FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department of State US Consulate General, Erbil Kurdistan Region - Iraq Prepared by ENGINEERS SURVEYORS PLANNERS Local Office: Suite 42, Building B3, Pak City, Sulaymania, Iraq International Headquarters: 312 Commerce Drive, Pawleys Island, SC (USA) www.ldainternational.com 6 February 2013

Upload: others

Post on 20-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

FY012 PROJ 10 OFFICE REMODELING PROJECT

S-60 BUILDING (RESIDENCE)

100% Design Drawings Contract No: SIZ25012MO166

Prepared For

US Department of State US Consulate General, Erbil

Kurdistan Region - Iraq

Prepared by

ENGINEERS │ SURVEYORS │ PLANNERS Local Office: Suite 42, Building B3, Pak City, Sulaymania, Iraq

International Headquarters: 312 Commerce Drive, Pawleys Island, SC (USA) www.ldainternational.com

6 February 2013

Page 2: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

SHEET INDEX

SHEETNO. DESCRIPTION

i COVER SHEET

ii SHEET INDEX

ARCHITECTURAL DRAWINGS

1 EXISTING SITE PLAN

2 EXISTING FIRST FLOOR PLAN

3 EXISTING SECOND FLOOR PLAN

4 EXISTING ROOF PLAN

5 NEW SITE PLAN

6 NEW FIRST FLOOR PLAN

7 NEW SECOND FLOOR PLAN

8 NEW ROOF PLAN

IT - ELECTRICAL - LIGHTING DRAWINGS

9 IT - ELECTRICAL - LIGHTING LEGEND

10 IT - ELECTRICAL - LIGHTING PLAN - FIRST FLOOR

11 IT - ELECTRICAL - LIGHTING PLAN - SECOND FLOOR

12 IT - ELECTRICAL - LIGHTING PLAN - ROOF

13 ELECTRICAL SINGLE LINE DIAGRAM

14 PANELBOARD SCHEDULE

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

INDEX SHEET

Page 3: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

UP

BEDROOMA 102

BEDROOMA 103

LIVING ROOMA 101

KITCHENA 104

BATHROOM 105

W

D

BATHROOM106

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

EXISTING SITE PLAN

EXISTING ADDITIONALSTORE ROOM

ADDITIONAL BLOCKWALL

Page 4: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

UP

W

D

BEDROOMA 102

BEDROOMA 103

LIVING ROOMA 101

KITCHENA 104

BATHROOM 105

BATHROOM106

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

EXISTING FIRST FLOOR

Page 5: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

UP

UP

BEDROOMA 201

BAL201

BAL202

HALLWAYA 204

BEDROOMA 202

BATHROOMA 203

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

EXISTING SECOND FLOOR

EXISTING HANDRAIL

Page 6: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

ROOF301

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

EXISTING ROOF PLAN

Page 7: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

UP

BEDROOMA 102

BEDROOMA 103

LIVING ROOMA 101

KITCHENA 104

BATHROOM 105

W

D

BATHROOM106

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

SITE PLAN - NEW WORK

REPLACEEXISTING PORCH TILE

REMOVEEXISTING GATE

REPLACE EXISTING3 COLUMNS

REMOVE BLOCK WALL

REMOVEEXISTING GATEINCREASE GATEOPENING TO 1.5m

ALL EXISTING WALLTO BE LOWERED TO 40cm ABOVE GROUND.REPLASTER AND REPAINT

REMOVESTORE ROOM

INSTALL NEW EXTERIOR TILESALONG ALL SIDEWALKS AROUND HOUSE.

Page 8: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

UP

W

D

BEDROOMA 102

BEDROOMA 103

LIVING ROOMA 101

KITCHENA 104

BATHROOM 105

BATHROOM106

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

FIRST FLOOR - NEW WORK

INSTALL NEW EXTERIORSTEEL DOOR (3 REQUIRED)

ADDITION OF RAILINGALONG STAIRS (TO 107cm)

INSTALL FLOOR TILESFOR STAIRWAY FROM SECONDFLOOR, INCLUDING INTERMEDIATELANDING

INSTALL NEW SHOWER EXHAUSTFAN, AND BATHROOM FURNISHING

INSTALL NEW TOILET, SINKBATHROOM FURNISHINGSAND EXHAUST FAN

INSTALL NEWCOUNTERS

INSTALL NEW KITCHENSINK & PLUMBING

ALL INTERIOR DOORS TO BEREPLACED PER SPECIFICATIONS

ALL WINDOWSTO BE REPLACED PER SPECIFICATIONS

Page 9: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

UP

UP

BEDROOMA 201

BAL201

BAL202

HALLWAYA 204

BEDROOMA 202

BATHROOMA 203

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

SECOND FLOOR - NEW WORK

REMOVE AND REPLACE ALLEXISTING HANDRAILWITH CONCRETE RAILING(95cm HEIGHT)

INSTALL NEWEXTERIOR TILES ONLOWER BALCONY

INSTALL NEW TOILET,ENCLOSED SHOWER, SINK,AND EXHAUST FAN, INSTALLNEW FLOOR TILES.

INSTALL NEW EXTERIORSTEEL DOORS(3 REQUIRED)

ADDITIONOF RAILING(TO 107cm)

REPLACE INTERIOR STEPS ANDINSTALL RAILS, INSTALL TILES ONSTAIRS. (2 LOCATIONS)

INSTALL NEW EXTERIORTILES ON BALCONY

INSTALL NEW EXTERIORTILES ON BALCONY

INSTALL NEWEXTERIOR TILES ONUPPER BALCONY.

REMOVE EXISTINGSTAIRS AND REPLACEWITH NEW STEEL STAIRS(3 LOCATIONS)

REMOVE EXISTINGSTAIRS AND REPLACEWITH NEW STEEL STAIRS

INSTALL NEW INTERIORFLOOR TILES FOR STAIRWAYFROM FIRST FLOOR TO SECOND FLOOR,INCLUDING INTERMEDIATE LAND

Page 10: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

ROOF301

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

ROOF PLAN - NEW WORK

REMOVE AND REPLACEENTIRE EXISTING WALLON ROOF

INSTALL CONCRETE BLOCKSTEPS WITH RAILING AT SPLIT LEVEL.

Page 11: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

A/C

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

IT - ELECTRICAL - LIGHTING LEGEND

Page 12: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

E

E

E

C-23

A/C

C-11 C-12

C-23

C-13

C-13

C-13

C-13

C-13

C-13

C-13

C-13

C-15

C-13

C-13

C-15

C-15

C-15

C-11

C-15

C-23

R

C-7

D

C-9

C-10

WASHER

C-12

2

C-12

2 2C-11

2Rh

RhRh

C-1 C-3

C-11

C-15

C-24

C-24

C-24

C-24

C-11

C-11

C-11

C-24

C-24

C-24

COUNTER TOPRECEPTACLES TO BEMOUNTED 20MM ABOVECOUNTERTOP

2 Rh

2

C-12

C-2

C-11

C-2

C-1

WATERPUMP

WATERHEATER

C-5

C-6

C-12

ELECTRICAL NOTES:

220V, 1Ø, CIRCUIT CONDUCTORINSULATION SHALL BE COLOR CODED:LINE - BLACKNEUTRAL - WHITEEARTH - GREEN

CONDUIT SHALL BE 3/4" MINIMUM

2

C-14

C-23

C-24

C-23

C-12

200A NEMA 12 PANELBOARD,24-1P BREAKERS PER SCHEDULE

200A NEMA 3R SERVICEDISCONNECT SWITCH

ENGINEERS - SURVEYORS - PLANNERS

WWW . LDAINTERNATIONAL . COM

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

IT - ELECTRICAL - LIGHTING PLAN - FIRST FLOOR

Page 13: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

2

C-14

EC-11

C-11

E

C-11

E

C-11

C-11

Rh2

2

C-14

Rh

C-14

2

C-14

C-23

C-23

C-23

C-16

C-16

C-16

C-16

C-16

C-16

C-16

C-16

C-16

C-16

C-16C-16

C-16

2

2C-14

C-23

C-4

C-3

C-4

W

C-14

ENGINEERS - SURVEYORS - PLANNERS

WWW . LDAINTERNATIONAL . COM

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

IT - ELECTRICAL - LIGHTING PLAN - SECOND FLOOR

Page 14: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

C-23

NEMA 4 TERMINALBOX FOR PUMPELECTRICAL

C-8

ELECTRICAL NOTES:

ROOF LIGHTS ARE POLE MOUNTED ANDLOCATED ON TOP OF THE WALL. SETLIGHTS AT 2.4m ABOVE ROOF.

W

ENGINEERS - SURVEYORS - PLANNERS

WWW . LDAINTERNATIONAL . COM

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

IT - ELECTRICAL - LIGHTING PLAN - ROOF

Page 15: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

ENGINEERS - SURVEYORS - PLANNERS

WWW . LDAINTERNATIONAL . COM

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

ELECTRICAL SINGLE LINE DIAGRAM

Page 16: FY012 PROJ 10 OFFICE REMODELING PROJECT S …...FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDING (RESIDENCE) 100% Design Drawings Contract No: SIZ25012MO166 Prepared For US Department

NEUTRAL BUSGROUND BUS

CKT AMP POLEWIRE

(AWG) DESCRIPTION LOAD A B C LOAD DESCRIPTIONWIRE

(AWG) POLE AMP CKT1 30 1 10 A/C Room 101, 102 4350 8700 4350 A/C Room A104, 105 10 1 30 23 30 1 10 A/C Room 103, 203 4350 8700 4350 A/C Room A201, 202 10 1 30 45 30 1 8 Water Heater 5500 7000 1500 Water Supply Pump 12 1 20 67 40 1 8 Range 6700 8200 1500 Roof Pressure Pump 12 1 20 89 40 1 8 Dryer 7200 8700 1500 Washer 12 1 20 1011 20 1 12 Emergency Lights 700 3700 3000 1st Floor Lights 12 1 20 12

13 20 1 12Rooms A102, 103

Recepts 4000 6400 2400 2nd Floor & Roof Lights 12 1 20 14

15 20 1 12 Rooms A101, 107 Recepts 4000 8000 4000 2nd Floor Recepts 12 1 20 16

17 20 1 SPARE 0 0 SPARE 1 20 1819 20 1 SPARE 0 0 SPARE 1 20 2021 20 1 SPARE 0 0 SPARE 1 20 22

23 20 1 12 Outdoor, bath, kitchen recepts 2000 6000 4000 Kitchen , Ex Fan,

appliance recepts 12 1 20 24

TOTALS 23300 25400 16700 WATTS

= 65400 WATTS S-60

CKT 23 is equipped with GFCI circuit breaker.

TOTAL 3Ø W

PANELBOARD SCHEDULE

125 AMP MAIN BREAKER

250A PANELBOARD230/400 VOLT, THREE PHASE, FOUR WIRE, WITH GROUND BUS, RATED 15kAIC

CKT 24 is equipped with GFCI circuit breaker.

ENGINEERS - SURVEYORS - PLANNERS

WWW . LDAINTERNATIONAL . COM

I N T E R N A T I O N A LLDA

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGPROJECT:

FY012 PROJ 10 OFFICE REMODELING PROJECT S-60 BUILDINGSHEET TITLE:

PANELBOARD SCHEDULE