HRT - PURCHASE OF 20 TRANSIT BUSESDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,254Project Contributions: Various Sources
0 0 0 0 0 0 5,016RSTP (STP Regional): Federal
0 0 0 0 0 0 6,270Total
06/19/2013 407
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
INCREASE SERVICE FREQUENCY AND ADD
SUNDAY SERVICE, PHASE 1
PROJECT
UPC NO.: T4224
NFOProject Report Req'd
Administered by DRPTREPORT NOTE:
FROM: Regional Sunday Bus Service James City York
County TO: Newport Newports
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,268CMAQ: Federal
0 0 0 0 0 0 567CMAQ: State Match
0 0 0 0 0 0 2,836Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
NEWPORT NEWS/JAMES CITY CO EMPLOYEE
CONNECTION, PHASE 2
PROJECT
UPC NO.: T4223
NFOProject Report Req'd
MPO Project - Administered by DRPT.REPORT NOTE:
FROM: Newport News TO: James City CountyDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 78CMAQ: Federal
0 0 0 0 0 0 20CMAQ: State Match
0 0 0 0 0 0 98Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
DOWNTOWN PORTSMOUTH SHUTTLE
SERVICE, PHASE 2
PROJECT
UPC NO.: T4211
NFOProject Report Req'd
MPO Project - Administered by DRPT. Revised estimate required.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 124CMAQ: Federal
0 0 0 0 0 0 354CMAQ: State Match
0 0 0 0 0 0 478Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
DOWNTOWN PORTSMOUTH SHUTTLE
SERVICE, PHASE 1
PROJECT
UPC NO.: T4210
NFOProject Report Req'd
MPO Project - Administered by DRPT.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 248CMAQ: Federal
0 0 0 0 0 0 543CMAQ: State Match
0 0 0 0 0 0 791Total
408 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
CITYWIDE BUS SHELTER PROGRAM
PROJECT
UPC NO.: T4196
NFOProject Report Req'd
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 189CMAQ: Federal
0 0 0 0 0 0 47CMAQ: State Match
0 0 0 0 0 0 236Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
NORFOLK LRT - OPERATING ASSISTANCE
PROJECT
UPC NO.: T4184
NFOProject Report Req'd
MPO Project - Administered by DRPT.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 8,556CMAQ: Federal
0 0 0 0 0 0 2,139CMAQ: State Match
0 0 0 0 0 0 10,695Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
RIDESHARING AND TDM PROGRAM
PROJECT
UPC NO.: T196
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 462CMAQ: Federal
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE 20 TRANSIT COACHES FOR NEW
HOV EXPRESS BUS SERVICE
PROJECT
UPC NO.: T195
NFOPublic Transportation
MPO Projects.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,440CMAQ: Federal
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
JAMES CITY COUNTY TRANSIT SHOPPING
CIRCULATOR
PROJECT
UPC NO.: T193
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 277CMAQ: Federal
0 0 0 0 0 0 277Total
06/19/2013 409
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PARK AND SAIL SHUTTLE SERVICE
PROJECT
UPC NO.: T191
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 104CMAQ: Federal
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
INDIAN RIVER HOV EXPRESS BUS SERVICE
PROJECT
UPC NO.: T190
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 108CMAQ: Federal
0 0 0 0 0 0 108Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
SAM'S CLUB HOV EXPRESS BUS SERVICE
PROJECT
UPC NO.: T186
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 129CMAQ: Federal
0 0 0 0 0 0 129Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HOV EXPRESS BUS SERVICE/I-64 CORRIDOR
FROM HAMPTON TO WILLIA
PROJECT
UPC NO.: T185
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 168CMAQ: Federal
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
SILVERLEAF HOV EXPRESS BUS SERVICE
PROJECT
UPC NO.: T184
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 115CMAQ: Federal
410 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HAMPTON ROADS CENTER/MAGRUDER
BOULEVARD CORRIDOR ROUTE SERVI
PROJECT
UPC NO.: T183
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 840CMAQ: Federal
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
BUS RTE #44 THRU MIDTOWN TUNNEL:
VAN/BUSPOOL SERVICE FROM CH
PROJECT
UPC NO.: T179
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 954CMAQ: Federal
0 0 0 0 0 0 50Non-Formula: Statewide
0 0 0 0 0 0 200RSTP (STP Regional): Federal
0 0 0 0 0 0 1,204Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
OYSTER POINT SHUTTLE SERVICE
PROJECT
UPC NO.: T178
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,110CMAQ: Federal
0 0 0 0 0 0 14Non-Formula: Statewide
0 0 0 0 0 0 56RSTP (STP Regional): Federal
0 0 0 0 0 0 1,180Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE 8 BUSES FOR NEW SERVICE
PROJECT
UPC NO.: T177
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,376CMAQ: Federal
06/19/2013 411
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
MERCURY/CENTRAL SHUTTLE
PROJECT
UPC NO.: T176
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 240CMAQ: Federal
0 0 0 0 0 0 40Non-Formula: Statewide
0 0 0 0 0 0 160RSTP (STP Regional): Federal
0 0 0 0 0 0 440Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
TRANSIT SERVICE TO YORK COUNTY
PROJECT
UPC NO.: T175
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 376CMAQ: Federal
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
SUNDAY TRANSIT SERVICE
PROJECT
UPC NO.: T172
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 736CMAQ: Federal
0 0 0 0 0 0 97Non-Formula: Statewide
0 0 0 0 0 0 389RSTP (STP Regional): Federal
0 0 0 0 0 0 1,222Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE 5 NEW BUSES FOR YORK COUNTY
AND X-ROADS SERVICE
PROJECT
UPC NO.: T171
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 880CMAQ: Federal
412 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
NEW PARK & RIDE SERVICE BETWEEN
VIRGINIA BEACH & DOWNTOWN NO
PROJECT
UPC NO.: T162
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 866CMAQ: Federal
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE 13 BUSES FOR NEW SERVICE (3
ROUTES FROM TDP)
PROJECT
UPC NO.: T148
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 520Non-Formula: Statewide
0 0 0 0 0 0 2,080RSTP (STP Regional): Federal
0 0 0 0 0 0 2,600Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE 12 BUSES FOR NEW SERVICE (5
ROUTES FROM TDP)
PROJECT
UPC NO.: T147
NFOPublic Transportation
MPO Project..REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 480Non-Formula: Statewide
0 0 0 0 0 0 1,920RSTP (STP Regional): Federal
0 0 0 0 0 0 2,400Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE NEW BUSES (8) FOR NEW
TRANSIT SERVICE
PROJECT
UPC NO.: T146
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 462Non-Formula: Statewide
0 0 0 0 0 0 1,848RSTP (STP Regional): Federal
0 0 0 0 0 0 2,310Total
06/19/2013 413
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
CSX LRT PE & LAND ACQUISITION FOR
STATIONS
PROJECT
UPC NO.: T142
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,567Non-Formula: Statewide
0 0 0 0 0 0 6,269RSTP (STP Regional): Federal
0 0 0 0 0 0 7,836Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
FACILITY IMPROVEMENTS TRANS. CENTERS
AT HAMPTON/NEWPORT NEWS
PROJECT
UPC NO.: T141
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 200Non-Formula: Statewide
0 0 0 0 0 0 800RSTP (STP Regional): Federal
0 0 0 0 0 0 1,000Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PROGRAMMABLE FARE BOXES
PROJECT
UPC NO.: T140
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 170Non-Formula: Statewide
0 0 0 0 0 0 680RSTP (STP Regional): Federal
0 0 0 0 0 0 850Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
NEW BUSES (22) IMPLEMENT ENHANCED BUS
ALTERN/CSX/MIS
PROJECT
UPC NO.: T138
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,084Non-Formula: Statewide
0 0 0 0 0 0 4,336RSTP (STP Regional): Federal
0 0 0 0 0 0 5,420Total
414 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
LIGHT RAIL TRANSIT PE/DEIS
PROJECT
UPC NO.: T137
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,832Non-Formula: Statewide
0 0 0 0 0 0 11,329RSTP (STP Regional): Federal
0 0 0 0 0 0 14,161Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
TRANSPORTATION COMPLEX
PROJECT
UPC NO.: T136
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 40Non-Formula: Statewide
0 0 0 0 0 0 160RSTP (STP Regional): Federal
0 0 0 0 0 0 200Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
REPLACEMENT BUSES
PROJECT
UPC NO.: T135
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 724Non-Formula: Statewide
0 0 0 0 0 0 5,055RSTP (STP Regional): Federal
0 0 0 0 0 0 540RSTP (STP Regional): State Match
0 0 0 0 0 0 6,319Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PARATRANSIT TRANSITION PROJECT
PROJECT
UPC NO.: T133
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 35Non-Formula: Statewide
0 0 0 0 0 0 140RSTP (STP Regional): Federal
0 0 0 0 0 0 175Total
06/19/2013 415
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
REGIONAL TDM PROGRAM: TRAFFIX
PROJECT
UPC NO.: T132
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,877Non-Formula: Statewide
0 0 0 0 0 0 7,509RSTP (STP Regional): Federal
0 0 0 0 0 0 9,386Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
BUS ROUTE 45 (FY 96 OPERATIONS)
PROJECT
UPC NO.: T118
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 9Non-Formula: Statewide
0 0 0 0 0 0 38RSTP (STP Regional): Federal
0 0 0 0 0 0 47Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
AMTRAK STATION RELOCATION - AMTRAK
MULTIMODAL STATION RELOC
PROJECT
UPC NO.:
ROUTE:
102734
FO0000
MPO project, Revised estimate and schedule requiredREPORT NOTE:
Underway
SCHEDULE
3,200
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENewport News
FY2016 19,152CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 22,352
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 849CMAQ: Federal
0 0 3,651 4,922 5,042 0 0CMAQ: MPO - Federal
0 0 913 1,230 1,261 0 0CMAQ: MPO - State Match
0 0 0 0 0 0 27CMAQ: State Match
0 0 0 0 0 0 186Local Project Contributions: Local
0 0 0 0 0 0 42Non-Formula: State
0 0 0 0 0 0 1,768RSTP (STP Regional): Federal
0 0 0 278 507 0 0RSTP (STP Regional): MPO - Federal
0 0 0 70 127 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 400RSTP (STP Regional): State Match
1,081 0 4,564 6,500 6,936 0 0 3,270Total
416 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE REPLACEMENT FERRY
PROJECT
UPC NO.:
ROUTE:
103974
NFO0000
MPO projectREPORT NOTE:
FY2017
SCHEDULE
2,000
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEMulti-jurisdictional: Hampton Roads MPO
CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Ferry boats TO 2,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,798Ferry Boat Discretionary Funds: Federal
0 0 0 0 0 449 0Local Project Contributions: Local
-247 0 0 0 0 0 449 1,798Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
ROUTE 60 RAPID EXPRESS, PHASE 2
PROJECT
UPC NO.: T4188
NFOProject Report Req'd
Administered by DRPT.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 531CMAQ: Federal
0 0 0 0 0 0 133CMAQ: State Match
0 0 0 0 0 0 664Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HIGH SPEED RAIL STUDY
PROJECT
UPC NO.: T218
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 860Priority Transportation Funds: State
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
COMMUTER ROUTE 62, PHASE 2
PROJECT
UPC NO.: T4182
NFOProject Report Req'd
Administered by DRPT.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 241CMAQ: Federal
0 0 0 0 0 0 60CMAQ: State Match
0 0 0 0 0 0 302Total
06/19/2013 417
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
BUS PURCHASE - (13) 40' COACH STYLE
PASSENGER BUSES
PROJECT
UPC NO.: 93061
NFOProject Report Req'd
MPO Project.REPORT NOTE:
Bus Purchase - (13) 40ft. Coach Style PassengerDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 3,672CMAQ: Federal
0 0 0 0 0 0 918CMAQ: State Match
0 0 0 0 0 0 4,590Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
TELECOMMUTING
PROJECT
UPC NO.:
ROUTE:
70278
NFOCRPT
Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton Roads District-wide
CN
REGIONWIDEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 500State Transit Funds: Federal -500
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HAMPTON/NORFOLK SERVICE
PROJECT
UPC NO.:
ROUTE:
70279
NFOCRPT
Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
CN
REGIONWIDEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 163CMAQ TERMS: Federal
0 0 0 0 0 0 40CMAQ TERMS: State Match
0 0 0 0 0 0 960Minimum Guarantee: Federal
0 0 0 0 0 0 144Primary Formula: State
0 0 0 0 0 0 96State Transit Funds: Federal
-1,403 0 0 0 0 0 0 1,403Total
418 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
NEWPORT NEWS/WILLIAMSBURG
COMMUTER SERVICE
PROJECT
UPC NO.:
ROUTE:
70280
NFOCRPT
Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
CN
REGIONWIDEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 112CMAQ TERMS: Federal
0 0 0 0 0 0 28CMAQ TERMS: State Match
0 0 0 0 0 0 72Primary Formula: State
0 0 0 0 0 0 48State Transit Funds: Federal
0 0 0 0 0 0 480Transit Statewide STP: Federal
-740 0 0 0 0 0 0 740Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
NEWPORT NEWS/SMITHFIELD COMMUTER
SERVICE
PROJECT
UPC NO.:
ROUTE:
70281
NFOCRPT
Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
CN
REGIONWIDEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 360CMAQ TERMS: Federal
0 0 0 0 0 0 90CMAQ TERMS: State Match
0 0 0 0 0 0 720Minimum Guarantee: Federal
0 0 0 0 0 0 108Primary Formula: State
0 0 0 0 0 0 72State Transit Funds: Federal
-1,350 0 0 0 0 0 0 1,350Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HRT BIKE RACKS FOR HRT BUS PROJECT
PROJECT
UPC NO.:
ROUTE:
70282
NFOCRPT
Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
CN
REGIONWIDEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 48Primary Formula: State
0 0 0 0 0 0 32State Transit Funds: Federal
0 0 0 0 0 0 320Transit Statewide STP: Federal
-400 0 0 0 0 0 0 400Total
06/19/2013 419
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HRT VAN REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
70284
NFOCRPT
Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
CN
REGIONWIDEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 90Primary Formula: State
0 0 0 0 0 0 60State Transit Funds: Federal
0 0 0 0 0 0 600Transit Statewide STP: Federal
-750 0 0 0 0 0 0 750Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
CROSSROADS COMMUTER SERVICE CAPITAL
AND OPERATING
PROJECT
UPC NO.:
ROUTE:
70285
NFOCRPT
Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
CN
REGIONWIDEDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 168CMAQ TERMS: Federal
0 0 0 0 0 0 42CMAQ TERMS: State Match
0 0 0 0 0 0 72Primary Formula: State
0 0 0 0 0 0 48State Transit Funds: Federal
0 0 0 0 0 0 480Transit Statewide STP: Federal
-810 0 0 0 0 0 0 810Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
MOORETOWN RD CORRIDOR SERVICE
PROJECT
UPC NO.: T4226
NFOProject Report Req'd
MPO Project.REPORT NOTE:
Mooretown Road Corridor ServiceDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 252CMAQ: Federal
0 0 0 0 0 0 63CMAQ: State Match
0 0 0 0 0 0 315Total
420 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
ADVANCED COMMUNICATION SYSTEM,
AVL/GPS FOR BUS FLEET
PROJECT
UPC NO.: T7399
NFOProject Report Req'd
MPO projectREPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 163RSTP (STP Regional): Federal
0 0 0 0 0 0 41RSTP (STP Regional): State Match
0 0 0 0 0 0 204Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE 15 VANS FOR TRAFFIX VANPOOL
PROGRAM
PROJECT
UPC NO.:
ROUTE:
T4189
NFODRPT
MPO Project.REPORT NOTE:
Complete
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
CN
Purchase 15 Vans for Traffix vanpool programDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 600
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 480CMAQ: Federal
0 0 0 0 0 0 120CMAQ: State Match
0 0 0 0 0 0 0 600Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HRT PROJECT - PURCHASE REPLACEMENT
BUSES
PROJECT
UPC NO.:
ROUTE:
T1825
NFODRPT
MPO Project. Complete schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
Complete 9,000CN
Purchase Replacement BusesDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 9,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,920CMAQ: Federal
0 0 0 0 0 0 480CMAQ: State Match
6,600 0 0 0 0 0 0 2,400Total
06/19/2013 421
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HRT PROJECT - REPLACEMENT OF HRT
SOUTHSIDE BUS FACILITY
PROJECT
UPC NO.:
ROUTE:
T1824
NFODRPT
Administered by DRPT; Complete schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
NULLSTREET NAME:
PEHRT - DRPT
Complete 10,803CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 10,803
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 70Non-Formula: Statewide
0 0 0 0 0 0 9,804RSTP (STP Regional): Federal
0 0 0 0 0 0 2,451RSTP (STP Regional): State Match
0 0 0 0 0 0 278RSTP (STP Regional): Statewide
-1,800 0 0 0 0 0 0 12,603Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HRT PROJECT - REGIONAL TDM PROGRAM:
TRAFFIX
PROJECT
UPC NO.: T1823
NFOProject Report Req'd
MPO Project.REPORT NOTE:
HRT Project - Regional TDM Program: TRAFFIXDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,340CMAQ: Federal
0 0 0 0 0 0 800CMAQ: MPO - Federal
0 0 0 0 0 0 200CMAQ: MPO - State Match
0 0 0 0 0 0 1,875CMAQ: State Match
0 0 0 0 0 0 470Non-Formula: Statewide
0 0 0 0 0 0 2,112RSTP (STP Regional): Federal
0 0 0 0 0 0 528RSTP (STP Regional): State Match
0 0 0 0 0 0 1,880RSTP (STP Regional): Statewide
0 0 0 0 0 0 10,205Total
422 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HRT PROJECT - NORFOLK LRT - 8 MILE/11
STATIONS - PE PHASE
PROJECT
UPC NO.:
ROUTE:
T1822
NFODRPT
MPO Project; Administered by DRPT; Complete schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
NULLSTREET NAME:
PEHRT - DRPT
Complete 58,279CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 58,279
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 6,640CMAQ: Federal
0 0 0 0 0 0 986CMAQ: State Match
0 0 0 0 0 0 674Local Project Contributions: Local
0 0 0 0 0 0 3,787Non-Formula: Statewide
0 0 0 0 0 0 24,837RSTP (STP Regional): Federal
0 0 0 0 0 0 6,209RSTP (STP Regional): State Match
0 0 0 0 0 0 15,146RSTP (STP Regional): Statewide
0 0 0 0 0 0 0 58,279Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HRT PROJECT - PENINSULA LRT PROJECT -
PREPARE EIS
PROJECT
UPC NO.:
ROUTE:
T1821
NFODRPT
MPO Project; Administered by DRPT; Complete schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
NULLSTREET NAME:
PEHRT - DRPT
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 861Project Contributions: Various Sources
0 0 0 0 0 0 2,174RSTP (STP Regional): Federal
0 0 0 0 0 0 543RSTP (STP Regional): State Match
-3,578 0 0 0 0 0 0 3,578Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
WAT PROJECT - MOORETOWN RD - 2 NEW
BUSES FOR THE NEW TRANSIT
PROJECT
UPC NO.:
ROUTE:
T1819
NFODRPT
MPO Project. Complete schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
NULLSTREET NAME:
PEWAT - DRPT
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 116Non-Formula: Statewide
0 0 0 0 0 0 464RSTP (STP Regional): Statewide
-580 0 0 0 0 0 0 580Total
06/19/2013 423
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
WAT PROJECT - BUS ON CHASSIS VEHICLES -
5 NEW REPLACEMENT VE
PROJECT
UPC NO.:
ROUTE:
T1818
NFODRPT
MPO Project. Complete schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
NULLSTREET NAME:
PEWAT - DRPT
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 65Non-Formula: Statewide
0 0 0 0 0 0 260RSTP (STP Regional): Statewide
-325 0 0 0 0 0 0 325Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
NEWPORT NEWS/JAMES CITY CO EMPLOYEE
CONNECTION, PHASE 1
PROJECT
UPC NO.: T4222
NFOProject Report Req'd
MPO Project.REPORT NOTE:
Newport News/James City Co. Employee Connection
Phase I
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 147CMAQ: Federal
0 0 0 0 0 0 37CMAQ: State Match
0 0 0 0 0 0 184Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
EASTERN SEABOARD INTERMODAL TRNASP
APPLICATIONS CENTER
PROJECT
UPC NO.:
ROUTE:
82130
NFOESTA
Complete estimate & schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Hampton Roads MPO
CNDESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,075SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 269SAFETEA-LU Earmarks: State Match
-1,343 0 0 0 0 0 0 1,343Total
424 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
HIGH SPEED AND INTERCITY PASSENGER
RAIL STUDY PH 2
PROJECT
UPC NO.:
ROUTE:
102728
FOHR11
Complete
SCHEDULE
600
ESTIMATED COST (000's)
JURISDICTION:
NASTREET NAME:
PEHampton Roads District-wide
CN
FROM: NA TO: NADESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 600
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 447CMAQ: Federal
0 0 0 0 0 0 153CMAQ: State Match
0 0 0 0 0 0 0 600Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE 8 ELECTRIC/DIESEL BUSES TO
EXPAND SUNDAY SERVICE
PROJECT
UPC NO.: T4162
NFOProject Report Req'd
MPO Project. Complete estimate & schedule required.REPORT NOTE:
Purchase BusesDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,576RSTP (STP Regional): Federal
0 0 0 0 0 0 394RSTP (STP Regional): State Match
0 0 0 0 0 0 1,970Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PURCHASE 8 BUSES FOR NEW SERVICE (4
ROUTES FROM TDP)
PROJECT
UPC NO.: T149
NFOPublic Transportation
MPO Project.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 320Non-Formula: Statewide
0 0 0 0 0 0 1,280RSTP (STP Regional): Federal
0 0 0 0 0 0 1,600Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
ROUTE 60 RAPID EXPRESS, PHASE 1
PROJECT
UPC NO.: T4186
NFOProject Report Req'd
MPO Project - Administered by DRPT.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,286CMAQ: Federal
0 0 0 0 0 0 321CMAQ: State Match
0 0 0 0 0 0 1,607Total
06/19/2013 425
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
WAT PROJECT - MOORETOWN RD CORRIDOR
NEW TRANSIT SERVICE (OPE
PROJECT
UPC NO.:
ROUTE:
T1829
NFORD00
MPO Project. Complete schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
NULLSTREET NAME:
PEWAT - DRPT
CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: TO 0
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 111CMAQ: Federal
0 0 0 0 0 0 28CMAQ: State Match
-139 0 0 0 0 0 0 139Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
ROUTE DEVIATION/ENHANCED BUS SERVICE
HAMPTON AND NEWPORT NEW
PROJECT
UPC NO.: T202
NFOPublic Transportation
MPO Project. Complete estimate and schedule required.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,779CMAQ: Federal
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
ARRA NORFLOK LIGHT RAIL - ENHANCE
FACILITIES/STATIONS
PROJECT
UPC NO.: T9853
NFOARRA09
FROM: Virginia Medical Center TO: Newtown Road
(7.4000 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 10,000American Recovery and Reinvestment Act:
Flexible
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
ARRA - PREVENTIVE MAINTENANCE FOR
HAMPTON ROADS TRANSIT
PROJECT
UPC NO.: T8479
NFOARRA09
Preventive MaintenanceDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 1,000American Recovery and Reinvestment Act:
Urbanized Area > 200K
426 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Public Transportation
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
PATRICK HENRY MALL TRANSFER CENTER
PROJECT
UPC NO.:
ROUTE:
T7306
NFOU000
MPO Project - Administered by DRPTREPORT NOTE:
Complete
SCHEDULE
898
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHRT - DRPT
CN
Bus Transfer Center at Patrick Henry MallDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 898
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 719CMAQ: Federal
0 0 0 0 0 0 180CMAQ: State Match
0 0 0 0 0 0 0 898Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
COLISEUM CENTRAL TRANSIT SHELTERS
PROJECT
UPC NO.:
ROUTE:
84474
NFOU000
MPO Project - Locally Administered.REPORT NOTE:
Complete
SCHEDULE
64
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEHampton
Complete 361CN
Coliseum Central Business DistrictDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 425
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 240CMAQ: Federal
0 0 0 0 0 0 60CMAQ: State Match
0 0 0 0 0 0 134Local Project Contributions: Local
-9 0 0 0 0 0 0 434Total
MPO Area
Hampton RoadsPublic Transportation
PROGRAM/SYSTEM
GODWIN BLVD/ROUTE 58 PARK & RIDE LOT
PROJECT
UPC NO.:
ROUTE:
98815
NFOU000
Complete
SCHEDULE
121
ESTIMATED COST (000's)
JURISDICTION:
Godwin BlvdSTREET NAME:
PESuffolk
Underway 780CN
@ Route 58DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 901
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 320CMAQ: Federal
0 0 0 0 0 0 80CMAQ: State Match
501 0 0 0 0 0 0 400Total
06/19/2013 427
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Rail
MPO Area
Hampton RoadsRail
PROGRAM/SYSTEM
RTE 13 - MILITARY HWY - INSTALL
CANTILEVER FLASHING LIGHTS,
PROJECT
UPC NO.:
ROUTE:
68069
NFO0013
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
MILITARY HWYSTREET NAME:
PEChesapeake
Complete 120CNFROM: GATES & SIMULTANEOUS INTERCONNECTION
WITH TRAFFIC SIGNAL TO: 0.50 MILE NORTH CANAL
DRIVE
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rail/Highway Crossing TO 120
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 108(R) Safety Funds: Rail Safety
0 0 0 0 0 0 12Urban Formula: State Match
0 0 0 0 0 0 0 120Total
MPO Area
Hampton RoadsRail
PROGRAM/SYSTEM
RTE 17 - INSTALL RUBBER RAIL SEAL &
ASPH.
PROJECT
UPC NO.:
ROUTE:
58428
NFO0017
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
G WASHINGTON HWYSTREET NAME:
PEChesapeake
Complete 50CNFROM: AT NORFOLK SOUTHERN RAILROAD - DOT
#467-706P TO: (0.14 MILE NORTH OF SPRINGDALE)
(0.1400 MI)
DESCRIPTION: RW
PROJECT LENGTH: 0.1400 MISCOPE OF WORK: Rail/Highway Crossing TO 50
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 45(R) Safety Funds: Rail Safety
0 0 0 0 0 0 5Urban Formula: State Match
0 0 0 0 0 0 0 50Total
MPO Area
Hampton RoadsRail
PROGRAM/SYSTEM
ARRA ROUTE 164 RAIL - ADDITIONAL RAIL
LINE
PROJECT
UPC NO.: T7820
NFOARRA09
Previously allocated funds transferred to VPAREPORT NOTE:
Rail Relocation Along Route 164 CorridorDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 9,000American Recovery and Reinvestment Act:
Flexible
428 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Rail
MPO Area
Hampton RoadsRail
PROGRAM/SYSTEM
RTE 238 - UPGRADE FLG WITH CWT
PRODICTOR & INCL EVENT REC.
PROJECT
UPC NO.:
ROUTE:
18705
NFO0238
High Speed Rail - Section 1103. Revised schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
YORKTOWN RDSTREET NAME:
PENewport News
Complete 120CNFROM: YORKTOWN ROAD TO: (0.03 MILE NORTHEAST
ROUTE 60-WARWICK RD-DOT# 224-171W CSX)
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 120
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 120High Speed Rail (Section 1103): Federal 0
MPO Area
Hampton RoadsRail
PROGRAM/SYSTEM
ARRA
NORFOLK/PORTSMOUTH/CHESAPEAKE/SUFF
OLK RAIL FROM NIT
PROJECT
UPC NO.: 93527
NFOARRA09
FROM: Norfolk International Terminal TO: Route 17 in
Suffolk (3.9200 MI)
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 11,306American Recovery and Reinvestment Act:
Flexible
MPO Area
Hampton RoadsRail
PROGRAM/SYSTEM
WARWICK BLVD. - INSTALL CANTILEVER
FLASHING LIGHTS & GATES
PROJECT
UPC NO.:
ROUTE:
14952
NFOU000
Locally Administered. Revised schedule required.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
WARWICK BLVDSTREET NAME:
PENewport News
Complete 325CNFROM: RAILROAD - DOT #224-170P TO: (AT
INTERSECTION OF FORT EUSTIS BOULEVARD)
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rail/Highway Crossing TO 325
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 293(R) Safety Funds: Rail Safety
0 0 0 0 0 0 0State Formula: Urban - Local Match
0 0 0 0 0 0 21Urban Formula: Federal/State
0 0 0 0 0 0 11Urban Formula: State Match
0 0 0 0 0 0 0 325Total
06/19/2013 429
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Rail
MPO Area
Hampton RoadsRail
PROGRAM/SYSTEM
WARWICK BLVD-INSTALL LIGHTS, GATES &
CONCRETE X-ING SURFACE
PROJECT
UPC NO.:
ROUTE:
56604
NFOU000
CN only.REPORT NOTE:
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
WARWICK BLVDSTREET NAME:
PENewport News
Complete 424CNFROM: AT CSX RAILROAD - DOT #224-173K TO: (0.24
MILE NORTH OF ROUTE 238)
DESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rail/Highway Crossing TO 424
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 16 0Local Project Contributions: Local
0 0 0 0 0 0 0Local Project Contributions: Urban - Local
Match
0 0 0 0 0 0 382(R) Safety Funds: Rail Safety
0 0 0 0 0 0 15Urban Formula: State
0 0 0 0 0 0 10Urban Formula: State Match
1 0 0 0 0 0 16 407Total
430 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Miscellaneous
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
HSIP DISTRICT-WIDE HIGH RISK RURAL
ROADS HAMPTON ROADS
PROJECT
UPC NO.: 86608
NFODistrict-wide
HSIP District-wide HighDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 913High Risk Rural: Federal
0 0 0 0 0 0 101High Risk Rural: State Match
0 0 0 0 0 0 1,014Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
VPA INTER-TERMINAL BARGE SERVICE
(NORFOLK & PORTSMOUTH)
PROJECT
UPC NO.:
ROUTE:
98808
FO0000
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEMulti-jurisdictional: Hampton Roads MPO
Underway 8,190CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Transit TO 8,190
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,079CMAQ: Federal
1,491 0 0 0 0 1,491 1,491CMAQ: MPO - Federal
373 0 0 0 0 373 373CMAQ: MPO - State Match
0 0 0 0 0 0 520CMAQ: State Match
0 0 0 0 0 1,864 1,864 4,463Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
VPA ECONOMIC ANALYSIS OF TOLL PRICING
IN HAMPTON ROADS
PROJECT
UPC NO.:
ROUTE:
103464
NFO0000
Complete
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
VariousSTREET NAME:
PEHampton Roads District-wide
CN
FROM: Various TO: VariousDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 400
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 320RSTP (STP Regional): Federal
0 0 0 0 0 0 80RSTP (STP Regional): State Match
0 0 0 0 0 0 0 400Total
06/19/2013 431
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Miscellaneous
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
DRAINAGE PONDS @ I-264 & FREDERICK
BLVD
PROJECT
UPC NO.:
ROUTE:
97725
NFO0017
Complete
SCHEDULE
70
ESTIMATED COST (000's)
JURISDICTION:
Frederick BlvdSTREET NAME:
PEPortsmouth
Complete 486CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 556
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 464RSTP (STP Regional): Federal
0 0 0 0 0 0 116RSTP (STP Regional): State Match
-24 0 0 0 0 0 0 580Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
ROUTE 60/143 CONNECTOR STUDY
PROJECT
UPC NO.:
ROUTE:
98812
NFO0060
Revised schedule requiredREPORT NOTE:
Complete
SCHEDULE
300
ESTIMATED COST (000's)
JURISDICTION:
Route 60 - Pocohontas TrailSTREET NAME:
PEJames City County
CNFROM: I-64 across 143 - route 60 TO: I-64, 143, Route 60
(1.0000 MI)
DESCRIPTION: RW
PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Preliminary Engineering TO 300
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 240RSTP (STP Regional): Federal
0 0 0 0 0 0 60RSTP (STP Regional): State Match
0 0 0 0 0 0 0 300Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
MOORETOWN RD EXTENSION STUDY
PROJECT
UPC NO.:
ROUTE:
98810
FO0603
Complete
SCHEDULE
400
ESTIMATED COST (000's)
JURISDICTION:
Mooretown RdSTREET NAME:
PEJames City County
CN
FROM: Lightfoot Rd TO: Croaker RdDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 400
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 320RSTP (STP Regional): Federal
0 0 0 0 0 0 80RSTP (STP Regional): State Match
0 0 0 0 0 0 0 400Total
432 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Miscellaneous
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
LONGHILL RD CORRIDOR STUDY
PROJECT
UPC NO.:
ROUTE:
98811
FO0612
Revised schedule requiredREPORT NOTE:
Complete
SCHEDULE
500
ESTIMATED COST (000's)
JURISDICTION:
Longhill RdSTREET NAME:
PEJames City County
CN
FROM: Centerville Rd TO: Route 199DESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 500
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 240RSTP (STP Regional): Federal
0 0 0 0 0 0 160RSTP (STP Regional): MPO - Federal
0 0 0 0 0 0 40RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 60RSTP (STP Regional): State Match
0 0 0 0 0 0 0 500Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
HSIP HAMPTON ROADS DISTRICTWIDE
PROJECT
UPC NO.: T6522
NFODistrict-wide
Various locationsDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 2,668Highway Safety Improvements: Federal
0 0 0 0 0 0 296Highway Safety Improvements: State Match
0 0 0 0 0 0 2,965Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
CONSTRUCT/INSTALL BUS SHELTERS
PROJECT
UPC NO.: 50041
NFOProject Report Req'd
BUS SHELTERSDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 120Accounts Receivable: Local
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
CATHODIC BRDG PROTECTION FOR
VETERANS MEMORIAL BR & BERKLEY
PROJECT
UPC NO.:
ROUTE:
80480
NFOCBPS
Complete estimate and schedule required.REPORT NOTE:
Underway
SCHEDULE
538
ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PENorfolk
CN
IN THE COMMONWEALTH OF VADESCRIPTION: RW
PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 538
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 502SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 125SAFETEA-LU Earmarks: State Match
-89 0 0 0 0 0 0 627Total
06/19/2013 433
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Miscellaneous
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
HAMPTON ROADS MPO CMAQ BALANCE
ENTRY
PROJECT
UPC NO.: 70714
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 0CMAQ: Federal
0 0 0 0 0 0 1,987CMAQ: MPO - Federal
0 0 0 0 0 0 497CMAQ: MPO - State Match
0 0 0 0 0 0 0CMAQ: State Match
0 0 0 0 0 0 2,484Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
HOV MARKETING & ANALYSIS - REGIONWIDE
PROJECT
UPC NO.: 50651
FOProject Report Req'd
HOV MARKETING & ANALYSISDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 513Bonus OA: Federal
0 0 0 0 0 0 5,153CMAQ TERMS: Federal
0 0 0 0 0 0 953CMAQ TERMS: State Match
0 0 0 0 0 0 932DRPT: Federal
0 0 0 0 0 0 7,551Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
TRANSPORTATION STUDY
PROJECT
UPC NO.: 50519
NFOProject Report Req'd
WILLIAMSBURG 2007DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 329TEA-21 High Priority Funds: Statewide
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
INFASTRUCTURE IMPROVEMENTS FOR
JAMESTOWN 2007
PROJECT
UPC NO.: 93060
NFOProject Report Req'd
Complete estimate and schedule required.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 369SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 92SAFETEA-LU Earmarks: State Match
0 0 0 0 0 0 461Total
434 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Miscellaneous
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
DISTRICTWIDE TRAFFIC SIGNALS AND ITS
PROJECT
UPC NO.: 81396
FODistrict-wide
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 484Highway Safety Improvements: Federal
0 0 0 0 0 0 54Highway Safety Improvements: State Match
0 0 0 0 0 0 538Total
MPO Area
NonMPOMiscellaneous
PROGRAM/SYSTEM
PROJECT PRESCOPING - HAMPTON
PROJECT
UPC NO.: 99571
NFOBalance Entry
FROM: Various TO: VariousDESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
2,389 2,715 2,628 2,546 2,464 2,314 4,709Prescoping Funds: State
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
PUBLIC SAFETY ANNOUNCEMENT POINTS
(PSAP) YORK COUNTY
PROJECT
UPC NO.:
ROUTE:
97910
NFOPSAP
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEYork County
Underway 98CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 98
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 79CMAQ TERMS: Federal
0 0 0 0 0 0 20CMAQ TERMS: State Match
-1 0 0 0 0 0 0 99Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
PUBLIC SAFETY ANNOUNCEMENT POINTS
(PSAP) CHESAPEAKE
PROJECT
UPC NO.:
ROUTE:
97911
NFOPSAP
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEChesapeake
Underway 98CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 98
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 79CMAQ TERMS: Federal
0 0 0 0 0 0 20CMAQ TERMS: State Match
-1 0 0 0 0 0 0 99Total
06/19/2013 435
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Miscellaneous
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
PUBLIC SAFETY ANNOUNCEMENT POINTS
PSAP, JAMES CITY COUNTY
PROJECT
UPC NO.:
ROUTE:
102562
NFOPSAP
SCHEDULE ESTIMATED COST (000's)
JURISDICTION:
STREET NAME:
PEJames City County
Underway 95CNDESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 95
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 72CMAQ TERMS: Federal
0 0 0 0 0 0 18CMAQ TERMS: State Match
4 0 0 0 0 0 0 91Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
DISTRICTWIDE ROADWAY SAFETY
ASSESSMENT
PROJECT
UPC NO.: 81392
NFODistrict-wide
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 154 804Highway Safety Improvements: Federal
0 0 0 0 0 17 0Highway Safety Improvements: Soft Match
0 0 0 0 0 0 89Highway Safety Improvements: State Match
0 0 0 0 0 171 894Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
HAMPTON ROADS DISTRICT REGIONAL STP
(RSTP) BALANCE ENTRY
PROJECT
UPC NO.: 70715
NFOBalance Entry
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 337RSTP (STP Regional): Federal
0 431 960 0 0 0 0RSTP (STP Regional): MPO - Federal
0 108 240 0 0 0 0RSTP (STP Regional): MPO - State Match
0 0 0 0 0 0 152RSTP (STP Regional): State Match
539 1,200 0 0 0 0 488Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
DISTRICTWIDE SHOULDER IMPROVEMENTS
PROJECT
UPC NO.: 81394
NFODistrict-wide
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 143Highway Safety Improvements: Federal
0 0 0 0 0 0 16Highway Safety Improvements: State Match
0 0 0 0 0 0 159Total
436 06/19/2013
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Miscellaneous
MPO Area
NonMPOMiscellaneous
PROGRAM/SYSTEM
TOWN OF CHINCOTEAGUE - SRTS -
CHINCOTEAGUE ES, CS - TRAIL
PROJECT
UPC NO.:
ROUTE:
102827
NFOSRTS
Underway
SCHEDULE
39
ESTIMATED COST (000's)
JURISDICTION:
Hallie Whealton Smith DriveSTREET NAME:
PEChincoteague
FY2015 162CN
FY2014FROM: Chincoteague ES TO: Chincoteague CS/HSDESCRIPTION: 5RW
PROJECT LENGTH: _SCOPE OF WORK: Safety TO 206
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 206Safe Routes to School: Federal 0
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
TRANSPORTATION IMPROVEMENTS TO
HISTORIC JAMESTOWN 2007
PROJECT
UPC NO.: 93059
NFOProject Report Req'd
Complete estimate and schedule required.REPORT NOTE:
DESCRIPTION:
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 0 0 0 0 0 4,678SAFETEA-LU Earmarks: Federal
0 0 0 0 0 0 1,169SAFETEA-LU Earmarks: State Match
0 0 0 0 0 0 5,847Total
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
GREEN OPERATOR OCEAN-GOING VESSEL
HYBRID
PROJECT
UPC NO.:
ROUTE:
103927
NFOU000
MPO projectREPORT NOTE:
Underway
SCHEDULE
4,000
ESTIMATED COST (000's)
JURISDICTION:
N/ASTREET NAME:
PEHampton Roads District-wide
CN
FROM: N/A TO: N/ADESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Other TO 4,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
0 1,200 1,200 800 0 0 400CMAQ: MPO - Federal
0 300 300 200 0 0 100CMAQ: MPO - State Match
-500 1,500 1,500 1,000 0 0 0 500Total
06/19/2013 437
HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program
FY14 FINAL Miscellaneous
MPO Area
Hampton RoadsMiscellaneous
PROGRAM/SYSTEM
GREEN OPERATOR TRUCK REPLACEMENT
PROJECT
UPC NO.:
ROUTE:
103928
NFOU000
MPO projectREPORT NOTE:
FY2015
SCHEDULE
3,000
ESTIMATED COST (000's)
JURISDICTION:
N/ASTREET NAME:
PEHampton Roads District-wide
CN
FROM: N/A TO: N/ADESCRIPTION: RW
PROJECT LENGTH: _SCOPE OF WORK: Environmental Only TO 3,000
REQ'D AFTER
2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources
REQUIRED ALLOCATIONS (000's)
400 400 400 800 400 0 0CMAQ: MPO - Federal
100 100 100 200 100 0 0CMAQ: MPO - State Match
0 500 500 1,000 500 500 0 0Total
438 06/19/2013