FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO FALKO BETHMANN, DIETER OLLINGER, OLIVER ZINGG, FRÉDÉRIC GUINOT, FLORENTIN LADNER INDUCED SEISMICITY WORKSHOP, DAVOS SCHATZALP, 13.3.2015 Swiss centre of competence for deep geothermal energy for power and heat production

Upload: trinhkien

Post on 17-Sep-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

FUTURE MULTI-STAGE EGS PROJECTS IN

SWITZERLAND

PETER MEIER, CEO

FALKO BETHMANN, DIETER OLLINGER, OLIVER ZINGG, FRÉDÉRIC

GUINOT, FLORENTIN LADNER

INDUCED SEISMICITY WORKSHOP, DAVOS SCHATZALP, 13.3.2015

Swiss centre of competence for deep

geothermal energy for power and

heat production

Page 2: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Basel reservoir:

IS too strong, Permeability too weak2

Page 3: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Key findings seismicity (Serianex, 2009):

Magnitude of induced seismicity increases with

stimulated reservoir area

Detailed analysis of the Basel data set and numerical simulations

corroborate this general relationship from many data sets worldwide.

Also the project in St. Gallen follows this relationship.

3

Page 4: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Concept DHM Basel vs.

„new“ horizontal multi-frac system

Page 5: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation
Page 6: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

assuming rock conditions of the Gotthard

base tunnel (Masset & Loew, 2013)

MC simulations demonstrate the improvement of

circulation rates using a multi-stage stimulation system

instead of a stimulation in an open borehole

Page 7: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Stimulation factor (Evans, 2013)

Page 8: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Medium Transmissivity (Gneiss, Masset & Loew 2013, Higher Bound K)

30 stages

20 stages

15 stages

Open-hole

stimulation

of 3 fractures

Open-hole

Stimulation

of 1 fracture

Flow rates from MC calculations for different numbers of

successful stages versus open-hole stimulation

111 l/s

75 l/s

52 l/s

32 l/s

17 l/s

Page 9: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Low risk areas for first pilot projects and

safety distance to large fault zones9

Page 10: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

130 potential sites for pilot projects were evaluated

within different plays within crystalline basement and

sediments

Haute-Sorne

Avenches

EtzwilenPfaffnau Triengen

St. Gallen

10

Page 11: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Geological cross-section with

well and reservoir sketch11

Page 12: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Conceptual design

Page 13: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Deterministic study (Q-con)Numerical modeling of ground motions

Mw=2.6

Damage < 5000 CHFpgv[mm/s]

13

Page 14: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Traffic light system with lower thresholds

A system of predefined

thresholds allows an

automated stop before

damage occurs safety buffer

14

Page 15: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Probabilistic risk study according to SED philosophy & ATLS

R=700m

R=300m

M=2

P(M>2.6)=5%

15

Page 16: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Project site Haute-Sorne16

Page 17: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Dossier 12J049 – Version 001 – Page n°17

plans: Kury&Staehelin

Power plant contruction permit: Pmax = 5 MWel

Electrical Power will be sold to Swissgrid (KEV-waiting list)

Page 18: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Accompanying Group18

Deliver detailed information to all stakeholders

Communication relay with the population

Project improvement driven by the group’s feedback

Page 19: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Time plan Haute-Sorne

Preliminary impact and risk studies

- Accompanying groups

- Application of construction permit and main environmental impact and risk studies

Examination by authorities

Risk guarantie BFE/Swissgrid

Drilling

Power plant working

2012

2013

2014

2015

2017

2020+

Page 20: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Geothermie - Aus gutem Grund

Page 21: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

November 26 2014Geo-Energie Suisse SA

21

Haute-Sorne

Haute-Sorne

21

Regional geology

Construction of the geological model

Page 22: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

22

Page 23: FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND · FUTURE MULTI-STAGE EGS PROJECTS IN SWITZERLAND PETER MEIER, CEO ... Geothermie - Aus gutem Grund ... PowerPoint-Präsentation

Preservation of evidence

Geo-Energie Suisse SA

23

Groupes de

bâtiments

représentatifs

Objet

individuels

sensibles

8 avril 2014