future transportation projects within the loxahatchee river basin
DESCRIPTION
Future Transportation Projects within the Loxahatchee River Basin. Florida Department of Transportation District IV 3400 W. Commercial Blvd. Ft. Lauderdale, FL 33309. Photo by Jeff Ripple. FDOT District 4 Work Program Loxahatchee River Basin. I-95 – widening, add HOV lanes - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/1.jpg)
Future Transportation Projects within the Loxahatchee River
Basin
Florida Department of TransportationDistrict IV
3400 W. Commercial Blvd.Ft. Lauderdale, FL 33309
Photo by Jeff Ripple
![Page 2: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/2.jpg)
FDOT District 4 Work Program Loxahatchee River Basin
1. I-95 – widening, add HOV lanes
a) from Don Ross Rd to SR 706 - Oct. 2007
b) From SR 706 to St. Lucie Co. – Year 2011
c) I-95 resurfacing – SR 76 to St. Lucie Co. – Oct. 2007
2. SR 706 from the Turnpike to Chasewood Plaza – Aug. 2007
3. I-95 ITS installation - June 2007
![Page 3: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/3.jpg)
Current Activities
ETDM Screening
Wildlife Crossing Survey
Collect Traffic Data
![Page 4: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/4.jpg)
WHAT IS ETDM? A GIS based software program that allows
agencies the opportunity to post comments regarding the proposed transportation improvement project.
![Page 5: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/5.jpg)
Current Activities-ETDM
• SFWMD – coordinate with LRCC, coordinate with
CERP, coordinate with Park
• FDEP – coordinate with LRCC, coordinate with
CERP, coordinate with Park
No comments from Department of Interior regarding W&S
![Page 6: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/6.jpg)
Culvert/Bridge Crossing Usage Survey
![Page 7: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/7.jpg)
Culvert/Bridge Crossing Usage Survey
nongame species Vehicle/pedestrian
activities
![Page 8: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/8.jpg)
Preliminary Traffic Study
Initial Analysis indicates need for additional capacity – one additional lane in each direction
(This was determined by developing a long term Average Annual Daily Traffic forecast based on
current and planned future developments)
![Page 9: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/9.jpg)
Purpose Start data collection early to identify issues up front to allow
input from stakeholders that will be useful during the PD&E study
• Does the bridge profile need to be studied?
![Page 10: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/10.jpg)
Agency CoordinationAgency coordination required for transportation
projects within the Loxahatchee River Basin:
Loxahatchee River• Wild and Scenic River• Section 4(f) property
Jonathan Dickinson State Park• Section 4(f) property
![Page 11: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/11.jpg)
FDOT Coordination for Wild and Scenic Rivers
Coordination with National Park Service (NPS):
• Coordination letter describing the proposed activities is submitted to NPS for review and comment
• NPS must respond within 30 days
• NPScomments should be incorporated into the appropriate PD&E Document
![Page 12: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/12.jpg)
Compensation for Unavoidable Impacts
• Mitigation for impacts to wetlands and/or park land would be required for unavoidable impacts from FDOT projects
• Agencies (South Florida Water Management District, U.S. Army Corps of Engineers) prefer mitigation to be:
In kind Within the same drainage basin as the impact
• FDOT will need potential mitigation areas/projects within the basin
![Page 13: Future Transportation Projects within the Loxahatchee River Basin](https://reader036.vdocuments.mx/reader036/viewer/2022062521/56816728550346895ddbc425/html5/thumbnails/13.jpg)
Questions?