furnace area & volume (1)
TRANSCRIPT
-
8/12/2019 Furnace Area & Volume (1)
1/22
UNIT JOTUN CARBOLINE INTERNATIONAL
Jotatemp 650 Thermaline 4001 Gray Intertherm 50
RM/L 580.00 165.80 65.00
D.F.T micron 125 25 25
Area/Litre m2/litre 6.1 21 18
D.F.T micron 250 250 250
Volume litre/m2 3.05 2.1 1.8
C 649 500 540
C 18 2.7 25
- 12 months at 24'C 12 months min at 25'C
- Store indoor -
8 - 10 weeks by sea-freight 3 -
4 weeks by airfreight
included
not included. Paint is
supplied from USA included
- Not Specified
for Furnace 1 - 3 Consumption L 712.60 490.64 420.55
Area = 233.64 m2
for Furnace 4 - 5 Consumption L 648.40 446.44 382.66
Area = 212.59 m2
PRODUCT
Product Code
Price
Theoretical Coverage
Applied Coverage
Storage Life
Delivery Period
FOB
Flash Point
Shelf Life
Max. Temperature
-
8/12/2019 Furnace Area & Volume (1)
2/22
Painting Area Volume of Scaffolding
x1 233.64 399.20
x2 233.64 399.20
x3 233.64 399.20
x4 212.59 368.73
x5 212.59 368.73
x6 212.59 368.73
Scaffold Volume, V
= *(ro^2 - r3^2)*(H+1.0) (m3)Furnace
Furnace Surface Area, A
= 2*ri*h1 (m2)
-
8/12/2019 Furnace Area & Volume (1)
3/22
-
8/12/2019 Furnace Area & Volume (1)
4/22
3.142
-
8/12/2019 Furnace Area & Volume (1)
5/22
Height in mm Dia in mm Area in Mt2
Final Area with
10% Flex
Req Of
Scaffolding in
Mt3
Unit Rate Of
scaffolding in
RM /Mt3
Consumption of
paint in Ltr
Unit Price Of
paint/Ltr.
Furnace-1 6700 11100 233.64 257.00 399.20 35.00 783.85 580.00
Furnace-2 6700 11100 233.64 257.00 399.20 35.00 783.85 580.00
Furnace-3 6700 11100 233.64 257.00 399.20 35.00 783.85 580.00
Furnace-4 6700 10100 212.59 233.85 368.73 35.00 713.24 580.00
Furnace-5 6700 10100 212.59 233.85 368.73 35.00 713.24 580.00
Furnace-6 6700 10100 212.59 233.85 368.73 35.00 713.24 580.00
To be hired Equipment Qty Unit Rate
Period in
month Total cost Total cost
Compressor 350 CFM 2 5,400.00 1 10,800.00
Blasting Pod 4 5,400.00 1 21,600.00
Storage Porta cabin 1 1,800.00 1 1,800.00
Bus 42 Seater 1 15,000.00 1 15,000.00
Man Power Jun Sal/Month in RM
OT @2Hr/Day
&@1.5T(26
WD) Total Sal
Project Engineer/Manager 1 0Painting Supervisor 2
Scaffolding Supervisor 2
Painting Foreman 2
Scaffolding Foreman 2
Grit Blaster 4
Spray painter 5 @25Mt2/paint
Brush painter 2 @5Mt2/painte
Scaffolder 5
Helper 8
Electrician 1
34
Other Cost
Licensing(0.01%)
Training(0.01%)
Documentation(0.01%)
Financing Charges(@12%)
Insurance(0.05%)
Miscellaneous (5%)
Mark up(Shall be decided by Mgt)
-
8/12/2019 Furnace Area & Volume (1)
6/22
Selling Price
-
8/12/2019 Furnace Area & Volume (1)
7/22
Height in mm Dia in mm Area in Mt2
Final Area with
10% Flex
Furnace-1 6700 11100 233.64 257.00
Furnace-2 6700 11100 233.64 257.00
Furnace-3 6700 11100 233.64 257.00
Furnace-4 6700 10100 212.59 233.85
Furnace-5 6700 10100 212.59 233.85
Furnace-6 6700 10100 212.59 233.85
To be hired Equipment Qty Unit Rate
Period in
month Total cost
Compressor 350 CFM 2 5,400.00 1 10,800.00
Blasting Pod 4 5,400.00 1 21,600.00
Storage Porta cabin 1 1,800.00 1 1,800.00
Bus 42 Seater 1 15,000.00 1 15,000.00
Man Power Jun Sal/Month in RM
Project Engineer/Manager 1
Painting Supervisor 2
Scaffolding Supervisor 2
Painting Foreman 2
Scaffolding Foreman 2
Grit Blaster 4
Spray painter 5
Brush painter 2
Scaffolder 5
Helper 8
Electrician 1
34
-
8/12/2019 Furnace Area & Volume (1)
8/22
Other Cost
Licensing(0.01%)
Training(0.01%)
Documentation(0.01%)
Financing Charges(@12%)
Insurance(0.05%)Miscellaneous (5%)
Mark up(Shall be decided by Mgt)
Selling Price
-
8/12/2019 Furnace Area & Volume (1)
9/22
Req Of
Scaffolding in
Mt3
Unit Rate Of
scaffolding in
RM /Mt3
Consumption of
paint in Ltr
Unit Price Of
paint/Ltr.
Consumption of
Thinner in Ltr
Unit Price Of
Thinner/Ltr.
399.20 35.00 539.70 165.80 0.00 14.50
399.20 35.00 539.70 165.80 0.00 14.50
399.20 35.00 539.70 165.80 0.00 14.50
368.73 35.00 491.09 165.80 0.00 14.50
368.73 35.00 491.09 165.80 0.00 14.50
368.73 35.00 491.09 165.80 0.00 14.50
for spray application
Total cost
OT @2Hr/Day
&@1.5T(26
WD) Total Sal
0
@25Mt2/painter/day
@5Mt2/painter/day
-
8/12/2019 Furnace Area & Volume (1)
10/22
-
8/12/2019 Furnace Area & Volume (1)
11/22
Total cost of
Paint
Total Cost of
Thinner
Cost of Other
consumables @ 20%
of Paint & Thinner
Total Cost Of
Scaffolding in RM
Total Cost
of
Material &
Services
89,482.26 0.00 13,972.00
89,482.26 0.00 13,972.00
89,482.26 0.00 13,972.00
81,421.89 0.00 12,905.55
81,421.89 0.00 12,905.55
81,421.89 0.00 12,905.55
-
8/12/2019 Furnace Area & Volume (1)
12/22
-
8/12/2019 Furnace Area & Volume (1)
13/22
Other Cost
Licensing(0.01%)
Training(0.01%)
Documentation(0.01%)
Financing Charges(@12%)
Insurance(0.05%)Miscellaneous (5%)
Mark up(Shall be decided by Mgt)
Selling Price
-
8/12/2019 Furnace Area & Volume (1)
14/22
Req Of
Scaffolding in
Mt3
Unit Rate Of
scaffolding in
RM /Mt3
Consumption of
paint in Ltr
Unit Price Of
paint/Ltr.
Consumption of
Thinner in Ltr
Unit Price Of
Thinner/Ltr.
399.20 35.00 462.60 65.00 19.00
399.20 35.00 462.60 65.00 19.00
399.20 35.00 462.60 65.00 19.00
368.73 35.00 420.93 65.00 19.00
368.73 35.00 420.93 65.00 19.00
368.73 35.00 420.93 65.00 19.00
Total cost
OT @2Hr/Day
&@1.5T(26
WD) Total Sal
0
@25Mt2/painter/day
@5Mt2/painter/day
-
8/12/2019 Furnace Area & Volume (1)
15/22
-
8/12/2019 Furnace Area & Volume (1)
16/22
Total cost of
Paint
Total Cost of
Thinner
Cost of Other
cosumables @
20% of Paint &
Thinner
Total Cost
Of
Scaffoldin
g in RM
Total Cost
of
Material &
Services
30,069.00 13,972.00
30,069.00 13,972.00
30,069.00 13,972.00
27,360.45 12,905.55
27,360.45 12,905.55
27,360.45 12,905.55
-
8/12/2019 Furnace Area & Volume (1)
17/22
Activities
DATE 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
Delivery Of Container to Site
Delivery Of Scaffolding Material to Site
Setting up & Connectivities to Site
Erection of Scaffolding for furnace -1,2&3
Erection of Scaffolding for furnace -4Erection of Scaffolding for furnace -5
Erection of Scaffolding for furnace -6
Removal Of Scaffolding
Grit Blasting to Furnace 1
Grit Blasting to Furnace 2
Grit Blasting to Furnace 3
Grit Blasting to Furnace 4
Grit Blasting to Furnace 5
Grit Blasting to Furnace 6
Application of 1st
Coat Primer to Furnace-1
Application of 2nd
Coat Primer to Furnace-1
Application of 1st
Coat of Paint to Furnace-1
Application of 2nd
Coat Paint to Furnace-1
Application of 3rd
Coat Paint to Furnace-1
Application of 1st
Coat Primer to Furnace-2
Application of 2nd
Coat Primer to Furnace-2
Application of 1st
Coat of Paint to Furnace-2
Application of 2nd
Coat Paint to Furnace-2
Application of 3rd
Coat Paint to Furnace-2
Application of 1stCoat Primer to Furnace-3
Application of 2nd
Coat Primer to Furnace-3
Application of 1st
Coat of Paint to Furnace-3
Application of 2nd
Coat Paint to Furnace-3
Application of 3rd
Coat Paint to Furnace-3
Application of 1st
Coat Primer to Furnace-4
Application of 2nd
Coat Primer to Furnace-4
Application of 1st
Coat of Paint to Furnace-4
Application of 2nd
Coat Paint to Furnace-4
Application of 3rdCoat Paint to Furnace-4
Application of 1st
Coat Primer to Furnace-5
Application of 2nd
Coat Primer to Furnace-5
Application of 1st
Coat of Paint to Furnace-5
Application of 2nd
Coat Paint to Furnace-5
Application of 3rd
Coat Paint to Furnace-5
Application of 1st
Coat Primer to Furnace-6
Application of 2nd
Coat Primer to Furnace-6
May-2014
-
8/12/2019 Furnace Area & Volume (1)
18/22
Application of 1st
Coat of Paint to Furnace-6
Application of 2nd
Coat Paint to Furnace-6
Application of 3rd
Coat Paint to Furnace-6
Documentation & Handing Over
-
8/12/2019 Furnace Area & Volume (1)
19/22
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
June-2014
-
8/12/2019 Furnace Area & Volume (1)
20/22
-
8/12/2019 Furnace Area & Volume (1)
21/22
Categories
Date : 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
Project Engineer/Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Painting Supervisor 2 2 2 2 2 2 2 2 2 2 2 2
Scaffolding Supervisor 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Painting Foreman 2 2 2 2 2 2 2 2 2 2 2 2
Scaffolding Foreman 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2Grit Blaster 4 4 4 4 4 4 4 4 4 4 4 4
Spray painter 5 5 5 5 5 5 5 5 5 5 5 5
Brush painter 2 2 2 2 2 2 2 2 2 2 2 2
Scaffolder 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Helper 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Electrician 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL : 10 19 19 19 34 34 34 34 34 34 34 34 34 34 34 34
May-2014
-
8/12/2019 Furnace Area & Volume (1)
22/22
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 24 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
5 5 5 2 2 2 2 2 2 2 2 5 5 5 5 5 5 5
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
34 34 34 31 31 31 31 31 31 31 31 34 34 34 34 34 34 34
Jun-2014