Foothills Stream Crossing Partnership

Geotextile Reinforced Soil Arch Photo Gallery

Hardisty Creek – July 2009

www.foothillsresearchinstitute.ca

Page 2: Fscp 2009 07 photogall hardistycreekdemosite

View of outlet before construction with a hanging

culvert

Page 3: Fscp 2009 07 photogall hardistycreekdemosite

Removal of the culvert

Page 4: Fscp 2009 07 photogall hardistycreekdemosite

Removal of the culvert

Page 5: Fscp 2009 07 photogall hardistycreekdemosite

Removal of the culvert

Page 6: Fscp 2009 07 photogall hardistycreekdemosite

Installing a temporary net to

prevent fish from moving

upstream during

construction

Page 7: Fscp 2009 07 photogall hardistycreekdemosite

Installing the temporary net

Page 8: Fscp 2009 07 photogall hardistycreekdemosite

Stream diversion ditch upstream

Page 9: Fscp 2009 07 photogall hardistycreekdemosite

Geotextile lined diversion ditch to prevent scouring

of forest floor

Page 10: Fscp 2009 07 photogall hardistycreekdemosite

Downstream diversion ditch in action

Page 11: Fscp 2009 07 photogall hardistycreekdemosite

View of the diversion ditch outlet. A culvert was

placed under the road and upon construction

completion, turned into a French Drain

Page 12: Fscp 2009 07 photogall hardistycreekdemosite

Metal Cages

Page 13: Fscp 2009 07 photogall hardistycreekdemosite

Metal cages layered with geotextile to contain the

compacted soil

Page 14: Fscp 2009 07 photogall hardistycreekdemosite

Placement of metal cages to prepare for another

layer of soil

Page 15: Fscp 2009 07 photogall hardistycreekdemosite

Steel anchors used to

secure the arch once in the

streambed

Page 16: Fscp 2009 07 photogall hardistycreekdemosite

Construction of the arch,

pieces must be aligned

Page 17: Fscp 2009 07 photogall hardistycreekdemosite

Construction of the metal arch

Page 18: Fscp 2009 07 photogall hardistycreekdemosite

Construction of the metal arch before installation

Page 19: Fscp 2009 07 photogall hardistycreekdemosite

Placement of boulders into streambed where the

culvert was previously

Page 20: Fscp 2009 07 photogall hardistycreekdemosite

Placement of Arch - Placement of the first arch piece

into the streambed

Page 21: Fscp 2009 07 photogall hardistycreekdemosite

Preparing to release the stream into the stream

diversion ditch

Page 22: Fscp 2009 07 photogall hardistycreekdemosite

Compressing the bank to allow the water to flow

through the diversion ditch

Page 23: Fscp 2009 07 photogall hardistycreekdemosite

View of arch from downstream side during

construction

Page 24: Fscp 2009 07 photogall hardistycreekdemosite

Compaction of soil around the arch

Page 25: Fscp 2009 07 photogall hardistycreekdemosite

Compaction of soil around the arch

Page 26: Fscp 2009 07 photogall hardistycreekdemosite

Rocks after washing the sediment surrounding them

to prevent sediment from entering the creek

Page 27: Fscp 2009 07 photogall hardistycreekdemosite

View of arch from water level facing downstream

Page 28: Fscp 2009 07 photogall hardistycreekdemosite

Inside Arch - View inside of the arch after

construction

Page 29: Fscp 2009 07 photogall hardistycreekdemosite

Coconut matting, silt fencing and rip rap was used

as sediment control at the outlet

Page 30: Fscp 2009 07 photogall hardistycreekdemosite

Outlet - View of outlet after construction

Page 31: Fscp 2009 07 photogall hardistycreekdemosite

Inlet from Left Upstream - View of inlet upon

completion of construction

Page 32: Fscp 2009 07 photogall hardistycreekdemosite

Inlet from Right Upstream - View of inlet upon

completion of construction

Page 33: Fscp 2009 07 photogall hardistycreekdemosite

Inlet - View of inlet

Page 34: Fscp 2009 07 photogall hardistycreekdemosite

Inlet - Arch inlet after completion of construction

Page 35: Fscp 2009 07 photogall hardistycreekdemosite

View of inlet as a semi-truck passes over

Page 36: Fscp 2009 07 photogall hardistycreekdemosite

View of the road after construction

Page 37: Fscp 2009 07 photogall hardistycreekdemosite

Interpretive Signs at Crossing

Page 38: Fscp 2009 07 photogall hardistycreekdemosite

Panel 1

Page 39: Fscp 2009 07 photogall hardistycreekdemosite

Panel 2

Page 40: Fscp 2009 07 photogall hardistycreekdemosite

Panel 3

Page 41: Fscp 2009 07 photogall hardistycreekdemosite

Signs with crossing in background