FULL DEPTH RECLAMATION

“Build a good foundation and a road will last forever” – Wm. H. Peckham, 1927

Page 2: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

RECLAMATION, LLC

Reclamation was founded in 1979One of the larger road recycling companies in North AmericaSpecialize in Full Depth and Cold In Place Recycling processesServing the Northeast, New England and Mid-Atlantic States

www.reclamationllc.com

Page 3: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

PECKHAM INDUSTRIES INC. -Parent Company

www.peckham.com

Formed in 1924

3rd Generation Family Owned Company

500 plus employees

We have a strong emphasis on “Customer Relations”

We are an experienced provider ofcustomized solutions to your road construction and maintenance needs.

Page 4: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

PECKHAM INDUSTRIES, INC.What We Do

11 Hot Mix Asphalt Plants• 8 Aggregate Quarries

3 Sand and Gravel Operations2 Emulsion Mills and Liquid Terminals3 Bulk Asphalt Barge TerminalsRoad Recycling Division – Cold in Place, Full Depth Reclamation and Milling OperationsRoad Construction and Paving Division2 Redi-Mix PlantsPrecast Pre-Stressed Concrete PlantLiquid Calcium Chloride Terminal and Operation

Page 5: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

WHAT IS FULL DEPTH RECLAMATION?

A recycling method that pulverizes and blend deteriorated existing asphalt pavement structures with a predetermined portion of underlying sub base materials

Allows additives such as Foamed Asphalt, Asphalt Emulsion, Calcium Chloride, Portland Cement and additional Aggregates

Page 6: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

WHY FULL DEPTH RECLAMATION?Rebuilds a New and Stronger Foundation• Saves $$$$ by recycling existing materials

that have already been paid for• Maximizes pavement life• Eliminates excavation and replacement with

new materials expediting construction time

“Green” Technology• Recycling 100% of existing materials• Utilizes your initial investment of the

existing pavement• Conserves natural resources, fuel and energy

Page 7: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

PROJECT EVALUATIONVisual Inspection

• Visit the proposed site• Make a thorough visual

assessment of the site• Things to look for:

Condition of the drainageSub-grade Material (Clay like Materials, Excessive Fines, Moisture in Material)

Sub-gradePavement CompositionTraffic Volume

• History of Pavement

DOT RATING 1-5

Page 8: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

Fatigued pavements with base failures and other irregularities warrant FDR.

• Wheel Rutting• Alligator Cracking• Irregular Profiles• Longitudinal and Lateral

Cracking• Pavement Raveling• Heavily Patched• Reflective Cracking• Potholes• Deficient Sub-Base Material

CONDITIONS THAT WARRANT FDR

8

Page 9: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

IS THIS A CANDIDATE?

OH YEAH!

Page 10: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

CANDIDATES FOR FDR

• State Roads• County Roads• Borough/Township Roads• City/Village Streets• Parking Lots• Airports• Gravel Roads• Recreational surfaces

Basketball and Tennis CourtsGolf Cart Paths

Page 11: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

EQUIPMENT USED FOR FDRGrader

Roller Athey

Page 12: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

WHAT DOES ALL THIS EQUIPMENT DO?

Basic TermsStep 1• Reclaimer pulverizes

existing asphalt and underlying sub base materials

• Average depths rangefrom 8-16 inches

.

Page 13: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

WHAT DOES ALL THIS EQUIPMENT DO?

Step 2• Grader rough grades

recycled material

• Athey Loader removesmaterial to lower the grade if necessary

Page 14: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

WHAT DOES ALL THIS EQUIPMENT DO?Step 3• Stabilizing Agent added

and is thoroughly mixedby Reclaimer

• Addition of aggregatesor millings if needed

Page 15: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

WHAT DOES ALL THIS EQUIPMENT DO?

Step 4• Grader fine grades

recycled/stabilized material to the desired grade and cross slope.

Page 16: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

WHAT DOES ALL THIS EQUIPMENT DO?

Step 5• 10-15 ton Steel Vibratory

Roller thoroughly compacts recycled/stabilized material and is now ready for wearing course.

Page 17: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

TYPICAL FDR PROFILES

Sub-base

Pulverized

Pulverizationto desired

depth

Sub-base

Pulverized

Pulverizationto desired

depth

Stabilization to desired depth

Removal of excess material (if necessary)

Existing Mat Pulverization Removal of Stabilization to Final surfaceto desired Excess Material desired depth Treatmentdepth (if Necessary)

Page 18: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

SOLUTIONS TO IMPROVE STRENGTH

Reclaimed/Recycled material can be improved with a variety of stabilizing agents to add more strength to the road foundation.

• Foamed Asphalt• Asphalt Emulsion• Calcium Chloride• Portland Cement

Page 19: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

FDR - CURING

Differs with Stabilizing Agent• Foamed Asphalt – Typically – allow recycled material to cure

for (1-2) days before applying a wearing course.• Asphalt Emulsion – Typically – allow recycled material to cure

for (7-10) days before applying a wearing course.• Calcium Chloride – Typically – allow recycled material to cure

for (1-2) days before applying a wearing course.• Portland Cement – Typically – allow recycled material to cure

for (5-7) days before applying a wearing course.

Cure times may vary depending on weather conditions.

Page 20: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

FIELD SAMPLING

• SamplingSmall Mill best sampling method Allows you to obtain a representativesample at a specified depthMinimum 3 sample locations per mileThis method leaves the project in good condition with minimal traffic disruption

Page 21: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

LABORATORY MIX DESIGN

• Liquid StabilizersFoamed Asphalt Asphalt Emulsion

• TestingGradationAsphalt ContentRetained Stability

Generally the design procedure takes 5 days to complete

Page 22: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

LABORATORY MIX DESIGN

● Portland Cement StabilizerDetermine the maximum dry density and optimum moisture content

o Typical designs vary between 3 and 5 percent cement by weight of dry material

o Cure and Break Samples

Generally the design procedure takes 7 days to complete

Page 23: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

● Unconfined Compressive Strength Testing

7- day strengths ranging from200 psi to 400 psi are generallyrecommended

Proven strength (support) under Extremely heavy traffic conditions

Proven performance (durability) inwet-dry and freeze-thaw environments

LABORATORY MIX DESIGN

Page 24: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

REDUCED MOISTURE SUSCEPTIBILITY

Page 25: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

PORTLANT CEMENT STABILIZATION –Rt 125 Middlebury, VT

Project was completed before Hurricane Irene

Page 26: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

MONITORING DENSITY – COMPACTION

Page 27: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

WORKING AROUND STRUCTURES

Page 28: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

FDR IMPROVEMENTS

• Completed Projects Improve

Longevity for wearing course by strengthening the underlying structural capacityCross Slope and ProfileDrainage Capabilities Ride Quality

Page 29: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

WEARING COURSE OPTIONS

• Hot Mix Asphalt – (HMA)• Warm Mix Asphalt – (WMA)• Cold Mix Paving• Chip Seal Application

Page 30: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

FDR IN ACTION

Page 31: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

FDR STABILIZATION IN ACTION

Page 32: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

ROCKY MOUNTAIN NATIONAL PARK, COFoamed Asphalt Stabilization

Page 33: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

VIRGINIA I-81 Cold in Place Project

Page 34: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

DUTCHESS COUNTY DPWWearing Course Application -2” HMA Over Stabilized Base

Page 35: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

ULSTER COUNTY DPWWearing Course Application - Cold Mix Paving Over FDR Stabilized Base

Page 36: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

ESSEX COUNTY DPWWearing Course Application – Seal Coat Over FDR Stabilized Base

Page 37: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

ORANGE COUNTY DPWAdding Additional Aggregates/Glass To Be Remixed By Reclaimer

Page 38: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

MAINE DOTFoamed Asphalt Stabilization

Page 39: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

BOROUGH OF PARAMUS, NJFoamed Asphalt Stabilization

Page 40: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

TOWN OF LLOYDCompleted Foamed Asphalt Stabilized Base

Page 41: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

TOWN OF SAUGERTIESAsphalt Emulsion Stabilization

Page 42: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

TOWN OF MONTGOMERY Liquid Calcium Chloride Stabilization

Page 43: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

RANDOLPH TOWNSHIP, NJPortland Cement Stabilization

Page 44: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

CITY OF BEACONRemoving Pulverized Material To Lower Grade

Page 45: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

ADIRONDACK AIRPORT RUNWAYSaranac, NY

Page 46: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

WESTCHESTER COUNTY CONDOMINIUMSRecycling Tennis Court Project

Page 47: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

PUTNAM COUNTY GOLF COURSERecycling Cart Paths

Page 48: FULL DEPTH RECLAMATION -  · PDF fileFull Depth Reclamation master.pptx ... Grader Roller Athey. ... Phone: 845-331-6500 Fax: 845-331-3330  . Title:

Full Depth Reclamation master.pptx

Questions?Please contact:

Michael HaggertyReclamation, LLC

P.O. Box 292

West Hurley, NY 12491

Phone: 845-331-6500

Fax: 845-331-3330

www.reclamation.net