    UNIT JOTUN CARBOLINE INTERNATIONAL

    Jotatemp 650 Thermaline 4001 Gray Intertherm 50

    RM/L 580.00 165.80 65.00

    D.F.T micron 125 25 25

    Area/Litre m2/litre 6.1 21 18

    D.F.T micron 250 250 250

    Volume litre/m2 3.05 2.1 1.8

    C 649 500 540

    C 18 2.7 25

    - 12 months at 24'C 12 months min at 25'C

    - Store indoor -

    8 - 10 weeks by sea-freight 3 -

    4 weeks by airfreight

    included

    not included. Paint is

    supplied from USA included

    - Not Specified

    for Furnace 1 - 3 Consumption L 712.60 490.64 420.55

    Area = 233.64 m2

    for Furnace 4 - 5 Consumption L 648.40 446.44 382.66

    Area = 212.59 m2

    PRODUCT

    Product Code

    Price

    Theoretical Coverage

    Applied Coverage

    Storage Life

    Delivery Period

    FOB

    Flash Point

    Shelf Life

    Max. Temperature

  • 8/12/2019 Furnace Area & Volume (1)

    2/22

    Painting Area Volume of Scaffolding

    x1 233.64 399.20

    x2 233.64 399.20

    x3 233.64 399.20

    x4 212.59 368.73

    x5 212.59 368.73

    x6 212.59 368.73

    Scaffold Volume, V

    = *(ro^2 - r3^2)*(H+1.0) (m3)Furnace

    Furnace Surface Area, A

    = 2*ri*h1 (m2)

  • 8/12/2019 Furnace Area & Volume (1)

    3/22

  • 8/12/2019 Furnace Area & Volume (1)

    4/22

    3.142

  • 8/12/2019 Furnace Area & Volume (1)

    5/22

    Height in mm Dia in mm Area in Mt2

    Final Area with

    10% Flex

    Req Of

    Scaffolding in

    Mt3

    Unit Rate Of

    scaffolding in

    RM /Mt3

    Consumption of

    paint in Ltr

    Unit Price Of

    paint/Ltr.

    Furnace-1 6700 11100 233.64 257.00 399.20 35.00 783.85 580.00

    Furnace-2 6700 11100 233.64 257.00 399.20 35.00 783.85 580.00

    Furnace-3 6700 11100 233.64 257.00 399.20 35.00 783.85 580.00

    Furnace-4 6700 10100 212.59 233.85 368.73 35.00 713.24 580.00

    Furnace-5 6700 10100 212.59 233.85 368.73 35.00 713.24 580.00

    Furnace-6 6700 10100 212.59 233.85 368.73 35.00 713.24 580.00

    To be hired Equipment Qty Unit Rate

    Period in

    month Total cost Total cost

    Compressor 350 CFM 2 5,400.00 1 10,800.00

    Blasting Pod 4 5,400.00 1 21,600.00

    Storage Porta cabin 1 1,800.00 1 1,800.00

    Bus 42 Seater 1 15,000.00 1 15,000.00

    Man Power Jun Sal/Month in RM

    OT @2Hr/Day

    &@1.5T(26

    WD) Total Sal

    Project Engineer/Manager 1 0Painting Supervisor 2

    Scaffolding Supervisor 2

    Painting Foreman 2

    Scaffolding Foreman 2

    Grit Blaster 4

    Spray painter 5 @25Mt2/paint

    Brush painter 2 @5Mt2/painte

    Scaffolder 5

    Helper 8

    Electrician 1

    34

    Other Cost

    Licensing(0.01%)

    Training(0.01%)

    Documentation(0.01%)

    Financing Charges(@12%)

    Insurance(0.05%)

    Miscellaneous (5%)

    Mark up(Shall be decided by Mgt)

  • 8/12/2019 Furnace Area & Volume (1)

    6/22

    Selling Price

  • 8/12/2019 Furnace Area & Volume (1)

    7/22

    Height in mm Dia in mm Area in Mt2

    Final Area with

    10% Flex

    Furnace-1 6700 11100 233.64 257.00

    Furnace-2 6700 11100 233.64 257.00

    Furnace-3 6700 11100 233.64 257.00

    Furnace-4 6700 10100 212.59 233.85

    Furnace-5 6700 10100 212.59 233.85

    Furnace-6 6700 10100 212.59 233.85

    To be hired Equipment Qty Unit Rate

    Period in

    month Total cost

    Compressor 350 CFM 2 5,400.00 1 10,800.00

    Blasting Pod 4 5,400.00 1 21,600.00

    Storage Porta cabin 1 1,800.00 1 1,800.00

    Bus 42 Seater 1 15,000.00 1 15,000.00

    Man Power Jun Sal/Month in RM

    Project Engineer/Manager 1

    Painting Supervisor 2

    Scaffolding Supervisor 2

    Painting Foreman 2

    Scaffolding Foreman 2

    Grit Blaster 4

    Spray painter 5

    Brush painter 2

    Scaffolder 5

    Helper 8

    Electrician 1

    34

  • 8/12/2019 Furnace Area & Volume (1)

    8/22

    Other Cost

    Licensing(0.01%)

    Training(0.01%)

    Documentation(0.01%)

    Financing Charges(@12%)

    Insurance(0.05%)Miscellaneous (5%)

    Mark up(Shall be decided by Mgt)

    Selling Price

  • 8/12/2019 Furnace Area & Volume (1)

    9/22

    Req Of

    Scaffolding in

    Mt3

    Unit Rate Of

    scaffolding in

    RM /Mt3

    Consumption of

    paint in Ltr

    Unit Price Of

    paint/Ltr.

    Consumption of

    Thinner in Ltr

    Unit Price Of

    Thinner/Ltr.

    399.20 35.00 539.70 165.80 0.00 14.50

    399.20 35.00 539.70 165.80 0.00 14.50

    399.20 35.00 539.70 165.80 0.00 14.50

    368.73 35.00 491.09 165.80 0.00 14.50

    368.73 35.00 491.09 165.80 0.00 14.50

    368.73 35.00 491.09 165.80 0.00 14.50

    for spray application

    Total cost

    OT @2Hr/Day

    &@1.5T(26

    WD) Total Sal

    0

    @25Mt2/painter/day

    @5Mt2/painter/day

  • 8/12/2019 Furnace Area & Volume (1)

    10/22

  • 8/12/2019 Furnace Area & Volume (1)

    11/22

    Total cost of

    Paint

    Total Cost of

    Thinner

    Cost of Other

    consumables @ 20%

    of Paint & Thinner

    Total Cost Of

    Scaffolding in RM

    Total Cost

    of

    Material &

    Services

    89,482.26 0.00 13,972.00

    89,482.26 0.00 13,972.00

    89,482.26 0.00 13,972.00

    81,421.89 0.00 12,905.55

    81,421.89 0.00 12,905.55

    81,421.89 0.00 12,905.55

  • 8/12/2019 Furnace Area & Volume (1)

    12/22

  • 8/12/2019 Furnace Area & Volume (1)

    13/22

    Other Cost

    Licensing(0.01%)

    Training(0.01%)

    Documentation(0.01%)

    Financing Charges(@12%)

    Insurance(0.05%)Miscellaneous (5%)

    Mark up(Shall be decided by Mgt)

    Selling Price

  • 8/12/2019 Furnace Area & Volume (1)

    14/22

    Req Of

    Scaffolding in

    Mt3

    Unit Rate Of

    scaffolding in

    RM /Mt3

    Consumption of

    paint in Ltr

    Unit Price Of

    paint/Ltr.

    Consumption of

    Thinner in Ltr

    Unit Price Of

    Thinner/Ltr.

    399.20 35.00 462.60 65.00 19.00

    399.20 35.00 462.60 65.00 19.00

    399.20 35.00 462.60 65.00 19.00

    368.73 35.00 420.93 65.00 19.00

    368.73 35.00 420.93 65.00 19.00

    368.73 35.00 420.93 65.00 19.00

    Total cost

    OT @2Hr/Day

    &@1.5T(26

    WD) Total Sal

    0

    @25Mt2/painter/day

    @5Mt2/painter/day

  • 8/12/2019 Furnace Area & Volume (1)

    15/22

  • 8/12/2019 Furnace Area & Volume (1)

    16/22

    Total cost of

    Paint

    Total Cost of

    Thinner

    Cost of Other

    cosumables @

    20% of Paint &

    Thinner

    Total Cost

    Of

    Scaffoldin

    g in RM

    Total Cost

    of

    Material &

    Services

    30,069.00 13,972.00

    30,069.00 13,972.00

    30,069.00 13,972.00

    27,360.45 12,905.55

    27,360.45 12,905.55

    27,360.45 12,905.55

  • 8/12/2019 Furnace Area & Volume (1)

    17/22

    Activities

    DATE 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3

    Delivery Of Container to Site

    Delivery Of Scaffolding Material to Site

    Setting up & Connectivities to Site

    Erection of Scaffolding for furnace -1,2&3

    Erection of Scaffolding for furnace -4Erection of Scaffolding for furnace -5

    Erection of Scaffolding for furnace -6

    Removal Of Scaffolding

    Grit Blasting to Furnace 1

    Grit Blasting to Furnace 2

    Grit Blasting to Furnace 3

    Grit Blasting to Furnace 4

    Grit Blasting to Furnace 5

    Grit Blasting to Furnace 6

    Application of 1st

    Coat Primer to Furnace-1

    Application of 2nd

    Coat Primer to Furnace-1

    Application of 1st

    Coat of Paint to Furnace-1

    Application of 2nd

    Coat Paint to Furnace-1

    Application of 3rd

    Coat Paint to Furnace-1

    Application of 1st

    Coat Primer to Furnace-2

    Application of 2nd

    Coat Primer to Furnace-2

    Application of 1st

    Coat of Paint to Furnace-2

    Application of 2nd

    Coat Paint to Furnace-2

    Application of 3rd

    Coat Paint to Furnace-2

    Application of 1stCoat Primer to Furnace-3

    Application of 2nd

    Coat Primer to Furnace-3

    Application of 1st

    Coat of Paint to Furnace-3

    Application of 2nd

    Coat Paint to Furnace-3

    Application of 3rd

    Coat Paint to Furnace-3

    Application of 1st

    Coat Primer to Furnace-4

    Application of 2nd

    Coat Primer to Furnace-4

    Application of 1st

    Coat of Paint to Furnace-4

    Application of 2nd

    Coat Paint to Furnace-4

    Application of 3rdCoat Paint to Furnace-4

    Application of 1st

    Coat Primer to Furnace-5

    Application of 2nd

    Coat Primer to Furnace-5

    Application of 1st

    Coat of Paint to Furnace-5

    Application of 2nd

    Coat Paint to Furnace-5

    Application of 3rd

    Coat Paint to Furnace-5

    Application of 1st

    Coat Primer to Furnace-6

    Application of 2nd

    Coat Primer to Furnace-6

    May-2014

  • 8/12/2019 Furnace Area & Volume (1)

    18/22

    Application of 1st

    Coat of Paint to Furnace-6

    Application of 2nd

    Coat Paint to Furnace-6

    Application of 3rd

    Coat Paint to Furnace-6

    Documentation & Handing Over

  • 8/12/2019 Furnace Area & Volume (1)

    19/22

    4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

    June-2014

  • 8/12/2019 Furnace Area & Volume (1)

    20/22

  • 8/12/2019 Furnace Area & Volume (1)

    21/22

    Categories

    Date : 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4

    Project Engineer/Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

    Painting Supervisor 2 2 2 2 2 2 2 2 2 2 2 2

    Scaffolding Supervisor 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

    Painting Foreman 2 2 2 2 2 2 2 2 2 2 2 2

    Scaffolding Foreman 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2Grit Blaster 4 4 4 4 4 4 4 4 4 4 4 4

    Spray painter 5 5 5 5 5 5 5 5 5 5 5 5

    Brush painter 2 2 2 2 2 2 2 2 2 2 2 2

    Scaffolder 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

    Helper 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

    Electrician 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

    TOTAL : 10 19 19 19 34 34 34 34 34 34 34 34 34 34 34 34

    May-2014

  • 8/12/2019 Furnace Area & Volume (1)

    22/22

    5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

    1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

    2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

    2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

    2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

    2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 24 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

    5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

    2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

    5 5 5 2 2 2 2 2 2 2 2 5 5 5 5 5 5 5

    8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

    1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

    34 34 34 31 31 31 31 31 31 31 31 34 34 34 34 34 34 34

    Jun-2014