Page 1: Future Dataflow Bottlenecks

Future Dataflow Bottlenecks

Christopher O’Grady

with A. Perazzo and M. Weaver

Babar Dataflow Group

Page 2: Future Dataflow Bottlenecks

View of the DAQ System

• A series of parallel assembly lines• System runs as fast as the slowest worker on

the assembly line• Trigger rate projections tell us how fast workers

should work, event size projections tell us how fast they actually take.

• Use software written by Amedeo Perazzo and James Swain to record system performance info

• We use this information to project into the future. All the following plots are made by Matt Weaver.

Page 3: Future Dataflow Bottlenecks

Projections

• On June 25, 2001 I predicted the DCH readout would be a bottleneck in 2005.

• Also, when we saw unexplained deadtime from GLT, the projection system “told” us that there was 90us delay shipping data (which we then saw on the scope).

• This projection system works well.

Page 4: Future Dataflow Bottlenecks

Projection Improvements

• Matt has split all occupancy projections into HER/LER/LUM components (previously, only for DCH).

• Using Jan 2004 background runs.

• Looks at all ROMs individually. Previously just the worst.

• Projecting through 2007-2010 (3*10**34)

Page 5: Future Dataflow Bottlenecks

General Observations

• HER worse than 2002

• LER better than 2002

• Now see a luminosity term in sizes

• Event size is 75kb in 2007 (3*10**34)

Page 6: Future Dataflow Bottlenecks

Trigger Rate Projections

• From the Trigger Group:

• Need <140us!

Page 7: Future Dataflow Bottlenecks

Fiber Transfer Bottlenecks

• DCH/SVT the largest. GLT also important.

140us

Page 8: Future Dataflow Bottlenecks

Behaviour of Fiber Deadtime

• Worse than other deadtime, since “earliest” buffering in the system.

Page 9: Future Dataflow Bottlenecks

Plan of Attack for Fiber

• DCH: in progress

• GLT/DCT: sudong in progress, should be straightforward

• SVT: 1. try running system at 60MHz, or

2. reduce occupancy (and efficiency) with thresholds

• EMT: straightforward

Page 10: Future Dataflow Bottlenecks

Feature Extraction Bottleneck

DCH/DRC/EMC/EMT/SVT ideally need work

140us

Page 11: Future Dataflow Bottlenecks

Plan of Attack for FEX

• DCH FEX taken care of with electronics upgrade.

• DRC and SVT FEX relatively easy (don’t “do” anything).

• EMT FEX requires data format change (some work but doable, in principle). Amedeo already did one pass.

• EMC FEX hard! Already a lot of work on that by Matt.

Page 12: Future Dataflow Bottlenecks

EMC FEX

• Need new idea (like Walt had) or new CPUs.

• new CPUs won't necessarily work easily: mechanical, electrical, software issues. significant work and money.

• Maybe 20% gain from nbr bits, but hardware untested and corners may not see gain.

Page 13: Future Dataflow Bottlenecks

VME Bottleneck

Currently overestimated. EMC/DRC/SVT

140us

Page 14: Future Dataflow Bottlenecks

Plan of Attack for VME

• Many bottlenecks, but maybe not a problem.

• Could imagine going to all-network event build.

• For this would likely need ~150 Gbit network cards ($45K) + fibers + network switch ($60K?). Maybe more L3 nodes.

Page 15: Future Dataflow Bottlenecks

Summary

• Up until now have been able to reduce big bottlenecks: EMT FEX, EMC FEX, network stack, DCH data transfer(in progress), GLT/DCT data transfer (sudong, in progress).

• With the above work we should be able to sustain 5kHz in 2007. Not good enough for predicted 7kHz L1.

• EMC FEX and SVT fiber transfer hardest.• Bottlenecks getting varied and difficult: ~$100K +

significant code mods to eliminate VME. ~$500K for new CPUs, and new CPUs may be tough.

• There are deadtime periods we don’t quantitatively understand.

Page 16: Future Dataflow Bottlenecks

My Intuition

• It’s going to be a little rough by 2007.

• Continue improving the system piece by piece with manpower and money we have, BUT

• Tightening the trigger in 2007 will likely be necessary.