THE VIRGINIA TRANSPORTATION

Commonwealth Transportation BoardVirginia Department of Transportation

Virginia Department of Rail and Public Transportation

2014 – 2019

Final

Hampton roaDS DiStrict

This Page Is Intentionally Left Blank

246 06/19/2013

FY14 FINAL

FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICT

FY2018 FY2019FY2017FY2016FY2015FY2014Fund Source Name

Funding Allocation Summary (000's)

HAMPTON ROADS DISTRICT

System Totals

Interstate

CTB Formula

$0$0$0$0$0$3,731Bridge - Federal $3,731

0 0 0 0 0 933Bridge - Soft Match 933

16,113 21,587 15,957 3,125 175 0Bridge - State 56,957

0 0 0 0 0 418High Priority - Federal 418

0 0 0 0 0 104High Priority - Soft Match 104

0 0 3,067 0 1,830 0High Priority - State 4,897

0 717 18,124 0 6,910 2,800Paving - Federal 28,550

0 80 2,014 0 768 311Paving - Soft Match 3,172

0 0 4,765 50,726 30,569 0Paving - State 86,059

34,896 7,193 13,068 0 0 299PPTA - Federal 55,455

8,724 1,798 3,267 0 0 75PPTA - Soft Match 13,864

2,074 11,957 2,699 13,951 0 0PPTA - State 30,681

GARVEE

752 748 753 747 751 746Debt Service - Federal 4,497

188 187 188 187 188 187Debt Service - Soft Match 1,124

Highway Safety Improvements

0 0 0 0 405 81Federal 486

0 0 0 0 45 9Soft Match 54

NHPP

0 0 7,019 5,883 6,389 4,860Statewide - Federal 24,151

0 0 780 654 710 615Statewide - Soft Match 2,758

Operating Revenue

0 0 0 1,003 2,006 1,003Other Funds 4,012

TIFIA/PAB

0 0 0 340 634 255PAB & Private Equity 1,229

$62,747$44,266$71,700$76,615$51,380$16,427Total $323,136

Primary

Bond Proceeds

$0$0$0$0$0$3,964CPR Bonds $3,964

0 0 0 0 0 33,704GARVEE Bonds 33,704

CMAQ

1,049 1,147 550 134 1,393 835MPO - Federal 5,109

262 287 138 33 348 209MPO - State Match 1,277

CTB Formula

0 0 0 0 0 393Bridge - Federal 393

0 0 0 0 0 98Bridge - Soft Match 98

0 0 622 0 375 0Bridge - State 997

0 0 0 0 0 100High Priority - Federal 100

0 0 0 0 0 25High Priority - Soft Match 25

0 0 264 300 850 0High Priority - State 1,414

139 1,104 1,890 3,916 4,245 0Paving - Federal 11,294

35 276 472 979 1,061 0Paving - Soft Match 2,823

0 0 1,192 0 3,958 0PPTA - State 5,151

GARVEE

26,569 26,455 26,601 26,412 26,525 25,289Debt Service - Federal 157,851

6,642 6,614 6,650 6,603 6,631 6,322Debt Service - Soft Match 39,463

Highway Safety Improvements

0 0 0 1,665 0 2,913Federal 4,578

0 0 0 185 0 324Soft Match 509

06/19/2013 247

FY14 FINAL

FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICT

FY2018 FY2019FY2017FY2016FY2015FY2014Fund Source Name

Funding Allocation Summary (000's)

HAMPTON ROADS DISTRICT - cont.

System Totals

Local Project Contributions

0 0 0 71,322 83,185 80,217Local 234,724

NHPP

783 0 192 2,000 2,000 1,899Bridge - Federal 6,875

196 0 48 500 500 475Bridge - Soft Match 1,719

0 0 0 0 0 1,954Statewide - Federal 1,954

0 0 0 0 0 488Statewide - Soft Match 488

Operating Revenue

0 0 0 61,642 123,284 61,642Other Funds 246,569

Residue Parcel Revenue

0 0 0 0 0 65State 65

Revenue Sharing Funds

0 0 0 0 0 1,398Local Match 1,398

0 0 0 0 0 1,398State Match 1,398

RSTP (STP Regional)

6,935 5,440 0 9,858 2,080 2,547MPO - Federal 26,861

1,734 1,360 0 2,465 520 637MPO - State Match 6,715

State Formula

3,636 3,006 2,407 0 0 0Primary - State 9,049

STP

922 646 3,186 4,328 4,486 5,504Bridge - Federal 19,072

230 162 797 1,082 1,121 1,376Bridge - Soft Match 4,768

0 6,584 15,086 4,000 4,000 0Statewide - Federal 29,670

0 1,646 3,772 1,000 1,000 0Statewide - Soft Match 7,417

TIFIA/PAB

0 0 0 10,992 20,501 8,258PAB & Private Equity 39,751

$49,131$54,727$63,867$209,417$288,064$242,035Total $907,241

Secondary

Bond Proceeds

$0$0$0$0$0$3,008CPR Bonds $3,008

CTB Formula

3,505 2,275 2,000 362 138 0Bridge - State 8,280

3,189 1,990 0 0 0 0High Priority - State 5,180

698 698 698 609 402 48Unpaved - State 3,154

Revenue Sharing Funds

0 0 0 0 0 3,631Local Match 3,631

0 0 0 0 0 3,631State Match 3,631

RSTP (STP Regional)

1,600 640 0 0 0 0MPO - Federal 2,240

400 160 0 0 0 0MPO - State Match 560

State Formula

1,818 1,503 1,203 0 0 0Secondary - State 4,524

129 106 85 0 0 0Secondary - Unpaved 320

STP

3,134 3,090 1,218 0 0 1,206Bridge - Federal 8,649

784 773 304 0 0 302Bridge - Soft Match 2,162

1,004 779 940 1,161 1,008 594BROS - Federal 5,485

251 195 235 290 252 149BROS - Soft Match 1,371

0 0 0 1,292 1,000 996Statewide - Federal 3,288

0 0 0 323 250 249Statewide - Soft Match 822

248 06/19/2013

FY14 FINAL

FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICT

FY2018 FY2019FY2017FY2016FY2015FY2014Fund Source Name

Funding Allocation Summary (000's)

HAMPTON ROADS DISTRICT - cont.

System Totals

Telecommunications

780 780 780 780 780 747State 4,646

$17,291$12,989$7,463$4,817$3,829$14,561Total $60,951

Urban

Bond Proceeds

$0$0$0$0$0$14,140CPR Bonds $14,140

CMAQ

4,830 2,249 3,742 2,960 4,494 2,063MPO - Federal 20,338

1,208 562 935 740 1,124 516MPO - State Match 5,084

CTB Formula

0 14,220 13,000 1,238 0 0Bridge - State 28,458

21,999 18,750 12,500 750 0 0High Priority - State 53,999

Highway Safety Improvements

0 0 0 0 0 2,536Federal 2,536

0 0 0 0 0 282Soft Match 282

Local Project Contributions

0 10,000 11,572 8,000 6,000 13,866Local 49,438

NHPP

0 0 0 0 0 3,101Bridge - Federal 3,101

0 0 0 0 0 775Bridge - Soft Match 775

0 0 0 0 8,363 4,973Statewide - Federal 13,335

0 0 0 0 2,091 1,243Statewide - Soft Match 3,334

Residue Parcel Revenue

0 0 0 0 0 101State 101

Revenue Sharing Funds

0 0 0 0 0 22,010Local Match 22,010

0 0 0 0 0 22,010State Match 22,010

RSTP (STP Regional)

10,578 10,893 21,667 11,580 11,164 9,207MPO - Federal 75,089

2,645 2,723 5,417 2,895 2,791 2,302MPO - State Match 18,772

State Formula

114 94 76 0 0 0Urban - Local Match 284

17,126 14,160 11,336 0 0 0Urban - State 42,622

STP

0 0 0 0 321 408BROS - Federal 729

0 0 0 0 80 102BROS - Soft Match 182

0 0 1,225 2,400 444 3,213Statewide - Federal 7,282

0 0 306 600 111 803Statewide - Soft Match 1,821

$58,501$73,652$81,775$31,163$36,983$103,651Total $385,724

Enhancement

Local Project Contributions

$0$0$0$0$0$1,606Local $1,606

TAP

1,689 1,689 1,689 1,689 1,689 1,074MPO - Federal 9,519

0 0 0 0 0 1,090Statewide - Federal 1,090

$1,689$1,689$1,689$1,689$1,689$3,769Total $12,215

Transit

CMAQ

$0$3,651$4,922$7,420$3,135$3,465MPO - Federal $22,593

0 913 1,230 1,855 784 866MPO - State Match 5,648

06/19/2013 249

FY14 FINAL

FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICT

FY2018 FY2019FY2017FY2016FY2015FY2014Fund Source Name

Funding Allocation Summary (000's)

HAMPTON ROADS DISTRICT - cont.

System Totals

Local Project Contributions

0 0 0 0 0 449Local 449

RSTP (STP Regional)

0 0 278 507 8,700 7,650MPO - Federal 17,136

0 0 70 127 2,175 1,913MPO - State Match 4,284

$0$4,564$6,500$9,908$14,795$14,344Total $50,110

Rail

Local Project Contributions

$0$0$0$0$0$16Local $16

$0$0$0$0$0$16Total $16

Other

CMAQ

$1,600$1,600$1,600$400$1,891$1,491MPO - Federal $8,582

400 400 400 100 473 373MPO - State Match 2,146

Highway Safety Improvements

0 0 0 0 0 154Federal 154

0 0 0 0 0 17Soft Match 17

Prescoping Funds

2,715 2,628 2,546 2,464 2,389 2,314State 15,055

RSTP (STP Regional)

431 960 0 0 0 0MPO - Federal 1,391

108 240 0 0 0 0MPO - State Match 348

$5,254$5,828$4,546$2,964$4,753$4,349Total $27,693

Grand Total $194,614$197,716$237,541$336,573$401,492$399,152 $1,767,087

250 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

I-264/LYNNHAVEN INTERCHANGE

IMPROVEMENTS (PHASE II)

PROJECT

UPC NO.:

ROUTE:

19005

FO0044

Partial PE only. MPO Project. Revised schedule required based on available funding.REPORT NOTE:

Underway

SCHEDULE

11,862

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEVirginia Beach

FY2020 101,146CN

FY2018LYNNHAVENDESCRIPTION: 11,744RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 124,751

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 400CMAQ: Federal

0 0 0 0 0 0 2,066Interstate: Federal

0 0 0 0 0 0 263Interstate: State Match

0 0 0 0 0 0 132Non-Formula: Statewide

0 0 0 0 0 0 4,343Priority Transportation Funds: State

0 0 0 0 0 0 528RSTP (STP Regional): Federal

0 0 0 0 0 0 100Urban Formula: State Match

116,919 0 0 0 0 0 0 7,832Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

HAMPTON ROADS THIRD CROSSING - (PE

ONLY)

PROJECT

UPC NO.:

ROUTE:

12834

FO0064

Partial PE only. Includes Patriot's Crossing.REPORT NOTE:

Underway

SCHEDULE

791,991

ESTIMATED COST (000's)

JURISDICTION:

THIRD CROSSINGSTREET NAME:

PENorfolk

FY2021 3,983,237CN

FY2017FROM: I-64 (HAMPTON COLISEUM) TO: I-564DESCRIPTION: 75,128RW

PROJECT LENGTH: 0.0000 KMSCOPE OF WORK: New Construction Roadway TO 4,850,356

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 4,748Demonstration Funds: Federal

0 0 0 0 0 0 3,392Interstate: Federal

0 0 0 0 0 0 848Interstate: State Match

4,841,368 0 0 0 0 0 0 8,988Total

06/19/2013 251

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

I- 64/NORVIEW AVENUE - RAMP

IMPROVEMENT

PROJECT

UPC NO.:

ROUTE:

17824

FO0064

Complete

SCHEDULE

970

ESTIMATED COST (000's)

JURISDICTION:

I-64 EBSTREET NAME:

PENorfolk

Underway 4,511CN

CompleteFROM: 0.309 MI. WEST OF NORVIEW AVENUE TO:

0.128 MI. EAST OF NORVIEW AVENUE (0.4370 MI)

DESCRIPTION: 1,538RW

PROJECT LENGTH: 0.4370 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 7,019

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3,019Interstate: Federal

0 0 0 0 0 0 531Interstate: State Match

0 0 0 0 0 0 15(X) Maintenance Funds: Statewide

0 0 0 0 0 0 187NHPP: State Match

0 0 0 0 0 0 2,175NHPP: Statewide - Federal

0 0 0 0 0 0 123NHPP: Statewide - Soft Match

0 0 0 0 0 0 40Non-Formula: Statewide

0 0 0 0 0 0 347Residue Parcel Revenue: State

0 0 0 0 0 0 605RSTP (STP Regional): Federal

0 0 0 0 0 0 111RSTP (STP Regional): State Match

0 0 0 0 0 0 117Soft Match: Federal

-251 0 0 0 0 0 0 7,270Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

ROUTE 64 - VARIABLE MESSAGE SIGNS

PROJECT

UPC NO.:

ROUTE:

62854

FO0064

Complete

SCHEDULE

98

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEChesapeake

Complete 1,212CN

FROM: ROUTE 464 TO: ROUTE 17DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 1,310

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,145Interstate: Federal

0 0 0 0 0 0 286Interstate: State Match

0 0 0 0 0 0 200(X) Maintenance Funds: Statewide

-322 0 0 0 0 0 0 1,632Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

RTE 64 - LIGHTING AND ELECTRICAL

UPGRADES

PROJECT

UPC NO.:

ROUTE:

71598

FO0064

Complete

SCHEDULE

482

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

Complete 9,974CN

HAMPTON ROADS BRIDGE TUNNELDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Restoration and Rehabilitation TO 10,456

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 9,411Interstate: Federal

0 0 0 0 0 0 1,046Interstate: State Match

0 0 0 0 0 0 0 10,456Total

252 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

RTE 64 - CONSTRUCT NEW INTERCHANGE

(CITY LINE ROAD)

PROJECT

UPC NO.:

ROUTE:

80029

FO0064

Partial PE only. Revised schedule and estimate

required.

REPORT NOTE:

FY2016

SCHEDULE

15,558

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMulti-jurisdictional: Hampton Roads MPO

FY2018 89,344CN

AT CITY LINE ROADDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 104,902

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 9,703SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 1,168SAFETEA-LU Earmarks: State Bond Match

0 0 0 0 0 0 1,258SAFETEA-LU Earmarks: State Match

92,774 0 0 0 0 0 0 12,129Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

ARRA CHESAPEAKE I64

PATCHING/OVERLAY/GUARDRAIL UPGRADES

PROJECT

UPC NO.: 92557

FOARRA09

FROM: Milepost 20.1 E & W TO: Milepost 27.9 E & W

(15.6000 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 14,377American Recovery and Reinvestment Act:

Flexible

0 0 0 0 0 0 1,244(X) Maintenance Funds: Statewide

0 0 0 0 0 0 15,621Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

REPLACE DENBIGH BLVD BRIDGE OVER I-64

AND CSX RAILROAD

PROJECT

UPC NO.:

ROUTE:

93077

FO0064

Underway

SCHEDULE

4,100

ESTIMATED COST (000's)

JURISDICTION:

Denbigh BoulevardSTREET NAME:

PENewport News

FY2017 33,000CN

FY2016FROM: 0.5 Mile South of I-64 TO: 0.5 Mile North of I-64

(1.0000 MI)

DESCRIPTION: 2,900RW

PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 40,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 9,466 14,334 11,500 600 0 0CTB Formula: Bridge - State

0 0 0 0 0 0 2,160Interstate: Federal

0 0 0 0 0 0 262Interstate: State Match

790 0 0 0 0 720 0NHPP: Statewide - Federal

88 0 0 0 0 80 0NHPP: Statewide - Soft Match

0 9,466 14,334 11,500 600 878 800 2,422Total

06/19/2013 253

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

INSTALL VMS AND LENGTHEN RAMP AND

WEAVE ON I-64 WB

PROJECT

UPC NO.:

ROUTE:

98098

NFO0064

Underway

SCHEDULE

429

ESTIMATED COST (000's)

JURISDICTION:

Interstate 64 WBSTREET NAME:

PEYork County

FY2016 0CN

FY2014FROM: Interstate 64 WB TO: Near Mile Post 242DESCRIPTION: 0RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 429

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 386Highway Safety Improvements: Federal

0 0 0 0 0 0 43Highway Safety Improvements: State Match

0 0 0 0 0 0 0 429Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

HRBT SWITCHGEAR INSTALLATION

PROJECT

UPC NO.:

ROUTE:

103344

FO0064

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

HRBT-Interstate 64STREET NAME:

PEHampton

Underway 16,728CNFROM: HRBT South Shore Norfolk TO: HRBT North

Shore-Hampton (5.0000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 5.0000 MISCOPE OF WORK: Other TO 16,728

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 261(X) Maintenance Funds: Statewide

5,599 0 0 0 5,621 3,600 0NHPP: Statewide - Federal

622 0 0 0 625 400 0NHPP: Statewide - Soft Match

0 0 0 0 6,245 6,221 4,000 261Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

I-64 & I-264 PAVEMENT REHABILITATION - D/B

PROJECT # 1

PROJECT

UPC NO.:

ROUTE:

104329

FO0064

New Project

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

I-64 and I-264STREET NAME:

PENorfolk

FY2014 50,400CNFROM: VARIOUS LOCATIONS TO: VARIOUS

LOCATIONS (10.1900 MI)

DESCRIPTION: RW

PROJECT LENGTH: 10.1900 MISCOPE OF WORK: Restoration and Rehabilitation TO 50,400

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

6,910 0 0 8,727 0 744 0CTB Formula: Paving - Federal

768 0 0 970 0 83 0CTB Formula: Paving - Soft Match

6,435 0 0 4,765 21,000 0 0CTB Formula: Paving - State

0 0 0 14,461 21,000 14,112 827 0Total

254 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

I-64 & I-264 PAVEMENT REHABILITATION - D/B

PROJECT # 2

PROJECT

UPC NO.:

ROUTE:

104330

FO0064

New Project

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

I-64STREET NAME:

PENorfolk

FY2014 15,700CNFROM: Hampton Roads Bridge Tunnel (East Abutment)

TO: Little Creek Road (4.9500 MI)

DESCRIPTION: RW

PROJECT LENGTH: 4.9500 MISCOPE OF WORK: Restoration and Rehabilitation TO 15,700

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 245 0CTB Formula: Paving - Federal

0 0 0 0 0 27 0CTB Formula: Paving - Soft Match

7,730 0 0 0 7,698 0 0CTB Formula: Paving - State

0 0 0 0 7,698 7,730 273 0Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

I-64/LASALLE- RECONSTRUCT OFF RAMP

PROJECT

UPC NO.:

ROUTE:

104363

NFO0064

New Project

FY2014

SCHEDULE

90

ESTIMATED COST (000's)

JURISDICTION:

I-64STREET NAME:

PEHampton

FY2015 450CN

FROM: I-64 EB Off Ramp TO: LaSalle Ave (0.1000 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 540

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

405 0 0 0 0 81 0Highway Safety Improvements: Federal

45 0 0 0 0 9 0Highway Safety Improvements: Soft Match

0 0 0 0 0 450 90 0Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

I 64 ENVIRONMENTAL STUDY FROM I-464 TO

I-664/264

PROJECT

UPC NO.:

ROUTE:

104366

NFO0064

New Project

Revised schedule required.REPORT NOTE:

FY2016

SCHEDULE

5,000

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEChesapeake

CN

FROM: I464 TO: I-664/264DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 5,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 3,460 0CTB Formula: Bridge - Federal

0 0 0 0 0 865 0CTB Formula: Bridge - Soft Match

0 0 0 0 0 540 0NHPP: Statewide - Federal

0 0 0 0 0 135 0NHPP: Statewide - Soft Match

0 0 0 0 0 0 5,000 0Total

06/19/2013 255

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

NonMPOInterstate

PROGRAM/SYSTEM

I-64 CAPACITY IMPROVEMENTS FROM

NEWPORT NEWS TO WILLIAMSBURG

PROJECT

UPC NO.:

ROUTE:

104905

NFO0064

New Project

FY2014

SCHEDULE

10,000

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

FY2018 65,000CN

FY2016FROM: Newport News TO: WilliamsburgDESCRIPTION: 25,000RW

PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 100,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 34,896 7,193 13,068 0 299 0CTB Formula: PPTA - Federal

0 8,724 1,798 3,267 0 75 0CTB Formula: PPTA - Soft Match

0 2,074 11,957 2,699 13,951 0 0CTB Formula: PPTA - State

0 45,695 20,948 19,033 13,951 0 374 0Total

MPO Area

NonMPOInterstate

PROGRAM/SYSTEM

REPLACE BRIDGES

PROJECT

UPC NO.:

ROUTE:

83164

FO0095

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

2,780

ESTIMATED COST (000's)

JURISDICTION:

I-95 Southbound & I-95 NorthboundSTREET NAME:

PEEmporia

FY2015 21,115CN

FY2014FROM: 0.3 Mile South of the Meherrin River TO: 0.3 Mile

North of the Meherrin River (0.6000 MI)

DESCRIPTION: 301RW

PROJECT LENGTH: 0.6000 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 24,196

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,811Bonus OA: Federal

0 0 0 0 0 0 453Bonus OA: State Match

0 0 0 0 0 271 0CTB Formula: Bridge - Federal

0 0 0 0 0 68 0CTB Formula: Bridge - Soft Match

175 6,647 7,253 4,457 2,525 0 0CTB Formula: Bridge - State

0 0 0 0 0 0 72Interstate: State Match

0 0 0 0 0 0 46NHPP: State Match

0 0 0 0 0 0 418NHPP: Statewide - Federal

0 6,647 7,253 4,457 2,525 175 339 2,800Total

256 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

NonMPOInterstate

PROGRAM/SYSTEM

I-95 SHOULDER IMPROVEMENTS AND

RUMBLE STRIPS

PROJECT

UPC NO.:

ROUTE:

98905

FO0095

Complete

SCHEDULE

151

ESTIMATED COST (000's)

JURISDICTION:

I-95STREET NAME:

PEGreensville County

Underway 4,006CN

FROM: MP 0 TO: MP 17.1 Sussex CLDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 4,157

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 250Discretionary Grants: State Match

0 0 0 0 0 0 4,212Highway Safety Improvements: Federal

0 0 0 0 0 0 218Highway Safety Improvements: State Match

-523 0 0 0 0 0 0 4,680Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

DT/MT/MLK - INTERSTATE CONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

T11488

FO0264

Complete

SCHEDULE

7,044

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

Underway 53,915CN

UnderwayFROM: Downtown and Midtown Tunnels; extension of

MLK to I-264 TO: Downtown and Midtown Tunnels;

extension of MLK to I-264 (3.9000 MI)

DESCRIPTION: 1,476RW

PROJECT LENGTH: 3.9000 MISCOPE OF WORK: Bridge, New Construction TO 62,435

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 12,000Bond Proceeds: GARVEE Bonds

0 0 0 0 0 0 360(X) Maintenance Funds: Statewide

2,006 0 0 0 1,003 1,003 0Operating Revenue: Other Funds

634 0 0 0 340 255 44,560TIFIA/PAB: PAB & Private Equity

0 0 0 0 0 0 273Toll Facilities: Toll Facilities Revolving

0 0 0 0 1,343 2,640 1,258 57,193Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

RTE 264 - INTERCHANGE IMPROVEMENT

PROJECT

UPC NO.:

ROUTE:

17630

FO0264

PE only.REPORT NOTE:

Underway

SCHEDULE

11,603

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEVirginia Beach

FY2020 107,969CN

FY2018FROM: 0.426 MILE EAST OF WBL I-64 TO: 0.473 MILE

EAST OF WITCHDUCK RD (2.2800 MI)

DESCRIPTION: 54,393RW

22219,28992,28993 -2,74PROJECT LENGTH: 2.2800 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Reconstruction w/ Added Capacity TO 173,964

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,250FRAN Bond Proceeds: FRAN

0 0 0 0 0 0 6,392Interstate: Federal

0 0 0 0 0 0 682Interstate: State Match

0 0 0 0 0 0 473Non-Formula: Statewide

0 0 0 0 0 0 815Priority Transportation Funds: State

0 0 0 0 0 0 1,892RSTP (STP Regional): Federal

0 0 0 0 0 0 99Soft Match: Federal

162,361 0 0 0 0 0 0 11,603Total

06/19/2013 257

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

I-264 CONCRETE PAVEMENT REPAIR

PROJECT

UPC NO.:

ROUTE:

52305

FO0264

Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

175

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEVirginia Beach

Underway 17,538CNFROM: 0.2MI West of Witchduck Rd. at RR Bridge TO:

West Abutment of Rosemont Road (7.3000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 3.8000 MISCOPE OF WORK: Restoration and Rehabilitation TO 17,713

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 418 0CTB Formula: High Priority - Federal

0 0 0 0 0 104 0CTB Formula: High Priority - Soft Match

1,250 0 0 0 0 0 0CTB Formula: High Priority - State

0 0 0 0 0 0 3,881Interstate: Federal

0 0 0 0 0 0 431Interstate: State Match

0 0 0 0 0 0 2,073(X) Maintenance Funds: Statewide

0 0 0 0 0 0 2,413NHPP: Statewide - Federal

0 0 0 0 0 0 603NHPP: Statewide - Soft Match

6,540 0 0 0 0 1,250 522 9,401Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

RTE 264 - INTERCHANGE IMPROVEMENTS - 64

WB RAMP TO 264 EB

PROJECT

UPC NO.:

ROUTE:

57048

FO0264

PE only.REPORT NOTE:

Underway

SCHEDULE

5,048

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENorfolk

FY2020 116,848CN

FY2018FROM: 0.4 MILE SOUTH OF CURLEW DRIVE TO: 0.426

MILE EAST OF WBL I-64 (1.5200 MI)

DESCRIPTION: 11,571RW

28988,28989,28990,28991 -2PROJECT LENGTH: 1.5200 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Reconstruction w/o Added Capacity TO 133,466

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3,238Interstate: Federal

0 0 0 0 0 0 809Interstate: State Match

0 0 0 0 0 0 1,000Priority Transportation Funds: State

128,419 0 0 0 0 0 0 5,048Total

258 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

I-264/LYNNHAVEN INTERCHANGE

IMPROVEMENTS - PHASE II (PART 1)

PROJECT

UPC NO.:

ROUTE:

80157

FO0264

CN on ARRA project UPC 94544REPORT NOTE:

Complete

SCHEDULE

2,300

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEVirginia Beach

CN

CompleteFROM: 0.33 Mi. east of Lynnhaven Parkway (Rte. 414)

along I-264 TO: 0.15 Mi. south of I-264 along London

Bridge Road (Rte. 279) (1.4000 MI)

DESCRIPTION: 2,676RW

PROJECT LENGTH: 1.4000 MISCOPE OF WORK: New Construction Roadway TO 4,976

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 4,937SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 1,234SAFETEA-LU Earmarks: State Match

-1,195 0 0 0 0 0 0 6,171Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

ARRA PORTSMOUTH/CHESAPEAKE I264

RESURF./SHOULDERS/GUARDRAILS

PROJECT

UPC NO.: 92555

NFOARRA09

FROM: Milepost 0 E & W TO: Milepost 6.43 E & W

(12.8300 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 7,048American Recovery and Reinvestment Act:

Flexible

0 0 0 0 0 0 429NHPP: Statewide - Federal

0 0 0 0 0 0 107NHPP: Statewide - Soft Match

0 0 0 0 0 0 7,585Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

ARRA VA BEACH 264 LYNNHAVEN

INTERCHANGE IMPROVEMENTS/RAMPS

PROJECT

UPC NO.: 94544

FOARRA09

Revised estimate required. PE and RW on UPC 80157. ARRA parent UPC 94544. ARRA child

UPC 95554.

REPORT NOTE:

FROM: 0.33 Mi. east of Lynnhaven Parkway (Rte. 414)

along I-264 TO: 0.15 Mi. south of I-264 along London

Bridge Road (Rte. 279) (1.4000 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,031American Recovery and Reinvestment Act:

Urbanized Area > 200K

0 0 0 0 0 0 5,518Interstate: Federal

0 0 0 0 0 0 1,379Interstate: State Match

0 0 0 0 0 0 5,272SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 232SAFETEA-LU Earmarks: State Bond Match

0 0 0 0 0 0 1,086SAFETEA-LU Earmarks: State Match

0 0 0 0 0 0 15,518Total

06/19/2013 259

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

I-264 DOWNTOWN TUNNEL PPTA DEV. &

MGNT. OVERSIGHT DT/MT/MLK

PROJECT

UPC NO.:

ROUTE:

97175

NFO0264

Complete

SCHEDULE

1,960

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMulti-jurisdictional: Hampton Roads MPO

CN

UnderwayDOWNTOWN TUNNEL PROJECTDESCRIPTION: 203RW

PROJECT LENGTH: _SCOPE OF WORK: Preliminary Engineering TO 2,163

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 197Interstate: Federal

0 0 0 0 0 0 22Interstate: State Match

0 0 0 0 0 0 1,568NHPP: Statewide - Federal

0 0 0 0 0 0 392NHPP: Statewide - Soft Match

-16 0 0 0 0 0 0 2,180Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

DT/MT/MLK INTERSTATE DEBT SERVICE

PROJECT

UPC NO.:

ROUTE:

103037

FO0264

Underway

SCHEDULE

1,001

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

Underway 13,469CNFROM: Downtown and Midtown Tunnels; extension of

MLK to I-264 TO: Downtown and Midtown Tunnels;

extension of MLK to I-264 (3.9000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 3.9000 MISCOPE OF WORK: Bridge, New Construction TO 14,470

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

751 752 748 753 747 746 703GARVEE: Debt Service - Federal

188 188 187 188 187 187 176GARVEE: Debt Service - Soft Match

7,970 940 935 941 934 939 933 879Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

I-64 & I-264 PAVEMENT REHABILITATION - D/B

PROJECT # 3

PROJECT

UPC NO.:

ROUTE:

104331

FO0264

New Project

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

I-264STREET NAME:

PEVirginia Beach

FY2014 54,100CNFROM: Railroad Bridge West of Witchduck Road TO:

Parks Avenue (10.4100 MI)

DESCRIPTION: RW

PROJECT LENGTH: 10.4100 MISCOPE OF WORK: Restoration and Rehabilitation TO 54,100

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 9,398 0 799 0CTB Formula: Paving - Federal

0 0 0 1,044 0 89 0CTB Formula: Paving - Soft Match

15,278 0 0 0 19,402 0 0CTB Formula: Paving - State

0 0 0 7,019 263 0 0NHPP: Statewide - Federal

0 0 0 780 29 0 0NHPP: Statewide - Soft Match

0 0 0 18,240 19,694 15,278 888 0Total

260 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

ARRA CHESAPEAKE/NORFOLK I464

RESURFACING/GUARDRAIL UPGRADES

PROJECT

UPC NO.: 92556

NFOARRA09

FROM: Milepost 0.82 N & S TO: Milepost 5.61 N & S

(9.5800 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 4,990American Recovery and Reinvestment Act:

Flexible

0 0 0 0 0 0 94Interstate: Federal

0 0 0 0 0 0 10Interstate: State Match

0 0 0 0 0 0 79NHPP: Statewide - Federal

0 0 0 0 0 0 20NHPP: Statewide - Soft Match

0 0 0 0 0 0 5,193Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

AIR TERMINAL INTERCHANGE - INTERMODAL

CONNECTOR

PROJECT

UPC NO.:

ROUTE:

59175

FO0564

PE and RW only. Accruing funds for CN.REPORT NOTE:

FY2014

SCHEDULE

3,067

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENorfolk

FY2017 57,257CN

FY2016AT CHAMBERS FIELD AIR STATIONDESCRIPTION: 592RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 60,916

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

580 0 0 3,067 0 0 0CTB Formula: High Priority - State

0 0 0 0 0 0 5,082SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 1,271SAFETEA-LU Earmarks: State Bond Match

50,916 0 0 3,067 0 580 0 6,353Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

ARRA CHESAPEAKE/SUFFOLK I664

PAVING/DRAINS/GUARDRAIL

PROJECT

UPC NO.: 93861

FOARRA09

Revised estimate requiredREPORT NOTE:

FROM: .5 MI North of JCT with Rte 58 TO: South

Abutment of the MMBT (7.5000 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 14,098American Recovery and Reinvestment Act:

Flexible

0 0 0 0 0 0 2,069NHPP: Statewide - Federal

0 0 0 0 0 0 517NHPP: Statewide - Soft Match

0 0 0 0 0 0 16,685Total

06/19/2013 261

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

I-664 - INSTAL MEDIAN GUARDRAIL AND

SHOULDER RUMBLE STRIPS

PROJECT

UPC NO.:

ROUTE:

98454

NFO0664

Complete

SCHEDULE

114

ESTIMATED COST (000's)

JURISDICTION:

I-664STREET NAME:

PEChesapeake

Underway 1,086CN

FROM: M.P. 10.87 TO: M.P. 19.55 (8.6800 MI)DESCRIPTION: RW

PROJECT LENGTH: 8.6800 MISCOPE OF WORK: Safety TO 1,200

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 120Discretionary Grants: State Match

0 0 0 0 0 0 1,080Highway Safety Improvements: Federal

0 0 0 0 0 0 0 1,200Total

MPO Area

NonMPOInterstate

PROGRAM/SYSTEM

HAMPTON ROADS INTERSTATE PAVING

BALANCE ENTRY

PROJECT

UPC NO.: T13509

NFOBalance Entry

New Project

FROM: Various TO: VariousDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 717 0 0 1,012 0CTB Formula: Paving - Federal

0 0 80 0 0 112 0CTB Formula: Paving - Soft Match

1,126 0 0 0 2,626 0 0CTB Formula: Paving - State

0 796 0 2,626 1,126 1,124 0Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

ARRA - JAMES CITY 60/64/143/321

RESURFACING

PROJECT

UPC NO.: 92553

NFOARRA09

FROM: Various TO: VariousDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 5,891American Recovery and Reinvestment Act:

Flexible

0 0 0 0 0 0 1,109(X) Maintenance Funds: Statewide

0 0 0 0 0 0 265Minimum Guarantee: Federal

0 0 0 0 0 0 836Primary Formula: State

0 0 0 0 0 0 8,102Total

262 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Interstate

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

R000 - I-564 INTERMODAL CONNECTOR

PROJECT

UPC NO.:

ROUTE:

18968

FOR000

Complete

SCHEDULE

15,086

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENorfolk

FY2015 157,343CN

UnderwayFROM: I-564 TO: NORFOLK NAVAL BASE/N.I.T. (1.6000

MI)

DESCRIPTION: 16,709RW

11111,26419,26420,26493,27567,27568 -2,95,100PROJECT LENGTH: 1.6000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: New Construction Roadway TO 189,138

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 105,301Bond Proceeds: CPR Bonds

0 0 0 0 0 0 166Demonstration Funds: Federal

0 0 0 0 0 0 3,404FRAN Bond Proceeds: FRAN

0 0 0 0 0 0 13,586Interstate: Federal

0 0 0 0 0 0 3,396Interstate: State Match

0 0 0 0 0 0 1,459Priority Transportation Funds: State

0 0 0 0 0 0 30,431SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 3,905SAFETEA-LU Earmarks: State Bond Match

0 0 0 0 0 0 3,703SAFETEA-LU Earmarks: State Match

0 0 0 0 0 0 3,787TEA-21 High Priority Funds: Statewide

20,000 0 0 0 0 0 0 169,138Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

UPGRADE SIGN PANELS TO CLEARVIEW

FONT

PROJECT

UPC NO.:

ROUTE:

99402

NFOTS05

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEHampton Roads District-wide

Complete 861CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 861

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 900Highway Safety Improvements: Federal

0 0 0 0 0 0 100Highway Safety Improvements: State Match

-139 0 0 0 0 0 0 1,000Total

MPO Area

Hampton RoadsInterstate

PROGRAM/SYSTEM

UPGRADE SIGN PANELS TO CLEARVIEW

FONT

PROJECT

UPC NO.:

ROUTE:

103433

NFOTS05

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

Underway 764CN

FROM: Various TO: VaroiusDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 764

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 142 63(X) Maintenance Funds: Statewide

0 0 0 0 0 0 399Safety Funds: Hazard Elimination

159 0 0 0 0 0 142 462Total

06/19/2013 263

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

DT/MT/MLK PPTA - (MIDTOWN TUNNEL AND

MLK) - ERC

PROJECT

UPC NO.:

ROUTE:

95149

NFO0000

Underway

SCHEDULE

10,000

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: New Construction Roadway TO 10,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,000Bond Match: State Bond Match

0 0 0 0 0 0 5,787Minimum Guarantee: Federal

0 0 0 0 0 0 2,213Minimum Guarantee Funds: Federal

0 0 0 0 0 0 0 10,000Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

UPGRADE SIGNAL AT INTERSECTION RTE 5

AND RTE 199

PROJECT

UPC NO.:

ROUTE:

98435

NFO0005

Complete

SCHEDULE

30

ESTIMATED COST (000's)

JURISDICTION:

SR 5STREET NAME:

PEWilliamsburg

Complete 210CN

FROM: SR 31 TO: SR 199DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 240

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 315Highway Safety Improvements: Federal

0 0 0 0 0 0 35Highway Safety Improvements: State Match

-110 0 0 0 0 0 0 350Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

UPGRADE EXISTING SIGNAL ON MILITARY

HIGHWAY

PROJECT

UPC NO.:

ROUTE:

93600

NFO0013

Complete

SCHEDULE

54

ESTIMATED COST (000's)

JURISDICTION:

Military HighwaySTREET NAME:

PEChesapeake

Complete 238CNFROM: 205 ft. south of Rt. 13 Military Highway & Old

Greenbrier Rd TO: To: 220 ft. north of Rt. 13 Military

Highway & Old Greenbrie

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 292

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 263Highway Safety Improvements: Federal

0 0 0 0 0 0 29Highway Safety Improvements: State Match

0 0 0 0 0 0 0 292Total

264 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

HRRR INTERSECTION RELATED WARNING

LANKFORD HWY

PROJECT

UPC NO.:

ROUTE:

95411

NFO0013

Complete

SCHEDULE

51

ESTIMATED COST (000's)

JURISDICTION:

Lankford HighwaySTREET NAME:

PEAccomack County

Complete 75CN

FROM: Route 13 TO: Route 648DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 126

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 115High Risk Rural: Federal

0 0 0 0 0 0 13High Risk Rural: State Match

-2 0 0 0 0 0 0 128Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

HRRR SIGNAL UPGRADE LANKFORD HWY

PROJECT

UPC NO.:

ROUTE:

95419

NFO0013

Complete

SCHEDULE

52

ESTIMATED COST (000's)

JURISDICTION:

Lankford HighwaySTREET NAME:

PEAccomack County

Complete 192CN

FROM: US 13 TO: SR 176DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 245

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 224High Risk Rural: Federal

0 0 0 0 0 0 25High Risk Rural: State Match

-4 0 0 0 0 0 0 249Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

HRRR SIGNAL UPGRADE ON LANKFORD HWY

AND W. MAIN ST

PROJECT

UPC NO.:

ROUTE:

95421

NFO0013

Complete

SCHEDULE

56

ESTIMATED COST (000's)

JURISDICTION:

Lankford HighwaySTREET NAME:

PEAccomack County

Complete 232CN

FROM: US 13 TO: SR 179DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 288

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 260High Risk Rural: Federal

0 0 0 0 0 0 29High Risk Rural: State Match

-1 0 0 0 0 0 0 289Total

06/19/2013 265

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE 17 - WIDEN FROM 2 TO 4 LANES &

REPLACE RIVER XING BRIDGE

PROJECT

UPC NO.:

ROUTE:

56187

FO0017

Steel Bridge; Local contributions include VTIB loan and toll bond proceeds from City; State

funds - AC for future federal conversion. Administered by the City as a toll project.

REPORT NOTE:

Complete

SCHEDULE

16,089

ESTIMATED COST (000's)

JURISDICTION:

Dominion BlvdSTREET NAME:

PEChesapeake

Underway 327,188CN

CompleteFROM: 0.75 Mile South of Cedar Road TO: 0.52 Mile

North of Great Bridge Blvd (3.8000 MI)

DESCRIPTION: 68,592RW

26479,28792,28793,28794,28795,28796,28797,28798,28799-2PROJECT LENGTH: 3.8000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Reconstruction w/ Added Capacity TO 411,869

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,200Bond Match: State Bond Match

0 0 0 0 0 0 6,486Demonstration Funds: Federal

83,185 0 0 0 71,322 79,501 91,918Local Project Contributions: Local

0 0 0 0 0 0 8,800Minimum Guarantee: Federal

0 0 0 0 0 0 369Non-Formula: State Match

0 0 0 0 0 0 1,169Primary Formula: Federal

0 0 0 0 0 0 1,054Primary Formula: State

0 0 0 0 0 0 292Primary Formula: State Match

0 0 0 0 0 0 198Priority Transportation Funds: State

0 0 0 0 0 0 29,031RSTP (STP Regional): Federal

0 0 0 0 9,858 387 4,258RSTP (STP Regional): MPO - Federal

0 0 0 0 2,465 97 1,065RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 6,889RSTP (STP Regional): State Match

0 0 0 0 0 0 12,896SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 929SAFETEA-LU Earmarks: State Bond Match

0 0 0 0 0 0 2,295SAFETEA-LU Earmarks: State Match

0 0 0 0 0 0 222Special Grant Projects: Federal

-5,018 0 0 0 83,645 83,185 79,985 170,072Total

266 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE 17 - WIDEN FROM 4 TO 6 LANES

PROJECT

UPC NO.:

ROUTE:

60843

FO0017

Complete

SCHEDULE

4,230

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEYork County

Underway 33,092CN

CompleteFROM: 1.267 MILE SOUTH ROUTE 620 (LAKESIDE

DRIVE) TO: 1.517 MILE NORTH ROUTE 620 (LAKESIDE

DRIVE) (2.7840 MI)

DESCRIPTION: 20,343RW

27508 -2PROJECT LENGTH: 2.7840 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Reconstruction w/ Added Capacity TO 57,665

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 2,098 15,151Bond Proceeds: CPR Bonds

750 0 0 0 0 0 0CTB Formula: High Priority - State

0 0 0 0 0 0 5,083Minimum Guarantee: Federal

0 0 0 0 0 0 11,237National Highway System Allocations:

Federal

0 0 0 0 0 0 2,708National Highway System Allocations: State

Match

0 0 0 0 0 0 675NHPP: Statewide - Federal

0 0 0 0 0 0 169NHPP: Statewide - Soft Match

0 0 0 0 0 0 6Non-Formula: State Match

0 0 0 0 0 0 614Primary Formula: Federal

0 0 0 0 0 0 2,016Primary Formula: State

0 0 0 0 0 0 169Primary Formula: State Match

0 0 0 0 0 0 1,476Priority Transportation Funds: State

0 0 0 0 0 0 449Residue Parcel Revenue: State

0 0 0 0 0 0 770Revenue Sharing Funds: Local Match

0 0 0 0 0 0 770Revenue Sharing Funds: State Match

0 0 0 0 0 0 4,345RSTP (STP Regional): Federal

2,080 0 0 0 0 2,160 2,160RSTP (STP Regional): MPO - Federal

520 0 0 0 0 540 540RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 1,080RSTP (STP Regional): State Match

0 0 0 0 0 0 101Soft Match: Federal

0 0 0 0 0 3,350 4,798 49,516Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE 17 - DOMINION BOULEVARD CORRIDOR

STUDY

PROJECT

UPC NO.:

ROUTE:

77382

NFO0017

PE Only.REPORT NOTE:

Underway

SCHEDULE

150

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEChesapeake

CNFROM: NORTH CAROLINA LINE TO: DOMINION

BOULEVARD - CEDAR ROAD

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Preliminary Engineering TO 150

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 150Primary Formula: State 0

06/19/2013 267

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

ELECTRONIC TOLL COLLECTION & VIOL

ENFORCE SYSTEM

PROJECT

UPC NO.: 80382

NFOProject Report Req'd

GEORGE P. COLEMAN BRIDGEDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 486IFRO: State

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

INSTALL RIGHT / LEFT TURN LANES AND

SUPPLEMENTAL SIGNING

PROJECT

UPC NO.:

ROUTE:

98095

NFO0017

Underway

SCHEDULE

101

ESTIMATED COST (000's)

JURISDICTION:

Carrollton Blvd (US 17)STREET NAME:

PEIsle of Wight County

FY2016 212CN

FY2014FROM: Carrollton Blvd (US 17) TO: Kings Cove Way

(Route 659)

DESCRIPTION: 61RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 374

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 298Highway Safety Improvements: Federal

0 0 0 0 0 0 33Highway Safety Improvements: State Match

43 0 0 0 0 0 0 331Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

EXTEND NB LTL AND INTERSECTION

LIGHTING

PROJECT

UPC NO.:

ROUTE:

98096

NFO0017

Underway

SCHEDULE

126

ESTIMATED COST (000's)

JURISDICTION:

Carrollton Blvd (US 17)STREET NAME:

PEIsle of Wight County

FY2016 162CN

FY2014FROM: Carrollton Blvd (US 17) TO: Smiths Neck Road

(Route 669)

DESCRIPTION: 60RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 348

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 171Highway Safety Improvements: Federal

0 0 0 0 0 0 13Highway Safety Improvements: State Match

165 0 0 0 0 0 0 183Total

268 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

CONSTRUCT PHASE II PARKING LOT OF THE

BUS TRANSFER CENTER

PROJECT

UPC NO.:

ROUTE:

100609

NFO0017

MPO project, Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

50

ESTIMATED COST (000's)

JURISDICTION:

J CLYDE MORRIS BLVDSTREET NAME:

PENewport News

Underway 250CNFROM: RIVERSIDE REGIONAL MEDICAL CENTER TO:

PENINSULA HEALTH CENTER

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 300

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 240CMAQ: Federal

0 0 0 0 0 0 60CMAQ: State Match

0 0 0 0 0 0 0 300Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

BRIDGE REPL- RTE 31 OVER POWHATAN

CREEK (FED ID 10476)

PROJECT

UPC NO.:

ROUTE:

T13949

NFO0031

New Project

FY2018

SCHEDULE

360

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEJames City County

FY2020 1,100CN

FY2019DESCRIPTION: 800RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 2,260

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 922 366 0 0 0 0STP: Bridge - Federal

0 230 92 0 0 0 0STP: Bridge - Soft Match

650 1,152 458 0 0 0 0 0Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE 31 - WIDEN & RESTRIPE PAVEMENT

PROJECT

UPC NO.:

ROUTE:

77564

NFO0031

State funds - AC for future federal conversion.REPORT NOTE:

Complete

SCHEDULE

291

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESurry County

Complete 1,456CN

CompleteFROM: 0.586 MI SOUTH OF FERRY PIER TO: FERRY

PIER (0.5860 MI)

DESCRIPTION: 209RW

PROJECT LENGTH: 0.5860 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,956

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 52Primary Formula: State

0 0 0 0 0 0 651Revenue Sharing Funds: Local Match

0 0 0 0 0 0 651Revenue Sharing Funds: State Match

0 0 0 0 0 0 1,254SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 115SAFETEA-LU Earmarks: State Bond Match

0 0 0 0 0 0 197SAFETEA-LU Earmarks: State Match

-963 0 0 0 0 0 0 2,920Total

06/19/2013 269

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

JAMESTOWN FERRY BOAT

PROJECT

UPC NO.:

ROUTE:

100947

NFO0031

Revised schedule requiredREPORT NOTE:

Underway

SCHEDULE

2,500

ESTIMATED COST (000's)

JURISDICTION:

Rolfe Highway (Rte 31)STREET NAME:

PESurry County

FY2014 25,087CN

FROM: Jamestown Ferry TO: Jamestown FerryDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Ferry boats TO 27,587

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,000CMAQ TERMS: Federal

0 0 0 0 0 0 500CMAQ TERMS: State Match

0 0 6,584 13,486 0 0 0STP: Statewide - Federal

0 0 1,646 3,372 0 0 0STP: Statewide - Soft Match

0 0 8,230 16,858 0 0 0 2,500Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

JAMESTOWN SCOTLAND FERRY SECURITY

STATIONS

PROJECT

UPC NO.:

ROUTE:

102110

NFO0031

Complete

SCHEDULE

595

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESurry County

FY2014 1,792CN

UnderwayFROM: Surry Co line TO: James City Co line (1.0000 MI)DESCRIPTION: 153RW

PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Ferry boats TO 2,540

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,950Ferry Boat Discretionary Funds: Federal

200 0 0 0 0 290 100(X) Maintenance Funds: Statewide

0 0 0 0 0 200 290 2,050Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE 35 - BRIDGE REPLACEMENT

PROJECT

UPC NO.:

ROUTE:

81457

NFO0035

Complete

SCHEDULE

1,494

ESTIMATED COST (000's)

JURISDICTION:

Meherrin RdSTREET NAME:

PESouthampton County

FY2015 11,340CN

UnderwayFROM: 0.072 mi W. Southampton County Line TO: 0.364

mi. W. Southmapton County Line (0.2920 MI)

DESCRIPTION: 248RW

29902 -1PROJECT LENGTH: 0.2920 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 13,082

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 300Bond Match: State Bond Match

0 0 0 0 0 0 1,200Bridge Replacement: Federal

0 0 0 622 0 0 0CTB Formula: Bridge - State

0 0 0 0 0 0 1,858Federal STP: Federal

0 0 0 0 0 0 956Minimum Guarantee: Federal

0 0 0 0 0 0 704Soft Match: Federal

958 0 0 0 391 2,503 0STP: Bridge - Federal

239 0 0 0 98 626 0STP: Bridge - Soft Match

0 0 0 0 0 0 2,102STP: Statewide - Federal

0 0 0 0 0 0 525STP: Statewide - Soft Match

0 0 0 622 489 1,197 3,129 7,645Total

270 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

ROUTE 35 OVER TARRARA CREEK (VA STR

1017)

PROJECT

UPC NO.:

ROUTE:

101493

NFO0035

Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

400

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESouthampton County

FY2017 1,500CN

UnderwayFROM: Route 35 over Tarrara Creek Structure 1017 TO:

Route 35 over Tarrara Creek

DESCRIPTION: 100RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 2,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 30Bond Match: State Bond Match

0 0 0 0 0 0 120Bridge Replacement: Federal

0 0 280 500 500 0 200STP: Bridge - Federal

0 0 70 125 125 0 50STP: Bridge - Soft Match

0 0 350 625 625 0 0 400Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

BRIDGE REPL- RTE 58 OVER MEHERRIN (FED

ID 9028)

PROJECT

UPC NO.:

ROUTE:

T13956

NFO0058

New Project

Revised schedule required.REPORT NOTE:

FY2015

SCHEDULE

440

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEGreensville County

FY2017 1,310CN

FY2016DESCRIPTION: 520RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 2,270

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

500 0 0 0 1,316 0 0NHPP: Bridge - Federal

125 0 0 0 329 0 0NHPP: Bridge - Soft Match

0 0 0 0 1,645 625 0 0Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

MLK/MT/MLK - PRIMARY CONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

T11487

FO0058

Complete

SCHEDULE

178,930

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

Underway 1,813,697CN

UnderwayFROM: Downtown and Midtown Tunnels; extension of

MLK to I-264 TO: Downtown and Midtown Tunnels;

extension of MLK to I-264 (3.9000 MI)

DESCRIPTION: 26,265RW

PROJECT LENGTH: 3.9000 MISCOPE OF WORK: Bridge, New Construction TO 2,018,892

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 388,000Bond Proceeds: GARVEE Bonds

0 0 0 0 0 245 11,795(X) Maintenance Funds: Statewide

123,284 0 0 0 61,642 61,642 0Operating Revenue: Other Funds

20,501 0 0 0 10,992 8,258 1,323,946TIFIA/PAB: PAB & Private Equity

0 0 0 0 0 0 8,832Toll Facilities: Toll Facilities Revolving

-245 0 0 0 72,634 143,785 70,145 1,732,573Total

06/19/2013 271

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE 58 - CONSTRUCT INTERCHANGE

PROJECT

UPC NO.:

ROUTE:

17728

NFO0058

State funds - AC for future federal conversion.REPORT NOTE:

Complete

SCHEDULE

3,067

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESouthampton County

FY2014 24,305CN

UnderwayFROM: ROUTE 58 BUSINESS INTERCHANGE TO:

(EAST END COURTLAND BYPASS) (1.4685 KM)

DESCRIPTION: 1,245RW

PROJECT LENGTH: 1.4685 KMSCOPE OF WORK: Relocation TO 28,617

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 1,866 10,000Bond Proceeds: CPR Bonds

0 0 0 0 0 0 709Bond Proceeds: Rt 58 Bond CDP Funds

0 0 0 0 0 100 0CTB Formula: High Priority - Federal

0 0 0 0 0 25 0CTB Formula: High Priority - Soft Match

100 0 0 264 300 0 0CTB Formula: High Priority - State

0 0 0 0 0 0 896Primary Formula: State

0 0 0 0 0 0 2,016Priority Transportation Funds: State

0 0 0 0 0 0 171Revenue Sharing Funds: Local Match

0 0 0 0 0 0 171Revenue Sharing Funds: State Match

4,000 0 0 1,600 4,000 0 0STP: Statewide - Federal

1,000 0 0 400 1,000 0 0STP: Statewide - Soft Match

0 0 0 2,264 5,300 5,100 1,991 13,963Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE 58 - PPTA PROJECT DEV. & MGMT.

OVERSIGHT (DT/MT/MLK)

PROJECT

UPC NO.:

ROUTE:

76642

NFO0058

Complete

SCHEDULE

63,387

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

CN

N/AMIDTOWN TUNNEL CORRIDORDESCRIPTION: 6,563RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Preliminary Engineering TO 69,950

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,976Bond Match: State Bond Match

0 0 0 0 0 33,704 0Bond Proceeds: GARVEE Bonds

3,958 0 0 1,192 0 0 0CTB Formula: PPTA - State

0 0 0 0 0 0 5,075Federal STP: Federal

0 0 0 0 0 0 7,593Minimum Guarantee: Federal

0 0 0 0 0 0 4,313Minimum Guarantee Funds: Federal

0 0 0 0 0 1,954 5,621NHPP: Statewide - Federal

0 0 0 0 0 488 1,405NHPP: Statewide - Soft Match

0 0 0 0 0 0 400Primary Formula: State

0 0 0 0 0 0 1,269Soft Match: Federal

0 0 0 1,192 0 3,958 36,146 28,653Total

272 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE 58 BUSINESS BRIDGE (CARRSVILLE)

OVER RTE. 632 AND CSX

PROJECT

UPC NO.:

ROUTE:

81435

NFO0058

Underway

SCHEDULE

650

ESTIMATED COST (000's)

JURISDICTION:

Carrsville HwySTREET NAME:

PEIsle of Wight County

FY2015 3,394CN

FY2014FROM: 0.12 Miles East of route 641 TO: 0.46 Miles East

of Route 641 (0.3500 MI)

DESCRIPTION: 737RW

29863 -1PROJECT LENGTH: 0.3500 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,781

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 520Bridge Replacement: Federal

0 0 0 0 0 0 130Soft Match: Federal

700 0 0 307 462 900 936STP: Bridge - Federal

175 0 0 77 115 225 234STP: Bridge - Soft Match

0 0 0 384 577 875 1,125 1,820Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

ARRA - ISLE OF WIGHT 58 PAVEMENT

OVERLAY

PROJECT

UPC NO.: 95032

NFOARRA09

FROM: MP 6.65, City of Suffolk CL TO: MP 3.70, 2.16 mI.

East of Route 258 (1.8100 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 306American Recovery and Reinvestment Act:

Urbanized Area > 200K

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE. 58 - LANE REVERSAL

PROJECT

UPC NO.:

ROUTE:

95050

FO0058

MPO projectREPORT NOTE:

Complete

SCHEDULE

950

ESTIMATED COST (000's)

JURISDICTION:

RTE. 58STREET NAME:

PEHampton Roads District-wide

CNFROM: RTE 58 & RTE 13 Interchange TO: I-264 & I-64

Interchange (15.5000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 15.5000 MISCOPE OF WORK: Safety TO 950

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 600Bond Proceeds: CPR Bonds

0 0 0 0 0 0 800RSTP (STP Regional): Federal

0 0 0 0 0 0 200RSTP (STP Regional): State Match

-650 0 0 0 0 0 0 1,600Total

06/19/2013 273

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

DT/MT/MLK PRIMARY DEBT SERVICE

PROJECT

UPC NO.:

ROUTE:

103036

FO0058

Underway

SCHEDULE

32,373

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

Underway 477,228CNFROM: Downtown and Midtown Tunnels; extension of

MLK to I-264 TO: Downtown and Midtown Tunnels;

extension of MLK to I-264 (3.9000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 3.9000 MISCOPE OF WORK: Bridge, New Construction TO 509,601

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

26,525 26,569 26,455 26,601 26,412 25,289 22,725GARVEE: Debt Service - Federal

6,631 6,642 6,614 6,650 6,603 6,322 5,681GARVEE: Debt Service - Soft Match

283,881 33,211 33,069 33,252 33,016 33,156 31,611 28,407Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE 60 - RELOCATION & UPGRADING

PROJECT

UPC NO.:

ROUTE:

13496

FO0060

MPO Project. In conjunction with other systems project UPC 14598. Revised schedule

required. PE only - accrual for RW.

REPORT NOTE:

Underway

SCHEDULE

2,321

ESTIMATED COST (000's)

JURISDICTION:

Pocahontas TrailSTREET NAME:

PEJames City County

FY2019 23,233CN

FY2016FROM: WEST APPROACH OF SKIFFES CREEK

BRIDGE TO: 1.9 MILE WEST OF WCL CITY OF

NEWPORT NEWS (1.5600 MI)

DESCRIPTION: 11,439RW

PROJECT LENGTH: 1.5600 MISCOPE OF WORK: New Construction Roadway TO 36,994

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 304Non-Formula: State Match

0 0 0 0 0 0 200Primary Formula: Federal

0 0 0 0 0 0 50Primary Formula: State Match

0 0 0 0 0 0 2,400RSTP (STP Regional): Federal

0 0 0 0 0 0 296RSTP (STP Regional): State Match

33,744 0 0 0 0 0 0 3,250Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

UPGRADE SIGNAL, ADD PAVEMENT

MARKINGS, AND PEDESTRIAN ACCESS

PROJECT

UPC NO.:

ROUTE:

97010

NFO0060

Complete

SCHEDULE

50

ESTIMATED COST (000's)

JURISDICTION:

Richmond RoadSTREET NAME:

PEJames City County

Complete 384CN

FROM: US 60 Richmond Road TO: Rte 645 Airport RoadDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 434

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 422Highway Safety Improvements: Federal

0 0 0 0 0 0 47Highway Safety Improvements: State Match

-36 0 0 0 0 0 0 469Total

274 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

SKIFFES CREEK CONNECTOR

PROJECT

UPC NO.:

ROUTE:

100200

FO0060

MPO project, Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

3,000

ESTIMATED COST (000's)

JURISDICTION:

Skiffes Creek ConnectorSTREET NAME:

PEJames City County

FY2017 25,000CN

FY2016FROM: Route 60 TO: Route 143DESCRIPTION: 7,000RW

PROJECT LENGTH: _SCOPE OF WORK: New Construction Roadway TO 35,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,000Non-Formula: State Match

0 0 0 0 0 0 8,000RSTP (STP Regional): Federal

0 5,895 4,800 0 0 0 0RSTP (STP Regional): MPO - Federal

0 1,474 1,200 0 0 0 0RSTP (STP Regional): MPO - State Match

11,631 7,369 6,000 0 0 0 0 10,000Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RICHMOND ROAD INTERSECTION

IMPROVEMENTS @ RTE 199 WEST RAMP

PROJECT

UPC NO.:

ROUTE:

102947

NFO0060

MPO project; Revised schedule required.REPORT NOTE:

FY2016

SCHEDULE

80

ESTIMATED COST (000's)

JURISDICTION:

Richmond RoadSTREET NAME:

PEJames City County

FY2018 545CN

FY2017FROM: Route 199 West Ramp TO: West Ramp onto

Richmond Road

DESCRIPTION: 25RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 650

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 280 51 33 0 0 0CMAQ: MPO - Federal

0 70 13 8 0 0 0CMAQ: MPO - State Match

195 350 64 41 0 0 0 0Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

POCAHONTAS TRAIL RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

102980

NFO0060

MPO projectREPORT NOTE:

FY2018

SCHEDULE

700

ESTIMATED COST (000's)

JURISDICTION:

Pocahontas TrailSTREET NAME:

PEJames City County

FY2020 5,000CN

FY2019FROM: James City County Fire Station #2 (8429

Pocahontas Trail) TO: James City County Elementary

School (8901 Pocahontas Trail) (1.8000 MI)

DESCRIPTION: 400RW

PROJECT LENGTH: 1.8000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 6,100

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 1,040 640 0 0 0 0RSTP (STP Regional): MPO - Federal

0 260 160 0 0 0 0RSTP (STP Regional): MPO - State Match

4,000 1,300 800 0 0 0 0 0Total

06/19/2013 275

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE 105 - CONSTRUCTION OF PARALLEL

LANES (WESTBOUND)

PROJECT

UPC NO.:

ROUTE:

13497

FO0105

PE and RW only - CN on ARRA UPC 92992 and inplan utilities on UPC 93243REPORT NOTE:

Complete

SCHEDULE

2,515

ESTIMATED COST (000's)

JURISDICTION:

FT. EUSTIS BOULEVARDSTREET NAME:

PEHampton Roads District-wide

CN

CompleteFROM: 0.721 KILOMETER EAST OF ROUTE 143 TO:

0.024 KILOMETER WEST OF ROUTE 17 (5.0850 KM)

DESCRIPTION: 571RW

11111 95PROJECT LENGTH: 5.0850 KM STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Reconstruction w/ Added Capacity TO 3,086

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,469National Highway System Allocations:

Federal

0 0 0 0 0 0 617National Highway System Allocations: State

Match

-1 0 0 0 0 0 0 3,087Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

ARRA BRAC NEWPORT NEWS/YORK 105 WB

PARALLEL LANES CONST.

PROJECT

UPC NO.: 92992

FOARRA09

PE and RW on UPC 13497 and Inplan utilities on UPC 93243REPORT NOTE:

FROM: 0.721 KILOMETER EAST OF ROUTE 143 TO:

0.024 KILOMETER WEST OF ROUTE 17 (3.1597 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 18,724American Recovery and Reinvestment Act:

Flexible

0 0 0 0 0 0 18,724Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

IN-PLAN UTILITY WORK ON ROUTE 105

WIDENING

PROJECT

UPC NO.:

ROUTE:

93243

FO0105

CN on ARRA UPC 92992 - PE and RW on UPC 13497REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Fort Eustis BoulevardSTREET NAME:

PEHampton Roads District-wide

Underway 763CNFROM: 1.250 KILOMETER EAST OF ROUTE 143 TO:

0.250 KILOMETER WEST OF ROUTE 17 (4.3100 KM)

DESCRIPTION: RW

PROJECT LENGTH: 4.3100 KMSCOPE OF WORK: Reconstruction w/ Added Capacity TO 763

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 961Local Project Contributions: Local

0 0 0 0 0 0 320National Highway System Allocations:

Federal

0 0 0 0 0 0 80National Highway System Allocations: State

Match

-599 0 0 0 0 0 0 1,361Total

276 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

BRIDGE REPL-RTE 134 OVER KILN CREEK

(FED ID 19855/19856)

PROJECT

UPC NO.:

ROUTE:

T13955

NFO0134

New Project

Revised schedule required.REPORT NOTE:

FY2014

SCHEDULE

870

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEYork County

FY2016 2,600CN

FY2015DESCRIPTION: 1,050RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 4,520

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 783 0 192 467 0 0NHPP: Bridge - Federal

0 196 0 48 117 0 0NHPP: Bridge - Soft Match

2,717 979 0 241 584 0 0 0Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

ARRA - YORK 134 EXTEND TURN LANE AT

TABB SMITH TRAIL

PROJECT

UPC NO.: 94459

NFOARRA09

FROM: Median break East of Tabb Smith Trail TO: 400 ft

west of median break (0.0800 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 111American Recovery and Reinvestment Act:

Urbanized Area > 200K

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

CAPITOL LANDING RD BICYCLE

ACCOMODATION

PROJECT

UPC NO.:

ROUTE:

84484

NFO0143

MPO Project.REPORT NOTE:

Complete

SCHEDULE

89

ESTIMATED COST (000's)

JURISDICTION:

Route 143 (Capitol Landing Rd)STREET NAME:

PEYork County

Complete 361CNFROM: Queens Creek Br (York/Wmbg CL) TO: East

Rochambeau Drive (0.7000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.7000 MISCOPE OF WORK: Safety TO 449

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 298CMAQ: Federal

0 0 0 0 0 0 94CMAQ: MPO - Federal

0 0 0 0 0 0 24CMAQ: MPO - State Match

0 0 0 0 0 0 75CMAQ: State Match

-41 0 0 0 0 0 0 491Total

06/19/2013 277

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

REBUILD EXISTING TRAFFIC SIGNAL, RTE 143

@ RTE 132

PROJECT

UPC NO.:

ROUTE:

94127

NFO0143

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

INTERSECTION OF RTE 143 @ RTE 132STREET NAME:

PEYork County

Complete 161CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 161

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 140Highway Safety Improvements: Federal

0 0 0 0 0 0 16Highway Safety Improvements: State Match

6 0 0 0 0 0 0 155Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RECONSTRUCT INTERSECTION AS

ROUNDABOUT

PROJECT

UPC NO.:

ROUTE:

104337

NFO0143

New Project

FY2014

SCHEDULE

370

ESTIMATED COST (000's)

JURISDICTION:

Route 143STREET NAME:

PEYork County

FY2016 1,850CN

FROM: Route 143 TO: I-64 (0.2000 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.2000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,220

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 1,665 333 0Highway Safety Improvements: Federal

0 0 0 0 185 37 0Highway Safety Improvements: Soft Match

0 0 0 0 1,850 0 370 0Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

TRAFFIC SIGNAL MAST ARM CONVERSION

PROJECT

UPC NO.:

ROUTE:

104377

NFO0143

New Project

FY2014

SCHEDULE

40

ESTIMATED COST (000's)

JURISDICTION:

Jefferson AvenueSTREET NAME:

PENewport News

FY2015 180CN

FY2014FROM: Jefferson Avenue TO: Center Avenue (0.0500 MI)DESCRIPTION: 75RW

PROJECT LENGTH: 0.0500 MISCOPE OF WORK: Traffic Management/Engineering TO 295

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 148 0Revenue Sharing Funds: Local Match

0 0 0 0 0 148 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 295 0Total

278 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE 164 - RAIL RELOCATION

PROJECT

UPC NO.:

ROUTE:

80478

FO0164

Previous SAFETEA-LU earmark funding transferred to VPAREPORT NOTE:

Complete

SCHEDULE

4,803

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEPortsmouth

Complete 54,596CN

RAIL RELOCATION ALONG ROUTE 164 CORRIDORDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 59,398

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 282Bond Match: State Bond Match

0 0 0 0 0 0 1,129Minimum Guarantee Funds: Federal

57,987 0 0 0 0 0 0 1,412Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

OVERPASS RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

101247

NFO0168

Underway

SCHEDULE

500

ESTIMATED COST (000's)

JURISDICTION:

Tidewater Drive/E. Little Creek RoadSTREET NAME:

PENorfolk

FY2014 5,091CN

FROM: Gregory Drive TO: Bancker Road (0.3200 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.3200 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 5,591

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 716 0Local Project Contributions: Local

0 0 0 0 0 0 2,438Revenue Sharing Funds: Local Match

0 0 0 0 0 0 2,438Revenue Sharing Funds: State Match

0 0 0 0 0 0 716 4,875Total

06/19/2013 279

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE 175 - REPLACE 1 BRIDGE ON NEW

LOCATION

PROJECT

UPC NO.:

ROUTE:

1896

FO0175

State funds - AC for future federal conversion.REPORT NOTE:

Complete

SCHEDULE

7,500

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEAccomack County

Complete 84,893CN

CompleteFROM: APPROACHES & BRIDGE OVER BLACK

NARROWS, CHINCOTEAGUE AND TO: LEWIS CREEK

CHANNELS (1.1000 MI)

DESCRIPTION: 5,352RW

27534 94PROJECT LENGTH: 1.1000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 97,745

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 5,500Bond Match: State Bond Match

0 0 0 0 0 0 1,785Bonus OA: Federal

0 0 0 0 0 0 36,055Bridge Replacement: Federal

0 0 0 0 0 0 1,501Demonstration Funds: Federal

0 0 0 0 0 0 2,000FRAN Bond Proceeds: FRAN

0 0 0 0 0 0 18,399Minimum Guarantee: Federal

0 0 0 0 0 0 13,353Primary Formula: Federal

0 0 0 0 0 0 10,890Primary Formula: State

0 0 0 0 0 0 3,173Primary Formula: State Match

0 0 0 0 0 0 5,089Priority Transportation Funds: State

0 0 0 0 0 0 0 97,745Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

BRIDGE RTE. 189 (SOUTHQUAY ROAD) OVER

BLACKWATER RIVER

PROJECT

UPC NO.:

ROUTE:

98813

NFO0189

Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

816

ESTIMATED COST (000's)

JURISDICTION:

Southquay RoadSTREET NAME:

PEMulti-jurisdictional: Hampton Roads MPO

Underway 6,874CN

CompleteFROM: 0.0 Mile to Suffolk C.L. TO: 0.06 Mile from Suffolk

C.L.

DESCRIPTION: 591RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 8,281

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 573Bridge Replacement: Federal

0 0 0 0 0 393 0CTB Formula: Bridge - Federal

0 0 0 0 0 98 0CTB Formula: Bridge - Soft Match

375 0 0 0 0 0 0CTB Formula: Bridge - State

0 0 0 0 0 0 143Soft Match: Federal

1,381 0 0 1,613 1,160 0 1,205STP: Bridge - Federal

345 0 0 403 290 0 301STP: Bridge - Soft Match

0 0 0 2,016 1,450 2,101 491 2,222Total

280 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

BRIDGE REPL- RTE 199 OVER TOUR ROAD

(FED ID 10511/10513)

PROJECT

UPC NO.:

ROUTE:

T13957

NFO0199

New Project

Revised schedule requiredREPORT NOTE:

FY2016

SCHEDULE

1,000

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEJames City County

FY2018 3,560CN

FY2017DESCRIPTION: 2,600RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 7,160

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

1,500 0 0 0 217 1,899 0NHPP: Bridge - Federal

375 0 0 0 54 475 0NHPP: Bridge - Soft Match

2,640 0 0 0 271 1,875 2,374 0Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

ARRA - JAMES CITY 199/5 INTERSECTION

IMPROVEMENTS/TURN LANES

PROJECT

UPC NO.: 94541

NFOARRA09

PE on UPC 82681;REPORT NOTE:

FROM: Intersection Rt 5 TO: Intersection Improvements

(0.4000 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 850American Recovery and Reinvestment Act:

Urbanized Area > 200K

0 0 0 0 0 0 55RSTP (STP Regional): Federal

0 0 0 0 0 0 14RSTP (STP Regional): State Match

0 0 0 0 0 0 919Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE 199 - OVERLAY - QUIET PAVEMENT

STUDY

PROJECT

UPC NO.:

ROUTE:

99408

NFO0199

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

RTE 199 - Hummelsine BlvdSTREET NAME:

PEJames City County

Complete 8,060CNFROM: Rte 199 @ I-64 Exit 234 TO: SR 321 Monticello

Avenue (6.3300 MI)

DESCRIPTION: RW

PROJECT LENGTH: 6.3300 MISCOPE OF WORK: Resurfacing TO 8,060

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 7,593(X) Maintenance Funds: Federal

0 0 0 0 0 0 113(X) Maintenance Funds: Statewide

0 0 0 0 0 0 364Research Incentive & Implementation Funds:

State

-11 0 0 0 0 0 0 8,071Total

06/19/2013 281

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

ROUTE 199 INTERSECTION IMPROVEMENTS

AT BROOKWOOD DRIVE

PROJECT

UPC NO.:

ROUTE:

102948

NFO0199

MPO projectREPORT NOTE:

FY2016

SCHEDULE

50

ESTIMATED COST (000's)

JURISDICTION:

Route 199STREET NAME:

PEJames City County

FY2018 200CN

FY2017FROM: Brookwood Drive TO: Route 199 (Intersection)DESCRIPTION: 25RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 275

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 60 100 20 40 0 0CMAQ: MPO - Federal

0 15 25 5 10 0 0CMAQ: MPO - State Match

0 75 125 25 50 0 0 0Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

SHOULDER RUMBLE STRIPS- DISTRICTWIDE

PROJECT

UPC NO.:

ROUTE:

104364

NFO0199

New Project

FY2014

SCHEDULE

2,363

ESTIMATED COST (000's)

JURISDICTION:

Multiple LocationsSTREET NAME:

PEMulti-jurisdictional: Hampton Roads MPO

CN

FROM: Multiple Locations TO: Multiple LocationsDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 2,363

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 2,127 0Highway Safety Improvements: Federal

0 0 0 0 0 236 0Highway Safety Improvements: Soft Match

0 0 0 0 0 0 2,363 0Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

RTE 258 - ADD LEFT AND RIGHT TURN LANES

AT RTE. 620

PROJECT

UPC NO.:

ROUTE:

58297

NFO0258

MPO Project. PE & RW only, accrual for CN. Balance to be provided by MPO. Revised

schedule required.

REPORT NOTE:

Underway

SCHEDULE

463

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEIsle of Wight County

FY2015 1,723CN

FY2014FROM: 0.19 MILE WEST OF ROUTE 620 TO: 0.19 MILE

EAST OF ROUTE 620 (0.3800 MI)

DESCRIPTION: 796RW

PROJECT LENGTH: 0.3800 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,982

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 87Non-Formula: State Match

0 0 0 0 0 0 748RSTP (STP Regional): Federal

0 0 0 0 0 0 720RSTP (STP Regional): MPO - Federal

0 0 0 0 0 0 180RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 100RSTP (STP Regional): State Match

1,147 0 0 0 0 0 0 1,835Total

282 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

ARRA&PED & BIKE STUDY FOR WINDSOR

MIDDLE SCHOOL AND WESTSIDE

PROJECT

UPC NO.: 95025

NFOARRA09

FROM: Twin Ponds Drive TO: Route 460DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 70American Recovery and Reinvestment Act:

Urbanized Area > 200K

0 0 0 0 0 0 5Districtwide: Federal

0 0 0 0 0 0 75Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

WINDSOR SIDEWALK IMPROVEMENT ALONG

ROUTE 258 & N. COURT ST

PROJECT

UPC NO.:

ROUTE:

100541

NFO0258

Complete

SCHEDULE

152

ESTIMATED COST (000's)

JURISDICTION:

US 258 & N. Court StreetSTREET NAME:

PEIsle of Wight County

Underway 723CNFROM: Five Forks Rd (Route 606) TO: 550' South of

Joyner Town Lane (1.6000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 1.6000 MISCOPE OF WORK: Safety TO 875

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 300 0CMAQ: MPO - Federal

0 0 0 0 0 75 0CMAQ: MPO - State Match

0 0 0 0 0 0 11Discretionary Grants: State Match

0 0 0 0 0 0 788Highway Safety Improvements: Federal

0 0 0 0 0 0 77Highway Safety Improvements: State Match

-375 0 0 0 0 0 375 875Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

MAIN STREET PEDESTRIAN IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

102951

NFO0258

Revised schedule required. MPO project.REPORT NOTE:

FY2015

SCHEDULE

17

ESTIMATED COST (000's)

JURISDICTION:

Main StreetSTREET NAME:

PEIsle of Wight County

FY2016 149CN

FROM: Route 10 TO: Route 10 (Intersection)DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 165

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 132 0 0 0CMAQ: MPO - Federal

0 0 0 33 0 0 0CMAQ: MPO - State Match

0 0 0 165 0 0 0 0Total

06/19/2013 283

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE 301 - BRIDGE REPLACEMENT OVER CSX

RAILROAD

PROJECT

UPC NO.:

ROUTE:

77359

NFO0301

Complete

SCHEDULE

901

ESTIMATED COST (000's)

JURISDICTION:

Sussex DriveSTREET NAME:

PEGreensville County

FY2015 6,298CN

UnderwayFROM: 0.15 MILE SOUTH OF CSX RAILROAD TO: 0.15

MILE NORTH OF CSX RAILROAD (0.3000 MI)

DESCRIPTION: 121RW

29883 -1PROJECT LENGTH: 0.3000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 7,320

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 90Bond Match: State Bond Match

0 0 0 0 0 0 658Bridge Replacement: Federal

0 0 0 0 0 0 153Primary Formula: Federal

0 0 0 0 0 0 38Primary Formula: State Match

0 0 0 0 0 0 86Priority Transportation Funds: State

0 0 0 0 0 0 74Soft Match: Federal

500 0 0 0 676 2,000 1,800STP: Bridge - Federal

125 0 0 0 169 500 450STP: Bridge - Soft Match

0 0 0 0 845 625 2,500 3,349Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

BRIDGE REPLACEMENT RTE 301 OVER

NOTTOWAY RIVER (VA STR 1014)

PROJECT

UPC NO.:

ROUTE:

101232

NFO0301

Underway

SCHEDULE

892

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESussex County

FY2016 3,430CN

FY2015FROM: beginning of bridge TO: end of bridgeDESCRIPTION: 135RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 4,457

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

947 0 0 766 1,139 101 613STP: Bridge - Federal

237 0 0 191 285 25 153STP: Bridge - Soft Match

0 0 0 957 1,424 1,183 126 766Total

284 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

RTE 316 - INTERSECTION IMPROVEMENT

W/ROUNDABOUT DESIGN

PROJECT

UPC NO.:

ROUTE:

12331

NFO0316

REPORT NOTE:

Complete

SCHEDULE

480

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEAccomack County

Underway 1,552CN

CompleteAT ROUTES 316, 126, 13 BUSINESS (0.1210 MI)DESCRIPTION: 351RW

PROJECT LENGTH: 0.1210 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 2,384

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 453 0Highway Safety Improvements: Federal

0 0 0 0 0 50 0Highway Safety Improvements: Soft Match

0 0 0 0 0 0 988Minimum Guarantee: Federal

0 0 0 0 0 0 657Primary Formula: Federal

0 0 0 0 0 0 247Primary Formula: State

0 0 0 0 0 0 164Primary Formula: State Match

-176 0 0 0 0 0 504 2,056Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

ADD L&R TURN LANES ON MONTICELLO AVE

IRONBOUND RD

PROJECT

UPC NO.:

ROUTE:

82961

NFO0321

MPO Project. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

520

ESTIMATED COST (000's)

JURISDICTION:

MONTICELLO AVENUESTREET NAME:

PEJames City County

FY2014 1,650CN

UnderwayFROM: NEWS ROAD TO: OLD NEWS ROAD (0.5000 MI)DESCRIPTION: 1,036RW

PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 3,205

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,323CMAQ: Federal

622 0 0 0 94 535 0CMAQ: MPO - Federal

156 0 0 0 23 134 0CMAQ: MPO - State Match

0 0 0 0 0 0 172CMAQ: State Match

0 0 0 0 0 0 159(S) Telecommunications: State

-13 0 0 0 117 778 669 1,654Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

HAMPTON ROADS PRIMARY PAVING

BALANCE ENTRY

PROJECT

UPC NO.: T13919

NFOBalance Entry

New Project

FROM: various TO: variousDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

4,245 139 1,104 1,890 3,916 0 0CTB Formula: Paving - Federal

1,061 35 276 472 979 0 0CTB Formula: Paving - Soft Match

0 3,636 3,006 2,407 0 0 0State Formula: Primary - State

3,810 4,387 4,769 4,895 5,306 0 0Total

06/19/2013 285

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

IMPROVE PRINCE DREW RD. WITH CURB,

GUTTER AND SIDEWALK

PROJECT

UPC NO.:

ROUTE:

104373

NFO9999

New Project

FY2014

SCHEDULE

200

ESTIMATED COST (000's)

JURISDICTION:

Prince Drew RoadSTREET NAME:

PENewport News

FY2015 1,950CN

FY2014FROM: Warwick Boulevard TO: Moores Lane North

(0.5000 MI)

DESCRIPTION: 50RW

PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Traffic Management/Engineering TO 2,200

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 1,100 0Revenue Sharing Funds: Local Match

0 0 0 0 0 1,100 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 2,200 0Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

NEW CITYWIDE SIDEWALK INSTALLATION

PROJECT

UPC NO.:

ROUTE:

104376

NFO9999

New Project

FY2014

SCHEDULE

45

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PENewport News

FY2015 255CN

FROM: Various TO: Various (1.0000 MI)DESCRIPTION: RW

PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 300

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 150 0Revenue Sharing Funds: Local Match

0 0 0 0 0 150 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 300 0Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

CLASS I BIKEWAY/PEDESTRIAN ROUTE 60 &

CROAKER ROAD

PROJECT

UPC NO.:

ROUTE:

17633

NFOBW00

MPO Project. Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

515

ESTIMATED COST (000's)

JURISDICTION:

Richmond Road and Croaker RoadSTREET NAME:

PEJames City County

FY2015 2,010CN

FY2014FROM: Croaker Rd: Norge Library to Richmond Rd TO:

Richmond Rd: Croaker Rd to Old Church Rd (1.5000 MI)

DESCRIPTION: 150RW

10523 94PROJECT LENGTH: 1.5000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 2,675

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,936CMAQ: Federal

0 0 0 0 0 0 388CMAQ: State Match

0 0 0 0 0 0 1Non-Formula: State Match

0 0 0 0 0 0 7Primary Formula: State

0 0 0 0 0 0 234RSTP (STP Regional): Federal

0 0 0 0 0 0 58RSTP (STP Regional): State Match

0 0 0 0 0 0 50(S) Telecommunications: State

0 0 0 0 0 0 0 2,675Total

286 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

BUS SHELTER EXPANSION FOR TICKET

BOOTH

PROJECT

UPC NO.:

ROUTE:

76475

NFOCPL0

REPORT NOTE:

Complete

SCHEDULE

92

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEVirginia Beach

Complete 201CN

AT INDIAN RIVER ROAD COMMUTER LOTDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 293

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 217Minimum Guarantee: Federal

0 0 0 0 0 0 17Primary Formula: Federal

0 0 0 0 0 0 54Primary Formula: State

0 0 0 0 0 0 4Primary Formula: State Match

0 0 0 0 0 0 0 293Total

MPO Area

NonMPOPrimary

PROGRAM/SYSTEM

TRAFFIC OPERATIONS & SAFETY

IMPROVEMENT PROGRAM

PROJECT

UPC NO.: 5620

NFODistrict-wide

FROM: VARIOUS LOCATIONS TO: HAMPTON ROADS

DISTRICT

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 151Primary Formula: State

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

HAMPTON ROADS PRIMARY DISTRICTWIDE

PAVEMENT MARKERS

PROJECT

UPC NO.: 70620

NFODistrict-wide

VARIOUS ROUTESDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 16Primary Formula: State

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

HAMPTON ROADS PRIMARY DISTRICTWIDE

SIGNS

PROJECT

UPC NO.: 70622

NFODistrict-wide

VARIOUS ROUTESDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 362Primary Formula: State

06/19/2013 287

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Primary

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

HAMPTON ROADS PRIMARY DISTRICTWIDE

SIGNALS

PROJECT

UPC NO.: 70621

NFODistrict-wide

VARIOUS ROUTESDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 28Primary Formula: State

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

GENERAL R/W EXPENSES, VARIOUS

LOCATIONS DISTRICTWIDE

PROJECT

UPC NO.: 63840

NFOProject Report Req'd

DISTRICTWIDEDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 536Primary Formula: State

0 0 0 0 0 65 6Residue Parcel Revenue: State

0 0 0 0 0 65 542Total

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

SMART TRAFFIC CENTER

PROJECT

UPC NO.:

ROUTE:

52324

NFOST00

MPO Project. PE Only. Balance to be redistributed by MPO.REPORT NOTE:

Complete

SCHEDULE

190

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

CNFROM: REGIONAL ROADWAY INFORMATION SYSTEM

TO: (COMPUTER SYSTEM)

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Preliminary Engineering TO 190

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 260CMAQ: Federal -70

MPO Area

Hampton RoadsPrimary

PROGRAM/SYSTEM

HAMPTON ROADS PRIMARY DISTRICTWIDE

TECHNOLOGY

PROJECT

UPC NO.: 70666

NFODistrict-wide

VARIOUS ROUTESDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 157Primary Formula: State

288 06/19/2013

FY14 FINAL

FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICTSecondary

PROJECT PROGRAM/SYSTEM

SecondaryHAMPTON ROADS DISTRICT SSYP

DESCRIPTION:

REQUIRED ALLOCATIONS (000's)

Total available secondary allocations by locality and fund source.

Fund Source NameCounty FY2015 FY2017 FY2018 FY2019FY2016 TotalFY2014

Accomack County

CTB Formula

72 72 72 62 41 5Unpaved - State 323

State Formula

234 194 155 0 0 0Secondary - State 583

8 6 5 0 0 0Secondary - Unpaved 20

Telecommunications

93 93 93 93 93 89State 554

94 134 155 325 365 407Accomack County Total 1,479

Greensville County

State Formula

115 95 76 0 0 0Secondary - State 286

Telecommunications

37 37 37 37 37 36State 221

36 37 37 113 132 152Greensville County Total 507

Isle of Wight County

CTB Formula

215 215 215 187 124 15Unpaved - State 969

State Formula

195 161 129 0 0 0Secondary - State 485

32 27 21 0 0 0Secondary - Unpaved 80

Telecommunications

84 84 84 84 84 80State 499

95 207 271 448 486 525Isle of Wight County Total 2,032

James City County

State Formula

378 313 250 0 0 0Secondary - State 941

1 1 1 0 0 0Secondary - Unpaved 4

Telecommunications

211 211 211 211 211 202State 1,255

202 211 211 462 525 590James City County Total 2,200

Northampton County

State Formula

101 84 67 0 0 0Secondary - State 253

Telecommunications

38 38 38 38 38 36State 227

37 38 38 105 122 140Northampton County Total 479

Southampton County

CTB Formula

412 412 412 360 237 28Unpaved - State 1,862

State Formula

203 168 134 0 0 0Secondary - State 505

69 57 46 0 0 0Secondary - Unpaved 172

Telecommunications

57 57 57 57 57 55State 341

83 295 417 649 694 741Southampton County Total 2,879

06/19/2013 289

FY14 FINAL

FY2014-2019 Six-Year Improvement Program HAMPTON ROADS DISTRICTSecondary

PROJECT PROGRAM/SYSTEM

SecondaryHAMPTON ROADS DISTRICT SSYP

DESCRIPTION:

REQUIRED ALLOCATIONS (000's)

Total available secondary allocations by locality and fund source.

Fund Source NameCounty FY2015 FY2017 FY2018 FY2019FY2016 TotalFY2014

Surry County

State Formula

86 71 57 0 0 0Secondary - State 213

1 1 1 0 0 0Secondary - Unpaved 3

Telecommunications

21 21 21 21 21 20State 127

20 21 21 79 93 108Surry County Total 342

Sussex County

State Formula

149 123 99 0 0 0Secondary - State 372

16 14 11 0 0 0Secondary - Unpaved 41

Telecommunications

37 37 37 37 37 35State 220

35 37 37 147 174 203Sussex County Total 632

York County

State Formula

357 295 236 0 0 0Secondary - State 888

1 1 0 0 0 0Secondary - Unpaved 2

Telecommunications

202 202 202 202 202 193State 1,203

193 202 202 438 497 559York County Total 2,092

Grand Total 3,424 3,087 2,766 1,389 1,182 795 12,644

290 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 609 - RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

8300

NFO0609

County portion UPC 8300. Will be let with Town portion UPC 8301.REPORT NOTE:

Complete

SCHEDULE

825

ESTIMATED COST (000's)

JURISDICTION:

CHURCH RDSTREET NAME:

PEAccomack County

FY2014 3,780CN

UnderwayFROM: EAST CORPORATE LIMITS ONLEY TO: ROUTE

13 BUSINESS (2.4700 MI)

DESCRIPTION: 3,125RW

PROJECT LENGTH: 2.4700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 7,730

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 1,464 4,724Bond Proceeds: CPR Bonds

0 0 0 0 0 0 1,542(S) Secondary Formula: Federal/State

0 0 0 0 0 0 1,464 6,266Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 709 - IMPROVEMENT

PROJECT

UPC NO.:

ROUTE:

8312

NFO0709

Complete

SCHEDULE

1,703

ESTIMATED COST (000's)

JURISDICTION:

HORNTOWN ROADSTREET NAME:

PEAccomack County

FY2014 8,794CN

UnderwayFROM: ROUTE 13 TO: ROUTE 679 (3.9900 MI)DESCRIPTION: 4,815RW

PROJECT LENGTH: 3.9900 MISCOPE OF WORK: Restoration and Rehabilitation TO 15,312

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 1,500 5,337Bond Proceeds: CPR Bonds

0 0 0 0 0 0 1,515(S) Federal Formula STP: Federal

0 0 0 0 0 0 379(S) Federal Formula STP: State Bond Match

0 0 0 0 0 0 290(S) Secondary Formula: Federal

0 0 0 0 0 0 818(S) Secondary Formula: Federal/State

0 0 0 0 0 0 401(S) Secondary Formula: State

0 0 0 0 0 0 72(S) Secondary Formula: State Match

1,000 0 0 0 1,292 996 0STP: Statewide - Federal

250 0 0 0 323 249 0STP: Statewide - Soft Match

93 0 0 47 93 89 569(S) Telecommunications: State

0 0 0 47 1,708 1,343 2,834 9,380Total

06/19/2013 291

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

BRIDGE REPLACEMENT ROUTE T-1304 OVER

WEST RIDGE CK @ TANGIER

PROJECT

UPC NO.:

ROUTE:

98822

NFO1304

Revised schedule required.REPORT NOTE:

FY2015

SCHEDULE

100

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEAccomack County

FY2016 500CN

FY2015DESCRIPTION: 25RW

PROJECT LENGTH: _SCOPE OF WORK: TO 625

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

138 0 0 0 362 0 0CTB Formula: Bridge - State

0 0 100 0 0 0 0STP: BROS - Federal

0 0 25 0 0 0 0STP: BROS - Soft Match

0 0 125 0 362 138 0 0Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

BRIDGE REPLACEMENT RTE 1306 OVER WEST

RIDGE CK @ TANGIER

PROJECT

UPC NO.:

ROUTE:

98821

NFO1306

Revised schedule required.REPORT NOTE:

FY2015

SCHEDULE

100

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEAccomack County

FY2016 500CN

FY2015DESCRIPTION: 25RW

PROJECT LENGTH: _SCOPE OF WORK: TO 625

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 500 0 0 0CTB Formula: Bridge - State

0 0 100 0 0 0 0STP: BROS - Federal

0 0 25 0 0 0 0STP: BROS - Soft Match

0 0 125 500 0 0 0 0Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

OTTERDAM ROAD IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

104362

NFO0614

New Project

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Otterdam RoadSTREET NAME:

PEGreensville County

FY2015 6,202CN

FY2014FROM: Exit 13 I-95 TO: 4.2 mi north of I-95 (4.2000 MI)DESCRIPTION: 550RW

PROJECT LENGTH: 4.2000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 6,752

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 3,376 0Revenue Sharing Funds: Local Match

0 0 0 0 0 3,376 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 6,752 0Total

292 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 633 RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

84027

NFO0633

State funds - AC for future federal conversion. PE only, accruing for RW. Revised schedule

required.

REPORT NOTE:

Underway

SCHEDULE

573

ESTIMATED COST (000's)

JURISDICTION:

Independence Church RoadSTREET NAME:

PEGreensville County

FY2016 2,901CN

FY2015FROM: Intersection Route 627 TO: 1.3 Miles North of

Intersection Route 627 (1.3000 MI)

DESCRIPTION: 432RW

PROJECT LENGTH: 1.3000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 3,906

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 59Bond Match: State Bond Match

0 0 0 0 0 0 237Federal STP: Federal

0 0 0 0 0 0 213(S) Secondary Formula: Federal/State

0 0 0 0 0 0 323(S) Secondary Formula: State

0 115 95 76 0 0 0(S) State Formula: Secondary - State

37 37 37 37 37 36 275(S) Telecommunications: State

2,291 152 132 113 37 37 36 1,107Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

BRIDGE REPL-LOW GROUND RD OVER

MEHERRIN (FED ID 9139)

PROJECT

UPC NO.:

ROUTE:

T13950

NFO0730

New Project

FY2018

SCHEDULE

600

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEGreensville County

FY2020 1,810CN

FY2019DESCRIPTION: 720RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 3,130

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 722 600 0 0 0 0STP: Bridge - Federal

0 180 150 0 0 0 0STP: Bridge - Soft Match

1,478 902 750 0 0 0 0 0Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

RTE 602 OVER PAGAN CREEK VA STR. 6008

PROJECT

UPC NO.:

ROUTE:

100952

NFO0602

Revised estimate required.REPORT NOTE:

Underway

SCHEDULE

255

ESTIMATED COST (000's)

JURISDICTION:

Longview DriveSTREET NAME:

PEIsle of Wight County

FY2014 718CN

FY2014FROM: 1.0 Mile from Int. Rte. 644 TO: 1.0 MI from INt.

Rte. 644

DESCRIPTION: 160RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,133

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 126Bridge Replacement: Federal

0 0 0 0 0 0 31Soft Match: Federal

0 0 0 0 0 931 0STP: Bridge - Federal

0 0 0 0 0 233 0STP: Bridge - Soft Match

-189 0 0 0 0 0 1,164 157Total

06/19/2013 293

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

RTE 620 - RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

14994

NFO0620

Complete

SCHEDULE

402

ESTIMATED COST (000's)

JURISDICTION:

BROADWATER ROADSTREET NAME:

PEIsle of Wight County

Complete 2,466CN

CompleteFROM: 0.031 MI. W. INT. ROUTE 681 TO: 0.061 MI. E.

INT. ROUTE 637 (1.3900 MI)

DESCRIPTION: 498RW

PROJECT LENGTH: 1.3900 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 3,365

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 44 753Bond Proceeds: CPR Bonds

0 0 0 0 0 0 984(S) Federal Formula STP: Federal

0 0 0 0 0 0 246(S) Federal Formula STP: State Bond Match

0 0 0 0 0 0 369Revenue Sharing Funds: Local Match

0 0 0 0 0 0 369Revenue Sharing Funds: State Match

0 0 0 0 0 0 230(S) Secondary Formula: Federal

0 0 0 0 0 0 9(S) Secondary Formula: Federal/State

0 0 0 0 0 0 212(S) Secondary Formula: State

0 0 0 0 0 0 58(S) Secondary Formula: State Match

0 0 0 0 0 0 92(S) Telecommunications: State

0 0 0 0 0 0 44 3,321Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

RTE 621 OVER PASSENGER SWAMP VA STR.

6031

PROJECT

UPC NO.:

ROUTE:

100951

NFO0621

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

250

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEIsle of Wight County

FY2016 650CN

FY2015FROM: 1.10 Mi From Int. Rte. 635 TO: 1.11Mi From Int.

Rte. 635

DESCRIPTION: 133RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,033

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 150Bridge Replacement: Federal

0 0 0 0 0 0 38Soft Match: Federal

0 0 0 0 0 0 676STP: Bridge - Federal

0 0 0 0 0 0 169STP: Bridge - Soft Match

0 0 0 0 0 0 0 1,033Total

294 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

RTE 637 OVER NUBY RUN VA STR. 6045

PROJECT

UPC NO.:

ROUTE:

91168

NFO0637

Complete

SCHEDULE

230

ESTIMATED COST (000's)

JURISDICTION:

Orbit RoadSTREET NAME:

PEIsle of Wight County

FY2014 1,019CN

UnderwayFROM: 0.016 MI. SOUTH OF NUBY RUN TO: 0.017 MI.

NORTH OF NUBY RUN

DESCRIPTION: 374RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,622

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 24Bond Match: State Bond Match

0 0 0 0 0 0 95Bridge Replacement: Federal

0 0 0 0 0 0 129(S) Secondary Formula: Federal

0 0 0 0 0 0 32(S) Secondary Formula: State Match

0 0 0 0 0 4 0STP: Bridge - Federal

0 0 0 0 0 1 0STP: Bridge - Soft Match

325 0 0 0 0 594 150STP: BROS - Federal

81 0 0 0 0 149 38STP: BROS - Soft Match

0 0 0 0 0 407 748 468Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

TURNER DRIVE INTERSECTION

IMPROVEMENTS AT BENNS CHURCH BLVD

PROJECT

UPC NO.:

ROUTE:

103021

NFO0644

MPO projectREPORT NOTE:

FY2018

SCHEDULE

50

ESTIMATED COST (000's)

JURISDICTION:

Turner DriveSTREET NAME:

PEIsle of Wight County

FY2018 220CN

FY2018FROM: Benns Church (Route 10/32) TO: Benns Church

(Entersection)

DESCRIPTION: 30RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 300

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 240 0 0 0 0RSTP (STP Regional): MPO - Federal

0 0 60 0 0 0 0RSTP (STP Regional): MPO - State Match

0 0 300 0 0 0 0 0Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

RTE 680 OVER STALLINGS CREEK VA STR.

6075

PROJECT

UPC NO.:

ROUTE:

93080

NFO0680

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

150

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEIsle of Wight County

FY2016 851CN

FY2015FROM: 1.0 Mi. from Int. Rte. 683 TO: 1.0 Mi. from Int. Rte.

683

DESCRIPTION: 100RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,101

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 250 266 0 365STP: BROS - Federal

0 0 0 63 66 0 91STP: BROS - Soft Match

0 0 0 313 332 0 0 456Total

06/19/2013 295

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

CAPITAL TRAIL ACCESS OFF JOHN TYLER

HWY & MONTICELLO AVE

PROJECT

UPC NO.:

ROUTE:

104327

NFO0005

New Project

FY2014

SCHEDULE

10

ESTIMATED COST (000's)

JURISDICTION:

John Tyler Highway/Monticello AveSTREET NAME:

PEJames City County

FY2015 40CNFROM: 600' W and 400' E of Rte 321/Rt 5 Intersection TO:

Capital Trail (0.0100 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.0100 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 50

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 25 0Revenue Sharing Funds: Local Match

0 0 0 0 0 25 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 50 0Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

BRIDGE REPLACEMENT RTE 601 OVER

DIASCUND CREEK, FED ID 10516

PROJECT

UPC NO.:

ROUTE:

98823

NFO0601

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

175

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEJames City County

FY2019 1,029CN

FY2018FROM: 0.87 Mi to Int Rte. 603 TO: 0.87 Mi to Rte. 603DESCRIPTION: 150RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,354

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 225(S) Secondary Formula: Federal

0 0 0 0 0 0 56(S) Secondary Formula: State Match

0 474 0 0 0 0 0STP: Bridge - Federal

0 119 0 0 0 0 0STP: Bridge - Soft Match

0 94 290 0 0 0 0STP: BROS - Federal

0 24 73 0 0 0 0STP: BROS - Soft Match

0 711 363 0 0 0 0 281Total

296 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

FOUR LANE WIDENING FRM LIBRARY TO RT

60

PROJECT

UPC NO.:

ROUTE:

100920

NFO0607

Underway

SCHEDULE

1,452

ESTIMATED COST (000's)

JURISDICTION:

CROAKER ROADSTREET NAME:

PEJames City County

FY2018 11,208CN

FY2015FROM: RTE 60 TO: LIBRARY (1.0000 MI)DESCRIPTION: 337RW

PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 12,998

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 616(S) Federal Formula STP: Federal

0 0 0 0 0 0 154(S) Federal Formula STP: State Bond Match

0 1,600 400 0 0 0 0RSTP (STP Regional): MPO - Federal

0 400 100 0 0 0 0RSTP (STP Regional): MPO - State Match

10 211 211 10 10 10 214(S) Telecommunications: State

9,054 2,211 711 10 10 10 10 984Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

RTE 612 - TRAIL

PROJECT

UPC NO.:

ROUTE:

13719

NFO0612

MPO Project. Balance to be provided by MPO. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

299

ESTIMATED COST (000's)

JURISDICTION:

LONGHILL ROADSTREET NAME:

PEJames City County

FY2015 1,437CN

UnderwayFROM: ROUTE 614 (CENTERVILLE RD) TO: ROUTE 199

(2.8000 MI)

DESCRIPTION: 1,835RW

PROJECT LENGTH: 2.8000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 3,570

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 285CMAQ: Federal 3,285

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

RTE 612 - PAVED SHOULDER ALONG

LONGHILL ROAD

PROJECT

UPC NO.:

ROUTE:

71617

NFO0612

Project cancelled. Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

16

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEJames City County

FY2016 0CN

FY2015FROM: ROUTE 614 (CENTERVILLE ROAD) TO: ROUTE

199 (2.8000 MI)

DESCRIPTION: 0RW

PROJECT LENGTH: 2.8000 MISCOPE OF WORK: Safety TO 16

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 48CMAQ: Federal

0 0 0 0 0 0 16(S) Secondary Formula: Federal/State

-49 0 0 0 0 0 0 64Total

06/19/2013 297

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

SIGNAL UPGRADE AND INSTALL MEDIAN

BARRIER

PROJECT

UPC NO.:

ROUTE:

98279

NFO0612

Complete

SCHEDULE

73

ESTIMATED COST (000's)

JURISDICTION:

Longhill RoadSTREET NAME:

PEJames City County

Underway 242CNFROM: Longhill Road (Route 612) TO: Olde Towne Road

(Route 658)

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 315

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 361Highway Safety Improvements: Federal

0 0 0 0 0 0 40Highway Safety Improvements: State Match

-86 0 0 0 0 0 0 401Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

LONGHILL ROAD - ACCESS MANAGEMENT IN

FRONT OF THE 7-11

PROJECT

UPC NO.:

ROUTE:

104360

NFO0612

New Project

FY2014

SCHEDULE

12

ESTIMATED COST (000's)

JURISDICTION:

Longhill RoadSTREET NAME:

PEJames City County

FY2015 48CNFROM: 80' SE from Olde Town Road TO: 124' SE from

Olde Town Road (0.0100 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.0100 MISCOPE OF WORK: Other TO 60

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 30 0Revenue Sharing Funds: Local Match

0 0 0 0 0 30 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 60 0Total

298 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

RTE 615 - RECONSTRUCT TO 4 LANES

PROJECT

UPC NO.:

ROUTE:

50057

NFO0615

State funds - AC for future federal conversion. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

1,854

ESTIMATED COST (000's)

JURISDICTION:

IRONBOUND ROADSTREET NAME:

PEJames City County

Complete 8,072CN

CompleteFROM: 0.067 MILE SOUTH OF INTERSECTION ROUTE

616 TO: 0.005 MILES SOUTH OF ROUTE 747 (1.1200 MI)

DESCRIPTION: 4,153RW

PROJECT LENGTH: 1.1200 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 14,079

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 316Bond Match: State Bond Match

0 0 0 0 0 0 289(S) Federal Formula STP: Federal

0 0 0 0 0 0 100Local Project Contributions: Local

0 0 0 0 0 0 1,265Minimum Guarantee: Federal

0 0 0 0 0 0 737Non-Formula: State Match

0 0 0 0 0 0 950Revenue Sharing Funds: Local Match

0 0 0 0 0 0 950Revenue Sharing Funds: State Match

0 0 0 0 0 0 4,480RSTP (STP Regional): Federal

0 0 0 0 0 0 383RSTP (STP Regional): State Match

0 0 0 0 0 0 400(S) Secondary Formula: Federal

0 0 0 0 0 0 3,776(S) Secondary Formula: Federal/State

0 0 0 0 0 0 260(S) Secondary Formula: State

0 0 0 0 0 0 172(S) Secondary Formula: State Match

0 0 0 0 0 0 0 14,079Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

RTE 615 - PAVED SHOULDER ALONG ROUTE

615 & ROUTE 681

PROJECT

UPC NO.:

ROUTE:

71616

NFO0615

MPO Project. Balance to be provided by MPO. Required matching funds not shown. Revised

schedule required.

REPORT NOTE:

Underway

SCHEDULE

323

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEJames City County

FY2015 2,365CN

FY2014FROM: ROUTE 31 (JAMESTOWN ROAD) TO: ROUTE

613 (NEWS ROAD) (2.2000 MI)

DESCRIPTION: 849RW

PROJECT LENGTH: 2.2000 MISCOPE OF WORK: Safety TO 3,537

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3,114CMAQ: Federal 423

06/19/2013 299

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

CONSTRUCT SHOULDER BIKEWAY ALONG

AIRPORT RD

PROJECT

UPC NO.:

ROUTE:

83462

NFO0645

MPO Project. PE only, Revised schedule required. Balance to be provided by MPO.REPORT NOTE:

Underway

SCHEDULE

31

ESTIMATED COST (000's)

JURISDICTION:

AIRPORT RDSTREET NAME:

PEJames City County

FY2015 79CNFROM: RICHMOND RD (RTE 60) TO: MOORETOWN RD

(RTE 603)

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 110

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 24CMAQ: Federal

0 0 0 0 0 0 6CMAQ: State Match

80 0 0 0 0 0 0 30Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

ARRA COUNTY WIDE - PAVEMENT OVERLAY

VARIOUS ROADS

PROJECT

UPC NO.: 95044

NFOARRA09

ARRA UPC 95044, ARRA-C UPC 98870.REPORT NOTE:

FROM: TBD - VARIOUS TO: TBD - VARIOUS (10.0000

MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 748American Recovery and Reinvestment Act:

Urbanized Area > 200K

0 0 0 0 0 0 43RSTP (STP Regional): Federal

0 0 0 0 0 0 11RSTP (STP Regional): State Match

0 0 0 0 0 0 40(S) Secondary Formula: Federal/State

0 0 0 0 0 0 842Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

COUNTRY CLUB COURT, COUNTRY CLUB DR.,

AND LEXINGTON DR.

PROJECT

UPC NO.:

ROUTE:

104356

NFO9999

New Project

Underway

SCHEDULE

80

ESTIMATED COST (000's)

JURISDICTION:

Country Club Ct., Country Club Dr., & Lexington DrSTREET NAME:

PEJames City County

FY2015 320CNFROM: Longhill Road TO: 153 Country Club Drive (0.8500

MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.8500 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 400

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 200 0Revenue Sharing Funds: Local Match

0 0 0 0 0 200 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 400 0Total

300 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 642- RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

103391

NFO0642

Underway

SCHEDULE

910

ESTIMATED COST (000's)

JURISDICTION:

Old Cape Charles RoadSTREET NAME:

PENorthampton County

FY2022 4,212CN

FY2020FROM: 0.03 miles West of Route 1117 TO: 0.61 miles

West of Route 641 on Route 184 (1.6600 MI)

DESCRIPTION: 1,330RW

PROJECT LENGTH: 1.6600 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 6,452

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 3,189 1,990 0 0 0 0CTB Formula: High Priority - State

0 0 0 0 0 0 0(S) Residue Parcel Revenue: State

0 0 0 0 0 0 750(S) Secondary Formula: Federal/State

0 0 0 0 0 0 43(S) Secondary Formula: State

0 101 84 67 0 0 0(S) State Formula: Secondary - State

38 0 38 38 38 36 38(S) Telecommunications: State

0 3,291 2,112 105 38 38 37 831Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 609 - RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

8301

NFO0609

Town portion UPC 8301. Will be let with County portion UPC 8300. Revised Schedule

Required.

REPORT NOTE:

Complete

SCHEDULE

360

ESTIMATED COST (000's)

JURISDICTION:

PENNSYLVANIA AVESTREET NAME:

PEOnley

FY2014 1,137CN

UnderwayFROM: ROUTE 789, ONLEY TO: EAST CORPORATE

LIMITS ONLEY (0.4000 MI)

DESCRIPTION: 820RW

PROJECT LENGTH: 0.4000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,317

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,330Bond Proceeds: CPR Bonds

0 0 0 0 0 0 987(S) Secondary Formula: Federal/State

0 0 0 0 0 0 0 2,317Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

BRIDGE (FED ID 17757) RTE 308 OVER THREE

CREEK

PROJECT

UPC NO.:

ROUTE:

104965

NFO0308

FY2017

SCHEDULE

411

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESouthampton County

FY2019 2,843CN

FY2018FROM: 1000' beyond begining of bridge TO: 1000' beyond

end of bridge

DESCRIPTION: 100RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 3,354

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 758 1,307 618 0 0 0STP: Bridge - Federal

0 190 327 154 0 0 0STP: Bridge - Soft Match

0 948 1,634 772 0 0 0 0Total

06/19/2013 301

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 635 OVER N&W RAILROAD VA STR. 6042

PROJECT

UPC NO.:

ROUTE:

93078

NFO0635

Revised schedule required.REPORT NOTE:

FY2015

SCHEDULE

343

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESouthampton County

FY2016 1,372CN

FY2016DESCRIPTION: 5RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,720

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

137 614 289 194 142 0 0STP: BROS - Federal

34 154 72 48 36 0 0STP: BROS - Soft Match

0 768 361 242 178 172 0 0Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 659 OVER FLAT SWAMP VA STR. 6069

PROJECT

UPC NO.:

ROUTE:

93079

NFO0659

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

150

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESouthampton County

FY2015 575CN

FY2014FROM: 1.90 Mi to Int Rte. 665 TO: 1.90 MIle to Int. Rte.

665

DESCRIPTION: 100RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 825

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 60Bond Match: State Bond Match

0 0 0 0 0 0 242Bridge Replacement: Federal

0 0 0 222 196 0 0STP: BROS - Federal

0 0 0 56 49 0 0STP: BROS - Soft Match

0 0 0 278 245 0 0 302Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

ROUTE 671 OVER NOTTOWAY RIVER AND

NOTTOWAY RIVER ( TWO STRUC

PROJECT

UPC NO.:

ROUTE:

101495

NFO0671

Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

900

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESouthampton County

FY2020 9,240CN

FY2019FROM: Route 671 over Nottoway River and Nottoway River

TO: Route 671 over Nottoway River

DESCRIPTION: 150RW

29675,29676 -1PROJECT LENGTH: _ STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 10,290

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 130Bond Match: State Bond Match

0 0 0 0 0 0 520Bridge Replacement: Federal

0 3,069 1,800 1,500 0 0 0CTB Formula: Bridge - State

0 713 1,183 600 0 0 120STP: Bridge - Federal

0 178 296 150 0 0 30STP: Bridge - Soft Match

0 3,961 3,279 2,250 0 0 0 800Total

302 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

LOAFERS OAK RD OVER CYPRESS SWAMP

VA STRUC 6018

PROJECT

UPC NO.:

ROUTE:

85947

NFO0630

Complete

SCHEDULE

155

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESurry County

FY2014 493CN

UnderwayFROM: 1 mi to Int Rte 618 TO: 1.9 mi to Int Rte 616DESCRIPTION: 40RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 689

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 90Bond Match: State Bond Match

0 0 0 0 0 0 358Bridge Replacement: Federal

0 0 0 0 0 0 58(S) Secondary Formula: Federal

0 0 0 0 0 0 15(S) Secondary Formula: State Match

0 0 0 0 0 81 0STP: Bridge - Federal

0 0 0 0 0 20 0STP: Bridge - Soft Match

0 0 0 0 0 0 54STP: BROS - Federal

0 0 0 0 0 0 13STP: BROS - Soft Match

0 0 0 0 0 0 101 588Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

RTE 602 - WIDEN APPROACHES

PROJECT

UPC NO.:

ROUTE:

60499

NFO0602

Repeat Offender SafetyREPORT NOTE:

Complete

SCHEDULE

5

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESussex County

Complete 104CN

AT ROUTE 613DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 110

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 6Open Container Funds: Statewide

0 0 0 0 0 0 94Repeat Offender: Federal

10 0 0 0 0 0 0 100Total

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

BRIDGES ( FED ID 18304 18305, 18306) OVER

BLACKWATER RIVER

PROJECT

UPC NO.:

ROUTE:

104009

NFO0603

Underway

SCHEDULE

676

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESussex County

FY2018 3,862CN

FY2018DESCRIPTION: 75RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 4,613

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 436 475 0 0 0 0CTB Formula: Bridge - State

0 466 0 0 0 65 0STP: Bridge - Federal

0 117 0 0 0 16 0STP: Bridge - Soft Match

545 296 0 0 357 0 1,233STP: BROS - Federal

136 74 0 0 89 0 308STP: BROS - Soft Match

0 1,388 475 0 446 681 82 1,541Total

06/19/2013 303

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

NonMPOSecondary

PROGRAM/SYSTEM

STOKES RD OVER MAGUS MILL POND VA

STRUC 6054

PROJECT

UPC NO.:

ROUTE:

85946

NFO0635

Underway

SCHEDULE

160

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESussex County

FY2017 628CN

FY2015DESCRIPTION: 90RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 878

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 103(S) Secondary Formula: Federal

0 0 0 0 0 0 26(S) Secondary Formula: State Match

0 0 0 0 0 125 0STP: Bridge - Federal

0 0 0 0 0 31 0STP: Bridge - Soft Match

0 0 0 274 200 0 0STP: BROS - Federal

0 0 0 68 50 0 0STP: BROS - Soft Match

0 0 0 342 250 0 156 129Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

HRRR INTESECTION IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

95423

NFO0137

Underway

SCHEDULE

83

ESTIMATED COST (000's)

JURISDICTION:

Rochambeau DriveSTREET NAME:

PEYork County

FY2016 420CN

FY2016FROM: F-137 TO: Route 645DESCRIPTION: 15RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 518

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 463High Risk Rural: Federal

0 0 0 0 0 0 51High Risk Rural: State Match

4 0 0 0 0 0 0 514Total

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

ARRA - YORK 646/630/622/782 PAVEMENT

REHAB/OVERLAY

PROJECT

UPC NO.: 94460

NFOARRA09

FROM: VDOT PROVIDED WITH LIST FROM YORK TO:

VDOT PROVIDED WITH PRIORITY LIST FROM YORK

(7.8000 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,101American Recovery and Reinvestment Act:

Urbanized Area > 200K

0 0 0 0 0 0 71RSTP (STP Regional): Federal

0 0 0 0 0 0 18RSTP (STP Regional): State Match

0 0 0 0 0 0 1,189Total

304 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Secondary

MPO Area

Hampton RoadsSecondary

PROGRAM/SYSTEM

ARRA - YORK 134/716/ 690 CONSTRUCT

SIDEWALKS

PROJECT

UPC NO.: 94543

NFOARRA09

FROM: HAMPTON HWY, HUBBARD LANE, COMMONS

WAY TO: HAMPTON HWY, HUBBARD LANE,

COMMONS WAY (1.6000 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 351American Recovery and Reinvestment Act:

Urbanized Area > 200K

0 0 0 0 0 0 23RSTP (STP Regional): Federal

0 0 0 0 0 0 6RSTP (STP Regional): State Match

0 0 0 0 0 0 380Total

06/19/2013 305

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 13 - BRIDGE REPLACEMENT

PROJECT

UPC NO.:

ROUTE:

1904

FO0013

State funds - AC for future federal conversion.REPORT NOTE:

Complete

SCHEDULE

7,500

ESTIMATED COST (000's)

JURISDICTION:

SOUTH MILITARY HSTREET NAME:

PEChesapeake

Underway 166,272CN

CompleteFROM: 0.417 MILE WEST OF GILMERTON BRIDGE TO:

0.356 MILE EAST OF GILMERTON BRIDGE (0.7730 MI)

DESCRIPTION: 1,250RW

27144 84PROJECT LENGTH: 0.7730 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 175,022

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 11,724Bond Match: State Bond Match

0 0 0 0 0 0 17,104Bonus OA: Federal

0 0 0 0 0 0 45,780Bridge Replacement: Federal

0 0 0 0 0 0 5,989Demonstration Funds: Federal

0 0 0 0 0 0 1,381Federal Formula STP: Federal

0 0 0 0 0 0 221Federal Formula STP: State Bond Match

0 0 0 0 0 0 629Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 16,620Minimum Guarantee: Federal

0 0 0 0 0 3,101 11,462NHPP: Bridge - Federal

0 0 0 0 0 775 2,865NHPP: Bridge - Soft Match

0 0 0 0 0 0 1,362NHPP: Statewide - Federal

0 0 0 0 0 0 340NHPP: Statewide - Soft Match

0 0 0 0 0 0 977Non-Formula: State

0 0 0 0 0 0 12Non-Formula: Statewide

0 0 0 0 0 0 3,154Priority Transportation Funds: State

0 0 0 0 0 0 1Residue Parcel Revenue: State

0 0 0 0 0 0 3,660RSTP (STP Regional): Federal

0 0 0 0 0 0 47RSTP (STP Regional): Statewide

0 0 0 0 0 0 4,377Soft Match: Federal

0 0 0 0 0 0 222Special Grant Projects: Federal

0 0 0 0 0 0 173State Formula: Urban - Local Match

0 0 0 0 0 0 5,000TEA-21 High Priority Funds: Statewide

0 0 0 0 0 0 18,573Urban Formula: Federal

0 0 0 0 0 0 1,347Urban Formula: Federal/State

0 0 0 0 0 0 9,226Urban Formula: State

0 0 0 0 0 0 9,268Urban Formula: State Match

-369 0 0 0 0 0 3,876 171,515Total

306 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

MOUNT PLEASANT RD - WIDEN TO 4-LANES

PROJECT

UPC NO.:

ROUTE:

84359

NFO0165

PE only. Accruing funds for RW. MPO Project. Revised schedule required. Balance to be

provided by MPO.

REPORT NOTE:

Underway

SCHEDULE

1,495

ESTIMATED COST (000's)

JURISDICTION:

Mount Pleasant RdSTREET NAME:

PEChesapeake

FY2019 14,159CN

FY2016FROM: Chesapeake Expressway (RT 168) TO: Etheridge

Rd (0.8000 MI)

DESCRIPTION: 14,392RW

PROJECT LENGTH: 0.8000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 30,046

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,230RSTP (STP Regional): Federal

0 0 0 0 0 0 308RSTP (STP Regional): State Match

28,509 0 0 0 0 0 0 1,538Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 337 - WIDEN TO 4 LANES

PROJECT

UPC NO.:

ROUTE:

18591

NFO0337

MPO Project - Locally Administered.REPORT NOTE:

Underway

SCHEDULE

938

ESTIMATED COST (000's)

JURISDICTION:

Portsmouth BoulevardSTREET NAME:

PEChesapeake

FY2017 9,229CN

FY2015FROM: Suffolk/Chesapeake City Line TO: Westbound

Ramp to I-664 Southbound (1.0200 MI)

DESCRIPTION: 3,342RW

PROJECT LENGTH: 1.0200 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 13,509

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0Federal Formula STP: Federal

0 0 0 0 0 0 2General Fund: State

0 0 0 0 0 0 3Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 800Non-Formula: State

0 0 0 0 0 0 400Non-Formula: Statewide

0 0 0 0 0 0 10,565RSTP (STP Regional): Federal

0 0 0 0 0 0 1,841RSTP (STP Regional): State Match

0 0 0 0 0 0 1,600RSTP (STP Regional): Statewide

0 0 0 0 0 0 2State Formula: Urban - Local Match

0 0 0 0 0 0 103Urban Formula: Federal

0 0 0 0 0 0 87Urban Formula: Federal/State

0 0 0 0 0 0 339Urban Formula: State

0 0 0 0 0 0 38Urban Formula: State Match

-2,270 0 0 0 0 0 0 15,779Total

06/19/2013 307

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

SOUTHEASTERN EXPRESSWAY - 4 LANE (PE

ONLY IN SYIP)

PROJECT

UPC NO.:

ROUTE:

64058

FOU000

Corridor Preservation. Linked to UPC 16556. Partial RW only.REPORT NOTE:

Underway

SCHEDULE

20

ESTIMATED COST (000's)

JURISDICTION:

SOUTHEAST P&GSTREET NAME:

PEChesapeake

CN

N/AFROM: OAK GROVE CONNECTOR TO: ECLDESCRIPTION: 2,992RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 3,012

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 11Federal Formula STP: Federal

0 0 0 0 0 0 7Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 400Minimum Guarantee: Federal

0 0 0 0 0 0 0Non-Formula: State

0 0 0 0 0 0 1RSTP (STP Regional): Federal

0 0 0 0 0 0 0State Formula: Urban - Local Match

0 0 0 0 0 0 194Urban Formula: Federal

0 0 0 0 0 0 3Urban Formula: State

0 0 0 0 0 0 147Urban Formula: State Match

2,250 0 0 0 0 0 0 762Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

REDESIGN INTERSECTION

PROJECT

UPC NO.:

ROUTE:

86607

NFOU000

Complete

SCHEDULE

370

ESTIMATED COST (000's)

JURISDICTION:

Oak GroveSTREET NAME:

PEChesapeake

Underway 1,443CN

CompleteFROM: 0.27 Miles East of Knells Ridge Road TO: 0.44

Miles East of Knells Ridge Road

DESCRIPTION: 195RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 2,009

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,827Highway Safety Improvements: Federal

0 0 0 0 0 0 203Highway Safety Improvements: State Match

-22 0 0 0 0 0 0 2,030Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HSIP PROACTIVE SAFETY PROJECTS CITY OF

CHESAPEAKE

PROJECT

UPC NO.: 86614

NFODistrict-wide

City of Chesapeake Safety ImprovementsDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 797Highway Safety Improvements: Federal

0 0 0 0 0 0 89Highway Safety Improvements: State Match

0 0 0 0 0 0 886Total

308 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CHESAPEAKE EMERGENCY VEHICLE

PREEMPTION

PROJECT

UPC NO.:

ROUTE:

100537

NFOU000

MPO project. Locally administered.REPORT NOTE:

Complete

SCHEDULE

5

ESTIMATED COST (000's)

JURISDICTION:

Various Locations CitywideSTREET NAME:

PEChesapeake

Complete 498CN

FROM: Various Locations TO: Various LocationsDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 502

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 400CMAQ: Federal

0 0 0 0 0 0 100CMAQ: State Match

0 0 0 0 0 0 2Local Project Contributions: Local

0 0 0 0 0 0 0 502Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CHESAPEAKE TRAFFIC MANAGEMENT

CENTER & SYSTEM ADDITIONS

PROJECT

UPC NO.:

ROUTE:

100538

NFOU000

MPO project. Locally administered.REPORT NOTE:

Underway

SCHEDULE

300

ESTIMATED COST (000's)

JURISDICTION:

Various Locations CitywideSTREET NAME:

PEChesapeake

FY2014 1,700CN

FROM: Various Locations TO: Various LocationsDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 2,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

560 0 0 0 0 800 240CMAQ: MPO - Federal

140 0 0 0 0 200 60CMAQ: MPO - State Match

0 0 0 0 0 700 1,000 300Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITY OF CHESAPEAKE - FORMULA CITY

PAYMENT

PROJECT

UPC NO.: T13591

NFOProject Report Req'd

New Project

FROM: City of Chesapeake TO: City of ChesapeakeDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 2,643 2,185 1,749 0 0State Formula: Urban - State

MPO Area

NonMPOUrban

PROGRAM/SYSTEM

CHINCOTEAGUE BALANCE ENTRY ACCOUNT

PROJECT

UPC NO.: 70495

NFOBalance Entry

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 1 1 0 0 0 0State Formula: Urban - Local Match

0 35 29 23 0 0 0State Formula: Urban - State

35 29 23 0 0 0 0Total

06/19/2013 309

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

NonMPOUrban

PROGRAM/SYSTEM

IMPROVEMENT OF THE HALIFAX STREET

BRIDGE

PROJECT

UPC NO.:

ROUTE:

93304

NFO0610

Revised estimate requiredREPORT NOTE:

Complete

SCHEDULE

301

ESTIMATED COST (000's)

JURISDICTION:

Halifax StreetSTREET NAME:

PEEmporia

Underway 516CN

CompleteFROM: 126 ft (north) of the CL of the Halifax Street Bridge

TO: 129 ft (south) of the CL of the Halifax Street Bridge

(0.0480 MI)

DESCRIPTION: 93RW

29673 -1PROJECT LENGTH: 0.0480 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 910

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 327Federal Formula STP: Federal

0 0 0 0 0 0 63Federal Formula STP: State Bond Match

0 0 0 0 0 0 8Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 5State Formula: Urban - Local Match

0 0 0 0 0 0 253Urban Formula: Federal

0 0 0 0 0 0 247Urban Formula: State

0 0 0 0 0 0 74Urban Formula: State Match

-66 0 0 0 0 0 0 976Total

MPO Area

NonMPOUrban

PROGRAM/SYSTEM

EMPORIA BALANCE ENTRY ACCOUNT

PROJECT

UPC NO.: 70507

NFOBalance Entry

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 1 1 1 0 0 0State Formula: Urban - Local Match

0 70 58 46 0 0 0State Formula: Urban - State

71 59 47 0 0 0 0Total

MPO Area

NonMPOUrban

PROGRAM/SYSTEM

EAST ATLANTIC STREET RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

93307

NFOU000

Underway

SCHEDULE

50

ESTIMATED COST (000's)

JURISDICTION:

East Atlantic StreetSTREET NAME:

PEEmporia

FY2014 633CNFROM: US 58 TO: West of Georgia Pacific Entrance

(0.8500 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.8500 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 683

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3Bond Match: State Bond Match

0 0 0 0 0 0 11Minimum Guarantee: Federal

0 0 0 0 0 215 0Revenue Sharing Funds: Local Match

0 0 0 0 0 215 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 5State Formula: Urban - Local Match

0 0 0 0 0 0 20Urban Formula: Federal

0 0 0 0 0 0 169Urban Formula: Federal/State

0 0 0 0 0 0 41Urban Formula: State

0 0 0 0 0 0 5Urban Formula: State Match

0 0 0 0 0 0 430 253Total

310 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

NonMPOUrban

PROGRAM/SYSTEM

HUNTERDALE ROAD RESTORATION AND

SHOULDER IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

94325

NFO0641

Split from UPC 52057 07/31/09REPORT NOTE:

Complete

SCHEDULE

445

ESTIMATED COST (000's)

JURISDICTION:

HUNTERDALE RDSTREET NAME:

PEFranklin

FY2014 1,775CN

UnderwayFROM: ROUTE 58 (CLAY STREET) TO: NORFOLK

SOUTHERN RAILROAD (0.4290 MI)

DESCRIPTION: 403RW

PROJECT LENGTH: 0.4290 MISCOPE OF WORK: Restoration and Rehabilitation TO 2,623

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 631Federal Formula STP: Federal

0 0 0 0 0 0 93Federal Formula STP: State Bond Match

0 0 0 0 0 0 399Local Project Contributions: Local

0 0 0 0 0 0 28Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 9State Formula: Urban - Local Match

0 0 0 0 0 0 631Urban Formula: Federal

0 0 0 0 0 0 720Urban Formula: State

0 0 0 0 0 0 195Urban Formula: State Match

-84 0 0 0 0 0 0 2,706Total

MPO Area

NonMPOUrban

PROGRAM/SYSTEM

FRANKLIN BALANCE ENTRY ACCOUNT

PROJECT

UPC NO.: 70511

NFOBalance Entry

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 2 2 1 0 0 0State Formula: Urban - Local Match

0 102 84 67 0 0 0State Formula: Urban - State

104 86 69 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE TRAFFIC SIGNAL HRBT DIVERSION

SIGNAL TIMINGS

PROJECT

UPC NO.:

ROUTE:

97716

NFO0000

MPO project. Locally Administered.REPORT NOTE:

Complete

SCHEDULE

160

ESTIMATED COST (000's)

JURISDICTION:

32 Signals in SE area of CitySTREET NAME:

PEHampton

CNFROM: CITYWIDE - AREA AROUND HRBT TO:

CITYWIDE 32 INTERSECTIONS

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 160

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 128CMAQ: Federal

0 0 0 0 0 0 32CMAQ: State Match

0 0 0 0 0 0 0 160Total

06/19/2013 311

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE TRAFFIC SIGNAL SYSTEM

RETIMING

PROJECT

UPC NO.:

ROUTE:

97717

NFO0000

MPO project. Locally Administered.REPORT NOTE:

Underway

SCHEDULE

392

ESTIMATED COST (000's)

JURISDICTION:

Retime 10 Arterial StreetsSTREET NAME:

PEHampton

CN

FROM: Citywide TO: CitywideDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 392

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 314CMAQ: Federal

0 0 0 0 0 0 78CMAQ: State Match

0 0 0 0 0 0 0 392Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE TRAFFIC SIGNAL UPGRADE

PROJECT

UPC NO.:

ROUTE:

97718

NFO0000

MPO project. Locally Administered. Balance redistributed by the MPO.REPORT NOTE:

Underway

SCHEDULE

20

ESTIMATED COST (000's)

JURISDICTION:

Citywide Signal System UpgradeSTREET NAME:

PEHampton

FY2014 1,949CN

FY2014FROM: CITYWIDE TO: CITYWIDEDESCRIPTION: 0RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,969

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,919CMAQ: Federal

0 0 0 0 0 0 60CMAQ: MPO - Federal

0 0 0 0 0 0 15CMAQ: MPO - State Match

0 0 0 0 0 0 45CMAQ: State Match

0 0 0 0 0 0 0Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 8Urban Formula: State

-79 0 0 0 0 0 0 2,048Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INSTALL NEW TRAFFIC SIGNAL AT

KECOUGHTAN RD AND POWHATAN PWY

PROJECT

UPC NO.:

ROUTE:

89900

NFO0060

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

38

ESTIMATED COST (000's)

JURISDICTION:

Kecoughtan RdSTREET NAME:

PEHampton

Complete 214CN

Intersection of Kecoughtan Rd and Powhatan PkwyDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 252

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 190Highway Safety Improvements: Federal

0 0 0 0 0 0 21Highway Safety Improvements: State Match

0 0 0 0 0 7 35Local Project Contributions: Local

0 0 0 0 0 0 7 246Total

312 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

MAGRUDER BOULEVARD - CONSTRUCT RIGHT

TURN ACCELERATION LANE

PROJECT

UPC NO.:

ROUTE:

86678

NFO0134

Locally Administered.REPORT NOTE:

Underway

SCHEDULE

15

ESTIMATED COST (000's)

JURISDICTION:

Magruder BoulevardSTREET NAME:

PEHampton

FY2014 147CNFROM: At Intersection of Butler Farm Road TO: 300 Ft.

North of Intersection (0.0600 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.0600 MISCOPE OF WORK: Safety TO 162

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 106Highway Safety Improvements: Federal

0 0 0 0 0 0 12Highway Safety Improvements: State Match

0 0 0 0 0 15 29Local Project Contributions: Local

0 0 0 0 0 0 15 147Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

MAGRUDER BLVD @ SEMPLE FARM RD.-

IMPROVE DRAINAGE & LTL

PROJECT

UPC NO.:

ROUTE:

89904

NFO0134

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

25

ESTIMATED COST (000's)

JURISDICTION:

Magruder BoulevardSTREET NAME:

PEHampton

Underway 142CNFROM: Magruder Boulevard at Intersection of TO: Semple

Farm Road

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 167

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 145Highway Safety Improvements: Federal

0 0 0 0 0 0 16Highway Safety Improvements: State Match

0 0 0 0 0 0 6Local Project Contributions: Local

0 0 0 0 0 0 0 167Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ARMISTEAD AVE. - SIGNAL TIMING

COORDINATION/OPTIMIZATION

PROJECT

UPC NO.:

ROUTE:

89905

NFO0134

Locally Administered. PE only.REPORT NOTE:

Complete

SCHEDULE

65

ESTIMATED COST (000's)

JURISDICTION:

Armistead AvenueSTREET NAME:

PEHampton

CN

FROM: Pembroke Avenue TO: Settlers Landing RoadDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 65

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 41Highway Safety Improvements: Federal

0 0 0 0 0 0 5Highway Safety Improvements: State Match

0 0 0 0 0 0 20Local Project Contributions: Local

0 0 0 0 0 0 0 65Total

06/19/2013 313

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

MERCURY BLVD. - SIGNAL TIMING

COORDINATION/OPTIMIZATION

PROJECT

UPC NO.:

ROUTE:

89908

NFO0143

Locally Administered. PE only.REPORT NOTE:

Complete

SCHEDULE

58

ESTIMATED COST (000's)

JURISDICTION:

Mercury BoulevardSTREET NAME:

PEHampton

CN

Mercury Boulevard at Intersection of Woodland Rd.DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 58

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 30Highway Safety Improvements: Federal

0 0 0 0 0 0 3Highway Safety Improvements: State Match

0 0 0 0 0 0 25Local Project Contributions: Local

0 0 0 0 0 0 0 58Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WIDEN TODDS LN -ADDITION RIGHT TURN LA

LEFT TURN BIG BETHEL

PROJECT

UPC NO.:

ROUTE:

83454

NFO0152

MPO project, Locally Administered;REPORT NOTE:

Complete

SCHEDULE

500

ESTIMATED COST (000's)

JURISDICTION:

Todds LaneSTREET NAME:

PEHampton

FY2015 2,928CN

Underway Todds La/Big Bethel Rd Intersection ImprovementsDESCRIPTION: 1,235RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 4,663

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,182CMAQ: Federal

0 0 0 0 0 0 546CMAQ: State Match

0 0 0 0 0 163 1,772Local Project Contributions: Local

0 0 0 0 0 0 163 4,500Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INSTALL NEW TRAFFIC SIGNAL AT TODDS LN

AND WINCHESTER DR

PROJECT

UPC NO.:

ROUTE:

89899

NFO0152

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

4

ESTIMATED COST (000's)

JURISDICTION:

Todds LaneSTREET NAME:

PEHampton

Complete 203CN

Intersection of Todds Lane and Winchester DriveDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 208

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 177Highway Safety Improvements: Federal

0 0 0 0 0 0 20Highway Safety Improvements: State Match

0 0 0 0 0 0 7Local Project Contributions: Local

0 0 0 0 0 0 4Safety Funds: Hazard Elimination

0 0 0 0 0 0 0 208Total

314 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE SIGNAL TO MAST ARM DESIGN AT

TODDS LN AND WHEALTON

PROJECT

UPC NO.:

ROUTE:

89901

NFO0152

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

7

ESTIMATED COST (000's)

JURISDICTION:

Todds LaneSTREET NAME:

PEHampton

Complete 216CN

Intersection of Todds Lane and Whealton RoadDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 223

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 200Highway Safety Improvements: Federal

0 0 0 0 0 0 22Highway Safety Improvements: State Match

0 0 0 0 0 0 0Local Project Contributions: Local

0 0 0 0 0 0 0 223Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

TODD'S LANE MODIFY EXISTING SIGNAL

PROJECT

UPC NO.:

ROUTE:

93601

NFO0152

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

8

ESTIMATED COST (000's)

JURISDICTION:

Todd's LaneSTREET NAME:

PEHampton

Underway 270CN

FROM: Todd's Lane TO: Farmington Blvd/Orcutt AveDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 278

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 149Highway Safety Improvements: Federal

0 0 0 0 0 0 17Highway Safety Improvements: State Match

0 0 0 0 0 0 0Local Project Contributions: Local

0 0 0 0 0 0 46Safety Funds: Bike/Ped

0 0 0 0 0 0 66Safety Funds: Hazard Elimination

0 0 0 0 0 0 0 278Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE SIGNAL TO MAST ARM DESIGN AT

LASALLE AND VICTORIA

PROJECT

UPC NO.:

ROUTE:

89903

NFO0167

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

4

ESTIMATED COST (000's)

JURISDICTION:

LaSalle AvenueSTREET NAME:

PEHampton

Complete 264CN

Intersection of LaSalle Avenue & Victoria BoulevardDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 268

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 200Highway Safety Improvements: Federal

0 0 0 0 0 0 22Highway Safety Improvements: State Match

0 0 0 0 0 0 6Local Project Contributions: Local

0 0 0 0 0 0 41Safety Funds: Bike/Ped

0 0 0 0 0 0 0 268Total

06/19/2013 315

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

PEMBROKE AVE. - SIGNAL TIMING

COORDINATION/OPTIMIZATION

PROJECT

UPC NO.:

ROUTE:

89907

NFO0167

Locally Administered. PE only.REPORT NOTE:

Complete

SCHEDULE

58

ESTIMATED COST (000's)

JURISDICTION:

Pembroke AvenueSTREET NAME:

PEHampton

CN

FROM: Settlers Landing Road TO: LaSalle AvenueDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 58

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 30Highway Safety Improvements: Federal

0 0 0 0 0 0 3Highway Safety Improvements: State Match

0 0 0 0 0 0 25Local Project Contributions: Local

0 0 0 0 0 0 0 58Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CONSTRUCT LEFT TURN LANES ON FOX HILL

ROAD

PROJECT

UPC NO.:

ROUTE:

86488

NFO0169

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

105

ESTIMATED COST (000's)

JURISDICTION:

Fox Hill RoadSTREET NAME:

PEHampton

FY2014 648CN

UnderwayFoxhill Road at Clemwood ParkwayDESCRIPTION: 105RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 858

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 315Highway Safety Improvements: Federal

0 0 0 0 0 0 35Highway Safety Improvements: State Match

0 0 0 0 0 87 421Local Project Contributions: Local

0 0 0 0 0 0 87 771Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RECONSTRUCTION OF C&G, SIDEWALKS,

CROSSWALKS & LIGHTING

PROJECT

UPC NO.:

ROUTE:

102973

NFO0169

Complete

SCHEDULE

70

ESTIMATED COST (000's)

JURISDICTION:

Mallory StreetSTREET NAME:

PEHampton

FY2014 490CN

UnderwayFROM: Mercury Boulevard (Route 258) TO: West Sewell

Street (0.1200 MI)

DESCRIPTION: 140RW

PROJECT LENGTH: 0.1200 MISCOPE OF WORK: New Construction Roadway TO 700

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 198Local Project Contributions: Local

0 0 0 0 0 0 251Revenue Sharing Funds: Local Match

0 0 0 0 0 0 251Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 700Total

316 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WYTHE CREEK ROAD - WIDEN TO 4 LANES

PROJECT

UPC NO.:

ROUTE:

97715

NFO0172

MPO project. Balance provided by MPO.REPORT NOTE:

Underway

SCHEDULE

3,114

ESTIMATED COST (000's)

JURISDICTION:

Wythe Creek RoadSTREET NAME:

PEHampton

FY2019 16,417CN

FY2015FROM: Commander Shepard Blvd TO: NCL (Poquoson

CL) (1.0000 MI)

DESCRIPTION: 3,869RW

PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 23,400

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,440RSTP (STP Regional): Federal

3,561 0 0 3,121 3,580 1,518 0RSTP (STP Regional): MPO - Federal

890 0 0 780 895 379 0RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 360RSTP (STP Regional): State Match

6,876 0 0 3,902 4,475 4,451 1,897 1,800Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 258 - MERCURY BOULEVARD -

LANDSCAPING INTERCHANGE

PROJECT

UPC NO.:

ROUTE:

76680

FO0258

Urban Construction Initiative - matching funds provided in quarterly payment. No Local Match

per FY 2005 Budget Amendment. MG formula funding will be matched 50/50 with city funds.

REPORT NOTE:

Complete

SCHEDULE

65

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton

Complete 1,683CN

AT ROUTE 64 INTERCHANGEDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Landscaping/Beautification TO 1,748

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 870Local Project Contributions: Local

0 0 0 0 0 0 5NHPP: Statewide - Federal

0 0 0 0 0 0 1NHPP: Statewide - Soft Match

0 0 0 0 0 0 14Non-Formula: State

0 0 0 0 0 0 58RSTP (STP Regional): Federal

0 0 0 0 0 0 800Urban Formula: Federal

0 0 0 0 0 0 0 1,748Total

06/19/2013 317

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENTS AT MERCURY

BLVD & FOX HILL RD

PROJECT

UPC NO.:

ROUTE:

83370

NFO0258

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

11

ESTIMATED COST (000's)

JURISDICTION:

Mercury BlvdSTREET NAME:

PEHampton

Complete 451CN

FROM: Intersection of Mercury Blvd TO: at Fox Hill RoadDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 462

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 369CMAQ: Federal

0 0 0 0 0 0 92CMAQ: State Match

0 0 0 0 0 0 65Local Project Contributions: Local

-64 0 0 0 0 0 0 526Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE SIGNAL TO MAST ARM DESIGN AT

MERCURY BLD AND MALLORY

PROJECT

UPC NO.:

ROUTE:

89902

NFO0258

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

3

ESTIMATED COST (000's)

JURISDICTION:

Mercury BoulevardSTREET NAME:

PEHampton

Underway 222CN

Intersection of Mercury Blvd. and Mallory StreetDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 225

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 202Highway Safety Improvements: Federal

0 0 0 0 0 0 22Highway Safety Improvements: State Match

0 0 0 0 0 0 0Local Project Contributions: Local

0 0 0 0 0 0 0 225Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ARRA MERCURY BOULEVARD RESURFACING

PROJECT

UPC NO.: 93535

NFOARRA09

FROM: West City Limits to Big Bethel Road (Segment 2)

TO: Coliseum Drive to King Street (Segment 1) (3.4300

MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,829American Recovery and Reinvestment Act:

Flexible

318 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

MERCURY BLVD - INSTALL NEW SIDEWALKS

AND PEDESTRIAN LIGHTING

PROJECT

UPC NO.:

ROUTE:

104368

NFO0258

New Project

FY2014

SCHEDULE

115

ESTIMATED COST (000's)

JURISDICTION:

Mercury BoulevardSTREET NAME:

PEHampton

FY2016 960CN

FY2015FROM: 750' West of Coliseum Dr. TO: Armistead Avenue

(0.8000 MI)

DESCRIPTION: 100RW

PROJECT LENGTH: 0.8000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,175

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 588 0Revenue Sharing Funds: Local Match

0 0 0 0 0 588 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 1,175 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 351 - ADD TURN LANE

PROJECT

UPC NO.:

ROUTE:

81441

NFO0351

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

15

ESTIMATED COST (000's)

JURISDICTION:

Pembroke AvenueSTREET NAME:

PEHampton

Underway 591CN

CompleteAT ROUTE 134DESCRIPTION: 52RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 658

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 630Highway Safety Improvements: Federal

0 0 0 0 0 0 70Highway Safety Improvements: State Match

-42 0 0 0 0 0 0 700Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

PEMBROKE AVENUE - CONSTRUCT LEFT

TURN LANE

PROJECT

UPC NO.:

ROUTE:

86480

NFO0351

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

105

ESTIMATED COST (000's)

JURISDICTION:

Pembroke AvenueSTREET NAME:

PEHampton

FY2014 544CN

UnderwayE. Pembroke Ave & Grimes Rd Intersec Turn La ImprvDESCRIPTION: 35RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 684

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 428Highway Safety Improvements: Federal

0 0 0 0 0 0 48Highway Safety Improvements: State Match

0 0 0 0 0 209 0Local Project Contributions: Local

0 0 0 0 0 0 209 475Total

06/19/2013 319

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

BIG BETHEL ROAD - SIGNAL TIMING

COORDINATION/OPTIMIZATION

PROJECT

UPC NO.:

ROUTE:

89910

NFO0600

Locally Administered. PE only.REPORT NOTE:

Complete

SCHEDULE

75

ESTIMATED COST (000's)

JURISDICTION:

Big Bethel RoadSTREET NAME:

PEHampton

CN

FROM: Burton Street TO: North Park LaneDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 75

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 41Highway Safety Improvements: Federal

0 0 0 0 0 0 5Highway Safety Improvements: State Match

0 0 0 0 0 0 30Local Project Contributions: Local

0 0 0 0 0 0 0 75Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

BIG BETHEL ROAD UPGRADE EXISTING

SIGNAL

PROJECT

UPC NO.:

ROUTE:

93626

NFO0600

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

35

ESTIMATED COST (000's)

JURISDICTION:

Big Bethel RoadSTREET NAME:

PEHampton

Underway 251CN

FROM: Intersection of Big Bethel Road TO: Burton StreetDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 286

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 170Highway Safety Improvements: Federal

0 0 0 0 0 0 19Highway Safety Improvements: State Match

0 0 0 0 0 95 2Local Project Contributions: Local

0 0 0 0 0 0 95 191Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

FRANKLIN STREET - CONSTRUCTION OF NEW

ROADWAY SECTION

PROJECT

UPC NO.:

ROUTE:

104367

NFO9999

New Project

FY2014

SCHEDULE

80

ESTIMATED COST (000's)

JURISDICTION:

Franklin StreetSTREET NAME:

PEHampton

FY2015 445CN

FROM: Lincoln Street TO: Pembroke Avenue (0.1500 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.1500 MISCOPE OF WORK: New Construction Roadway TO 525

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 263 0Revenue Sharing Funds: Local Match

0 0 0 0 0 263 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 525 0Total

320 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

NORTH CAMPUS PARKWAY - FINAL OVERLAY

PROJECT

UPC NO.:

ROUTE:

104369

NFO9999

New Project

FY2014

SCHEDULE

10

ESTIMATED COST (000's)

JURISDICTION:

North Campus ParkwaySTREET NAME:

PEHampton

FY2014 295CNFROM: Magruder Boulevard TO: Commander Shepherd

Boulevard (0.7500 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.7500 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 305

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 140 0Revenue Sharing Funds: Local Match

0 0 0 0 0 140 0Revenue Sharing Funds: State Match

25 0 0 0 0 0 280 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

FREEMAN DR. RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

104372

NFO9999

New Project

FY2014

SCHEDULE

115

ESTIMATED COST (000's)

JURISDICTION:

Freeman DriveSTREET NAME:

PEHampton

FY2016 760CN

FY2015FROM: Armistead Avenue TO: 1800' West of Armistead

Avenue (0.3500 MI)

DESCRIPTION: 300RW

PROJECT LENGTH: 0.3500 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,175

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 588 0Revenue Sharing Funds: Local Match

0 0 0 0 0 588 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 1,175 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITY OF HAMPTON - 4 LANE SAUNDERS ROAD

PROJECT

UPC NO.:

ROUTE:

57047

NFOU000

MPO Project - Locally Administered.REPORT NOTE:

Complete

SCHEDULE

1,500

ESTIMATED COST (000's)

JURISDICTION:

SAUNDERS ROADSTREET NAME:

PEHampton

FY2014 13,450CN

UnderwayFROM: BIG BETHEL ROAD TO: CITY OF HAMPTON

WCL (0.7500 MI)

DESCRIPTION: 4,335RW

PROJECT LENGTH: 0.7500 MISCOPE OF WORK: New Construction Roadway TO 19,285

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 3,034 0Local Project Contributions: Local

0 0 0 0 0 0 1,610Non-Formula: State

0 0 0 0 0 0 13,001RSTP (STP Regional): Federal

0 0 0 0 0 0 1,640RSTP (STP Regional): State Match

0 0 0 0 0 0 3,034 16,251Total

06/19/2013 321

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

COMMANDER SHEPARD BOULEVARD PHASE

II 4 LANE DIVIDED

PROJECT

UPC NO.:

ROUTE:

60970

NFOU000

ARRA funds for RW on UPC 94440 - Urban Construction Initiative Project - matching funds

provided in quarterly payment. Phase II - RW & CN Only. PE funded in Phase I.

REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

COMMANDER SHEPARD BLVD.STREET NAME:

PEHampton

Underway 12,907CNFROM: INT. SAUNDERS RD. & BIG BETHEL RD. TO:

0.019 MI. W. INT. NORTH CAMPUS PKWY. (1.3100 MI)

DESCRIPTION: RW

PROJECT LENGTH: 1.3100 MISCOPE OF WORK: New Construction Roadway TO 12,907

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 14Federal Formula STP: Federal

0 0 0 0 0 0 64Local Project Contributions: Local

0 0 0 0 0 0 735(X) Local Project Contributions: State Match

0 0 0 0 0 0 534Minimum Guarantee: Federal

0 0 0 0 0 0 9,600RSTP (STP Regional): Federal

0 0 0 0 0 0 2,400RSTP (STP Regional): State Match

0 0 0 0 0 0 2,748Urban Formula: Federal

-3,188 0 0 0 0 0 0 16,096Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INT. IMPROVEMENTS- HAMPTON ROADS

CENTER PKWY AT BIG BETHEL

PROJECT

UPC NO.:

ROUTE:

83199

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

15

ESTIMATED COST (000's)

JURISDICTION:

HRCP BIG BETHELSTREET NAME:

PEHampton

Complete 270CNFROM: NORTHBOUND BIG BETHEL TO: EASTBOUND

HAMPTON RDS CENTER PARKWAY

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 285

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 204CMAQ: Federal

0 0 0 0 0 0 51CMAQ: State Match

0 0 0 0 0 0 30Local Project Contributions: Local

0 0 0 0 0 0 0 285Total

322 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENTS- BIG BETHEL

ROAD @ RADFORD DR

PROJECT

UPC NO.:

ROUTE:

83200

NFOU000

Locally Administered. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

15

ESTIMATED COST (000's)

JURISDICTION:

BIG BETHEL RD.STREET NAME:

PEHampton

Underway 271CN

CompleteFROM: BIG BETHEL RD TO: AT RADFORD DRDESCRIPTION: 0RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 286

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 216CMAQ: Federal

0 0 0 0 0 0 14CMAQ: State Match

0 0 0 0 0 0 56Local Project Contributions: Local

0 0 0 0 0 0 0 286Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WAYFINDER SIGNS

PROJECT

UPC NO.:

ROUTE:

84331

NFOU000

Locally Administered. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

110

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton

Complete 348CN

CitywideDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 458

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 280CMAQ: Federal

0 0 0 0 0 0 70CMAQ: State Match

0 0 0 0 0 53 55Local Project Contributions: Local

0 0 0 0 0 0 53 405Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE CCTV CAMERA LOCATIONS -

PHASE 2 (10 LOCATIONS)

PROJECT

UPC NO.:

ROUTE:

84364

NFOU000

Locally Administered. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

10

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PEHampton

Complete 545CN

CitywideDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 555

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 500CMAQ: Federal

0 0 0 0 0 0 55Local Project Contributions: Local

0 0 0 0 0 0 0 555Total

06/19/2013 323

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ANDREWS BLVD. AT WOODLAND RD. - ADD

LEFT TURN LANE

PROJECT

UPC NO.:

ROUTE:

86489

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

100

ESTIMATED COST (000's)

JURISDICTION:

Andrews BoulevardSTREET NAME:

PEHampton

FY2014 632CN

UnderwayWoodland Rd. / Andrews Blvd. Intersection Improvements

(0.1000 MI)

DESCRIPTION: 65RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Safety TO 797

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 432Highway Safety Improvements: Federal

0 0 0 0 0 0 48Highway Safety Improvements: State Match

0 0 0 0 0 317 0Local Project Contributions: Local

0 0 0 0 0 0 317 480Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

LASALLE AVENUE - CONSTRUCT LEFT TURN

LANE

PROJECT

UPC NO.:

ROUTE:

86490

NFOU000

Locally Administered. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

95

ESTIMATED COST (000's)

JURISDICTION:

LaSalle AvenueSTREET NAME:

PEHampton

Complete 401CN

CompleteAt Intersection of Queen StreetDESCRIPTION: 0RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 496

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 306Highway Safety Improvements: Federal

0 0 0 0 0 0 34Highway Safety Improvements: State Match

0 0 0 0 0 0 156Local Project Contributions: Local

0 0 0 0 0 0 0 496Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

SIGNAL IMPROVEMENTS - NEW MAST ARM

-MEDIAN CLOSURE 500'

PROJECT

UPC NO.:

ROUTE:

86494

NFOU000

Locally Administered. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

53

ESTIMATED COST (000's)

JURISDICTION:

Big Bethel RoadSTREET NAME:

PEHampton

Underway 99CN

At Intersection of Thomas Nelson Drive & Westpark LaneDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 151

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 236Highway Safety Improvements: Federal

0 0 0 0 0 0 26Highway Safety Improvements: State Match

-111 0 0 0 0 0 0 262Total

324 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENTS-EXECUTIVE

DRIVE/MARCELLA ROAD

PROJECT

UPC NO.:

ROUTE:

86500

NFOU000

Locally Administered. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

45

ESTIMATED COST (000's)

JURISDICTION:

Executive DriveSTREET NAME:

PEHampton

Underway 184CN

At Intersection of Marcella RoadDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 229

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 399Highway Safety Improvements: Federal

0 0 0 0 0 0 44Highway Safety Improvements: State Match

-215 0 0 0 0 0 0 443Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

COLISEUM DRIVE - INSTALL TRAFFIC SIGNAL

PROJECT

UPC NO.:

ROUTE:

86501

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

49

ESTIMATED COST (000's)

JURISDICTION:

Coliseum DriveSTREET NAME:

PEHampton

Underway 234CN

At North Coliseum Crossing EntranceDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 283

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 198Highway Safety Improvements: Federal

0 0 0 0 0 0 22Highway Safety Improvements: State Match

0 0 0 0 0 26 37Local Project Contributions: Local

0 0 0 0 0 0 26 257Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

NORTH KING STREET IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

91688

NFOU000

Complete

SCHEDULE

449

ESTIMATED COST (000's)

JURISDICTION:

NORTH KING STREETSTREET NAME:

PEHampton

Complete 3,762CN

CompleteFROM: MERCURY BOULEVARD TO: LITTLE BLACK

RIVER ROAD (0.5700 MI)

DESCRIPTION: 0RW

PROJECT LENGTH: 0.5700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 4,211

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,211Local Project Contributions: Local

0 0 0 0 0 0 1,000Revenue Sharing Funds: Local Match

0 0 0 0 0 0 1,000Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 4,211Total

06/19/2013 325

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

BRIDGE STREET OVER SALTERS CREEK VA

STR. 8009

PROJECT

UPC NO.:

ROUTE:

93081

NFOU000

Locally Administered.REPORT NOTE:

Underway

SCHEDULE

15

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton

FY2015 3,772CNFROM: Bridge street over Salters Creek VA Str. 8009 TO:

Bridge street over Salters Creek Str 8009

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 3,787

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 99Bond Match: State Bond Match

0 0 0 0 0 0 814Bridge Replacement: Federal

0 0 0 0 1,238 0 0CTB Formula: Bridge - State

0 0 0 0 0 850 0Local Project Contributions: Local

0 0 0 0 0 0 105Soft Match: Federal

84 0 0 0 0 298 163STP: BROS - Federal

21 0 0 0 0 74 41STP: BROS - Soft Match

0 0 0 0 1,238 105 1,222 1,222Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ARMISTEAD AVE OPTIMIZE SIGNAL TIMING

PROJECT

UPC NO.:

ROUTE:

93611

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

62

ESTIMATED COST (000's)

JURISDICTION:

Armistead AveSTREET NAME:

PEHampton

CN

FROM: Armistead Ave TO: LaSalle AveDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 62

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 28Highway Safety Improvements: Federal

0 0 0 0 0 0 3Highway Safety Improvements: State Match

0 0 0 0 0 0 30Local Project Contributions: Local

0 0 0 0 0 0 0 62Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

FOX HILL ROAD OPTIMIZE SIGNAL TIMING

PROJECT

UPC NO.:

ROUTE:

93612

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

18

ESTIMATED COST (000's)

JURISDICTION:

Fox Hill RoadSTREET NAME:

PEHampton

CN

FROM: Fox Hill Road TO: Clemwood PkwyDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 18

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 16Highway Safety Improvements: Federal

0 0 0 0 0 0 2Highway Safety Improvements: State Match

0 0 0 0 0 0 0 18Total

326 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

TODD'S LANE OPTIMIZE SIGNAL TIMING

PROJECT

UPC NO.:

ROUTE:

93613

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

61

ESTIMATED COST (000's)

JURISDICTION:

Todd's LaneSTREET NAME:

PEHampton

CN

FROM: Intersection of Todd's Lane TO: Cunningham DriveDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 61

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 36Highway Safety Improvements: Federal

0 0 0 0 0 0 4Highway Safety Improvements: State Match

0 0 0 0 0 0 20Local Project Contributions: Local

0 0 0 0 0 0 0 61Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

LASALLE AVE UPGRADE EXISTING SIGNAL

PROJECT

UPC NO.:

ROUTE:

93614

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

6

ESTIMATED COST (000's)

JURISDICTION:

LaSalle AveSTREET NAME:

PEHampton

Underway 238CN

FROM: Intersection of LaSalle Ave TO: Tide Mill LaneDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 244

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 220Highway Safety Improvements: Federal

0 0 0 0 0 0 24Highway Safety Improvements: State Match

0 0 0 0 0 0 0 244Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ARRA COMMANDER SHEPARD BOULEVARD,

PHASE II (R/W PHASE)

PROJECT

UPC NO.: 94440

NFOARRA09

CN on UPC 60970REPORT NOTE:

FROM: INT. SAUNDERS RD & BIG BETHEL RD TO:

0.019 MI. WEST INT. OF NORTH CAMPUS PKWY

(1.3100 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3,587American Recovery and Reinvestment Act:

Urbanized Area > 200K

06/19/2013 327

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE TRAFFIC SIGNAL UPGRADES

PHASE IV

PROJECT

UPC NO.:

ROUTE:

102865

NFOU000

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2015

SCHEDULE

553

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEHampton

CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 553

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 442 0 0 0CMAQ: MPO - Federal

0 0 0 111 0 0 0CMAQ: MPO - State Match

0 0 0 553 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

TRAFFIC SIGNAL SYSTEM RETIMING

PROJECT

UPC NO.:

ROUTE:

102867

NFOU000

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2016

SCHEDULE

698

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEHampton

CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 698

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 181 378 0 0 0CMAQ: MPO - Federal

0 0 45 94 0 0 0CMAQ: MPO - State Match

0 0 226 472 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITY OF HAMPTON - FORMULA CITY

PAYMENT

PROJECT

UPC NO.: 71789

NFOTown/City-wide

Urban Construction Initiative - matching funds to be distributed in quarterly payments. State

funds do not include 2% Match or Local Partnership Funds.

REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0Bond Match: State Bond Match

0 0 0 0 0 0Federal Formula STP: State Bond Match

0 0 0 0 0 0Residue Parcel Revenue: State

0 1,607 1,329 1,064 0 0State Formula: Urban - State

0 0 0 0 0 0Urban Formula: State

0 0 0 0 0 0Urban Formula: State Match

1,607 1,329 1,064 0 0 0Total

328 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ATLANTIC AVENUE TROLLEY, ITS, SPECIAL

EVENT SIGNALS

PROJECT

UPC NO.: 52378

NFOProject Report Req'd

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 484CMAQ: Federal

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

REGIONAL TRAFFIC SIGNAL UPGRADES

PROJECT

UPC NO.:

ROUTE:

103004

NFO0000

MPO project. Locally Administered.REPORT NOTE:

FY2018

SCHEDULE

133

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEMulti-jurisdictional: Hampton Roads MPO

CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 133

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 106 0 0 0 0RSTP (STP Regional): MPO - Federal

0 0 27 0 0 0 0RSTP (STP Regional): MPO - State Match

0 0 133 0 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HAMPTON RDS REGIONAL OPTICOM

PREEMPTION STRATEGIC PLAN & DEV

PROJECT

UPC NO.:

ROUTE:

100606

NFOU000

MPO project, PE only. Locally Administered.REPORT NOTE:

FY2014

SCHEDULE

1,650

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEMulti-jurisdictional: Hampton Roads MPO

CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,650

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

400 0 0 400 400 120 0CMAQ: MPO - Federal

100 0 0 100 100 30 0CMAQ: MPO - State Match

0 0 0 500 500 500 150 0Total

06/19/2013 329

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE WAYFINDING SIGN PROJECT -

PHASE 3

PROJECT

UPC NO.:

ROUTE:

97719

NFO0000

Revised schedule required from City. MPO project. Locally Administered.REPORT NOTE:

Complete

SCHEDULE

50

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PENewport News

Underway 829CNFROM: Various locations throughout City TO: Various

locations throughout City

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 879

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 703CMAQ: Federal

0 0 0 0 0 0 176CMAQ: State Match

0 0 0 0 0 0 0 879Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE SIGNAL SYSTEM RETIMING (2009)

PROJECT

UPC NO.:

ROUTE:

98830

NFO0000

Locally Administered. MPO project, PE onlyREPORT NOTE:

FY2014

SCHEDULE

500

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PENewport News

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

200 0 0 0 0 200 0CMAQ: MPO - Federal

50 0 0 0 0 50 0CMAQ: MPO - State Match

0 0 0 0 0 250 250 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

NEWPORT NEWS SIGNAL TIMING

IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

103016

NFO0000

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2015

SCHEDULE

900

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PENewport News

CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 900

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 432 48 240 0 0 0CMAQ: MPO - Federal

0 108 12 60 0 0 0CMAQ: MPO - State Match

0 540 60 300 0 0 0 0Total

330 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 17 - INTERSECTION IMPROVEMENT

PROJECT

UPC NO.:

ROUTE:

19022

NFO0017

MPO Project - Locally Administered. Revised schedule required from City. Balance to be

provided by the MPO.

REPORT NOTE:

Complete

SCHEDULE

52

ESTIMATED COST (000's)

JURISDICTION:

J. CLYDE MORRISSTREET NAME:

PENewport News

Underway 73CN

CompleteAT DILIGENCE DRIVEDESCRIPTION: 0RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 125

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 28CMAQ: Federal

0 0 0 0 0 0 0Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 6Urban Formula: State Match

91 0 0 0 0 0 0 34Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 60 - 6 LANES

PROJECT

UPC NO.:

ROUTE:

10797

NFO0060

Project linked with UPC 71690 (RW), 71691(RW), 77428 (CN), 77430 (CN), and 77432 (CN).

State funds - AC for future federal conversion.

REPORT NOTE:

Complete

SCHEDULE

7,048

ESTIMATED COST (000's)

JURISDICTION:

WARWICK BOULEVARDSTREET NAME:

PENewport News

N/A 33,704CN

CompleteFROM: 0.304 KM SOUTH OF ROUTE 312 TO: 0.319 KM

NORTH OF NETTLES DRIVE (3.4550 KM)

DESCRIPTION: 45,261RW

PROJECT LENGTH: 3.4550 KMSCOPE OF WORK: Reconstruction w/ Added Capacity TO 86,013

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,097Accounts Receivable: Local

0 0 0 0 0 0 2,494Bond Match: State Bond Match

0 0 0 0 0 0 13Federal Formula STP: Federal

0 0 0 0 0 0 1Federal Formula STP: State Bond Match

0 0 0 0 0 0 1,006Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 9,977Minimum Guarantee: Federal

0 0 0 0 0 0 2,926Non-Formula: State

0 0 0 0 0 0 11,704RSTP (STP Regional): Federal

0 0 0 0 0 0 228State Formula: Urban - Local Match

0 0 0 0 0 0 39,636Urban Formula: Federal

0 0 0 0 0 0 2,000Urban Formula: Federal/State

0 0 0 0 0 0 5,710Urban Formula: State

0 0 0 0 0 0 8,921Urban Formula: State Match

300 0 0 0 0 0 0 85,713Total

06/19/2013 331

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 60 RELOCATION - 4 LANE (PE ONLY IN

SYP)

PROJECT

UPC NO.:

ROUTE:

14598

NFO0060

MPO Project. PE only - accrual for RW. In conjunction with other systems project UPC

13496. Complete schedule required. Project administered by James City County.

REPORT NOTE:

Underway

SCHEDULE

1,563

ESTIMATED COST (000's)

JURISDICTION:

WARWICK BLVDSTREET NAME:

PENewport News

CN

FY2016FROM: ROUTE 105 (FORT EUSTIS BOULEVARD) TO:

EAST END OF BRIDGE OVER SKIFFES CREEK (1.4200

MI)

DESCRIPTION: 4,390RW

PROJECT LENGTH: 1.4200 MISCOPE OF WORK: New Construction Roadway TO 5,953

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 320Non-Formula: State

0 0 0 0 0 0 1,280RSTP (STP Regional): Federal

4,353 0 0 0 0 0 0 1,600Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INSTALL ROUNDABOUT AT US 60 AND

MADISON AVE

PROJECT

UPC NO.:

ROUTE:

89911

NFO0060

Locally Administered. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

30

ESTIMATED COST (000's)

JURISDICTION:

25th StreetSTREET NAME:

PENewport News

Complete 475CN

CompleteFROM: 25th Street TO: Madison AveDESCRIPTION: 61RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 566

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 230Highway Safety Improvements: Federal

0 0 0 0 0 0 26Highway Safety Improvements: State Match

0 0 0 0 0 0 311Local Project Contributions: Local

0 0 0 0 0 0 0 566Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HUNTINGTON AVENUE BRIDGE REPLACEMENT

PROJECT

UPC NO.:

ROUTE:

94832

NFO0060

Complete

SCHEDULE

235

ESTIMATED COST (000's)

JURISDICTION:

Huntington AvenueSTREET NAME:

PENewport News

Complete 965CN

FROM: 41st Street TO: 39th StreetDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,200

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 942 0Local Project Contributions: Local

0 0 0 0 0 0 1,674Revenue Sharing Funds: Local Match

0 0 0 0 0 0 1,674Revenue Sharing Funds: State Match

-3,090 0 0 0 0 0 942 3,349Total

332 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE SIGNAL HARDWARE ON WARWICK

BLVD

PROJECT

UPC NO.:

ROUTE:

100542

NFO0060

Locally Administered.REPORT NOTE:

Underway

SCHEDULE

10

ESTIMATED COST (000's)

JURISDICTION:

Warwick BoulevardSTREET NAME:

PENewport News

FY2014 340CN

FROM: Tabbs Lane TO: Beechmont DriveDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 350

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 324Highway Safety Improvements: Federal

0 0 0 0 0 0 36Highway Safety Improvements: State Match

-10 0 0 0 0 0 0 360Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE ITS UPGRADES - MULTI

LOCATIONS

PROJECT

UPC NO.:

ROUTE:

100608

NFO0060

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2015

SCHEDULE

60

ESTIMATED COST (000's)

JURISDICTION:

Intersection on Various Routes (see proj purpose)STREET NAME:

PENewport News

FY2017 240CNFROM: Warwick, Jefferson, Denbigh, Huntington, 25th St.

TO: various intersecting Rds

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 300

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 192 48 0 0 0CMAQ: MPO - Federal

0 0 48 12 0 0 0CMAQ: MPO - State Match

0 0 240 60 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

REPLACEMENT OF BRIDGE OVER LAKE

MAURY

PROJECT

UPC NO.:

ROUTE:

101279

NFO0060

Underway

SCHEDULE

564

ESTIMATED COST (000's)

JURISDICTION:

Warwick BoulevardSTREET NAME:

PENewport News

FY2014 4,836CNFROM: .32 miles south of route 312 TO: .29 miles south

of route 312 (0.0300 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.0300 MISCOPE OF WORK: New Construction Roadway TO 5,400

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 134 0Local Project Contributions: Local

0 0 0 0 0 375 1,860Revenue Sharing Funds: Local Match

0 0 0 0 0 375 1,860Revenue Sharing Funds: State Match

796 0 0 0 0 0 884 3,719Total

06/19/2013 333

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

LOWER JEFFERSON AVE CORRIDOR

IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

98829

NFO0143

MPO project. Locally Administered.REPORT NOTE:

Complete

SCHEDULE

150

ESTIMATED COST (000's)

JURISDICTION:

Jefferson AveSTREET NAME:

PENewport News

CN

FROM: 25th St TO: 36th St (0.6000 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.6000 MISCOPE OF WORK: Safety TO 150

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 120CMAQ: Federal

0 0 0 0 0 0 30CMAQ: State Match

0 0 0 0 0 0 0 150Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

IMPROVE THE DRAINAGE AND RAISE THE

STREET ELEVATION

PROJECT

UPC NO.:

ROUTE:

104375

NFO9999

New Project

FY2014

SCHEDULE

100

ESTIMATED COST (000's)

JURISDICTION:

Gwynn CircleSTREET NAME:

PENewport News

FY2015 650CNFROM: East of Linbrook Drivet TO: Cul-de-Sac (0.1000

MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 750

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 375 0Revenue Sharing Funds: Local Match

0 0 0 0 0 375 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 750 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HOOPS ROAD - WIDEN RD & ADD PED SAFETY

PROJECT

UPC NO.:

ROUTE:

104378

NFO9999

New Project

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Hoopes RoadSTREET NAME:

PENewport News

FY2014 2,000CN

FY2014FROM: Denbigh Blvd TO: Old Courthouse Way (0.3000

MI)

DESCRIPTION: 300RW

PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 2,300

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 1,150 0Revenue Sharing Funds: Local Match

0 0 0 0 0 1,150 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 2,300 0Total

334 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ATKINSON BLVD - 4 LANES (PE ONLY IN SYIP)

PROJECT

UPC NO.:

ROUTE:

4483

NFOU000

Locally Administered. Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

4,225

ESTIMATED COST (000's)

JURISDICTION:

ATKINSON BLVD.STREET NAME:

PENewport News

FY2016 46,957CN

FY2015FROM: WARWICK BOULEVARD (ROUTE 60) TO:

JEFFERSON AVENUE (ROUTE 143) (1.2000 MI)

DESCRIPTION: 1,572RW

PROJECT LENGTH: 1.2000 MISCOPE OF WORK: New Construction Roadway TO 52,754

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 1,572 0 0 0Local Project Contributions: Local

0 0 0 0 0 0 400Non-Formula: State Match

0 0 0 0 0 0 1,600RSTP (STP Regional): Federal

0 5,481 7,575 16,709 8,000 0 765RSTP (STP Regional): MPO - Federal

0 1,370 1,894 4,177 2,000 0 191RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 20State Formula: Urban - Local Match

0 0 0 0 0 0 800Urban Formula: Federal

0 0 0 0 0 0 200Urban Formula: State Match

0 6,852 9,468 22,457 10,000 0 0 3,976Total

06/19/2013 335

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

MIDDLEGROUND BLVD - 4-LANE DIVIDED

WITH CURB,GUTTER,SIDEWALK

PROJECT

UPC NO.:

ROUTE:

11816

NFOU000

Complete

SCHEDULE

2,870

ESTIMATED COST (000's)

JURISDICTION:

MIDDLE GROUND BDSTREET NAME:

PENewport News

Underway 40,090CN

CompleteFROM: 0.143 MI. EAST OF JEFFERSON AVENUE TO:

0.102 MI. WEST OF WARWICK BOULEVARD (1.2210

MI)

DESCRIPTION: 27,028RW

PROJECT LENGTH: 1.2210 MISCOPE OF WORK: New Construction Roadway TO 69,988

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 5,226Accounts Receivable: Local

0 0 0 0 0 0 4,182Bond Match: State Bond Match

0 0 0 0 0 0 5,980Bonus OA: Federal

0 0 0 0 0 0 1,495Bonus OA: State Match

0 0 0 0 0 0 0Federal Formula STP: Federal

0 0 0 0 0 0 13,517Federal STP: Federal

0 0 0 0 0 0 24Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 5,637Minimum Guarantee: Federal

0 0 0 0 0 0 900Non-Formula: State

0 0 0 0 0 0 20Residue Parcel Revenue: State

0 0 0 0 0 0 5,200RSTP (STP Regional): Federal

0 0 0 0 0 0 400RSTP (STP Regional): State Match

0 0 0 0 0 0 445Soft Match: Federal

0 0 0 0 0 0 0State Formula: Urban - Local Match

444 0 0 0 2,400 3,213 14,556STP: Statewide - Federal

111 0 0 0 600 803 3,639STP: Statewide - Soft Match

0 0 0 0 0 0 936Urban Formula: Federal

0 0 0 0 0 0 17Urban Formula: Federal/State

0 0 0 0 0 0 0Urban Formula: State

0 0 0 0 0 0 239Urban Formula: State Match

0 0 0 0 3,000 555 4,016 62,416Total

336 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

J. CLYDE MORRIS BOULEVARD CORRIDOR -

SIDEWALK IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

13478

NFOU000

MPO Project - Locally Administered.REPORT NOTE:

Complete

SCHEDULE

160

ESTIMATED COST (000's)

JURISDICTION:

J CLYDE MORRISSTREET NAME:

PENewport News

Complete 822CNFROM: JEFFERSON AVENUE TO: MARINERS

MUSEUM

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 982

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 15Anticipated Local Constr Funds: Local

0 0 0 0 0 0 360CMAQ: Federal

0 0 0 0 0 0 400CMAQ: MPO - Federal

0 0 0 0 0 0 100CMAQ: MPO - State Match

0 0 0 0 0 0 2Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 25Urban Formula: Federal

0 0 0 0 0 0 94Urban Formula: State Match

-15 0 0 0 0 0 0 997Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

J CLYDE MORRIS BOULEVARD CORRIDOR

(BIKEWAY PHASE IV)

PROJECT

UPC NO.:

ROUTE:

16103

NFOU000

MPO project; Locally Administered.REPORT NOTE:

Complete

SCHEDULE

153

ESTIMATED COST (000's)

JURISDICTION:

J. CLYDE MORRISSTREET NAME:

PENewport News

Underway 297CNFROM: CANON BOULEVARD TO: OYSTER POINT

ROAD

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 450

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,256CMAQ: Federal

0 0 0 0 0 0 253CMAQ: State Match

0 0 0 0 0 0 6Local Project Contributions: Local

0 0 0 0 0 0 1Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 61Urban Formula: State Match

0 0 0 0 0 0 1,577Total

06/19/2013 337

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CHESTNUT AVENUE - SHIFT ALIGNMENT AND

ADD MAST ARM

PROJECT

UPC NO.:

ROUTE:

17522

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

62

ESTIMATED COST (000's)

JURISDICTION:

CHESTNUT AVENUESTREET NAME:

PENewport News

Complete 1,040CNAT INTERSECTION WITH BRIARFIELD ROAD (0.3000

MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Safety TO 1,102

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 144Local Project Contributions: Local

0 0 0 0 0 0 2Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 339Safety Funds: Hazard Elimination

0 0 0 0 0 0 11State Formula: Urban - Local Match

0 0 0 0 0 0 563Urban Formula: Federal/State

0 0 0 0 0 0 44Urban Formula: State Match

0 0 0 0 0 0 0 1,102Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RIVERMONT BIKE TRAIL

PROJECT

UPC NO.:

ROUTE:

52343

NFOU000

MPO Project - Locally Administered. Partial PE only. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

168

ESTIMATED COST (000's)

JURISDICTION:

RIVERMONT TRAILSTREET NAME:

PENewport News

Complete 4,652CNDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 4,820

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 25CMAQ: Federal

0 0 0 0 0 0 0Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 6Urban Formula: State Match

4,789 0 0 0 0 0 0 31Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITY OF NEWPORT NEWS - ITS FIBER LINK

PROJECT

UPC NO.:

ROUTE:

52346

NFOU000

MPO Project. Linked to UPC 94431. Balance to be redistributed by MPO.REPORT NOTE:

Complete

SCHEDULE

56

ESTIMATED COST (000's)

JURISDICTION:

TRAFFIC CENTERSTREET NAME:

PENewport News

Complete 52CNFROM: TRAFFIC OPERATIONS CENTER TO: I-64 AT

JEFFERSON AVENUE

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 108

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 235CMAQ: Federal

0 0 0 0 0 0 41Non-Formula: State

0 0 0 0 0 0 164RSTP (STP Regional): Federal

-332 0 0 0 0 0 0 440Total

338 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITY OF NEWPORT NEWS - SIGNAL SYSTEM

UPGRADE

PROJECT

UPC NO.:

ROUTE:

52350

NFOU000

MPO Project - VDOT Administered. Linked to UPC 94431. Balance to be redistributed by MPO.REPORT NOTE:

Complete

SCHEDULE

1,750

ESTIMATED COST (000's)

JURISDICTION:

CITYWIDESTREET NAME:

PENewport News

Complete 9,504CN

225 INTERSECTIONSDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 11,254

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 13,613CMAQ: Federal

0 0 0 0 0 0 540CMAQ: State Match

0 0 0 0 0 0 1Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 215RSTP (STP Regional): Federal

0 0 0 0 0 0 54RSTP (STP Regional): State Match

0 0 0 0 0 0 63Urban Formula: State Match

-3,232 0 0 0 0 0 0 14,486Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITY OF NEWPORT NEWS - OYSTER PT

SUBAREA CCTV & STATIC SIGNS

PROJECT

UPC NO.:

ROUTE:

73002

NFOU000

MPO Project - VDOT Administered. Linked to UPC 94431. Balance to be redistributed by MPO.REPORT NOTE:

Complete

SCHEDULE

39

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENewport News

Complete 99CNFROM: AT OYSTER POINT ROAD, J CLYDE MORRIS

BOULEVARD, TO: AND JEFFERSON AVENUE

CORRIDORS

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 138

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 225RSTP (STP Regional): Federal

0 0 0 0 0 0 56RSTP (STP Regional): State Match

-143 0 0 0 0 0 0 281Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

JEFFERSON AVE SIDEWALK PROJECT

PROJECT

UPC NO.:

ROUTE:

83252

NFOU000

Locally Administered. Revised schedule required.REPORT NOTE:

Complete

SCHEDULE

125

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENewport News

Underway 710CN

CompleteDESCRIPTION: 165RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 538CMAQ: Federal

0 0 0 0 0 0 462CMAQ: State Match

0 0 0 0 0 0 1,000Total

06/19/2013 339

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

MARINER'S MUSEUM MULTI-PURPOSE TRAIL

PROJECT

UPC NO.:

ROUTE:

83254

NFOU000

Revised schedule required from City. Locally Administered. MPO project.REPORT NOTE:

Complete

SCHEDULE

245

ESTIMATED COST (000's)

JURISDICTION:

Warwick BoulevareSTREET NAME:

PENewport News

Complete 1,505CNFROM: Int. of Warwick Blvd. & Avenue of the Arts TO:

North of the Int. of Warwick Blvd. & Harpersville Rd.

(1.0000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,750

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,400CMAQ: Federal

0 0 0 0 0 0 350CMAQ: State Match

0 0 0 0 0 0 0 1,750Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

J CLYDE MORRIS BLVD CORRIDOR BIKE

TRAIL PHASE V

PROJECT

UPC NO.:

ROUTE:

83435

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

120

ESTIMATED COST (000's)

JURISDICTION:

J. Clyde Morris BoulevardSTREET NAME:

PENewport News

Underway 820CN

CompleteDESCRIPTION: 60RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 800CMAQ: Federal

0 0 0 0 0 0 200CMAQ: State Match

0 0 0 0 0 0 1,000Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

PERIODIC CITYWIDE SIGNAL SYSTEM

RETIMING

PROJECT

UPC NO.:

ROUTE:

83436

NFOU000

This project is linked to ARRA UPC 94432. Locally Administered.REPORT NOTE:

Complete

SCHEDULE

450

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENewport News

CNDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 450

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 450CMAQ: Federal 0

340 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WARWICK BLVD SIDEWALK WIDENING

PROJECT

UPC NO.:

ROUTE:

83437

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

110

ESTIMATED COST (000's)

JURISDICTION:

Warwick BoulevardSTREET NAME:

PENewport News

FY2014 910CN

UnderwayFROM: ALONG WARWICK BLVD FROM J CLYDE

MORRIS TO: LUCAS CREEK (3.0000 MI)

DESCRIPTION: 280RW

PROJECT LENGTH: 3.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,300

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,040CMAQ: Federal

0 0 0 0 0 0 260CMAQ: State Match

0 0 0 0 0 0 1,300Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WAYFINDING SIGNS, PHASE 2

PROJECT

UPC NO.:

ROUTE:

84365

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

17

ESTIMATED COST (000's)

JURISDICTION:

Jefferson Ave /J.Clyde Morris Blvd/Oyster Point RdSTREET NAME:

PENewport News

Underway 483CNFROM: Oyster Point Road/Warwick Blvd./Jefferson

Avenue TO: J. Clyde Morris Blvd/I-64/I-64

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 400CMAQ: Federal

0 0 0 0 0 0 100CMAQ: State Match

0 0 0 0 0 0 0 500Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WASHINGTON AVE OVER NNS AND DD RWY

VA STRUC 8009

PROJECT

UPC NO.:

ROUTE:

85955

NFOU000

Revised schedule required from City. Locally Administered.REPORT NOTE:

Complete

SCHEDULE

315

ESTIMATED COST (000's)

JURISDICTION:

Washington AvenueSTREET NAME:

PENewport News

FY2014 1,136CN

UnderwayFROM: 0.04 Mi to Rte. 351 TO: 0.04 Mi 41st Street

(0.5000 MI)

DESCRIPTION: 35RW

8009 95PROJECT LENGTH: 0.5000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 1,486

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 97Bond Match: State Bond Match

0 0 0 0 0 0 691Bridge Replacement: Federal

0 0 0 0 0 0 76Soft Match: Federal

237 0 0 0 0 111 150STP: BROS - Federal

59 0 0 0 0 28 37STP: BROS - Soft Match

0 0 0 0 0 296 138 1,052Total

06/19/2013 341

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HSIP PROACTIVE SAFETY PROJECTS CITY OF

NEWPORT NEWS

PROJECT

UPC NO.: 86615

NFOProject Report Req'd

City-WideDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 904Highway Safety Improvements: Federal

0 0 0 0 0 0 100Highway Safety Improvements: State Match

0 0 0 0 0 0 22Local Project Contributions: Local

0 0 0 0 0 0 1,026Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ARRA - NEWPORT NEWS 143/60 PAVEMENT

MILLING/RESURFACING

PROJECT

UPC NO.: 94430

FOARRA09

Various Locations (6.5200 MI)DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3,161American Recovery and Reinvestment Act:

Urbanized Area > 200K

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ARRA - NEWPORT NEWS SIGNAL SYSTEM

UPGRADE INTEGRATION

PROJECT

UPC NO.: 94431

NFOARRA09

Linked to UPCs 52350, 52346 and 73002.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 637American Recovery and Reinvestment Act:

Urbanized Area > 200K

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ARRA NEWPORT NEWS CITYWIDE SIGNAL

SYSTEM RETIMING

PROJECT

UPC NO.: 94432

NFOARRA09

Project linked to UPC 83436. Locally administered.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 350American Recovery and Reinvestment Act:

Urbanized Area > 200K

342 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

OAKLAND INDUSTRIAL PARK SIDEWALK,

PHASE 2

PROJECT

UPC NO.:

ROUTE:

100856

NFOU000

Locally Administered. Revised schedule required from City.REPORT NOTE:

Complete

SCHEDULE

90

ESTIMATED COST (000's)

JURISDICTION:

Harwood Drive & Pickett's LaneSTREET NAME:

PENewport News

FY2015 726CN

UnderwayFROM: ON: Hardwood Dr FRM Enterprise Dr to Enterprise

Dr TO: ON: Pickett's Lane FRM: Enterprise Dr to Warwick

Blvd (1.5500 MI)

DESCRIPTION: 100RW

PROJECT LENGTH: 1.5500 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 916

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 72CMAQ: Federal

0 0 0 0 0 826 0Local Project Contributions: Local

0 0 0 0 0 0 0Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 18Urban Formula: State Match

0 0 0 0 0 0 826 90Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

NEWPORT NEWS PEDESTRIAN

IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

103059

NFOU000

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2016

SCHEDULE

100

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PENewport News

FY2016 900CN

FROM: Various locations TO: Various locationsDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 200 200 0 0 0 0CMAQ: MPO - Federal

0 50 50 0 0 0 0CMAQ: MPO - State Match

500 250 250 0 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITY OF NEWPORT NEWS - FORMULA CITY

PAYMENT

PROJECT

UPC NO.: T9403

NFOProject Report Req'd

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 41Residue Parcel Revenue: State

0 2,118 1,751 1,402 0 0State Formula: Urban - State

0 0 0 0 0 0Urban Formula: State

2,118 1,751 1,402 0 0 41Total

06/19/2013 343

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

NORFOLK ATMS PHASE IV

PROJECT

UPC NO.:

ROUTE:

98828

NFO0000

MPO project. Locally Administered. Balance to be provided by the MPO.REPORT NOTE:

Underway

SCHEDULE

500

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PENorfolk

FY2015 3,700CN

FY2014FROM: Citywide TO: CitywideDESCRIPTION: 300RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 4,500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 800CMAQ: Federal

912 0 0 1,168 800 0 0CMAQ: MPO - Federal

228 0 0 292 200 0 0CMAQ: MPO - State Match

0 0 0 0 0 0 100CMAQ: State Match

0 0 0 1,460 1,000 1,140 0 900Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 13 - 8 LANES

PROJECT

UPC NO.:

ROUTE:

9783

NFO0013

State funds - AC for future federal conversion. Lowery Road Section. Balance to be redistributed

by MPO.

REPORT NOTE:

Complete

SCHEDULE

3,600

ESTIMATED COST (000's)

JURISDICTION:

MILITARY HIGHWAYSTREET NAME:

PENorfolk

FY2014 13,756CN

UnderwayFROM: 0.023 MILE SOUTH OF LOWERY ROAD TO:

0.012 MILE SOUTH OF NORTHAMPTON BOULEVARD

(0.8190 MI)

DESCRIPTION: 8,799RW

PROJECT LENGTH: 0.8190 MISCOPE OF WORK: New Construction Roadway TO 26,156

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0Local Project Contributions: Local

0 0 0 0 0 0 103Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 2,400RSTP (STP Regional): Federal

2,803 0 0 0 0 3,426 2,400RSTP (STP Regional): MPO - Federal

701 0 0 0 0 856 600RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 600RSTP (STP Regional): State Match

0 0 0 0 0 0 161State Formula: Urban - Local Match

0 0 0 0 0 0 2,771Urban Formula: Federal

0 0 0 0 0 0 611Urban Formula: Federal/State

0 0 0 0 0 0 8,877Urban Formula: State

0 0 0 0 0 0 682Urban Formula: State Match

-835 0 0 0 0 3,504 4,282 19,204Total

344 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

EAST OCEAN VIEW SIGNAL UPGRADES AND

CORRIDOR INTEGRATION

PROJECT

UPC NO.:

ROUTE:

92748

NFO0060

Locally Administered. MPO Project. Balance to be redistributed by MPO.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

East Ocean View AvenueSTREET NAME:

PENorfolk

Complete 557CN

FROM: 4th View Street TO: Shore Drive/ Little Creek RoadDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 557

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 800CMAQ: Federal -243

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 165 - 6 & 8 LANES

PROJECT

UPC NO.:

ROUTE:

1765

NFO0165

Intersection Project. Project linked to UPC 84243. Includes PE for UPC 84243.REPORT NOTE:

Underway

SCHEDULE

10,350

ESTIMATED COST (000's)

JURISDICTION:

MILITARY HIGHWAYSTREET NAME:

PENorfolk

FY2014 28,719CN

FY2014FROM: 0.307 MILES SOUTH OF NORTHAMPTON

BOULEVARD TO: 0.289 MILES NORTH OF

NORTHAMPTON (0.5960 MI)

DESCRIPTION: 26,131RW

PROJECT LENGTH: 0.5960 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 65,200

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 4,452Bond Proceeds: CPR Bonds

0 21,999 18,750 12,500 750 0 0CTB Formula: High Priority - State

0 0 0 0 0 0 138Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 1Residue Parcel Revenue: State

0 0 0 0 0 0 18State Formula: Urban - Local Match

0 0 0 681 0 0 0STP: Statewide - Federal

0 0 0 170 0 0 0STP: Statewide - Soft Match

0 0 0 0 0 0 1,105Urban Formula: Federal

0 0 0 0 0 0 3,838Urban Formula: Federal/State

0 0 0 0 0 0 532Urban Formula: State

0 0 0 0 0 0 266Urban Formula: State Match

0 21,999 18,750 13,351 750 0 0 10,350Total

06/19/2013 345

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ROBIN HOOD RD & MILITARY HWY PHASE 1,

LINK W/ UPC 1765 &9783

PROJECT

UPC NO.:

ROUTE:

84243

NFO0165

Project linked to UPC 1765. PE for UPC 84243 included on UPC 1765. State funds - AC for

future federal conversion. Balance to be redistributed by the MPO.

REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Military HighwaySTREET NAME:

PENorfolk

FY2014 16,914CN

UnderwayDESCRIPTION: 4,500RW

PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 21,414

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 103Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 2,400RSTP (STP Regional): Federal

0 0 0 0 0 2,155 1,600RSTP (STP Regional): MPO - Federal

0 0 0 0 0 539 400RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 600RSTP (STP Regional): State Match

0 0 0 0 0 0 181State Formula: Urban - Local Match

0 0 0 0 0 0 3,597Urban Formula: Federal

0 0 0 0 0 0 6,860Urban Formula: Federal/State

0 0 0 0 0 0 2,642Urban Formula: State

0 0 0 0 0 0 811Urban Formula: State Match

-473 0 0 0 0 0 2,693 19,194Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

MODIFY EXISTING TRAFFIC SIGNAL

PROJECT

UPC NO.:

ROUTE:

86499

NFO0165

REPORT NOTE:

Complete

SCHEDULE

116

ESTIMATED COST (000's)

JURISDICTION:

Military HighwaySTREET NAME:

PENorfolk

Complete 231CNFROM: 0.033 Mi S. intersection Route 192 TO: 0.017 Mi

N. intersection Rte 192 (0.0500 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.0500 MISCOPE OF WORK: Safety TO 347

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 215Highway Safety Improvements: Federal

0 0 0 0 0 0 24Highway Safety Improvements: State Match

0 0 0 0 0 0 2State Formula: Urban - Local Match

0 0 0 0 0 0 108Urban Formula: Federal/State

-3 0 0 0 0 0 0 350Total

346 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE EXISTING TRAFFIC SIGNAL

PROJECT

UPC NO.:

ROUTE:

86491

NFO0247

Complete

SCHEDULE

205

ESTIMATED COST (000's)

JURISDICTION:

Norview AvenueSTREET NAME:

PENorfolk

Complete 626CN

CompleteFROM: 0.060 Miles West Int. Military HWY. & Norview

Avenue TO: 0.024 Miles East Int. Military HWY & Norview

Avenue (0.0840 MI)

DESCRIPTION: 61RW

PROJECT LENGTH: 0.0840 MISCOPE OF WORK: Safety TO 892

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 675Highway Safety Improvements: Federal

0 0 0 0 0 0 75Highway Safety Improvements: State Match

0 0 0 0 0 0 24Local Project Contributions: Local

0 0 0 0 0 0 5State Formula: Urban - Local Match

0 0 0 0 0 0 237Urban Formula: Federal/State

-124 0 0 0 0 0 0 1,016Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 337 - RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

14672

FO0337

Complete

SCHEDULE

8,563

ESTIMATED COST (000's)

JURISDICTION:

HAMPTON BLVDSTREET NAME:

PENorfolk

Underway 50,093CN

CompleteFROM: 0.005 KILOMETER NORTH OF ROGERS

AVENUE TO: 0.011 KILOMETER SOUTH OF "B"

AVENUE (0.7500 KM)

DESCRIPTION: 30,061RW

26493,27579 -2,0PROJECT LENGTH: 0.7500 KM STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Reconstruction w/o Added Capacity TO 88,718

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 27,068FRAN Bond Proceeds: FRAN

0 0 0 0 0 0 46,395National Highway System Allocations:

Federal

0 0 0 0 0 0 8,243National Highway System Allocations: State

Match

0 0 0 0 0 0 2,686NHPP: Statewide - Federal

0 0 0 0 0 0 672NHPP: Statewide - Soft Match

0 0 0 0 0 0 298Priority Transportation Funds: State

0 0 0 0 0 0 3,356Soft Match: Federal

0 0 0 0 0 0 0 88,718Total

06/19/2013 347

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

NonMPOUrban

PROGRAM/SYSTEM

ADD ROADWAY WIDTH FOR INSTALLATION

MULTI-USE PATH

PROJECT

UPC NO.:

ROUTE:

104381

NFO0407

New Project

FY2014

SCHEDULE

2

ESTIMATED COST (000's)

JURISDICTION:

East Indian River RoadSTREET NAME:

PENorfolk

FY2014 398CNFROM: Approx. 500 ft east of Pescara Creek TO: Approx.

500 ft west of Pescara Creek (0.1000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 400

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 200 0Revenue Sharing Funds: Local Match

0 0 0 0 0 200 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 400 0Total

MPO Area

NonMPOUrban

PROGRAM/SYSTEM

ADD ROADWAY WIDTH FOR INSTALLATION

OF MULTI-USE PATH

PROJECT

UPC NO.:

ROUTE:

104382

NFO0407

New Project

FY2014

SCHEDULE

2

ESTIMATED COST (000's)

JURISDICTION:

West Indian River RoadSTREET NAME:

PENorfolk

FY2014 398CNFROM: Approx. 500ft east of Spotico Creek TO: Approx.

500ft west of Spotico Creek (0.1000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 400

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 200 0Revenue Sharing Funds: Local Match

0 0 0 0 0 200 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 400 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE EXISTING SIGNAL AND PAVEMENT

MARKINGS

PROJECT

UPC NO.:

ROUTE:

86496

NFO0460

Locally administered.REPORT NOTE:

Complete

SCHEDULE

90

ESTIMATED COST (000's)

JURISDICTION:

Monticello AvenueSTREET NAME:

PENorfolk

Complete 194CN

FROM: 26th Street TO: IntersectionDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 284

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 397Highway Safety Improvements: Federal

0 0 0 0 0 0 44Highway Safety Improvements: State Match

-158 0 0 0 0 0 0 441Total

348 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WESTMINSTER AVENUE OVERLAY

PROJECT

UPC NO.:

ROUTE:

104383

NFO9999

New Project

FY2014

SCHEDULE

3

ESTIMATED COST (000's)

JURISDICTION:

Westiminster AvenueSTREET NAME:

PENorfolk

FY2015 697CNFROM: Ballentine Boulevard TO: Stapleton Street (0.7000

MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.7000 MISCOPE OF WORK: Resurfacing TO 700

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 108 0Revenue Sharing Funds: Local Match

0 0 0 0 0 108 0Revenue Sharing Funds: State Match

483 0 0 0 0 0 217 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

NORFOLK BALANCE ENTRY ACCOUNT

PROJECT

UPC NO.: 70533

NFOBalance Entry

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 27Accounts Receivable: Local

0 0 0 0 0 0 15Local Project Contributions: Urban - Local

Match

0 58 48 39 0 0 14State Formula: Urban - Local Match

0 2,855 2,360 1,890 0 0 0State Formula: Urban - State

0 0 0 0 0 0 2,156Urban Formula: Federal

0 0 0 0 0 0 365Urban Formula: Federal/State

0 0 0 0 0 0 327Urban Formula: State

0 0 0 0 0 0 485Urban Formula: State Match

2,913 2,408 1,928 0 0 0 3,390Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

PHASE III EXPANSION OF COMPUTERIZED

SIGNAL SYSTEM

PROJECT

UPC NO.:

ROUTE:

79114

NFOU000

MPO project - Locally Administered. Balance to be redistributed by the MPO.REPORT NOTE:

Complete

SCHEDULE

1,570

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENorfolk

CN

CITYWIDEDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 1,570

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,168CMAQ: Federal

-598 0 0 0 0 0 0 2,168Total

06/19/2013 349

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

LOWERY ROAD - INTERSECTION

SIGNALIZATION

PROJECT

UPC NO.:

ROUTE:

87288

NFOU000

Complete

SCHEDULE

30

ESTIMATED COST (000's)

JURISDICTION:

Lowery RoadSTREET NAME:

PENorfolk

Complete 300CN

Lowery Road at Wal-Mart EntranceDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 330

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 30Local Project Contributions: Local

0 0 0 0 0 0 150Revenue Sharing Funds: Local Match

0 0 0 0 0 0 150Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 330Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

TRAFFIC SIGNAL UPGRADES - HAMPTON

BLVD

PROJECT

UPC NO.:

ROUTE:

92750

NFOU000

Locally Administered. MPO Project. Balance to be redistributed by MPO.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Hampton BoulevardSTREET NAME:

PENorfolk

Complete 109CNFROM: Hampton Blvd at43rd street TO: Hampton Blvd

at49th street

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 109

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 200CMAQ: Federal -91

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ARRA - NORFOLK CITYWIDE REPAVING

PROJECT

PROJECT

UPC NO.: 94434

NFOARRA09

Locally Administered.REPORT NOTE:

FROM: Citywide TO: CitywideDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 5,217American Recovery and Reinvestment Act:

Urbanized Area > 200K

0 0 0 0 0 0 849Local Project Contributions: Local

0 0 0 0 0 0 6,065Total

350 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE SIGNAL RETIMING (NORFOLK)

PHASE 2

PROJECT

UPC NO.:

ROUTE:

97721

NFOU000

MPO project. Locally Administered.REPORT NOTE:

Complete

SCHEDULE

500

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PENorfolk

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 400CMAQ: Federal

0 0 0 0 0 0 100CMAQ: State Match

0 0 0 0 0 0 0 500Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ATMS CONTROLLER MIGRATION &

INTERCONNECT - DESIGN PLANS II

PROJECT

UPC NO.:

ROUTE:

97722

NFOU000

Locally Administered. Balance to be redistributed by the MPO.REPORT NOTE:

Complete

SCHEDULE

42

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PENorfolk

Underway 136CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 178

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 240CMAQ: Federal

0 0 0 0 0 0 60CMAQ: State Match

-122 0 0 0 0 0 0 300Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE CITYWIDE TRAFFIC SIGNALS TO

LED FOR NORFOLK

PROJECT

UPC NO.:

ROUTE:

100544

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

11

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PENorfolk

Underway 80CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 91

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 270Highway Safety Improvements: Federal

0 0 0 0 0 0 30Highway Safety Improvements: State Match

-209 0 0 0 0 0 0 300Total

06/19/2013 351

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE INTERSECTION SAFETY

IMPROVEMENTS - CITY OF NORFOLK

PROJECT

UPC NO.:

ROUTE:

100546

NFOU000

Locally Administered.REPORT NOTE:

Underway

SCHEDULE

595

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PENorfolk

FY2014 2,806CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 3,401

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 2,536 755Highway Safety Improvements: Federal

0 0 0 0 0 282 0Highway Safety Improvements: Soft Match

0 0 0 0 0 0 84Highway Safety Improvements: State Match

-257 0 0 0 0 0 2,818 839Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

NORFOLK - CITYWIDE INTERSECT SAFETY

IMPROVEMENTS - GROUP 1

PROJECT

UPC NO.:

ROUTE:

102524

NFOU000

Locally Administered.REPORT NOTE:

Underway

SCHEDULE

426

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PENorfolk

FY2014 2,031CN

FROM: Various TO: Various (0.2800 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.2800 MISCOPE OF WORK: Safety TO 2,457

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 69Discretionary Grants: State Match

0 0 0 0 0 0 1,980Highway Safety Improvements: Federal

0 0 0 0 0 0 151Highway Safety Improvements: State Match

0 0 0 0 0 0 257Local Project Contributions: Local

0 0 0 0 0 0 0 2,457Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

NORFOLK - CITYWIDE INTERSECT SAFETY

IMPROVEMENTS - GROUP 2

PROJECT

UPC NO.:

ROUTE:

102526

NFOU000

Locally Administered.REPORT NOTE:

Underway

SCHEDULE

477

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PENorfolk

FY2014 2,474CN

FROM: Various TO: Various (0.2800 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.2800 MISCOPE OF WORK: Safety TO 2,951

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,656Highway Safety Improvements: Federal

0 0 0 0 0 0 295Highway Safety Improvements: State Match

0 0 0 0 0 0 0 2,951Total

352 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

NORFOLK SIGNAL TIMING IMPROVEMENTS -

PHASE III

PROJECT

UPC NO.:

ROUTE:

102950

NFOU000

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2015

SCHEDULE

600

ESTIMATED COST (000's)

JURISDICTION:

Tidewater/ Little Creek/ Chesapeake/ MilitarySTREET NAME:

PENorfolk

CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 600

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 160 160 160 0 0CMAQ: MPO - Federal

0 0 40 40 40 0 0CMAQ: MPO - State Match

0 0 200 200 200 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CONVERT EX. SPAN WIRE TRAFFIC SIGNAL

TO MAST ARM

PROJECT

UPC NO.:

ROUTE:

104379

NFOU000

New Project

FY2014

SCHEDULE

2

ESTIMATED COST (000's)

JURISDICTION:

21 StreetSTREET NAME:

PENorfolk

FY2014 398CN

FROM: 21 Street TO: Llewellyn Avenue (0.0500 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.0500 MISCOPE OF WORK: Traffic Management/Engineering TO 400

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 200 0Revenue Sharing Funds: Local Match

0 0 0 0 0 200 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 400 0Total

06/19/2013 353

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 172 - CITY OF POQUOSON - PHASE I

PROJECT

UPC NO.:

ROUTE:

13427

NFO0172

State funds - AC for future federal conversion. Revised schedule requested. MPO project.REPORT NOTE:

Underway

SCHEDULE

1,448

ESTIMATED COST (000's)

JURISDICTION:

WYTHE CREEK RD.STREET NAME:

PEPoquoson

FY2019 12,959CN

FY2015FROM: ALPHUS STREET TO: SCL POQUOSON (1.0000

MI)

DESCRIPTION: 4,808RW

PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 19,215

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 32Federal Formula STP: Federal

0 0 0 0 0 0 6Federal Formula STP: State Bond Match

0 0 0 0 0 0 46Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 3,807RSTP (STP Regional): Federal

4,800 0 0 1,837 0 1,167 1,317RSTP (STP Regional): MPO - Federal

1,200 0 0 459 0 292 329RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 952RSTP (STP Regional): State Match

0 0 0 0 0 0 14State Formula: Urban - Local Match

0 0 0 12 0 0 0State Formula: Urban - State

0 0 0 0 0 0 1,303Urban Formula: Federal

0 0 0 0 0 0 21Urban Formula: Federal/State

0 0 0 0 0 0 1,327Urban Formula: State

0 0 0 0 0 0 295Urban Formula: State Match

0 0 0 2,308 0 6,000 1,458 9,449Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

POQUOSON BALANCE ENTRY ACCOUNT

PROJECT

UPC NO.: 70539

NFOBalance Entry

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 3 2 2 0 0 0State Formula: Urban - Local Match

0 143 118 83 0 0 0State Formula: Urban - State

146 121 84 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WYTHE CREEK ROAD TRAFFIC SIGNAL

UPGRADE

PROJECT

UPC NO.:

ROUTE:

102999

NFOU000

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2017

SCHEDULE

60

ESTIMATED COST (000's)

JURISDICTION:

Wythe CreekSTREET NAME:

PEPoquoson

FY2017 200CN

FROM: Hampton City Line TO: Yorktown RoadDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 260

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 208 0 0 0 0CMAQ: MPO - Federal

0 0 52 0 0 0 0CMAQ: MPO - State Match

0 0 260 0 0 0 0 0Total

354 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE SIGNAL TIMING - PHASE 4

PROJECT

UPC NO.:

ROUTE:

98824

NFO0000

Locally Administered. MPO project. Revised schedule required.REPORT NOTE:

FY2015

SCHEDULE

132

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PEPortsmouth

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 132

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 106 0 0 0CMAQ: MPO - Federal

0 0 0 26 0 0 0CMAQ: MPO - State Match

0 0 0 132 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE SIGNAL TIMING - PHASE 3

PROJECT

UPC NO.:

ROUTE:

98825

NFO0000

Locally Administered. MPO projectREPORT NOTE:

FY2014

SCHEDULE

120

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PEPortsmouth

CNFROM: VARIOUS LOCATIONS TO: VARIOUS

LOCATIONS

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 120

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 120CMAQ: Federal 0

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

PORTSMOUTH TRAFFIC SIGNAL UPGRADES

PROJECT

UPC NO.:

ROUTE:

103025

NFO0000

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2017

SCHEDULE

720

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEPortsmouth

FY2018 2,280CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 3,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 1,600 800 0 0 0 0CMAQ: MPO - Federal

0 400 200 0 0 0 0CMAQ: MPO - State Match

0 2,000 1,000 0 0 0 0 0Total

06/19/2013 355

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE SIGNAL AND MARKINGS ON US 17

AND GREENWOOD DRIVE

PROJECT

UPC NO.:

ROUTE:

96901

NFO0017

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

26

ESTIMATED COST (000's)

JURISDICTION:

George Washington HighwaySTREET NAME:

PEPortsmouth

Complete 167CNFROM: US 17 George Washington Highway TO:

Greenwood Drive

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 193

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 188Highway Safety Improvements: Federal

0 0 0 0 0 0 21Highway Safety Improvements: State Match

-16 0 0 0 0 0 0 209Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE EXIST SIGNAL, ADD PED FACILTIES

AND SIDEWALK ON US17

PROJECT

UPC NO.:

ROUTE:

96906

NFO0017

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

56

ESTIMATED COST (000's)

JURISDICTION:

US 17 Frederick BlvdSTREET NAME:

PEPortsmouth

Complete 245CNFROM: US 17 Frederick Blvd TO: Rte 919 (Deep Creek

Blvd)

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 301

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 286Highway Safety Improvements: Federal

0 0 0 0 0 0 32Highway Safety Improvements: State Match

-17 0 0 0 0 0 0 318Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE SIGNAL, RECONFIGURE

INTERSECTION, ADD LTL ON US 17

PROJECT

UPC NO.:

ROUTE:

96908

NFO0017

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

63

ESTIMATED COST (000's)

JURISDICTION:

George Washington HighwaySTREET NAME:

PEPortsmouth

Complete 488CN

FROM: George Washington Highway TO: Frederick BlvdDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 551

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 533Highway Safety Improvements: Federal

0 0 0 0 0 0 59Highway Safety Improvements: State Match

-41 0 0 0 0 0 0 592Total

356 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE SIGNAL, CONSTR NB TURN LANE

ON US17

PROJECT

UPC NO.:

ROUTE:

97054

NFO0017

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

59

ESTIMATED COST (000's)

JURISDICTION:

US 17 Frederick BlvdSTREET NAME:

PEPortsmouth

Complete 325CN

FROM: US 17 Frederick Blvd TO: Portsmouth BlvdDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 383

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 372Highway Safety Improvements: Federal

0 0 0 0 0 0 41Highway Safety Improvements: State Match

-29 0 0 0 0 0 0 413Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

BRIDGE REPLACEMENT - CHURCHLAND

BRIDGE

PROJECT

UPC NO.:

ROUTE:

102715

NFO0017

Underway

SCHEDULE

2,500

ESTIMATED COST (000's)

JURISDICTION:

High Street (Churchland Bridge)STREET NAME:

PEPortsmouth

FY2014 25,000CN

FY2014FROM: Grayson Street TO: Seagrove Road/Craney Street

(1.0000 MI)

DESCRIPTION: 2,000RW

21199 48PROJECT LENGTH: 1.0000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Bridge Replacement w/ Added Capacity TO 29,500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 27,000Local Project Contributions: Local

0 0 0 0 0 1,000 1,250Revenue Sharing Funds: Local Match

0 0 0 0 0 1,000 1,250Revenue Sharing Funds: State Match

-2,000 0 0 0 0 0 2,000 29,500Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

BRIDGE MAINTENANCE - CHURCHLAND

BRIDGE (SBL)

PROJECT

UPC NO.:

ROUTE:

104385

NFO0017

New Project

FY2014

SCHEDULE

3

ESTIMATED COST (000's)

JURISDICTION:

High StreetSTREET NAME:

PEPortsmouth

FY2015 497CNFROM: Grayson Street TO: Seagrove Road/ Carney

Street (1.0000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Restoration and Rehabilitation TO 500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 77 0Revenue Sharing Funds: Local Match

0 0 0 0 0 77 0Revenue Sharing Funds: State Match

345 0 0 0 0 0 155 0Total

06/19/2013 357

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

MODIFY SIGNAL AND MARKINGS AT

EFFINGHAM AND PORTSMOUTH BLVD

PROJECT

UPC NO.:

ROUTE:

96902

NFO0141

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

29

ESTIMATED COST (000's)

JURISDICTION:

Effingham StreetSTREET NAME:

PEPortsmouth

Complete 285CNFROM: Rte 141 Effingham Street TO: Rte 337 Portsmouth

Boulevard

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 315

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 307Highway Safety Improvements: Federal

0 0 0 0 0 0 34Highway Safety Improvements: State Match

-26 0 0 0 0 0 0 341Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 164 - REIMBURSEMENT OF TOLL

FACILITIES REVOLVING

PROJECT

UPC NO.: 70564

NFOTown/City-wide

FUNDS FOR PROJECT UPC 11750DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 25Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 3Residue Parcel Revenue: State

0 23 19 15 0 0 115State Formula: Urban - Local Match

0 1,128 932 746 0 0 0State Formula: Urban - State

0 0 0 0 0 0 6,875Urban Formula: State

1,151 951 762 0 0 0 7,018Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CONSTRUCT SOUND WALLS ON ROUTE 164

AT AND NEAR MAERSK INTER

PROJECT

UPC NO.:

ROUTE:

81559

NFO0164

Locally Administered. Complete schedule required.REPORT NOTE:

Complete

SCHEDULE

125

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEPortsmouth

Underway 1,495CN

CompleteAT MAERSK TERMINAL IN PORTSMOUTHDESCRIPTION: 75RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: New Construction Roadway TO 1,695

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,433SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 358SAFETEA-LU Earmarks: State Match

-96 0 0 0 0 0 0 1,791Total

358 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

MODIFY SIGNAL AND MARKINGS AT VICTORY

AND AIRLINE BLVD

PROJECT

UPC NO.:

ROUTE:

96904

NFO0239

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

6

ESTIMATED COST (000's)

JURISDICTION:

Victory BoulevardSTREET NAME:

PEPortsmouth

Complete 245CN

FROM: Rte 239 Victory Boulevard TO: Airline BoulevardDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 251

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 241Highway Safety Improvements: Federal

0 0 0 0 0 0 27Highway Safety Improvements: State Match

-17 0 0 0 0 0 0 268Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

BRIDGE MAINTENANCE - PARADISE CREEK

BRIDGE

PROJECT

UPC NO.:

ROUTE:

104384

NFO0239

New Project

FY2014

SCHEDULE

2

ESTIMATED COST (000's)

JURISDICTION:

Victory BoulevardSTREET NAME:

PEPortsmouth

FY2015 198CNFROM: Driveway entrance south of Bridge TO: Entrance

north of the Bridge (0.5000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.5000 MISCOPE OF WORK: Restoration and Rehabilitation TO 200

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 31 0Revenue Sharing Funds: Local Match

0 0 0 0 0 31 0Revenue Sharing Funds: State Match

138 0 0 0 0 0 62 0Total

06/19/2013 359

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 337 - 4 LANES

PROJECT

UPC NO.:

ROUTE:

3950

NFO0337

PE and RW only. Project linked to UPC 65655.REPORT NOTE:

Complete

SCHEDULE

3,845

ESTIMATED COST (000's)

JURISDICTION:

TURNPIKE ROADSTREET NAME:

PEPortsmouth

CN

CompleteFROM: PORTSMOUTH BOULEVARD TO:

CONSTITUTION AVENUE (INCLUDING OUTFALL) (2.0700

MI)

DESCRIPTION: 9,513RW

PROJECT LENGTH: 2.0700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 13,358

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 37Federal Formula STP: Federal

0 0 0 0 0 0 224Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 1State Formula: Urban - Local Match

0 0 0 0 0 0 8,792Urban Formula: Federal

0 0 0 0 0 0 237Urban Formula: Federal/State

0 0 0 0 0 0 2,177Urban Formula: State

0 0 0 0 0 0 2,182Urban Formula: State Match

-291 0 0 0 0 0 0 13,649Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 337 - 4 LANE

PROJECT

UPC NO.:

ROUTE:

65655

NFO0337

Project linked to UPC 3950 for PE and RW. State funds - AC for future federal conversion.

Revised schedule required by City.

REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

TURNPIKE ROADSTREET NAME:

PEPortsmouth

FY2014 22,453CNFROM: 0.154 MILES EAST OF FREDERICK

BOULEVARD TO: CONSTITUTION AVENUE (1.0800 MI)

DESCRIPTION: RW

PROJECT LENGTH: 1.0800 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 22,453

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3,001Accounts Receivable: Local

0 0 0 0 0 0 1,501Federal Formula STP: Federal

0 0 0 0 0 0 0Local Project Contributions: Local

0 0 0 0 0 0 143Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 1,100Revenue Sharing Funds: Local Match

0 0 0 0 0 0 1,100Revenue Sharing Funds: State Match

0 0 0 0 0 0 2,000RSTP (STP Regional): Federal

0 0 0 0 0 0 500RSTP (STP Regional): State Match

0 0 0 0 0 0 80State Formula: Urban - Local Match

0 0 0 0 0 0 4,828Urban Formula: Federal

0 0 0 0 0 0 2,954Urban Formula: Federal/State

0 0 0 0 0 0 1,501Urban Formula: State Match

3,747 0 0 0 0 0 0 18,706Total

360 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE SIGNAL & MARKINGS AT

PORTSMOUTH BLVD AND DEEP CREEK

PROJECT

UPC NO.:

ROUTE:

96900

NFO0337

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

41

ESTIMATED COST (000's)

JURISDICTION:

Portsmouth BoulevardSTREET NAME:

PEPortsmouth

Complete 185CNFROM: Rte 337 Portsmouth Boulevard TO: Deep Creek

Boulevard

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 226

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 220Highway Safety Improvements: Federal

0 0 0 0 0 0 24Highway Safety Improvements: State Match

-18 0 0 0 0 0 0 244Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE SIGNAL AND RE-STRIPE

INTERSECTION ON PORTSMOUTH BLVD

PROJECT

UPC NO.:

ROUTE:

96905

NFO0337

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

31

ESTIMATED COST (000's)

JURISDICTION:

Portsmouth BlvdSTREET NAME:

PEPortsmouth

Complete 176CN

FROM: Rte 337 Portsmouth Blvd TO: City Park AvenueDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 207

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 201Highway Safety Improvements: Federal

0 0 0 0 0 0 22Highway Safety Improvements: State Match

-17 0 0 0 0 0 0 223Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE SIGNAL AND EXTEND LEFT TURN

LANE

PROJECT

UPC NO.:

ROUTE:

97011

NFO0337

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

58

ESTIMATED COST (000's)

JURISDICTION:

Portsmouth BlvdSTREET NAME:

PEPortsmouth

Complete 415CN

FROM: Rte 337 Portsmouth Blvd TO: Elmhurst LaneDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 473

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 457Highway Safety Improvements: Federal

0 0 0 0 0 0 51Highway Safety Improvements: State Match

-35 0 0 0 0 0 0 508Total

06/19/2013 361

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INT. GEOMETERIC - PORTSMOUTH BLVD. RTE

337 & ELMHURST LANE

PROJECT

UPC NO.:

ROUTE:

100602

NFO0337

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2015

SCHEDULE

75

ESTIMATED COST (000's)

JURISDICTION:

Elmhurst LaneSTREET NAME:

PEPortsmouth

FY2016 425CNFROM: Portsmouth Blvd TO: 100' North of Portsmouth

Blvd on Elmhurst

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 340 60 0 0 0CMAQ: MPO - Federal

0 0 85 15 0 0 0CMAQ: MPO - State Match

0 0 425 75 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

US 58 - AIRLINE BLVD INTERSECTION

IMPROVEMENTS:

PROJECT

UPC NO.:

ROUTE:

82858

NFOU000

Locally Administered. MPO project. Balance to be redistributed by MPO.REPORT NOTE:

Complete

SCHEDULE

200

ESTIMATED COST (000's)

JURISDICTION:

AIRLINE BLVDSTREET NAME:

PEPortsmouth

Underway 811CN

FROM: Elmhurst Lane TO: Kings Highway (1.7500 MI)DESCRIPTION: RW

PROJECT LENGTH: 1.7500 MISCOPE OF WORK: Safety TO 1,011

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 12CMAQ: Federal

0 0 0 0 0 0 1,088CMAQ: State Match

-89 0 0 0 0 0 0 1,100Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ALEXANDER'S CORNER INTERSECTION

IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

83438

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

252

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEPortsmouth

Underway 1,226CN

FROM: PORTSMOUTH BLVD TO: AIRLINE BLVDDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 1,478

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 900CMAQ: Federal

0 0 0 0 0 0 400CMAQ: State Match

0 0 0 0 0 0 178Local Project Contributions: Local

0 0 0 0 0 0 0 1,478Total

362 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HSIP PROACTIVE SAFETY PROJECTS CITY OF

PORTSMOUTH

PROJECT

UPC NO.: 86612

NFODistrict-wide

City of Portsmouth Safety ImprovementsDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 10Discretionary Grants: State Match

0 0 0 0 0 0 895Highway Safety Improvements: Federal

0 0 0 0 0 0 89Highway Safety Improvements: State Match

0 0 0 0 0 0 995Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HIGH STREET UPGRADE EXISTING SIGNAL

PROJECT

UPC NO.:

ROUTE:

93665

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

40

ESTIMATED COST (000's)

JURISDICTION:

High StreetSTREET NAME:

PEPortsmouth

Underway 275CN

FROM: High Street TO: Court StreetDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 315

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 311Highway Safety Improvements: Federal

0 0 0 0 0 0 35Highway Safety Improvements: State Match

-31 0 0 0 0 0 0 346Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

SIGNAL UPGRADE AT TOWNE POINT AND

TWIN PINES RD

PROJECT

UPC NO.:

ROUTE:

96907

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

33

ESTIMATED COST (000's)

JURISDICTION:

Towne Point RoadSTREET NAME:

PEPortsmouth

Complete 230CN

FROM: Towne Point Road TO: Twin Pines RoadDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 263

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 256Highway Safety Improvements: Federal

0 0 0 0 0 0 28Highway Safety Improvements: State Match

-22 0 0 0 0 0 0 285Total

06/19/2013 363

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

SIGNAL SYSTEM UPGRADE - PHASES 2, 3, 4

PROJECT

UPC NO.:

ROUTE:

97720

NFOU000

MPO project. Locally Administered.REPORT NOTE:

Underway

SCHEDULE

750

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PEPortsmouth

FY2014 5,850CN

FROM: Citywide TO: Citywide (5.5000 MI)DESCRIPTION: RW

PROJECT LENGTH: 5.5000 MISCOPE OF WORK: Safety TO 6,600

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,921CMAQ: Federal

0 0 0 0 0 0 2,359CMAQ: MPO - Federal

0 0 0 0 0 0 590CMAQ: MPO - State Match

0 0 0 0 0 0 730CMAQ: State Match

0 0 0 0 0 0 0 6,600Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE SIGNAL TIMING - PHASE 2

PROJECT

UPC NO.:

ROUTE:

98826

NFOU000

MPO project. Locally Administered.REPORT NOTE:

Underway

SCHEDULE

112

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEPortsmouth

CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 112

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 90CMAQ: MPO - Federal

0 0 0 0 0 0 22CMAQ: MPO - State Match

0 0 0 0 0 0 0 112Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE SIGNAL TIMING - PHASE 1

PROJECT

UPC NO.:

ROUTE:

98827

NFOU000

MPO project. Locally Administered.REPORT NOTE:

Complete

SCHEDULE

120

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PEPortsmouth

CN

FROM: Citywide TO: CitywideDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 120

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 96CMAQ: Federal

0 0 0 0 0 0 24CMAQ: State Match

0 0 0 0 0 0 0 120Total

364 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WESTHAVEN BICYCLE IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

102985

NFOU000

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2018

SCHEDULE

60

ESTIMATED COST (000's)

JURISDICTION:

South StreetSTREET NAME:

PEPortsmouth

FY2019 440CNFROM: Intersection of Clifford St and Powhatan Avenue

TO: Intersection of Bart Street and Airline Blvd (1.1500 MI)

DESCRIPTION: RW

PROJECT LENGTH: 1.1500 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 400 0 0 0 0 0CMAQ: MPO - Federal

0 100 0 0 0 0 0CMAQ: MPO - State Match

0 500 0 0 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

PROVIDE KEY ROADWAY CONNECTION WITH

PORTSMOUTH TCC

PROJECT

UPC NO.:

ROUTE:

104390

NFOU000

New Project

FY2014

SCHEDULE

100

ESTIMATED COST (000's)

JURISDICTION:

Elliot AvenueSTREET NAME:

PEPortsmouth

FY2014 1,340CN

FROM: Freedom Avenue TO: Elliot Street (0.2500 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.2500 MISCOPE OF WORK: New Construction Roadway TO 1,440

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 720 0Revenue Sharing Funds: Local Match

0 0 0 0 0 720 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 1,440 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

TOWN OF SMITHFIELD BALANCE ENTRY

ACCOUNT

PROJECT

UPC NO.: 70553

NFOBalance Entry

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 2 2 1 0 0 0State Formula: Urban - Local Match

0 95 78 63 0 0 0State Formula: Urban - State

97 80 64 0 0 0 0Total

06/19/2013 365

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

GODWIN BLVD & KINGS HWY INTERSECTION

IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

104332

NFO0010

New Project

FY2014

SCHEDULE

200

ESTIMATED COST (000's)

JURISDICTION:

Godwin Blvd (Route 10)STREET NAME:

PESuffolk

FY2015 1,100CN

FY2014DESCRIPTION: 200RW

PROJECT LENGTH: _SCOPE OF WORK: Reconstruction w/ Added Capacity TO 1,500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 750 0Revenue Sharing Funds: Local Match

0 0 0 0 0 750 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 1,500 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

BRIDGE ROAD AND BENNETTS PASTURE

ROAD INT. IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

100604

NFO0017

MPO project. Locally Administered.REPORT NOTE:

Complete

SCHEDULE

123

ESTIMATED COST (000's)

JURISDICTION:

Bridge RoadSTREET NAME:

PESuffolk

Underway 717CN

FROM: Bennetts Pasture Road TO: IntersectionDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 840

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 60CMAQ: Federal

0 0 0 0 0 0 540CMAQ: MPO - Federal

0 0 0 0 0 0 135CMAQ: MPO - State Match

0 0 0 0 0 0 15CMAQ: State Match

0 0 0 0 0 100 0Local Project Contributions: Local

-10 0 0 0 0 0 100 750Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

BRIDGE ROAD AND LEE FARM LANE

INTERSECTION IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

100605

NFO0017

MPO project. Locally Administered. Balance to be redistributed by the MPO.REPORT NOTE:

Complete

SCHEDULE

113

ESTIMATED COST (000's)

JURISDICTION:

Bridge RoadSTREET NAME:

PESuffolk

Underway 548CN

FROM: Lee Farm Lane TO: IntersectionDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 661

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 60CMAQ: Federal

0 0 0 0 0 0 540CMAQ: MPO - Federal

0 0 0 0 0 0 135CMAQ: MPO - State Match

0 0 0 0 0 0 15CMAQ: State Match

-89 0 0 0 0 0 0 750Total

366 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

BRIDGE ROAD TRAFFIC SIGNAL UPGRADES

PROJECT

UPC NO.:

ROUTE:

102991

NFO0017

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2017

SCHEDULE

150

ESTIMATED COST (000's)

JURISDICTION:

Bridge RoadSTREET NAME:

PESuffolk

FY2018 1,107CN

FROM: College Drive TO: Eclipse Drive (6.8000 MI)DESCRIPTION: RW

PROJECT LENGTH: 6.8000 MISCOPE OF WORK: Traffic Management/Engineering TO 1,257

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 886 120 0 0 0 0CMAQ: MPO - Federal

0 221 30 0 0 0 0CMAQ: MPO - State Match

0 1,107 150 0 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ROUTE 58/ HOLLAND ROAD CORRIDOR

IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

100937

FO0058

Locally Administered. Revised schedule required.REPORT NOTE:

Underway

SCHEDULE

33

ESTIMATED COST (000's)

JURISDICTION:

Holland RoadSTREET NAME:

PESuffolk

FY2022 55,000CN

FY2015FROM: Rte 58/13/32 bypass TO: .7 miles west of

Manning Bridge Road (3.1000 MI)

DESCRIPTION: 14,000RW

PROJECT LENGTH: 3.1000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 69,033

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 24Federal Formula STP: Federal

0 0 0 0 0 0 6Federal Formula STP: State Bond Match

6,000 0 10,000 10,000 8,000 4,000 4,000Local Project Contributions: Local

0 0 0 0 0 60 0Residue Parcel Revenue: State

0 0 0 0 0 0 12,000Revenue Sharing Funds: Local Match

0 0 0 0 0 0 12,000Revenue Sharing Funds: State Match

0 0 0 0 0 0 5(S) Secondary Formula: Federal/State

0 20 17 14 0 0 0State Formula: Urban - Local Match

0 1,003 829 664 0 0 0State Formula: Urban - State

391 1,023 10,846 10,677 8,000 6,000 4,060 28,035Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

SUFFOLK BYPASS ITS IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

102994

NFO0058

MPO projectREPORT NOTE:

FY2018

SCHEDULE

135

ESTIMATED COST (000's)

JURISDICTION:

Suffolk BypassSTREET NAME:

PESuffolk

FY2019 1,515CNFROM: City of Chesapeake limits TO: Holland Road

(11.6000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 11.6000 MISCOPE OF WORK: Traffic Management/Engineering TO 1,650

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 1,212 108 0 0 0 0RSTP (STP Regional): MPO - Federal

0 303 27 0 0 0 0RSTP (STP Regional): MPO - State Match

0 1,515 135 0 0 0 0 0Total

06/19/2013 367

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

SUFFOLK BYPASS INTERSECTION

IMPROVEMENTS AT GODWIN BOULEVARD

PROJECT

UPC NO.:

ROUTE:

102998

FO0058

MPO project; Locally AdministeredREPORT NOTE:

FY2018

SCHEDULE

120

ESTIMATED COST (000's)

JURISDICTION:

Suffolk BypassSTREET NAME:

PESuffolk

FY2019 880CN

FROM: Godwin Boulevard TO: Suffolk BypassDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 1,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 500 0Revenue Sharing Funds: Local Match

0 0 0 0 0 500 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 1,000 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 337 - DEVELOP TO 4 LANE DIVIDED

FACILITY

PROJECT

UPC NO.:

ROUTE:

17568

NFO0337

Intersection of Nansemond Pkwy and Shoulders Hill Road.. Locally Administered.REPORT NOTE:

Complete

SCHEDULE

2,428

ESTIMATED COST (000's)

JURISDICTION:

NANSEMOND PKWYSTREET NAME:

PESuffolk

Complete 10,900CN

CompleteFROM: 0.3147 Mile W. of Shoulder Hill Road (Rte. 626)

TO: 0.3984 Mile E. of Shoulder Hill Road (Rte. 626)

(0.7131 MI)

DESCRIPTION: 5,390RW

PROJECT LENGTH: 0.7131 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 18,718

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 5,292Local Project Contributions: Local

0 0 0 0 0 0 21Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 3,014Revenue Sharing Funds: Local Match

0 0 0 0 0 0 3,014Revenue Sharing Funds: State Match

0 0 0 0 0 0 499(S) Secondary Formula: Federal/State

0 0 0 0 0 0 184(S) State Formula: Secondary - Unpaved

0 0 0 0 0 0 116State Formula: Urban - Local Match

0 0 0 0 0 0 6,705Urban Formula: State

-127 0 0 0 0 0 0 18,846Total

368 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 337 - WIDEN TO 4 LANES

PROJECT

UPC NO.:

ROUTE:

61407

NFO0337

Locally Administered. Project is for Roadway Widening. State funds - AC for future federal

conversion.

REPORT NOTE:

Underway

SCHEDULE

539

ESTIMATED COST (000's)

JURISDICTION:

NANSEMOND PKWYSTREET NAME:

PESuffolk

FY2017 4,586CN

FY2015FROM: 0.37 Mile E. of Shoulder Hill Road (Rte. 626) TO:

0.748 Mile E. of Shoulder Hill Road (Rte. 626) (0.3780 MI)

DESCRIPTION: 3,807RW

PROJECT LENGTH: 0.3780 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 8,932

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,730Federal Formula STP: Federal

0 0 0 0 0 0 422Federal Formula STP: State Bond Match

0 0 0 0 0 0 50Local Project Contributions: Urban - Local

Match

0 0 0 0 0 800 0RSTP (STP Regional): MPO - Federal

0 0 0 0 0 200 0RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 3,092(S) Secondary Formula: Federal/State

0 0 0 0 0 0 8State Formula: Urban - Local Match

0 0 0 0 0 0 976Urban Formula: Federal

0 0 0 0 0 0 294Urban Formula: Federal/State

0 0 0 0 0 0 93Urban Formula: State

0 0 0 0 0 0 454Urban Formula: State Match

-189 0 0 0 0 0 1,000 8,120Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CONTINUE TO EXTEND SIDEWALK ALONG

RTE 460 (N. MAIN ST).

PROJECT

UPC NO.:

ROUTE:

99172

NFO0460

Locally Administered.REPORT NOTE:

Underway

SCHEDULE

139

ESTIMATED COST (000's)

JURISDICTION:

North Main StreetSTREET NAME:

PESuffolk

FY2014 300CN

FY2014FROM: Walmart TO: VDOT Property Line (0.3000 MI)DESCRIPTION: 90RW

PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 529

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 423CMAQ: Federal

0 0 0 0 0 0 0Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 2State Formula: Urban - Local Match

0 0 0 0 0 0 86Urban Formula: Federal/State

0 0 0 0 0 0 17Urban Formula: State Match

0 0 0 0 0 0 0 529Total

06/19/2013 369

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

PRUDEN BLVD DRAINAGE IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

104333

NFO0460

New Project

FY2014

SCHEDULE

8

ESTIMATED COST (000's)

JURISDICTION:

Pruden BoulevardSTREET NAME:

PESuffolk

FY2014 842CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Other TO 850

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 425 0Revenue Sharing Funds: Local Match

0 0 0 0 0 425 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 850 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

NANSEMOND PKWY INTERSECTION

IMPROVEMENTS AT WILROY ROAD

PROJECT

UPC NO.:

ROUTE:

102995

NFO0614

MPO project.REPORT NOTE:

FY2018

SCHEDULE

300

ESTIMATED COST (000's)

JURISDICTION:

Nansemond ParkwaySTREET NAME:

PESuffolk

FY2019 1,000CN

FY2019FROM: Wilroy Road TO: Wilroy RoadDESCRIPTION: 300RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 1,600

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 800 0Revenue Sharing Funds: Local Match

0 0 0 0 0 800 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 1,600 0Total

370 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 626 - RECONSTRUCTION (PE & RW ONLY

IN SSYP)

PROJECT

UPC NO.:

ROUTE:

69050

NFO0626

Locally Administered; PE only. Revised schedule required based upon available funding. City of

Suffolk - Urban Project in FY07. State funds - AC for future federal conversion.

REPORT NOTE:

Underway

SCHEDULE

3,177

ESTIMATED COST (000's)

JURISDICTION:

SHOULDERS HILLSTREET NAME:

PESuffolk

FY2017 33,414CN

FY2016FROM: ROUTE 337 TO: ROUTE 17 (3.0700 MI)DESCRIPTION: 4,489RW

PROJECT LENGTH: 3.0700 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 41,080

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 445Federal Formula STP: Federal

0 0 0 0 0 0 111Federal Formula STP: State Bond Match

0 0 0 0 0 0 18Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 6(S) Secondary Formula: Federal/State

0 0 0 0 0 0 1,364STP: Statewide - Federal

0 0 0 0 0 0 341STP: Statewide - Soft Match

0 0 0 0 0 0 727Urban Formula: Federal

0 0 0 0 0 0 164Urban Formula: State Match

37,903 0 0 0 0 0 0 3,177Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HARBOUR VIEW AREA TRAFFIC SIGNAL

COORDINATION

PROJECT

UPC NO.:

ROUTE:

100603

NFO0658

MPO project. Locally Administered.REPORT NOTE:

FY2014

SCHEDULE

75

ESTIMATED COST (000's)

JURISDICTION:

Harbour View, College Dr, Townpoint Rd, Bridge RdSTREET NAME:

PESuffolk

FY2015 3,425CNFROM: Int. Harbour View, College Dr, Townpoint Rd,

Bridge Rd. TO: Intersection

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 3,500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

1,200 0 0 740 800 60 0CMAQ: MPO - Federal

300 0 0 185 200 15 0CMAQ: MPO - State Match

0 0 0 925 1,000 1,500 75 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITY OF SUFFOLK BALANCE ENTRY ACCOUNT

PROJECT

UPC NO.: 70560

NFOBalance Entry

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 24Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 952Urban Formula: Federal

0 0 0 0 0 0 214Urban Formula: State Match

0 0 0 0 0 0 1,191Total

06/19/2013 371

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HSIP PROACTIVE SAFETY PROJECTS CITY OF

SUFFOLK

PROJECT

UPC NO.: 86610

NFODistrict-wide

Revised schedule required from City.REPORT NOTE:

City of Suffolk Safety ImprovementsDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 393Highway Safety Improvements: Federal

0 0 0 0 0 0 44Highway Safety Improvements: State Match

0 0 0 0 0 0 437Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE TRAFFIC MANAGEMENT SYSTEM

PLAN

PROJECT

UPC NO.:

ROUTE:

97726

NFOU000

MPO project. Locally Administered.REPORT NOTE:

Complete

SCHEDULE

400

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PESuffolk

CN

FROM: Citywide TO: CitywideDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 400

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 320RSTP (STP Regional): Federal

0 0 0 0 0 0 80RSTP (STP Regional): State Match

0 0 0 0 0 0 0 400Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

PORTSMOUTH BOULEVARD PARK AND RIDE

LOT

PROJECT

UPC NO.:

ROUTE:

100607

NFOU000

MPO project. Locally Administered. Balance to be redistributed by MPO.REPORT NOTE:

Complete

SCHEDULE

120

ESTIMATED COST (000's)

JURISDICTION:

Portsmouth BoulevardSTREET NAME:

PESuffolk

Underway 590CN

FROM: B Street TO: B StreetDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 710

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 60CMAQ: Federal

0 0 0 0 0 0 540CMAQ: MPO - Federal

0 0 0 0 0 0 135CMAQ: MPO - State Match

0 0 0 0 0 0 15CMAQ: State Match

-40 0 0 0 0 0 0 750Total

372 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

NASEMOND PARKWAY TRAFFIC SIGNAL

UPGRADES

PROJECT

UPC NO.:

ROUTE:

102990

NFOU000

MPO project. Locally Administered. Revised schedule required.REPORT NOTE:

FY2018

SCHEDULE

294

ESTIMATED COST (000's)

JURISDICTION:

Nansemond ParkwaySTREET NAME:

PESuffolk

FY2019 2,454CNFROM: Intersection of Bridge Road and Shoulders Hill

Road TO: Intersection of Wilroy Road and Route 58

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Traffic Management/Engineering TO 2,748

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 1,313 0 0 0 0 0CMAQ: MPO - Federal

0 328 0 0 0 0 0CMAQ: MPO - State Match

1,107 1,641 0 0 0 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

KENYON ROAD CONNECTOR

PROJECT

UPC NO.:

ROUTE:

104359

NFOU000

New Project

FY2014

SCHEDULE

450

ESTIMATED COST (000's)

JURISDICTION:

Kenyon Road ConnectorSTREET NAME:

PESuffolk

FY2015 6,235CN

FY2014FROM: Terminus of Kenyon Court TO: Route 58DESCRIPTION: 1,025RW

PROJECT LENGTH: _SCOPE OF WORK: New Construction Roadway TO 7,710

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 2,000 0Revenue Sharing Funds: Local Match

0 0 0 0 0 2,000 0Revenue Sharing Funds: State Match

3,710 0 0 0 0 0 4,000 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

COLLEGE DR & HARBOUR VIEW BLVD

INTERSECTION IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

104361

NFOU000

New Project

FY2014

SCHEDULE

250

ESTIMATED COST (000's)

JURISDICTION:

College DriveSTREET NAME:

PESuffolk

FY2015 1,550CN

FY2014FROM: College Drive TO: Harbour View Blvd (0.0100 MI)DESCRIPTION: 200RW

PROJECT LENGTH: 0.0100 MISCOPE OF WORK: Safety TO 2,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 1,000 0Revenue Sharing Funds: Local Match

0 0 0 0 0 1,000 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 2,000 0Total

06/19/2013 373

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CENTERVILLE TURNPIKE WIDENING

PROJECT

UPC NO.:

ROUTE:

103005

NFO0000

PE only. Accruing for RW. MPO project. Revised schedule required.. Locally Administered.REPORT NOTE:

FY2014

SCHEDULE

1,550

ESTIMATED COST (000's)

JURISDICTION:

Centerville TurnpikeSTREET NAME:

PEVirginia Beach

FY2019 20,820CN

FY2018FROM: Kempsville Road TO: Indian River Road (1.8300

MI)

DESCRIPTION: 8,630RW

PROJECT LENGTH: 1.8300 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 31,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 2,263 0Local Project Contributions: Local

0 0 0 0 0 10,000 0Revenue Sharing Funds: Local Match

0 0 0 0 0 10,000 0Revenue Sharing Funds: State Match

0 3,885 3,104 0 0 0 0RSTP (STP Regional): MPO - Federal

0 971 776 0 0 0 0RSTP (STP Regional): MPO - State Match

0 4,857 3,880 0 0 0 22,263 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 58 - WIDEN TO 6-LANE DIVIDED FACILITY

PROJECT

UPC NO.:

ROUTE:

12546

NFO0058

PE and RW only. Revised schedule required based upon available funding.REPORT NOTE:

Complete

SCHEDULE

6,131

ESTIMATED COST (000's)

JURISDICTION:

LASKIN ROADSTREET NAME:

PEVirginia Beach

FY2014 57,910CN

UnderwayFROM: 0.449 KILOMETER WEST OF FIRST COLONIAL

ROAD TO: 0.515 KILOMETER EAST OF BIRDNECK

ROAD (3.3900 KM)

DESCRIPTION: 29,295RW

PROJECT LENGTH: 3.3900 KMSCOPE OF WORK: Reconstruction w/o Added Capacity TO 93,336

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3,667Accounts Receivable: Local

0 0 0 0 0 0 1,522Bond Match: State Bond Match

0 0 0 0 0 0 345Federal Formula STP: Federal

0 0 0 0 0 0 6,089Federal STP: Federal

0 0 0 0 0 0 400Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 3,985NHPP: Statewide - Federal

0 0 0 0 0 0 996NHPP: Statewide - Soft Match

0 0 0 0 0 0 15,240Urban Formula: Federal

0 0 0 0 0 0 3,991Urban Formula: State Match

57,100 0 0 0 0 0 0 36,236Total

374 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 58 - WIDEN TO 6 LANES PHASE III

PROJECT

UPC NO.:

ROUTE:

14601

NFO0058

Urban Construction Initiative Project - matching funds provided as part of quarterly payment.

Revised schedule required from City of Virginia Beach. Phase II - PE only. Accruing for RW.

REPORT NOTE:

Underway

SCHEDULE

850

ESTIMATED COST (000's)

JURISDICTION:

LASKIN ROADSTREET NAME:

PEVirginia Beach

FY2022 22,472CN

FY2021FROM: 0.32 MILES EAST OF BIRDNECK ROAD TO:

0.247 MILES WEST OF PACIFIC AVENUE (0.4200 MI)

DESCRIPTION: 3,178RW

PROJECT LENGTH: 0.4200 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 26,500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 32Local Project Contributions: Local

0 0 0 0 0 0 964Urban Formula: Federal

25,504 0 0 0 0 0 0 996Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CONSTRUCT SIDEWALK TO EXISTING

SIDEWALK ALONG VA BEACH BLVD

PROJECT

UPC NO.:

ROUTE:

86504

NFO0058

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

183

ESTIMATED COST (000's)

JURISDICTION:

Virginia Beach Blvd.STREET NAME:

PEVirginia Beach

Complete 1,466CN

CompleteFROM: North Oceana boulevard TO: Birdneck Rd (1.4200

MI)

DESCRIPTION: 39RW

PROJECT LENGTH: 1.4200 MISCOPE OF WORK: Safety TO 1,688

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,480Highway Safety Improvements: Federal

0 0 0 0 0 0 164Highway Safety Improvements: State Match

0 0 0 0 0 0 32Local Project Contributions: Local

0 0 0 0 0 0 12Safety Funds: Hazard Elimination

0 0 0 0 0 0 0 1,688Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE EXISTING SIGNAL AT VA BEACH

BLVD WITH MEDITERRANEAN

PROJECT

UPC NO.:

ROUTE:

93631

NFO0058

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

62

ESTIMATED COST (000's)

JURISDICTION:

Virginia Beach BlvdSTREET NAME:

PEVirginia Beach

Underway 210CN

FROM: 1600' Route 60 Pacific Ave TO: Mediterranean AveDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 272

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 235Highway Safety Improvements: Federal

0 0 0 0 0 0 26Highway Safety Improvements: State Match

0 0 0 0 0 0 11Local Project Contributions: Local

0 0 0 0 0 0 0 272Total

06/19/2013 375

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UTILITY BORE UNDER LYNNHAVEN INLET

PROJECT

UPC NO.:

ROUTE:

102781

NFO0058

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Laskin RoadSTREET NAME:

PEVirginia Beach

Underway 5,624CNFROM: Gay Drive TO: 0.104 Miles West of Red Robin

Road (0.2460 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.2460 MISCOPE OF WORK: Utilities TO 5,624

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,333Accounts Receivable: Local

0 0 0 0 0 0 8Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 3,112NHPP: Statewide - Federal

0 0 0 0 0 0 778NHPP: Statewide - Soft Match

0 0 0 0 0 0 320Urban Formula: Federal

0 0 0 0 0 0 72Urban Formula: State Match

0 0 0 0 0 0 0 5,624Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

LESNER BRIDGE REPLACEMENT PROJECT, VA

BEACH

PROJECT

UPC NO.:

ROUTE:

97737

FO0060

Locally Administered. PE funded by City.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Shore DriveSTREET NAME:

PEVirginia Beach

FY2014 82,839CN

UnderwayFROM: E Stratford Rd TO: Vista Circle (0.5900 MI)DESCRIPTION: 4,638RW

PROJECT LENGTH: 0.5900 MISCOPE OF WORK: Bridge Replacement w/o Added Capacity TO 87,478

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 14,140 28,699Bond Proceeds: CPR Bonds

0 0 14,220 13,000 0 0 0CTB Formula: Bridge - State

0 0 0 0 0 0 750Demonstration Funds: Federal

8,363 0 0 0 0 4,973 0NHPP: Statewide - Federal

2,091 0 0 0 0 1,243 0NHPP: Statewide - Soft Match

0 0 14,220 13,000 0 10,453 20,356 29,449Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

SHORE DRIVE- SAFETY/PED IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

102739

NFO0060

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Shore DriveSTREET NAME:

PEVirginia Beach

FY2014 10,813CN

FROM: Vista Circle TO: Croix Dr. (1.3000 MI)DESCRIPTION: RW

PROJECT LENGTH: 1.3000 MISCOPE OF WORK: TO 10,813

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 813Local Project Contributions: Local

0 0 0 0 0 0 5,000Revenue Sharing Funds: Local Match

0 0 0 0 0 0 5,000Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 10,813Total

376 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 165 - 4 LANES ON 8-LANE RIGHT OF WAY

PROJECT

UPC NO.:

ROUTE:

13482

NFO0165

CN on ARRA UPC 93522. Project linked to UPC 52048. PE is included in this project for UPC

52058.

REPORT NOTE:

Complete

SCHEDULE

7,887

ESTIMATED COST (000's)

JURISDICTION:

PRINCESS ANNE RDSTREET NAME:

PEVirginia Beach

CN

CompleteFROM: 0.122 MILES EAST OF DAM NECK ROAD TO:

0.108 MILES EAST OF NIMMO PARKWAY (2.1440 MI)

DESCRIPTION: 21,048RW

PROJECT LENGTH: 2.1440 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 28,935

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 5,260Accounts Receivable: Local

0 0 0 0 0 0 445Federal Formula STP: Federal

0 0 0 0 0 0 352Federal STP: Federal

0 0 0 0 0 0 465Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 88Soft Match: Federal

0 0 0 0 0 0 17,877Urban Formula: Federal

0 0 0 0 0 0 4,448Urban Formula: State Match

0 0 0 0 0 0 0 28,935Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 165 - INTERSECTION IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

51866

NFO0165

Urban Construction Initiative Project - matching funds provided as part of the quarterly payment.REPORT NOTE:

Complete

SCHEDULE

4,500

ESTIMATED COST (000's)

JURISDICTION:

PRINCESS ANNE RDSTREET NAME:

PEVirginia Beach

Complete 26,908CN

CompleteFROM: 0.389 MILES WEST OF KEMPSVILLE ROAD TO:

0.275 MILES EAST OF KEMPSVILLE ROAD (0.6640 MI)

DESCRIPTION: 52,194RW

22270,29394 -1,82PROJECT LENGTH: 0.6640 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: Reconstruction w/o Added Capacity TO 83,602

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 75Federal Formula STP: Federal

0 0 0 0 0 0 38,338Local Project Contributions: Local

0 0 0 0 0 0 5,288(X) Local Project Contributions: State Match

0 0 0 0 0 0 1,461Revenue Sharing Funds: Local Match

0 0 0 0 0 0 1,461Revenue Sharing Funds: State Match

0 0 0 0 0 0 36,979Urban Formula: Federal

0 0 0 0 0 0 0 83,602Total

06/19/2013 377

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 165 - NIMMO PARKWAY - 4 LANE ON 6

LANE RW (RW & CN ONLY)

PROJECT

UPC NO.:

ROUTE:

52058

NFO0165

Project linked to UPC 13482. PE included in UPC 13482.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

NIMMO PARKWAYSTREET NAME:

PEVirginia Beach

Underway 53,797CN

CompleteFROM: 0.02 Miles East of Holland Road TO: 0.43 Miles

West of General Booth Boulevard (1.7200 MI)

DESCRIPTION: 4,677RW

27513 100PROJECT LENGTH: 1.7200 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: New Construction Roadway TO 58,474

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 5,061Accounts Receivable: Local

0 0 0 0 0 0 81Federal Formula STP: Federal

0 0 0 0 0 600 35,783Local Project Contributions: Local

0 0 0 0 0 0 300Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 1,000Revenue Sharing Funds: Local Match

0 0 0 0 0 0 1,000Revenue Sharing Funds: State Match

0 0 0 0 0 0 11,943Urban Formula: Federal

0 0 0 0 0 0 2,705Urban Formula: State Match

0 0 0 0 0 0 600 57,874Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ARRA VIRGINIA BEACH 165 (PRINCESS ANNE

ROAD) 4 LANE WIDENING

PROJECT

UPC NO.: 93522

NFOARRA09

PE and RW on UPC 13482; ARRA parent UPC 93522; ARRA child UPC 96137, Additive UPC

95555

REPORT NOTE:

FROM: 0.124 MILES EAST OF DAM NECK ROAD TO:

0.108 MILE EAST OF NIMMO PARKWAY (2.1420 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 18,518American Recovery and Reinvestment Act:

Flexible

0 0 0 0 0 0 8,619American Recovery and Reinvestment Act:

Urbanized Area > 200K

0 0 0 0 0 0 2,589Local Project Contributions: Local

0 0 0 0 0 0 15Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 1,000Revenue Sharing Funds: Local Match

0 0 0 0 0 0 1,000Revenue Sharing Funds: State Match

0 0 0 0 0 0 585Urban Formula: Federal

0 0 0 0 0 0 132Urban Formula: State Match

0 0 0 0 0 0 32,457Total

378 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CONSTR LTL FOR SOUTH INDEPENDENCE

BLVD

PROJECT

UPC NO.:

ROUTE:

93661

NFO0410

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

86

ESTIMATED COST (000's)

JURISDICTION:

South Independence BlvdSTREET NAME:

PEVirginia Beach

Complete 306CNFROM: 130 feet east of Buckner Blvd TO: 610 feet north

on Independence

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 392

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 350Highway Safety Improvements: Federal

0 0 0 0 0 0 39Highway Safety Improvements: State Match

0 0 0 0 0 0 4Local Project Contributions: Local

0 0 0 0 0 0 0 392Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENTS AT GENERAL

BOOTH BLVD AND NIMMO PK

PROJECT

UPC NO.:

ROUTE:

93662

NFO0615

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

87

ESTIMATED COST (000's)

JURISDICTION:

General Booth BlvdSTREET NAME:

PEVirginia Beach

Complete 410CNFROM: 100 FT EAST OF GENERAL BOOTH BLVD TO:

600 FT WEST OF GENERAL BOOTH BLVD

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 497

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 360Highway Safety Improvements: Federal

0 0 0 0 0 0 40Highway Safety Improvements: State Match

0 0 0 0 0 0 97Local Project Contributions: Local

0 0 0 0 0 0 0 497Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HSIP - CONSTRUCT SIDEWALK ALONG 1.5 MI

OF N. LYNNHAVEN ROAD

PROJECT

UPC NO.:

ROUTE:

93664

NFO8711

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

72

ESTIMATED COST (000's)

JURISDICTION:

North Lynnhaven RoadSTREET NAME:

PEVirginia Beach

Complete 293CN

FROM: Virginia Beach Blvd TO: Kings Grant RoadDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 365

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 318Highway Safety Improvements: Federal

0 0 0 0 0 0 35Highway Safety Improvements: State Match

0 0 0 0 0 0 12Local Project Contributions: Local

0 0 0 0 0 0 0 365Total

06/19/2013 379

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

LYNNHAVEN PARKWAY - WIDENING TO 4

LANES

PROJECT

UPC NO.:

ROUTE:

14603

NFOU000

Complete

SCHEDULE

3,491

ESTIMATED COST (000's)

JURISDICTION:

LYNNHAVEN PKWYSTREET NAME:

PEVirginia Beach

FY2014 20,483CN

UnderwayFROM: 0.4571 Miles East of Centerville Turnpike TO:

0.1627 Miles West of Indian River Road (1.4340 MI)

DESCRIPTION: 9,141RW

PROJECT LENGTH: 1.4340 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 33,114

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 17,489Bond Proceeds: CPR Bonds

0 0 0 0 0 0 63Federal Formula STP: Federal

0 0 0 0 0 0 1,611Local Project Contributions: Local

0 0 0 0 0 0 223Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 121RSTP (STP Regional): Federal

0 0 0 0 0 142 2,044RSTP (STP Regional): MPO - Federal

0 0 0 0 0 36 511RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 30RSTP (STP Regional): State Match

0 0 0 0 0 0 8,840Urban Formula: Federal

0 0 0 0 0 0 2,003Urban Formula: State Match

0 0 0 0 0 0 178 32,937Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HOLLAND ROAD - UPGRADE TO 4 LANES

PROJECT

UPC NO.:

ROUTE:

15827

NFOU000

Complete

SCHEDULE

3,834

ESTIMATED COST (000's)

JURISDICTION:

HOLLAND ROADSTREET NAME:

PEVirginia Beach

FY2014 24,353CN

UnderwayFROM: 0.207 MILE NORTH OF DAM NECK ROAD TO:

0.152 MILE SOUTH OF NIMMO PARKWAY (2.7200 MI)

DESCRIPTION: 18,700RW

PROJECT LENGTH: 2.7200 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 46,887

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 22,308Bond Proceeds: CPR Bonds

0 0 0 0 0 0 142Federal Formula STP: Federal

0 0 0 0 0 0 817Local Project Contributions: Local

0 0 0 0 0 0 462Local Project Contributions: Urban - Local

Match

0 0 0 544 0 0 0STP: Statewide - Federal

0 0 0 136 0 0 0STP: Statewide - Soft Match

0 0 0 0 0 0 18,324Urban Formula: Federal

0 0 0 0 0 0 4,155Urban Formula: State Match

0 0 0 681 0 0 0 46,207Total

380 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

ELBOW RD - UPGRADE TO 4 LANES &

EXTENSION (PE ONLY IN SYIP)

PROJECT

UPC NO.:

ROUTE:

15828

NFOU000

Urban Construction Initiative Project - matching funds provided as part of quarterly payment. PE

and RW only. Revised schedule required based upon available funding.

REPORT NOTE:

Complete

SCHEDULE

4,495

ESTIMATED COST (000's)

JURISDICTION:

ELBOW ROADSTREET NAME:

PEVirginia Beach

FY2014 53,046CN

UnderwayFROM: INDIAN RIVER ROAD TO: 0.5 MILE WEST OF

PRINCESS ANN ROAD (3.1000 MI)

DESCRIPTION: 11,385RW

11111 95PROJECT LENGTH: 3.1000 MI STRUCTURE NO.: SUFFICIENCY RATING:

SCOPE OF WORK: New Construction Roadway TO 68,926

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,390Local Project Contributions: Local

0 0 0 0 0 0 148(X) Local Project Contributions: State Match

0 0 0 0 0 0 592Minimum Guarantee: Federal

0 0 0 0 0 0 5,000Revenue Sharing Funds: Local Match

0 0 0 0 0 0 5,000Revenue Sharing Funds: State Match

0 0 0 0 0 0 3,052Urban Formula: Federal

52,744 0 0 0 0 0 0 16,182Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INDIAN RIVER ROAD - UPGRADE TO 4 LANES

(PE ONLY IN SYIP)

PROJECT

UPC NO.:

ROUTE:

15829

NFOU000

Urban Construction Initiative Project - matching funds provided as part of quarterly payment. PE

and partial RW only. Revised estimate and schedule required from City of Virginia Beach.

REPORT NOTE:

Complete

SCHEDULE

4,154

ESTIMATED COST (000's)

JURISDICTION:

INDIAN RIVER ROASTREET NAME:

PEVirginia Beach

FY2022 55,362CN

UnderwayFROM: LYNNHAVEN PARKWAY TO: ELBOW ROAD

(3.5000 KM)

DESCRIPTION: 29,450RW

PROJECT LENGTH: 3.5000 KMSCOPE OF WORK: Reconstruction w/ Added Capacity TO 88,966

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,738Local Project Contributions: Local

0 0 0 0 0 0 3,610Urban Formula: Federal

82,618 0 0 0 0 0 0 6,348Total

06/19/2013 381

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

SOUTHEASTERN PKWY & GREENBELT - 4

LANES/PHASE I (PE ONLY)

PROJECT

UPC NO.:

ROUTE:

16556

FOU000

Partial PE only.REPORT NOTE:

Underway

SCHEDULE

76,919

ESTIMATED COST (000's)

JURISDICTION:

SOUTHEASTERN PKWSTREET NAME:

PEVirginia Beach

CNFROM: I-64 (AT OAK GROVE CONNECTOR) TO: I-264

(7.9800 KM)

DESCRIPTION: RW

PROJECT LENGTH: 7.9800 KMSCOPE OF WORK: New Construction Roadway TO 76,919

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 19Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 7,067TEA-21 High Priority Funds: Statewide

0 0 0 0 0 0 736Urban Formula: State

0 0 0 0 0 0 184Urban Formula: State Match

68,913 0 0 0 0 0 0 8,006Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WESLEYAN DRIVE - 4 LANE

PROJECT

UPC NO.:

ROUTE:

52148

NFOU000

MPO Project - Locally Administered. Balance to be redistributed by the MPO.REPORT NOTE:

Complete

SCHEDULE

1,435

ESTIMATED COST (000's)

JURISDICTION:

WESLEYAN DRIVESTREET NAME:

PEVirginia Beach

Complete 8,508CN

CompleteFROM: NORTHAMPTON BOULEVARD TO: BAKER

ROAD (0.4500 MI)

DESCRIPTION: 2,360RW

PROJECT LENGTH: 0.4500 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 12,303

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,059Non-Formula: State

0 0 0 0 0 0 11,640RSTP (STP Regional): Federal

0 0 0 0 0 0 1,851RSTP (STP Regional): State Match

-2,247 0 0 0 0 0 0 14,550Total

382 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WITCH DUCK ROAD - 6 LANES

PROJECT

UPC NO.:

ROUTE:

55202

NFOU000

Revised schedule required. Urban Construction Initiative Project - matching funds provided as

part of quarterly payment. PE & RW only. Accruing for CN.

REPORT NOTE:

Complete

SCHEDULE

2,234

ESTIMATED COST (000's)

JURISDICTION:

WITCH DUCK ROADSTREET NAME:

PEVirginia Beach

FY2014 25,175CN

UnderwayFROM: I-264 TO: VIRGINIA BEACH BLVD (0.7000 MI)DESCRIPTION: 26,977RW

PROJECT LENGTH: 0.7000 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 54,386

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 32,143Bond Proceeds: CPR Bonds

0 0 0 0 0 0 811Local Project Contributions: Local

0 0 0 0 0 0 5,000Revenue Sharing Funds: Local Match

0 0 0 0 0 0 5,000Revenue Sharing Funds: State Match

0 0 0 0 0 0 732Urban Formula: Federal

10,700 0 0 0 0 0 0 43,686Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE SIGNAL SYSTEM UPGRADE PHASE

II

PROJECT

UPC NO.:

ROUTE:

77277

NFOU000

MPO Project - Locally Administered. Revised estimate required from City.REPORT NOTE:

Complete

SCHEDULE

2,700

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEVirginia Beach

Complete 6,281CN

VARIOUS LOCATIONSDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 8,981

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 11,316CMAQ: Federal

0 0 0 0 0 0 200CMAQ: State Match

0 0 0 0 0 0 0Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 120Non-Formula: State

0 0 0 0 0 0 480RSTP (STP Regional): Federal

-3,136 0 0 0 0 0 0 12,116Total

06/19/2013 383

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENTS - ROSEMONT

RD & LYNNHAVEN PKWY

PROJECT

UPC NO.:

ROUTE:

84335

NFOU000

Locally AdministeredREPORT NOTE:

Complete

SCHEDULE

139

ESTIMATED COST (000's)

JURISDICTION:

Rosemont RdSTREET NAME:

PEVirginia Beach

Complete 601CN

CompleteFROM: 579.5 Ft South of Intersection TO: 357.82 Ft West

of Intersection (0.1780 MI)

DESCRIPTION: 29RW

PROJECT LENGTH: 0.1780 MISCOPE OF WORK: Resurfacing TO 770

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 560CMAQ: Federal

0 0 0 0 0 0 140CMAQ: State Match

0 0 0 0 0 0 70Local Project Contributions: Local

0 0 0 0 0 0 0 770Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INTERSECTION IMPROVEMENTS - INDIAN

RIVER RD & KEMPSVILLE RD

PROJECT

UPC NO.:

ROUTE:

84366

NFOU000

PE and RW only. Revised schedule required based on available funding. MPO project, Locally

Administered. Balance to be provided by MPO

REPORT NOTE:

Complete

SCHEDULE

984

ESTIMATED COST (000's)

JURISDICTION:

Indian River RdSTREET NAME:

PEVirginia Beach

FY2014 6,450CN

UnderwayFROM: Indian River Rd and Kempsville Rd Intersection

Improvements TO: Indian River Rd and Kempsville Rd

Intersection Improvements

DESCRIPTION: 6,350RW

PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 13,784

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,789CMAQ: Federal

1,222 0 0 0 800 883 2,636CMAQ: MPO - Federal

306 0 0 0 200 221 659CMAQ: MPO - State Match

0 0 0 0 0 0 697CMAQ: State Match

0 0 0 0 0 0 6Federal Formula STP: Federal

0 0 0 0 0 0 22Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 1,098Urban Formula: State

2,246 0 0 0 1,000 1,528 1,104 7,906Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

HSIP PROACTIVE SAFETY PROJECTS CITY OF

VA BEACH

PROJECT

UPC NO.: 86617

NFODistrict-wide

VA Beach Safety ImprovementsDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,384Highway Safety Improvements: Federal

0 0 0 0 0 0 154Highway Safety Improvements: State Match

0 0 0 0 0 0 78Local Project Contributions: Local

0 0 0 0 0 0 1,616Total

384 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

DESIGN AND BUILD THE NIMMO PKWY

WETLAND MITIGATION SITE

PROJECT

UPC NO.:

ROUTE:

91334

NFOU000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

West Neck RoadSTREET NAME:

PEVirginia Beach

Underway 1,587CNFROM: East Bank of West Neck Creek TO: West Neck

Road

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Environmental Only TO 1,587

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 32Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 1,270Urban Formula: Federal

0 0 0 0 0 0 286Urban Formula: State Match

0 0 0 0 0 0 0 1,587Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

VIRGINIA BEACH DYNAMIC MESSAGE SIGN

AND SYSTEM DETECTORS

PROJECT

UPC NO.:

ROUTE:

95983

NFOU000

MPO project. Locally Administered. Balance to be redistributed by MPOREPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Various LocationsSTREET NAME:

PEVirginia Beach

Complete 1,963CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,963

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,650CMAQ: Federal -687

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INSTALL SIDEWALK, ADA RAMPS AND

PEDESTRIAN SIGNALS

PROJECT

UPC NO.:

ROUTE:

96784

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

61

ESTIMATED COST (000's)

JURISDICTION:

Independence BlvdSTREET NAME:

PEVirginia Beach

Complete 481CN

FROM: Holland Road TO: Indian River RoadDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 542

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 288Highway Safety Improvements: Federal

0 0 0 0 0 0 32Highway Safety Improvements: State Match

0 0 0 0 0 144 77Local Project Contributions: Local

0 0 0 0 0 0 144 397Total

06/19/2013 385

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

UPGRADE SIGNAL, INSTALL ADA RAMPS AND

PED ACCOMODATIONS

PROJECT

UPC NO.:

ROUTE:

97012

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

74

ESTIMATED COST (000's)

JURISDICTION:

First Colonial RoadSTREET NAME:

PEVirginia Beach

Complete 340CN

FROM: First Colonial Road TO: Donna BlvdDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 414

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 363Highway Safety Improvements: Federal

0 0 0 0 0 0 40Highway Safety Improvements: State Match

0 0 0 0 0 0 11Local Project Contributions: Local

0 0 0 0 0 0 0 414Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE SIGNAL RETIMING - PHASE 3

PROJECT

UPC NO.:

ROUTE:

97768

NFOU000

MPO project. Locally Administered.REPORT NOTE:

Complete

SCHEDULE

2,255

ESTIMATED COST (000's)

JURISDICTION:

CitywideSTREET NAME:

PEVirginia Beach

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 2,255

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,933CMAQ: Federal

0 0 0 0 0 0 293CMAQ: State Match

0 0 0 0 0 0 0Local Project Contributions: Local

0 0 0 0 0 0 0Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 28Urban Formula: State Match

0 0 0 0 0 0 0 2,255Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

INSTALL PED SIGNALS AND ADA RAMPS AT

PROVIDENCE RD

PROJECT

UPC NO.:

ROUTE:

100539

NFOU000

Locally Administered.REPORT NOTE:

Underway

SCHEDULE

65

ESTIMATED COST (000's)

JURISDICTION:

Providence RoadSTREET NAME:

PEVirginia Beach

FY2013 430CNFROM: Matyiko Drive Intersection TO: Whitehurst

Landing Road Intersection

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 495

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 450Highway Safety Improvements: Federal

0 0 0 0 0 0 50Highway Safety Improvements: State Match

-5 0 0 0 0 0 0 500Total

386 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

OFFSET LEFT TURN LANES TWO LOCATIONS

VA BEACH

PROJECT

UPC NO.:

ROUTE:

100540

NFOU000

Locally Administered.REPORT NOTE:

Complete

SCHEDULE

218

ESTIMATED COST (000's)

JURISDICTION:

Shore Drive and Dam NeckSTREET NAME:

PEVirginia Beach

Underway 1,121CN

FROM: Lake Shores Road TO: Gate 3DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 1,339

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,178Highway Safety Improvements: Federal

0 0 0 0 0 0 131Highway Safety Improvements: State Match

0 0 0 0 0 0 30Local Project Contributions: Local

0 0 0 0 0 0 0 1,339Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITY OF VA BEACH - FORMULA CITY

PAYMENT

PROJECT

UPC NO.: 71787

NFOTown/City-wide

Urban Construction Initiative - matching funds provided in quarterly payment.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0Bond Match: State Bond Match

0 0 0 0 0 0Federal Formula STP: State Bond Match

0 0 0 0 0 0Residue Parcel Revenue: State

0 5,163 4,268 3,417 0 0State Formula: Urban - State

0 0 0 0 0 0Urban Formula: State

0 0 0 0 0 0Urban Formula: State Match

5,163 4,268 3,417 0 0 0Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

YORK STREET IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

104334

NFO0060

New Project

FY2014

SCHEDULE

44

ESTIMATED COST (000's)

JURISDICTION:

York StreetSTREET NAME:

PEWilliamsburg

FY2015 567CN

FROM: Page Street TO: Quarterpath Road (0.4900 MI)DESCRIPTION: RW

PROJECT LENGTH: 0.4900 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 612

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 306 0Revenue Sharing Funds: Local Match

0 0 0 0 0 306 0Revenue Sharing Funds: State Match

0 0 0 0 0 0 612 0Total

06/19/2013 387

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

RTE 615 - IRONBOUND ROAD IMPROVEMENTS

PHASE 1 - WILLIAMSBURG

PROJECT

UPC NO.:

ROUTE:

89062

NFO0615

PE and RW only. Accruing funds for CN. State funds - AC for future federal conversion. Revised

schedule required.

REPORT NOTE:

Underway

SCHEDULE

334

ESTIMATED COST (000's)

JURISDICTION:

Ironbound RoadSTREET NAME:

PEWilliamsburg

FY2021 1,553CN

FY2016FROM: Treyburn Drive TO: Richmond Road - Rte 60

(0.3000 MI)

DESCRIPTION: 626RW

PROJECT LENGTH: 0.3000 MISCOPE OF WORK: Reconstruction w/ Added Capacity TO 2,513

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2Bond Match: State Bond Match

0 0 0 0 0 0 10Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 7Minimum Guarantee: Federal

0 3 3 2 0 0 1State Formula: Urban - Local Match

0 167 138 110 0 0 0State Formula: Urban - State

0 0 0 0 0 0 254Urban Formula: Federal

0 0 0 0 0 0 208Urban Formula: State

0 0 0 0 0 0 58Urban Formula: State Match

1,552 170 141 113 0 0 0 538Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

WAT-DRPT ACQUISITION & INSTALLATION OF

1 BUS STOP SHELTER

PROJECT

UPC NO.:

ROUTE:

72697

NFOBS00

MPO Project. Complete schedule to be established at Project Scoping.REPORT NOTE:

N/A

SCHEDULE

1

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEWilliamsburg

N/A 14CN

WILLIAMSBURG SHOPPING CENTERDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 15

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3Non-Formula: State

0 0 0 0 0 0 13RSTP (STP Regional): Federal

-1 0 0 0 0 0 0 16Total

388 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Urban

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

CITYWIDE SIDEWALK IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

91689

NFOU000

Complete

SCHEDULE

2

ESTIMATED COST (000's)

JURISDICTION:

VARIOUS LOCATIONSSTREET NAME:

PEWilliamsburg

Complete 102CN

VARIOUS LOCATIONSDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Resurfacing TO 104

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 50Local Project Contributions: Local

0 0 0 0 0 0 250Revenue Sharing Funds: Local Match

0 0 0 0 0 0 250Revenue Sharing Funds: State Match

-446 0 0 0 0 0 0 550Total

MPO Area

Hampton RoadsUrban

PROGRAM/SYSTEM

PRINCE GEORGE STREET AND ARMISTEAD

AVENUE RECONSTRUCTION

PROJECT

UPC NO.:

ROUTE:

102778

NFOU000

Underway

SCHEDULE

49

ESTIMATED COST (000's)

JURISDICTION:

Prince George StreetSTREET NAME:

PEWilliamsburg

FY2014 546CNFROM: Prince George Street TO: Armistead Avenue

(0.1230 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.1230 MISCOPE OF WORK: Reconstruction w/o Added Capacity TO 595

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 44Local Project Contributions: Local

0 0 0 0 0 0 276Revenue Sharing Funds: Local Match

0 0 0 0 0 0 276Revenue Sharing Funds: State Match

0 0 0 0 0 0 0 595Total

06/19/2013 389

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Enhancement

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

BARRIER ISLANDS CENTER, INC.

PROJECT

UPC NO.:

ROUTE:

56428

NFOEN00

REPORT NOTE:

Complete

SCHEDULE

26

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENorthampton County

Complete 667CNFROM: DEVELOPMENT OF TRANSPORTATION

MUSEUM FOR ARTIFACTS ON MARI- TO: TIME,

CULTURAL & NATURAL HISTORY OF EASTERN

SHORE

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Acqusition of Scenic Easement or Sites TO 693

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 138Project Contributions: Various Sources

0 0 0 0 0 0 566Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 142(X) Transportation Enhancement Funds:

Local

-153 0 0 0 0 0 0 846Total

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

CONSTRUCT A PEDESTRIAN/BICYCLE PATH

PROJECT

UPC NO.:

ROUTE:

56430

NFOEN00

REPORT NOTE:

Underway

SCHEDULE

143

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENorfolk

Underway 2,840CN

N/AFROM: ALONG THE UNUSED RAILROAD RIGHT OF

WAY IN THE ATLANTIC CITY TO: SECTION OF

SOUTHWEST NORFOLK

DESCRIPTION: 1,152RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 4,135

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 20Project Contributions: Various Sources

0 0 0 0 0 107 203TAP: MPO - Federal

0 0 0 0 0 160 0TAP: Statewide - Federal

0 0 0 0 0 0 2,039Transportation Enhancement Funds:

Federal

0 0 0 0 0 67 661(X) Transportation Enhancement Funds:

Local

877 0 0 0 0 0 334 2,924Total

390 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Enhancement

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

DESIGN AND CONSTRUCTION OF

LANDSCAPING, UTILITY AND GENERAL

PROJECT

UPC NO.:

ROUTE:

56432

NFOEN00

Complete

SCHEDULE

349

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEChesapeake

Complete 5,512CNFROM: STREET AND SIDEWALK IMPROVEMENTS

AND OTHER ENHANCEMENTS FROM TO: I-464 TO

LIBERTY STREET

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Landscaping/Beautification TO 5,862

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,971Project Contributions: Various Sources

0 0 0 0 0 0 1,490Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 373(X) Transportation Enhancement Funds:

Local

1,029 0 0 0 0 0 0 4,833Total

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

CAPE CHARLES HISTORICAL SOCIETY

PROJECT

UPC NO.:

ROUTE:

56439

NFOEN00

Underway

SCHEDULE

2

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PECape Charles

Underway 346CNFROM: PURCHASE OF MATERIALS FOR THE BLOXOM

PASSENGER TO: STATION RECONSTRUCTION

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Landscaping/Beautification TO 348

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0Project Contributions: Various Sources

0 0 0 0 0 0 183Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 46(X) Transportation Enhancement Funds:

Local

119 0 0 0 0 0 0 229Total

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

CONSTRUCT PEDESTRIAN/BICYCLE TRAIL

ALONG MADDOX BLVD.

PROJECT

UPC NO.: 59766

NFOCTB Reporting Req'd

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 274 417TAP: Statewide - Federal

0 0 0 0 0 0 1,435Transportation Enhancement Funds:

Federal

0 0 0 0 0 69 463(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 343 2,316Total

06/19/2013 391

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Enhancement

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

RELOCATE AND RESTORATE NORGE DEPOT

FOR USE AS COMMUNITY CNTR

PROJECT

UPC NO.:

ROUTE:

59767

NFOEN01

REPORT NOTE:

Complete

SCHEDULE

12

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEJames City County

N/A 1,134CN

UnderwayDESCRIPTION: 26RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rehabilitation of Historic Bldgs/Facilities TO 1,172

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 22Project Contributions: Various Sources

0 0 0 0 0 0 755Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 189(X) Transportation Enhancement Funds:

Local

207 0 0 0 0 0 0 965Total

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

CONSTRUCTION OF NEW FOUNDATION AND

RENOVATION OF DEPOT

PROJECT

UPC NO.:

ROUTE:

59769

NFOEN01

REPORT NOTE:

Complete

SCHEDULE

93

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENewport News

Complete 3,220CN

CompleteLEE HALL DEPOTDESCRIPTION: 236RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rehabilitation of Historic Bldgs/Facilities TO 3,549

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 111Project Contributions: Various Sources

0 0 0 0 0 0 500TAP: MPO - Federal

0 0 0 0 0 0 1,499Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 500(X) Transportation Enhancement Funds:

Local

939 0 0 0 0 0 0 2,610Total

392 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Enhancement

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

SUFFOLK SEABOARD COASTLINE TRAIL

PROJECT

UPC NO.:

ROUTE:

59771

NFOEN01

$746,446 from cancelled project UPC 87011 was transferred to this projectREPORT NOTE:

Complete

SCHEDULE

649

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESuffolk

Complete 1,897CN

FROM: Trail at Train Station TO: Chesapeake City LineDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 2,546

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 647Demonstration Funds: Federal

0 0 0 0 0 0 1,076Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 215(X) Transportation Enhancement Funds:

Local

608 0 0 0 0 0 0 1,938Total

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

TOWN OF CAPE CHARLES - MULTI-USE

TRAILS

PROJECT

UPC NO.:

ROUTE:

63563

NFOEN02

$195,067 from T4971 as per CTB 6/19/08. $14,000 from #T4970.REPORT NOTE:

Complete

SCHEDULE

120

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PECape Charles

Complete 1,582CN

Circumnavigates Town of Cape CharlesDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,702

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 175 62TAP: Statewide - Federal

0 0 0 0 0 0 1,969Transportation Enhancement Funds:

Federal

0 0 0 0 0 44 508(X) Transportation Enhancement Funds:

Local

-1,056 0 0 0 0 0 219 2,539Total

06/19/2013 393

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Enhancement

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

GREENSVILLE COUNTY -

EMPORIA/GREENSVILLE SIDEWALK

EXTENSION

PROJECT

UPC NO.:

ROUTE:

63565

NFOEN02

Bicycle/Pedestrian ImprovementREPORT NOTE:

Complete

SCHEDULE

24

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEGreensville County

Complete 238CNCONSTRUCTION OF A SIDEWALK ALONG THE EAST

SIDE OF ROUTE 301

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 262

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 176Open Container Funds: Bike/Ped

0 0 0 0 0 0 69Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 17(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 0 0 262Total

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

GREENSVILLE COUNTY - WASHINGTON PARK

COMMUNITY SIDEWALK

PROJECT

UPC NO.:

ROUTE:

63566

NFOEN02

Bicycle/Pedestrian ImprovementREPORT NOTE:

Complete

SCHEDULE

1

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEGreensville County

Complete 150CN

CONSTRUCTION OF A SIDEWALKDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 152

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 63Open Container Funds: Bike/Ped

0 0 0 0 0 0 0Project Contributions: Various Sources

0 0 0 0 0 0 71Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 18(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 0 0 152Total

394 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Enhancement

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

FERRY PLANTATION HOUSE RESTORATION

PROJECT

UPC NO.:

ROUTE:

70305

NFOEN03

Complete

SCHEDULE

23

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEVirginia Beach

Complete 535CNDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rehabilitation of Historic Bldgs/Facilities TO 559

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 285Project Contributions: Various Sources

0 0 0 0 0 0 200Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 50(X) Transportation Enhancement Funds:

Local

24 0 0 0 0 0 0 535Total

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

REPLICA SHIPS - LIVING MUSEUMS

PROJECT

UPC NO.:

ROUTE:

70322

NFOEN03

Complete

SCHEDULE

1

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEJames City County

Complete 1,124CNFROM: REPLICA OF GODSPEED AND THE

DISCOVERY FOR USE AS LIVING TO: MUSEUMS AT

THE JAMESTOWN SETTLEMENTS

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Historic Preservation TO 1,125

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 54Project Contributions: Various Sources

0 0 0 0 0 0 857Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 214(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 0 0 1,125Total

06/19/2013 395

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Enhancement

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

ARRASMITHFIELD DOWNTOWN

REVITALIZATION-STREETSCAPING PHASE V

PROJECT

UPC NO.: 93722

NFOARRA09

ARRA parent UPC 93722; ARRA child UPC 95571REPORT NOTE:

FROM: Luter Drive TO: 1300' east of Jericho Road

(0.4720 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 165American Recovery and Reinvestment Act:

Urbanized Area > 200K

0 0 0 0 0 0 374Federal Formula STP: Federal

0 0 0 0 0 0 70Federal Formula STP: State Bond Match

0 0 0 0 0 0 6Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 46State Formula: Urban - Local Match

0 0 0 0 0 0 706Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 177(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 0 147Urban Formula: Federal

0 0 0 0 0 0 22Urban Formula: Federal/State

0 0 0 0 0 0 2,239Urban Formula: State

0 0 0 0 0 0 54Urban Formula: State Match

0 0 0 0 0 0 4,007Total

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

DISMAL SWAMP CREEK TRAIL

PROJECT

UPC NO.:

ROUTE:

77403

NFOEN05

Complete

SCHEDULE

524

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEChesapeake

Complete 1,532CNDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 2,056

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,736Demonstration Funds: Federal

0 0 0 0 0 175 90TAP: MPO - Federal

0 0 0 0 0 0 425Transportation Enhancement Funds:

Federal

0 0 0 0 0 44 129(X) Transportation Enhancement Funds:

Local

-542 0 0 0 0 0 219 2,380Total

396 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Enhancement

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

MARINER'S MUSEUM "USS MONITOR"-PHASE

I - LANDSCAPING/PARKING

PROJECT

UPC NO.:

ROUTE:

78243

NFOEN05

Complete

SCHEDULE

394

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENewport News

Complete 3,138CNFROM: Route 60 TO: Mariners Museum/USS Monitor

Center

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Landscaping/Beautification TO 3,532

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 896SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 116SAFETEA-LU Earmarks: State Bond Match

0 0 0 0 0 0 108SAFETEA-LU Earmarks: State Match

0 0 0 0 0 0 450Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 113(X) Transportation Enhancement Funds:

Local

1,850 0 0 0 0 0 0 1,682Total

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

ARRA- CITY OF CHESAPEAKE, DISMAL

SWAMP CANAL TRAIL

PROJECT

UPC NO.: 93203

NFOARRA09

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,300American Recovery and Reinvestment Act:

Enhancement

0 0 0 0 0 0 44Project Contributions: Various Sources

0 0 0 0 0 0 35Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 9(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 0 1,387Total

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

CITY OF HAMPTON - PINE CHAPEL ROAD

PEDESTRIAN/BICYCLE TRAIL

PROJECT

UPC NO.:

ROUTE:

87010

NFOEN07

Complete

SCHEDULE

10

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton

Complete 1,203CNFROM: Design and construction of the TO: Pine Chapel

Road Pedestrian/Bicycle Trail

DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,213

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 382 192TAP: MPO - Federal

0 0 0 0 0 320 0TAP: Statewide - Federal

0 0 0 0 0 0 400Transportation Enhancement Funds:

Federal

0 0 0 0 0 176 148(X) Transportation Enhancement Funds:

Local

-405 0 0 0 0 0 878 740Total

06/19/2013 397

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Enhancement

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

CONSTRUCTION OF A PEDESTRIAN/BICYCLE

TRAIL

PROJECT

UPC NO.:

ROUTE:

91219

NFOEN08

$71,000 transfer from #T4970 as per CTB (6/11).REPORT NOTE:

Underway

SCHEDULE

122

ESTIMATED COST (000's)

JURISDICTION:

S. Church StreetSTREET NAME:

PEIsle of Wight County

FY2014 465CN

FY2014FROM: Cypress Creek Bridge TO: Battery Park Rd.

(0.9000 MI)

DESCRIPTION: 491RW

PROJECT LENGTH: 0.9000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,079

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 409 211TAP: MPO - Federal

0 0 0 0 0 0 1,772Transportation Enhancement Funds:

Federal

0 0 0 0 0 102 496(X) Transportation Enhancement Funds:

Local

-1,912 0 0 0 0 0 512 2,479Total

MPO Area

NonMPOEnhancement

PROGRAM/SYSTEM

"CAPT. JOHN SMITH" FERRYBOAT

DECKHOUSE RESTORATION

PROJECT

UPC NO.:

ROUTE:

94277

NFOEN09

Complete

SCHEDULE

13

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PESurry County

Underway 212CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Historic Preservation TO 225

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 25Project Contributions: Various Sources

0 0 0 0 0 0 160Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 40(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 0 0 225Total

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

PHASE I:CONSTR BIKEWAYS & INST.BIKE

LOCKERS-WALLER MILL TR.

PROJECT

UPC NO.:

ROUTE:

13765

NFOEN93

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

Complete 1,927CNFROM: BARLOW ROAD - MOORETOWN ROAD TO:

ROUTE 143 - ROCHAMBEAU DRIVE (4.4000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 4.4000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 1,927

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 376CMAQ: Federal

0 0 0 0 0 0 960Transportation Enhancement Funds:

Federal

591 0 0 0 0 0 0 1,336Total

398 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Enhancement

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

CITY OF CHESAPEAKE - 5' PAVED BIKE LANES

WITH STRIPE ON

PROJECT

UPC NO.:

ROUTE:

15148

NFOEN94

REPORT NOTE:

Complete

SCHEDULE

3

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEChesapeake

Complete 390CNFROM: DOCK LANDING RD FROM PORTSMOUTH

BLVD TO NEAR DEVON DRIVE; TO: JOLIFF RD FROM

DAVID'S MILL DRIVE TO PORTSMOUTH BOULEVARD

(3.7000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 3.7000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 393

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 160CMAQ: Federal

0 0 0 0 0 0 1Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 220Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 55(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 0 39Urban Formula: State Match

-82 0 0 0 0 0 0 475Total

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

CITY OF VA BEACH - RESTORATION OF CAPE

HENRY LIGHTHOUSE

PROJECT

UPC NO.:

ROUTE:

15149

NFOEN94

REPORT NOTE:

Complete

SCHEDULE

36

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEVirginia Beach

Complete 567CNFROM: REPAIR & MAINTENANCE OF THE STRUCTURE

AND THE IMPROVEMENTS TO: NECESSARY FOR

PUBLIC ACCESS.

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Historic Preservation TO 603

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0Project Contributions: Various Sources

0 0 0 0 0 160 0TAP: Statewide - Federal

0 0 0 0 0 0 355Transportation Enhancement Funds:

Federal

0 0 0 0 0 40 89(X) Transportation Enhancement Funds:

Local

-41 0 0 0 0 0 200 444Total

06/19/2013 399

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Enhancement

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

CONSTRUCTION OF PEDESTRIAN

IMPROVEMENTS

PROJECT

UPC NO.:

ROUTE:

50119

NFOEN98

REPORT NOTE:

Complete

SCHEDULE

325

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENewport News

CN

WARWICK BOULEVARDDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 325

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 6Project Contributions: Various Sources

0 0 0 0 0 0 250Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 63(X) Transportation Enhancement Funds:

Local

6 0 0 0 0 0 0 319Total

MPO Area

Hampton RoadsEnhancement

PROGRAM/SYSTEM

CITY OF CHESAPEAKE - CONSTRUCTION

MULTI-USE PATH

PROJECT

UPC NO.:

ROUTE:

52005

NFOEN99

REPORT NOTE:

Complete

SCHEDULE

165

ESTIMATED COST (000's)

JURISDICTION:

Gum RoadSTREET NAME:

PEChesapeake

Complete 271CN

CompleteFROM: Portsmouth Boulevard (Rte 337) TO: 0.1000 mi

west of Portsmouth Boulevard (0.1000 MI)

DESCRIPTION: 302RW

PROJECT LENGTH: 0.1000 MISCOPE OF WORK: Facilities for Pedestrians and Bicycles TO 737

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 112Local Project Contributions: Local

0 0 0 0 0 0 500Transportation Enhancement Funds:

Federal

0 0 0 0 0 0 125(X) Transportation Enhancement Funds:

Local

0 0 0 0 0 0 0 737Total

400 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

INCREASE SERVICE FREQUENCY AND ADD

SUNDAY SERVICE, PHASE 2

PROJECT

UPC NO.:

ROUTE:

T4225

NFO

MPO Project - Administered by DRPT. Complete estimate and schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEWAT - DRPT

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,228CMAQ: Federal

0 0 0 0 0 0 307CMAQ: State Match

-1,535 0 0 0 0 0 0 1,535Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

COMMUTER ROUTE 62, PHASE 1

PROJECT

UPC NO.: T4179

NFOProject Report Req'd

MPO Project - Administered by DRPT.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,742CMAQ: Federal

0 0 0 0 0 0 435CMAQ: State Match

0 0 0 0 0 0 2,177Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

DOUBLE STACK CLEARANCE OF TUNNELS ON

THE NORFOLK WESTERN MAI

PROJECT

UPC NO.:

ROUTE:

T3890

NFO

Complete estimate and schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENorfolk

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 4,335SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 1,084SAFETEA-LU Earmarks: State Match

-5,418 0 0 0 0 0 0 5,418Total

06/19/2013 401

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

WILLIAMSBURG TRANSIT AUTHORITY (WATA)

NEW ROUTE

PROJECT

UPC NO.:

ROUTE:

T10862

FO0000

MPO projectREPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

Mounts Bay RouteSTREET NAME:

PEWAT - DRPT

FY2014 677CN

FROM: New Town TO: Mounts BayDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 677

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

262 0 0 0 0 280 0CMAQ: MPO - Federal

65 0 0 0 0 70 0CMAQ: MPO - State Match

0 0 0 0 0 327 350 0Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

NEW SERVICE - JAMESTOWN ROUTE

PROJECT

UPC NO.:

ROUTE:

T9150

FO0000

MPO projectREPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEWAT - DRPT

Underway 823CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 823

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 435CMAQ: Federal

0 0 0 0 0 0 224CMAQ: MPO - Federal

0 0 0 0 0 0 56CMAQ: MPO - State Match

0 0 0 0 0 0 109CMAQ: State Match

0 0 0 0 0 0 0 823Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE 1 REPLACEMENT TROLLEY

(CLEAN DIESEL MEDIUM BUS)

PROJECT

UPC NO.:

ROUTE:

T9149

FO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEWAT - DRPT

FY2015 315CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 315

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 252CMAQ: Federal

0 0 0 0 0 0 63CMAQ: State Match

0 0 0 0 0 0 0 315Total

402 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE 12 REPLACEMENT BUSES

PROJECT

UPC NO.:

ROUTE:

T9148

FO0000

MPO projectREPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEWAT - DRPT

Underway 6,103CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 6,103

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,909CMAQ: Federal

823 0 0 0 1,188 963 0CMAQ: MPO - Federal

206 0 0 0 297 241 0CMAQ: MPO - State Match

0 0 0 0 0 0 477CMAQ: State Match

0 0 0 0 1,485 1,028 1,204 2,386Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

CITYWIDE BUS SHELTER PROGRAM: VIRGINIA

BEACH

PROJECT

UPC NO.:

ROUTE:

T9145

FO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

Complete 100CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 100

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 80CMAQ: Federal

0 0 0 0 0 0 20CMAQ: State Match

0 0 0 0 0 0 0 100Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

CITYWIDE BUS SHELTER PROGRAM:

NEWPORT NEWS (PHASES 2-4)

PROJECT

UPC NO.:

ROUTE:

T9131

FO0000

MPO projectREPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

Underway 632CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 632

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 250CMAQ: Federal

0 0 0 0 0 0 256CMAQ: MPO - Federal

0 0 0 0 0 0 64CMAQ: MPO - State Match

0 0 0 0 0 0 62CMAQ: State Match

0 0 0 0 0 0 0 632Total

06/19/2013 403

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

TRANSIT VEHICLES- BUS REPLACEMENT AND

REBUILD

PROJECT

UPC NO.:

ROUTE:

T9126

FO0000

MPO projectREPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

Underway 17,600CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 17,600

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3,847CMAQ: Federal

1,931 0 0 0 1,190 1,922 803CMAQ: MPO - Federal

483 0 0 0 297 480 201CMAQ: MPO - State Match

0 0 0 0 0 0 962CMAQ: State Match

0 0 0 0 0 0 1,014RSTP (STP Regional): Federal

221 0 0 0 0 817 2,335RSTP (STP Regional): MPO - Federal

55 0 0 0 0 204 584RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 254RSTP (STP Regional): State Match

0 0 0 0 1,487 2,689 3,424 9,999Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

ENVIRONMENTAL MANAGEMENT SYSTEM

PROJECT

UPC NO.:

ROUTE:

T9125

FO0000

MPO projectREPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

Underway 600CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Environmental Only TO 600

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 120CMAQ: Federal

120 0 0 0 0 120 120CMAQ: MPO - Federal

30 0 0 0 0 30 30CMAQ: MPO - State Match

0 0 0 0 0 0 30CMAQ: State Match

0 0 0 0 0 150 150 300Total

404 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

FEEDER BUS SERVICE FOR THE TIDE LRT

PROJECT

UPC NO.:

ROUTE:

T9123

FO0000

MPO projectREPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

Underway 3,600CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 3,600

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,920CMAQ: Federal

0 0 0 0 0 0 960CMAQ: MPO - Federal

0 0 0 0 0 0 240CMAQ: MPO - State Match

0 0 0 0 0 0 480CMAQ: State Match

0 0 0 0 0 0 0 3,600Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

LIBERTY STREET TRANSFER STATION -

CHESAPEAKE

PROJECT

UPC NO.:

ROUTE:

T9111

FO0000

MPO projectREPORT NOTE:

Underway

SCHEDULE

25

ESTIMATED COST (000's)

JURISDICTION:

Liberty StSTREET NAME:

PEHRT - DRPT

FY2014 239CN

FROM: 20th St TO: 16th StDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 264

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 12CMAQ: Federal

0 0 0 0 0 180 20CMAQ: MPO - Federal

0 0 0 0 0 45 5CMAQ: MPO - State Match

0 0 0 0 0 0 3CMAQ: State Match

0 0 0 0 0 0 225 39Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

CHESAPEAKE BUS SHELTERS

PROJECT

UPC NO.:

ROUTE:

T9110

FO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

Complete 187CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 187

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 150CMAQ: Federal

0 0 0 0 0 0 37CMAQ: State Match

0 0 0 0 0 0 0 187Total

06/19/2013 405

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

VIRGINIA BEACH TRANSIT EXT STUDY

(AA/SDEIS PE FE)

PROJECT

UPC NO.:

ROUTE:

T9108

FO0000

Underway

SCHEDULE

6,241

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 6,241

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

2,080 0 0 0 0 2,033 880RSTP (STP Regional): MPO - Federal

520 0 0 0 0 508 220RSTP (STP Regional): MPO - State Match

0 0 0 0 0 2,600 2,541 1,100Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

LRT EXT TO NORFOLK NAVAL BASE & VB

OCEANFRONT: STUDIES & ROW

PROJECT

UPC NO.:

ROUTE:

T9093

FO0000

Underway

SCHEDULE

29,000

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 29,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 7,809RSTP (STP Regional): Federal

6,400 0 0 0 0 4,800 4,191RSTP (STP Regional): MPO - Federal

1,600 0 0 0 0 1,200 1,048RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 1,952RSTP (STP Regional): State Match

0 0 0 0 0 8,000 6,000 15,000Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HRT FACILITY UPGRADES

PROJECT

UPC NO.:

ROUTE:

T9092

FO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

Underway 4,102CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 4,102

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 575RSTP (STP Regional): Federal

0 0 0 0 0 0 2,706RSTP (STP Regional): MPO - Federal

0 0 0 0 0 0 677RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 144RSTP (STP Regional): State Match

0 0 0 0 0 0 0 4,102Total

406 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

SYSTEMWIDE BUS STOP SIGN PROGRAM

PROJECT

UPC NO.:

ROUTE:

T9091

FO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

Complete 2,138CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 2,138

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,711RSTP (STP Regional): Federal

0 0 0 0 0 0 428RSTP (STP Regional): State Match

0 0 0 0 0 0 0 2,138Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

ARRA - GPS/AVL TRACKING SYSTEM - WAT

PROJECT

UPC NO.: T8480

NFOARRA09

Greater Williamsburg RegionDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 350American Recovery and Reinvestment Act:

Urbanized Area > 200K

0 0 0 0 0 0 104RSTP (STP Regional): Federal

0 0 0 0 0 0 26RSTP (STP Regional): State Match

0 0 0 0 0 0 480Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

FIXED GUIDEWAY STUDY BT VA BEACH &

NAVAL STATION NORFOLK

PROJECT

UPC NO.:

ROUTE:

T7547

NFO0000

Complete

SCHEDULE

2,300

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 2,300

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,840RSTP (STP Regional): Federal

0 0 0 0 0 0 460RSTP (STP Regional): State Match

0 0 0 0 0 0 0 2,300Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HRT - PURCHASE OF 20 TRANSIT BUSES

PROJECT

UPC NO.: T4313

NFOProject Report Req'd

HRT - PURCHASE OF 20 TRANSIT BUSESDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,254Project Contributions: Various Sources

0 0 0 0 0 0 5,016RSTP (STP Regional): Federal

0 0 0 0 0 0 6,270Total

06/19/2013 407

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

INCREASE SERVICE FREQUENCY AND ADD

SUNDAY SERVICE, PHASE 1

PROJECT

UPC NO.: T4224

NFOProject Report Req'd

Administered by DRPTREPORT NOTE:

FROM: Regional Sunday Bus Service James City York

County TO: Newport Newports

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,268CMAQ: Federal

0 0 0 0 0 0 567CMAQ: State Match

0 0 0 0 0 0 2,836Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

NEWPORT NEWS/JAMES CITY CO EMPLOYEE

CONNECTION, PHASE 2

PROJECT

UPC NO.: T4223

NFOProject Report Req'd

MPO Project - Administered by DRPT.REPORT NOTE:

FROM: Newport News TO: James City CountyDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 78CMAQ: Federal

0 0 0 0 0 0 20CMAQ: State Match

0 0 0 0 0 0 98Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

DOWNTOWN PORTSMOUTH SHUTTLE

SERVICE, PHASE 2

PROJECT

UPC NO.: T4211

NFOProject Report Req'd

MPO Project - Administered by DRPT. Revised estimate required.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 124CMAQ: Federal

0 0 0 0 0 0 354CMAQ: State Match

0 0 0 0 0 0 478Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

DOWNTOWN PORTSMOUTH SHUTTLE

SERVICE, PHASE 1

PROJECT

UPC NO.: T4210

NFOProject Report Req'd

MPO Project - Administered by DRPT.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 248CMAQ: Federal

0 0 0 0 0 0 543CMAQ: State Match

0 0 0 0 0 0 791Total

408 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

CITYWIDE BUS SHELTER PROGRAM

PROJECT

UPC NO.: T4196

NFOProject Report Req'd

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 189CMAQ: Federal

0 0 0 0 0 0 47CMAQ: State Match

0 0 0 0 0 0 236Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

NORFOLK LRT - OPERATING ASSISTANCE

PROJECT

UPC NO.: T4184

NFOProject Report Req'd

MPO Project - Administered by DRPT.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 8,556CMAQ: Federal

0 0 0 0 0 0 2,139CMAQ: State Match

0 0 0 0 0 0 10,695Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

RIDESHARING AND TDM PROGRAM

PROJECT

UPC NO.: T196

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 462CMAQ: Federal

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE 20 TRANSIT COACHES FOR NEW

HOV EXPRESS BUS SERVICE

PROJECT

UPC NO.: T195

NFOPublic Transportation

MPO Projects.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3,440CMAQ: Federal

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

JAMES CITY COUNTY TRANSIT SHOPPING

CIRCULATOR

PROJECT

UPC NO.: T193

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 277CMAQ: Federal

0 0 0 0 0 0 277Total

06/19/2013 409

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PARK AND SAIL SHUTTLE SERVICE

PROJECT

UPC NO.: T191

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 104CMAQ: Federal

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

INDIAN RIVER HOV EXPRESS BUS SERVICE

PROJECT

UPC NO.: T190

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 108CMAQ: Federal

0 0 0 0 0 0 108Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

SAM'S CLUB HOV EXPRESS BUS SERVICE

PROJECT

UPC NO.: T186

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 129CMAQ: Federal

0 0 0 0 0 0 129Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HOV EXPRESS BUS SERVICE/I-64 CORRIDOR

FROM HAMPTON TO WILLIA

PROJECT

UPC NO.: T185

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 168CMAQ: Federal

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

SILVERLEAF HOV EXPRESS BUS SERVICE

PROJECT

UPC NO.: T184

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 115CMAQ: Federal

410 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HAMPTON ROADS CENTER/MAGRUDER

BOULEVARD CORRIDOR ROUTE SERVI

PROJECT

UPC NO.: T183

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 840CMAQ: Federal

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

BUS RTE #44 THRU MIDTOWN TUNNEL:

VAN/BUSPOOL SERVICE FROM CH

PROJECT

UPC NO.: T179

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 954CMAQ: Federal

0 0 0 0 0 0 50Non-Formula: Statewide

0 0 0 0 0 0 200RSTP (STP Regional): Federal

0 0 0 0 0 0 1,204Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

OYSTER POINT SHUTTLE SERVICE

PROJECT

UPC NO.: T178

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,110CMAQ: Federal

0 0 0 0 0 0 14Non-Formula: Statewide

0 0 0 0 0 0 56RSTP (STP Regional): Federal

0 0 0 0 0 0 1,180Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE 8 BUSES FOR NEW SERVICE

PROJECT

UPC NO.: T177

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,376CMAQ: Federal

06/19/2013 411

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

MERCURY/CENTRAL SHUTTLE

PROJECT

UPC NO.: T176

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 240CMAQ: Federal

0 0 0 0 0 0 40Non-Formula: Statewide

0 0 0 0 0 0 160RSTP (STP Regional): Federal

0 0 0 0 0 0 440Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

TRANSIT SERVICE TO YORK COUNTY

PROJECT

UPC NO.: T175

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 376CMAQ: Federal

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

SUNDAY TRANSIT SERVICE

PROJECT

UPC NO.: T172

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 736CMAQ: Federal

0 0 0 0 0 0 97Non-Formula: Statewide

0 0 0 0 0 0 389RSTP (STP Regional): Federal

0 0 0 0 0 0 1,222Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE 5 NEW BUSES FOR YORK COUNTY

AND X-ROADS SERVICE

PROJECT

UPC NO.: T171

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 880CMAQ: Federal

412 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

NEW PARK & RIDE SERVICE BETWEEN

VIRGINIA BEACH & DOWNTOWN NO

PROJECT

UPC NO.: T162

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 866CMAQ: Federal

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE 13 BUSES FOR NEW SERVICE (3

ROUTES FROM TDP)

PROJECT

UPC NO.: T148

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 520Non-Formula: Statewide

0 0 0 0 0 0 2,080RSTP (STP Regional): Federal

0 0 0 0 0 0 2,600Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE 12 BUSES FOR NEW SERVICE (5

ROUTES FROM TDP)

PROJECT

UPC NO.: T147

NFOPublic Transportation

MPO Project..REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 480Non-Formula: Statewide

0 0 0 0 0 0 1,920RSTP (STP Regional): Federal

0 0 0 0 0 0 2,400Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE NEW BUSES (8) FOR NEW

TRANSIT SERVICE

PROJECT

UPC NO.: T146

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 462Non-Formula: Statewide

0 0 0 0 0 0 1,848RSTP (STP Regional): Federal

0 0 0 0 0 0 2,310Total

06/19/2013 413

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

CSX LRT PE & LAND ACQUISITION FOR

STATIONS

PROJECT

UPC NO.: T142

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,567Non-Formula: Statewide

0 0 0 0 0 0 6,269RSTP (STP Regional): Federal

0 0 0 0 0 0 7,836Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

FACILITY IMPROVEMENTS TRANS. CENTERS

AT HAMPTON/NEWPORT NEWS

PROJECT

UPC NO.: T141

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 200Non-Formula: Statewide

0 0 0 0 0 0 800RSTP (STP Regional): Federal

0 0 0 0 0 0 1,000Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PROGRAMMABLE FARE BOXES

PROJECT

UPC NO.: T140

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 170Non-Formula: Statewide

0 0 0 0 0 0 680RSTP (STP Regional): Federal

0 0 0 0 0 0 850Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

NEW BUSES (22) IMPLEMENT ENHANCED BUS

ALTERN/CSX/MIS

PROJECT

UPC NO.: T138

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,084Non-Formula: Statewide

0 0 0 0 0 0 4,336RSTP (STP Regional): Federal

0 0 0 0 0 0 5,420Total

414 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

LIGHT RAIL TRANSIT PE/DEIS

PROJECT

UPC NO.: T137

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,832Non-Formula: Statewide

0 0 0 0 0 0 11,329RSTP (STP Regional): Federal

0 0 0 0 0 0 14,161Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

TRANSPORTATION COMPLEX

PROJECT

UPC NO.: T136

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 40Non-Formula: Statewide

0 0 0 0 0 0 160RSTP (STP Regional): Federal

0 0 0 0 0 0 200Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

REPLACEMENT BUSES

PROJECT

UPC NO.: T135

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 724Non-Formula: Statewide

0 0 0 0 0 0 5,055RSTP (STP Regional): Federal

0 0 0 0 0 0 540RSTP (STP Regional): State Match

0 0 0 0 0 0 6,319Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PARATRANSIT TRANSITION PROJECT

PROJECT

UPC NO.: T133

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 35Non-Formula: Statewide

0 0 0 0 0 0 140RSTP (STP Regional): Federal

0 0 0 0 0 0 175Total

06/19/2013 415

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

REGIONAL TDM PROGRAM: TRAFFIX

PROJECT

UPC NO.: T132

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,877Non-Formula: Statewide

0 0 0 0 0 0 7,509RSTP (STP Regional): Federal

0 0 0 0 0 0 9,386Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

BUS ROUTE 45 (FY 96 OPERATIONS)

PROJECT

UPC NO.: T118

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 9Non-Formula: Statewide

0 0 0 0 0 0 38RSTP (STP Regional): Federal

0 0 0 0 0 0 47Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

AMTRAK STATION RELOCATION - AMTRAK

MULTIMODAL STATION RELOC

PROJECT

UPC NO.:

ROUTE:

102734

FO0000

MPO project, Revised estimate and schedule requiredREPORT NOTE:

Underway

SCHEDULE

3,200

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENewport News

FY2016 19,152CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 22,352

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 849CMAQ: Federal

0 0 3,651 4,922 5,042 0 0CMAQ: MPO - Federal

0 0 913 1,230 1,261 0 0CMAQ: MPO - State Match

0 0 0 0 0 0 27CMAQ: State Match

0 0 0 0 0 0 186Local Project Contributions: Local

0 0 0 0 0 0 42Non-Formula: State

0 0 0 0 0 0 1,768RSTP (STP Regional): Federal

0 0 0 278 507 0 0RSTP (STP Regional): MPO - Federal

0 0 0 70 127 0 0RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 400RSTP (STP Regional): State Match

1,081 0 4,564 6,500 6,936 0 0 3,270Total

416 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE REPLACEMENT FERRY

PROJECT

UPC NO.:

ROUTE:

103974

NFO0000

MPO projectREPORT NOTE:

FY2017

SCHEDULE

2,000

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEMulti-jurisdictional: Hampton Roads MPO

CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Ferry boats TO 2,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,798Ferry Boat Discretionary Funds: Federal

0 0 0 0 0 449 0Local Project Contributions: Local

-247 0 0 0 0 0 449 1,798Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

ROUTE 60 RAPID EXPRESS, PHASE 2

PROJECT

UPC NO.: T4188

NFOProject Report Req'd

Administered by DRPT.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 531CMAQ: Federal

0 0 0 0 0 0 133CMAQ: State Match

0 0 0 0 0 0 664Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HIGH SPEED RAIL STUDY

PROJECT

UPC NO.: T218

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 860Priority Transportation Funds: State

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

COMMUTER ROUTE 62, PHASE 2

PROJECT

UPC NO.: T4182

NFOProject Report Req'd

Administered by DRPT.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 241CMAQ: Federal

0 0 0 0 0 0 60CMAQ: State Match

0 0 0 0 0 0 302Total

06/19/2013 417

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

BUS PURCHASE - (13) 40' COACH STYLE

PASSENGER BUSES

PROJECT

UPC NO.: 93061

NFOProject Report Req'd

MPO Project.REPORT NOTE:

Bus Purchase - (13) 40ft. Coach Style PassengerDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 3,672CMAQ: Federal

0 0 0 0 0 0 918CMAQ: State Match

0 0 0 0 0 0 4,590Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

TELECOMMUTING

PROJECT

UPC NO.:

ROUTE:

70278

NFOCRPT

Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton Roads District-wide

CN

REGIONWIDEDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 500State Transit Funds: Federal -500

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HAMPTON/NORFOLK SERVICE

PROJECT

UPC NO.:

ROUTE:

70279

NFOCRPT

Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

CN

REGIONWIDEDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 163CMAQ TERMS: Federal

0 0 0 0 0 0 40CMAQ TERMS: State Match

0 0 0 0 0 0 960Minimum Guarantee: Federal

0 0 0 0 0 0 144Primary Formula: State

0 0 0 0 0 0 96State Transit Funds: Federal

-1,403 0 0 0 0 0 0 1,403Total

418 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

NEWPORT NEWS/WILLIAMSBURG

COMMUTER SERVICE

PROJECT

UPC NO.:

ROUTE:

70280

NFOCRPT

Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

CN

REGIONWIDEDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 112CMAQ TERMS: Federal

0 0 0 0 0 0 28CMAQ TERMS: State Match

0 0 0 0 0 0 72Primary Formula: State

0 0 0 0 0 0 48State Transit Funds: Federal

0 0 0 0 0 0 480Transit Statewide STP: Federal

-740 0 0 0 0 0 0 740Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

NEWPORT NEWS/SMITHFIELD COMMUTER

SERVICE

PROJECT

UPC NO.:

ROUTE:

70281

NFOCRPT

Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

CN

REGIONWIDEDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 360CMAQ TERMS: Federal

0 0 0 0 0 0 90CMAQ TERMS: State Match

0 0 0 0 0 0 720Minimum Guarantee: Federal

0 0 0 0 0 0 108Primary Formula: State

0 0 0 0 0 0 72State Transit Funds: Federal

-1,350 0 0 0 0 0 0 1,350Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HRT BIKE RACKS FOR HRT BUS PROJECT

PROJECT

UPC NO.:

ROUTE:

70282

NFOCRPT

Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

CN

REGIONWIDEDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 48Primary Formula: State

0 0 0 0 0 0 32State Transit Funds: Federal

0 0 0 0 0 0 320Transit Statewide STP: Federal

-400 0 0 0 0 0 0 400Total

06/19/2013 419

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HRT VAN REPLACEMENT

PROJECT

UPC NO.:

ROUTE:

70284

NFOCRPT

Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

CN

REGIONWIDEDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 90Primary Formula: State

0 0 0 0 0 0 60State Transit Funds: Federal

0 0 0 0 0 0 600Transit Statewide STP: Federal

-750 0 0 0 0 0 0 750Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

CROSSROADS COMMUTER SERVICE CAPITAL

AND OPERATING

PROJECT

UPC NO.:

ROUTE:

70285

NFOCRPT

Congestion Relief Project. Complete estimate and schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

CN

REGIONWIDEDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Transit TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 168CMAQ TERMS: Federal

0 0 0 0 0 0 42CMAQ TERMS: State Match

0 0 0 0 0 0 72Primary Formula: State

0 0 0 0 0 0 48State Transit Funds: Federal

0 0 0 0 0 0 480Transit Statewide STP: Federal

-810 0 0 0 0 0 0 810Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

MOORETOWN RD CORRIDOR SERVICE

PROJECT

UPC NO.: T4226

NFOProject Report Req'd

MPO Project.REPORT NOTE:

Mooretown Road Corridor ServiceDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 252CMAQ: Federal

0 0 0 0 0 0 63CMAQ: State Match

0 0 0 0 0 0 315Total

420 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

ADVANCED COMMUNICATION SYSTEM,

AVL/GPS FOR BUS FLEET

PROJECT

UPC NO.: T7399

NFOProject Report Req'd

MPO projectREPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 163RSTP (STP Regional): Federal

0 0 0 0 0 0 41RSTP (STP Regional): State Match

0 0 0 0 0 0 204Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE 15 VANS FOR TRAFFIX VANPOOL

PROGRAM

PROJECT

UPC NO.:

ROUTE:

T4189

NFODRPT

MPO Project.REPORT NOTE:

Complete

SCHEDULE

600

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

CN

Purchase 15 Vans for Traffix vanpool programDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 600

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 480CMAQ: Federal

0 0 0 0 0 0 120CMAQ: State Match

0 0 0 0 0 0 0 600Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HRT PROJECT - PURCHASE REPLACEMENT

BUSES

PROJECT

UPC NO.:

ROUTE:

T1825

NFODRPT

MPO Project. Complete schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

Complete 9,000CN

Purchase Replacement BusesDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 9,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,920CMAQ: Federal

0 0 0 0 0 0 480CMAQ: State Match

6,600 0 0 0 0 0 0 2,400Total

06/19/2013 421

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HRT PROJECT - REPLACEMENT OF HRT

SOUTHSIDE BUS FACILITY

PROJECT

UPC NO.:

ROUTE:

T1824

NFODRPT

Administered by DRPT; Complete schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

NULLSTREET NAME:

PEHRT - DRPT

Complete 10,803CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 10,803

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 70Non-Formula: Statewide

0 0 0 0 0 0 9,804RSTP (STP Regional): Federal

0 0 0 0 0 0 2,451RSTP (STP Regional): State Match

0 0 0 0 0 0 278RSTP (STP Regional): Statewide

-1,800 0 0 0 0 0 0 12,603Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HRT PROJECT - REGIONAL TDM PROGRAM:

TRAFFIX

PROJECT

UPC NO.: T1823

NFOProject Report Req'd

MPO Project.REPORT NOTE:

HRT Project - Regional TDM Program: TRAFFIXDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,340CMAQ: Federal

0 0 0 0 0 0 800CMAQ: MPO - Federal

0 0 0 0 0 0 200CMAQ: MPO - State Match

0 0 0 0 0 0 1,875CMAQ: State Match

0 0 0 0 0 0 470Non-Formula: Statewide

0 0 0 0 0 0 2,112RSTP (STP Regional): Federal

0 0 0 0 0 0 528RSTP (STP Regional): State Match

0 0 0 0 0 0 1,880RSTP (STP Regional): Statewide

0 0 0 0 0 0 10,205Total

422 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HRT PROJECT - NORFOLK LRT - 8 MILE/11

STATIONS - PE PHASE

PROJECT

UPC NO.:

ROUTE:

T1822

NFODRPT

MPO Project; Administered by DRPT; Complete schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

NULLSTREET NAME:

PEHRT - DRPT

Complete 58,279CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 58,279

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 6,640CMAQ: Federal

0 0 0 0 0 0 986CMAQ: State Match

0 0 0 0 0 0 674Local Project Contributions: Local

0 0 0 0 0 0 3,787Non-Formula: Statewide

0 0 0 0 0 0 24,837RSTP (STP Regional): Federal

0 0 0 0 0 0 6,209RSTP (STP Regional): State Match

0 0 0 0 0 0 15,146RSTP (STP Regional): Statewide

0 0 0 0 0 0 0 58,279Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HRT PROJECT - PENINSULA LRT PROJECT -

PREPARE EIS

PROJECT

UPC NO.:

ROUTE:

T1821

NFODRPT

MPO Project; Administered by DRPT; Complete schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

NULLSTREET NAME:

PEHRT - DRPT

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 861Project Contributions: Various Sources

0 0 0 0 0 0 2,174RSTP (STP Regional): Federal

0 0 0 0 0 0 543RSTP (STP Regional): State Match

-3,578 0 0 0 0 0 0 3,578Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

WAT PROJECT - MOORETOWN RD - 2 NEW

BUSES FOR THE NEW TRANSIT

PROJECT

UPC NO.:

ROUTE:

T1819

NFODRPT

MPO Project. Complete schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

NULLSTREET NAME:

PEWAT - DRPT

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 116Non-Formula: Statewide

0 0 0 0 0 0 464RSTP (STP Regional): Statewide

-580 0 0 0 0 0 0 580Total

06/19/2013 423

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

WAT PROJECT - BUS ON CHASSIS VEHICLES -

5 NEW REPLACEMENT VE

PROJECT

UPC NO.:

ROUTE:

T1818

NFODRPT

MPO Project. Complete schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

NULLSTREET NAME:

PEWAT - DRPT

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 65Non-Formula: Statewide

0 0 0 0 0 0 260RSTP (STP Regional): Statewide

-325 0 0 0 0 0 0 325Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

NEWPORT NEWS/JAMES CITY CO EMPLOYEE

CONNECTION, PHASE 1

PROJECT

UPC NO.: T4222

NFOProject Report Req'd

MPO Project.REPORT NOTE:

Newport News/James City Co. Employee Connection

Phase I

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 147CMAQ: Federal

0 0 0 0 0 0 37CMAQ: State Match

0 0 0 0 0 0 184Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

EASTERN SEABOARD INTERMODAL TRNASP

APPLICATIONS CENTER

PROJECT

UPC NO.:

ROUTE:

82130

NFOESTA

Complete estimate & schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMulti-jurisdictional: Hampton Roads MPO

CNDESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,075SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 269SAFETEA-LU Earmarks: State Match

-1,343 0 0 0 0 0 0 1,343Total

424 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

HIGH SPEED AND INTERCITY PASSENGER

RAIL STUDY PH 2

PROJECT

UPC NO.:

ROUTE:

102728

FOHR11

Complete

SCHEDULE

600

ESTIMATED COST (000's)

JURISDICTION:

NASTREET NAME:

PEHampton Roads District-wide

CN

FROM: NA TO: NADESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Other TO 600

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 447CMAQ: Federal

0 0 0 0 0 0 153CMAQ: State Match

0 0 0 0 0 0 0 600Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE 8 ELECTRIC/DIESEL BUSES TO

EXPAND SUNDAY SERVICE

PROJECT

UPC NO.: T4162

NFOProject Report Req'd

MPO Project. Complete estimate & schedule required.REPORT NOTE:

Purchase BusesDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,576RSTP (STP Regional): Federal

0 0 0 0 0 0 394RSTP (STP Regional): State Match

0 0 0 0 0 0 1,970Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PURCHASE 8 BUSES FOR NEW SERVICE (4

ROUTES FROM TDP)

PROJECT

UPC NO.: T149

NFOPublic Transportation

MPO Project.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 320Non-Formula: Statewide

0 0 0 0 0 0 1,280RSTP (STP Regional): Federal

0 0 0 0 0 0 1,600Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

ROUTE 60 RAPID EXPRESS, PHASE 1

PROJECT

UPC NO.: T4186

NFOProject Report Req'd

MPO Project - Administered by DRPT.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,286CMAQ: Federal

0 0 0 0 0 0 321CMAQ: State Match

0 0 0 0 0 0 1,607Total

06/19/2013 425

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

WAT PROJECT - MOORETOWN RD CORRIDOR

NEW TRANSIT SERVICE (OPE

PROJECT

UPC NO.:

ROUTE:

T1829

NFORD00

MPO Project. Complete schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

NULLSTREET NAME:

PEWAT - DRPT

CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: TO 0

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 111CMAQ: Federal

0 0 0 0 0 0 28CMAQ: State Match

-139 0 0 0 0 0 0 139Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

ROUTE DEVIATION/ENHANCED BUS SERVICE

HAMPTON AND NEWPORT NEW

PROJECT

UPC NO.: T202

NFOPublic Transportation

MPO Project. Complete estimate and schedule required.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,779CMAQ: Federal

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

ARRA NORFLOK LIGHT RAIL - ENHANCE

FACILITIES/STATIONS

PROJECT

UPC NO.: T9853

NFOARRA09

FROM: Virginia Medical Center TO: Newtown Road

(7.4000 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 10,000American Recovery and Reinvestment Act:

Flexible

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

ARRA - PREVENTIVE MAINTENANCE FOR

HAMPTON ROADS TRANSIT

PROJECT

UPC NO.: T8479

NFOARRA09

Preventive MaintenanceDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 1,000American Recovery and Reinvestment Act:

Urbanized Area > 200K

426 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Public Transportation

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

PATRICK HENRY MALL TRANSFER CENTER

PROJECT

UPC NO.:

ROUTE:

T7306

NFOU000

MPO Project - Administered by DRPTREPORT NOTE:

Complete

SCHEDULE

898

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHRT - DRPT

CN

Bus Transfer Center at Patrick Henry MallDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 898

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 719CMAQ: Federal

0 0 0 0 0 0 180CMAQ: State Match

0 0 0 0 0 0 0 898Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

COLISEUM CENTRAL TRANSIT SHELTERS

PROJECT

UPC NO.:

ROUTE:

84474

NFOU000

MPO Project - Locally Administered.REPORT NOTE:

Complete

SCHEDULE

64

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEHampton

Complete 361CN

Coliseum Central Business DistrictDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 425

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 240CMAQ: Federal

0 0 0 0 0 0 60CMAQ: State Match

0 0 0 0 0 0 134Local Project Contributions: Local

-9 0 0 0 0 0 0 434Total

MPO Area

Hampton RoadsPublic Transportation

PROGRAM/SYSTEM

GODWIN BLVD/ROUTE 58 PARK & RIDE LOT

PROJECT

UPC NO.:

ROUTE:

98815

NFOU000

Complete

SCHEDULE

121

ESTIMATED COST (000's)

JURISDICTION:

Godwin BlvdSTREET NAME:

PESuffolk

Underway 780CN

@ Route 58DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 901

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 320CMAQ: Federal

0 0 0 0 0 0 80CMAQ: State Match

501 0 0 0 0 0 0 400Total

06/19/2013 427

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Rail

MPO Area

Hampton RoadsRail

PROGRAM/SYSTEM

RTE 13 - MILITARY HWY - INSTALL

CANTILEVER FLASHING LIGHTS,

PROJECT

UPC NO.:

ROUTE:

68069

NFO0013

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

MILITARY HWYSTREET NAME:

PEChesapeake

Complete 120CNFROM: GATES & SIMULTANEOUS INTERCONNECTION

WITH TRAFFIC SIGNAL TO: 0.50 MILE NORTH CANAL

DRIVE

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rail/Highway Crossing TO 120

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 108(R) Safety Funds: Rail Safety

0 0 0 0 0 0 12Urban Formula: State Match

0 0 0 0 0 0 0 120Total

MPO Area

Hampton RoadsRail

PROGRAM/SYSTEM

RTE 17 - INSTALL RUBBER RAIL SEAL &

ASPH.

PROJECT

UPC NO.:

ROUTE:

58428

NFO0017

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

G WASHINGTON HWYSTREET NAME:

PEChesapeake

Complete 50CNFROM: AT NORFOLK SOUTHERN RAILROAD - DOT

#467-706P TO: (0.14 MILE NORTH OF SPRINGDALE)

(0.1400 MI)

DESCRIPTION: RW

PROJECT LENGTH: 0.1400 MISCOPE OF WORK: Rail/Highway Crossing TO 50

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 45(R) Safety Funds: Rail Safety

0 0 0 0 0 0 5Urban Formula: State Match

0 0 0 0 0 0 0 50Total

MPO Area

Hampton RoadsRail

PROGRAM/SYSTEM

ARRA ROUTE 164 RAIL - ADDITIONAL RAIL

LINE

PROJECT

UPC NO.: T7820

NFOARRA09

Previously allocated funds transferred to VPAREPORT NOTE:

Rail Relocation Along Route 164 CorridorDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 9,000American Recovery and Reinvestment Act:

Flexible

428 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Rail

MPO Area

Hampton RoadsRail

PROGRAM/SYSTEM

RTE 238 - UPGRADE FLG WITH CWT

PRODICTOR & INCL EVENT REC.

PROJECT

UPC NO.:

ROUTE:

18705

NFO0238

High Speed Rail - Section 1103. Revised schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

YORKTOWN RDSTREET NAME:

PENewport News

Complete 120CNFROM: YORKTOWN ROAD TO: (0.03 MILE NORTHEAST

ROUTE 60-WARWICK RD-DOT# 224-171W CSX)

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Safety TO 120

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 120High Speed Rail (Section 1103): Federal 0

MPO Area

Hampton RoadsRail

PROGRAM/SYSTEM

ARRA

NORFOLK/PORTSMOUTH/CHESAPEAKE/SUFF

OLK RAIL FROM NIT

PROJECT

UPC NO.: 93527

NFOARRA09

FROM: Norfolk International Terminal TO: Route 17 in

Suffolk (3.9200 MI)

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 11,306American Recovery and Reinvestment Act:

Flexible

MPO Area

Hampton RoadsRail

PROGRAM/SYSTEM

WARWICK BLVD. - INSTALL CANTILEVER

FLASHING LIGHTS & GATES

PROJECT

UPC NO.:

ROUTE:

14952

NFOU000

Locally Administered. Revised schedule required.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

WARWICK BLVDSTREET NAME:

PENewport News

Complete 325CNFROM: RAILROAD - DOT #224-170P TO: (AT

INTERSECTION OF FORT EUSTIS BOULEVARD)

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rail/Highway Crossing TO 325

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 293(R) Safety Funds: Rail Safety

0 0 0 0 0 0 0State Formula: Urban - Local Match

0 0 0 0 0 0 21Urban Formula: Federal/State

0 0 0 0 0 0 11Urban Formula: State Match

0 0 0 0 0 0 0 325Total

06/19/2013 429

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Rail

MPO Area

Hampton RoadsRail

PROGRAM/SYSTEM

WARWICK BLVD-INSTALL LIGHTS, GATES &

CONCRETE X-ING SURFACE

PROJECT

UPC NO.:

ROUTE:

56604

NFOU000

CN only.REPORT NOTE:

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

WARWICK BLVDSTREET NAME:

PENewport News

Complete 424CNFROM: AT CSX RAILROAD - DOT #224-173K TO: (0.24

MILE NORTH OF ROUTE 238)

DESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Rail/Highway Crossing TO 424

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 16 0Local Project Contributions: Local

0 0 0 0 0 0 0Local Project Contributions: Urban - Local

Match

0 0 0 0 0 0 382(R) Safety Funds: Rail Safety

0 0 0 0 0 0 15Urban Formula: State

0 0 0 0 0 0 10Urban Formula: State Match

1 0 0 0 0 0 16 407Total

430 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Miscellaneous

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

HSIP DISTRICT-WIDE HIGH RISK RURAL

ROADS HAMPTON ROADS

PROJECT

UPC NO.: 86608

NFODistrict-wide

HSIP District-wide HighDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 913High Risk Rural: Federal

0 0 0 0 0 0 101High Risk Rural: State Match

0 0 0 0 0 0 1,014Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

VPA INTER-TERMINAL BARGE SERVICE

(NORFOLK & PORTSMOUTH)

PROJECT

UPC NO.:

ROUTE:

98808

FO0000

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEMulti-jurisdictional: Hampton Roads MPO

Underway 8,190CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Transit TO 8,190

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,079CMAQ: Federal

1,491 0 0 0 0 1,491 1,491CMAQ: MPO - Federal

373 0 0 0 0 373 373CMAQ: MPO - State Match

0 0 0 0 0 0 520CMAQ: State Match

0 0 0 0 0 1,864 1,864 4,463Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

VPA ECONOMIC ANALYSIS OF TOLL PRICING

IN HAMPTON ROADS

PROJECT

UPC NO.:

ROUTE:

103464

NFO0000

Complete

SCHEDULE

400

ESTIMATED COST (000's)

JURISDICTION:

VariousSTREET NAME:

PEHampton Roads District-wide

CN

FROM: Various TO: VariousDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Other TO 400

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 320RSTP (STP Regional): Federal

0 0 0 0 0 0 80RSTP (STP Regional): State Match

0 0 0 0 0 0 0 400Total

06/19/2013 431

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Miscellaneous

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

DRAINAGE PONDS @ I-264 & FREDERICK

BLVD

PROJECT

UPC NO.:

ROUTE:

97725

NFO0017

Complete

SCHEDULE

70

ESTIMATED COST (000's)

JURISDICTION:

Frederick BlvdSTREET NAME:

PEPortsmouth

Complete 486CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Other TO 556

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 464RSTP (STP Regional): Federal

0 0 0 0 0 0 116RSTP (STP Regional): State Match

-24 0 0 0 0 0 0 580Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

ROUTE 60/143 CONNECTOR STUDY

PROJECT

UPC NO.:

ROUTE:

98812

NFO0060

Revised schedule requiredREPORT NOTE:

Complete

SCHEDULE

300

ESTIMATED COST (000's)

JURISDICTION:

Route 60 - Pocohontas TrailSTREET NAME:

PEJames City County

CNFROM: I-64 across 143 - route 60 TO: I-64, 143, Route 60

(1.0000 MI)

DESCRIPTION: RW

PROJECT LENGTH: 1.0000 MISCOPE OF WORK: Preliminary Engineering TO 300

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 240RSTP (STP Regional): Federal

0 0 0 0 0 0 60RSTP (STP Regional): State Match

0 0 0 0 0 0 0 300Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

MOORETOWN RD EXTENSION STUDY

PROJECT

UPC NO.:

ROUTE:

98810

FO0603

Complete

SCHEDULE

400

ESTIMATED COST (000's)

JURISDICTION:

Mooretown RdSTREET NAME:

PEJames City County

CN

FROM: Lightfoot Rd TO: Croaker RdDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 400

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 320RSTP (STP Regional): Federal

0 0 0 0 0 0 80RSTP (STP Regional): State Match

0 0 0 0 0 0 0 400Total

432 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Miscellaneous

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

LONGHILL RD CORRIDOR STUDY

PROJECT

UPC NO.:

ROUTE:

98811

FO0612

Revised schedule requiredREPORT NOTE:

Complete

SCHEDULE

500

ESTIMATED COST (000's)

JURISDICTION:

Longhill RdSTREET NAME:

PEJames City County

CN

FROM: Centerville Rd TO: Route 199DESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 500

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 240RSTP (STP Regional): Federal

0 0 0 0 0 0 160RSTP (STP Regional): MPO - Federal

0 0 0 0 0 0 40RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 60RSTP (STP Regional): State Match

0 0 0 0 0 0 0 500Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

HSIP HAMPTON ROADS DISTRICTWIDE

PROJECT

UPC NO.: T6522

NFODistrict-wide

Various locationsDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 2,668Highway Safety Improvements: Federal

0 0 0 0 0 0 296Highway Safety Improvements: State Match

0 0 0 0 0 0 2,965Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

CONSTRUCT/INSTALL BUS SHELTERS

PROJECT

UPC NO.: 50041

NFOProject Report Req'd

BUS SHELTERSDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 120Accounts Receivable: Local

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

CATHODIC BRDG PROTECTION FOR

VETERANS MEMORIAL BR & BERKLEY

PROJECT

UPC NO.:

ROUTE:

80480

NFOCBPS

Complete estimate and schedule required.REPORT NOTE:

Underway

SCHEDULE

538

ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PENorfolk

CN

IN THE COMMONWEALTH OF VADESCRIPTION: RW

PROJECT LENGTH: 0.0000 MISCOPE OF WORK: Bridge Rehab w/o Added Capacity TO 538

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 502SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 125SAFETEA-LU Earmarks: State Match

-89 0 0 0 0 0 0 627Total

06/19/2013 433

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Miscellaneous

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

HAMPTON ROADS MPO CMAQ BALANCE

ENTRY

PROJECT

UPC NO.: 70714

NFOBalance Entry

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 0CMAQ: Federal

0 0 0 0 0 0 1,987CMAQ: MPO - Federal

0 0 0 0 0 0 497CMAQ: MPO - State Match

0 0 0 0 0 0 0CMAQ: State Match

0 0 0 0 0 0 2,484Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

HOV MARKETING & ANALYSIS - REGIONWIDE

PROJECT

UPC NO.: 50651

FOProject Report Req'd

HOV MARKETING & ANALYSISDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 513Bonus OA: Federal

0 0 0 0 0 0 5,153CMAQ TERMS: Federal

0 0 0 0 0 0 953CMAQ TERMS: State Match

0 0 0 0 0 0 932DRPT: Federal

0 0 0 0 0 0 7,551Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

TRANSPORTATION STUDY

PROJECT

UPC NO.: 50519

NFOProject Report Req'd

WILLIAMSBURG 2007DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 329TEA-21 High Priority Funds: Statewide

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

INFASTRUCTURE IMPROVEMENTS FOR

JAMESTOWN 2007

PROJECT

UPC NO.: 93060

NFOProject Report Req'd

Complete estimate and schedule required.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 369SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 92SAFETEA-LU Earmarks: State Match

0 0 0 0 0 0 461Total

434 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Miscellaneous

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

DISTRICTWIDE TRAFFIC SIGNALS AND ITS

PROJECT

UPC NO.: 81396

FODistrict-wide

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 484Highway Safety Improvements: Federal

0 0 0 0 0 0 54Highway Safety Improvements: State Match

0 0 0 0 0 0 538Total

MPO Area

NonMPOMiscellaneous

PROGRAM/SYSTEM

PROJECT PRESCOPING - HAMPTON

PROJECT

UPC NO.: 99571

NFOBalance Entry

FROM: Various TO: VariousDESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

2,389 2,715 2,628 2,546 2,464 2,314 4,709Prescoping Funds: State

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

PUBLIC SAFETY ANNOUNCEMENT POINTS

(PSAP) YORK COUNTY

PROJECT

UPC NO.:

ROUTE:

97910

NFOPSAP

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEYork County

Underway 98CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 98

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 79CMAQ TERMS: Federal

0 0 0 0 0 0 20CMAQ TERMS: State Match

-1 0 0 0 0 0 0 99Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

PUBLIC SAFETY ANNOUNCEMENT POINTS

(PSAP) CHESAPEAKE

PROJECT

UPC NO.:

ROUTE:

97911

NFOPSAP

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEChesapeake

Underway 98CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 98

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 79CMAQ TERMS: Federal

0 0 0 0 0 0 20CMAQ TERMS: State Match

-1 0 0 0 0 0 0 99Total

06/19/2013 435

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Miscellaneous

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

PUBLIC SAFETY ANNOUNCEMENT POINTS

PSAP, JAMES CITY COUNTY

PROJECT

UPC NO.:

ROUTE:

102562

NFOPSAP

SCHEDULE ESTIMATED COST (000's)

JURISDICTION:

STREET NAME:

PEJames City County

Underway 95CNDESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 95

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 72CMAQ TERMS: Federal

0 0 0 0 0 0 18CMAQ TERMS: State Match

4 0 0 0 0 0 0 91Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

DISTRICTWIDE ROADWAY SAFETY

ASSESSMENT

PROJECT

UPC NO.: 81392

NFODistrict-wide

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 154 804Highway Safety Improvements: Federal

0 0 0 0 0 17 0Highway Safety Improvements: Soft Match

0 0 0 0 0 0 89Highway Safety Improvements: State Match

0 0 0 0 0 171 894Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

HAMPTON ROADS DISTRICT REGIONAL STP

(RSTP) BALANCE ENTRY

PROJECT

UPC NO.: 70715

NFOBalance Entry

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 337RSTP (STP Regional): Federal

0 431 960 0 0 0 0RSTP (STP Regional): MPO - Federal

0 108 240 0 0 0 0RSTP (STP Regional): MPO - State Match

0 0 0 0 0 0 152RSTP (STP Regional): State Match

539 1,200 0 0 0 0 488Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

DISTRICTWIDE SHOULDER IMPROVEMENTS

PROJECT

UPC NO.: 81394

NFODistrict-wide

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 143Highway Safety Improvements: Federal

0 0 0 0 0 0 16Highway Safety Improvements: State Match

0 0 0 0 0 0 159Total

436 06/19/2013

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Miscellaneous

MPO Area

NonMPOMiscellaneous

PROGRAM/SYSTEM

TOWN OF CHINCOTEAGUE - SRTS -

CHINCOTEAGUE ES, CS - TRAIL

PROJECT

UPC NO.:

ROUTE:

102827

NFOSRTS

Underway

SCHEDULE

39

ESTIMATED COST (000's)

JURISDICTION:

Hallie Whealton Smith DriveSTREET NAME:

PEChincoteague

FY2015 162CN

FY2014FROM: Chincoteague ES TO: Chincoteague CS/HSDESCRIPTION: 5RW

PROJECT LENGTH: _SCOPE OF WORK: Safety TO 206

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 206Safe Routes to School: Federal 0

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

TRANSPORTATION IMPROVEMENTS TO

HISTORIC JAMESTOWN 2007

PROJECT

UPC NO.: 93059

NFOProject Report Req'd

Complete estimate and schedule required.REPORT NOTE:

DESCRIPTION:

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 0 0 0 0 0 4,678SAFETEA-LU Earmarks: Federal

0 0 0 0 0 0 1,169SAFETEA-LU Earmarks: State Match

0 0 0 0 0 0 5,847Total

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

GREEN OPERATOR OCEAN-GOING VESSEL

HYBRID

PROJECT

UPC NO.:

ROUTE:

103927

NFOU000

MPO projectREPORT NOTE:

Underway

SCHEDULE

4,000

ESTIMATED COST (000's)

JURISDICTION:

N/ASTREET NAME:

PEHampton Roads District-wide

CN

FROM: N/A TO: N/ADESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Other TO 4,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

0 1,200 1,200 800 0 0 400CMAQ: MPO - Federal

0 300 300 200 0 0 100CMAQ: MPO - State Match

-500 1,500 1,500 1,000 0 0 0 500Total

06/19/2013 437

HAMPTON ROADS DISTRICTFY2014-2019 Six-Year Improvement Program

FY14 FINAL Miscellaneous

MPO Area

Hampton RoadsMiscellaneous

PROGRAM/SYSTEM

GREEN OPERATOR TRUCK REPLACEMENT

PROJECT

UPC NO.:

ROUTE:

103928

NFOU000

MPO projectREPORT NOTE:

FY2015

SCHEDULE

3,000

ESTIMATED COST (000's)

JURISDICTION:

N/ASTREET NAME:

PEHampton Roads District-wide

CN

FROM: N/A TO: N/ADESCRIPTION: RW

PROJECT LENGTH: _SCOPE OF WORK: Environmental Only TO 3,000

REQ'D AFTER

2019FY2019 FY2018FY2017FY2016FY2015FY2014Prev. AllocFund Sources

REQUIRED ALLOCATIONS (000's)

400 400 400 800 400 0 0CMAQ: MPO - Federal

100 100 100 200 100 0 0CMAQ: MPO - State Match

0 500 500 1,000 500 500 0 0Total

438 06/19/2013