From: Khanna. Meena To: Auluck. Raiender Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00 PM Attachments: North Anna Earthquake Issue Commissioner Briefing final.ootx From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 AM To: Wilson, George Subject: North Anna Earthquake Issue Commissioner Briefing final with talking points

Upload: others

Post on 25-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

From: Khanna. MeenaTo: Auluck. RaienderSubject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking pointsDate: Tuesday, August 30, 2011 4:29:00 PMAttachments: North Anna Earthquake Issue Commissioner Briefing final.ootx

From: Khanna, MeenaSent: Tuesday, August 30, 2011 9:56 AMTo: Wilson, GeorgeSubject: North Anna Earthquake Issue Commissioner Briefing final with talking points

Page 2: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

North Anna Nuclear PowerPlant Se ismic Event

Presentation to the Commissioners

August 30 and September 1,2011

Page 3: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

* North Anna Nuclear Power Plant (NANPP) has twoDesign Basis Earthquake (DBE)* values

* Structures, systems,founded on top of roc

and components (SSCs):k, anchored at 0.12 g

m SSCs founded on top of soil, anchored .at 0.18 g

m NANPP has two corresponding Operating BasisEarthquake (OBE) values, anc:hored at 0.06 g

is 1/2 of the DBE)for

rock and 0.09 g for soil (OBE

* Design Basis Earthquake means the same as Safe Shutdown Earthquake

2

Page 4: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

" On August 23, 2011, North Anna Power Station declared an Alertdue to significant seismic activity onsite from an earthquakewhich had a measured magnitude of 5.8.

* The licensee conducted the 1 st general walkdown of the plant asrequired by the North Anna Power Station abnormal procedurefor seismic event.

* The licensee conducted the 2nd walkdown after the magnitude4.5 aftershock.

* Seismic Response Spectrum Recorder (scratch plate) readingsidentified that the Design Basis Earthquake had been exceededat certain frequencies.

* On August 26, the licensee declared all safety-related SSCs ofUnits 1 and 2 inoperable and issued a 10 CFR 72 Notification

3

Page 5: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

" Exceedance of the DBE is an unprecedented event at an operatingunit

" However, while Perry Unit was under construction, an earthquakeoccurred that exceeded SSE at high frequency (15hz)

A special safety inspection was conducted by the NRC's Region III Staffon February 5-7, 1986. See Inspection Reports 50-440/86005 and 50-440/86006. This included a post-earthquake walkdown and visualinspection of an extensive list of safety-related systems andcomponents.

" NRC staff performed independent analysis (See Figure 1)

4

Page 6: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

2.0 i-i I . .,.I i 4.-

C,)

C-)C-)

C,)

1.5-

1.0-

0.5-

NA Unit I &2 Rock SSE (Newmark at 0.1 2g)

OBE (1/2 SSE)

NA Unit 3 COL GMRS

0 USGS (ShakeCast Report Version 7)

- EPRI GMPE(2004, 2006) MW5.8 at 19ki /o - median and + I sd

//

//

//

/I-

.1/

\N

/

0.0 1.0.1

I-I I

1 10

frequency (Hz)100 5

Page 7: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

" Appendix A to Part 100-Paragraph V(a)(2),"Determination of Operating Basis Earthquake"(this regulation does not specifically addressbeyond design basis events.)

* RG 1.166, "Pre-earthquake Planning andImmediate Nuclear Power Plant Operator Post-earthquake Actions" references EPRI NP-6695,"Guidelines for Nuclear Plant Response to anEarthquake"

" RG 1.167, "Restart Of A Nuclear Power Plant ShutDown By A Seismic Event"

6

Page 8: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

* The staff will use RG 1.166, "Pre-earthquakePlanning and Immediate Nuclear Power PlantOperator Post-earthquake Actions" as guidance inevaluating the licensee's response to the seismicevent.

* Information from NANPP's seismic recordings willbe utilized by the staff to assist in theassessment of the licensee's operabilitydetermination

7

Page 9: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

m AIT was dispatched today, which will beconducted in accordance with MD 8.3, "NRCIncident Investigation Program."

m Objectives of the AIT include:" Collect, analyze and document factual information and

evidence" Assess licensee's actions and plant equipment response

during the earthquake and aftershocks

" Identify generic issues associated with the event

" Conduct independent extent of condition review

" Collect information to support final determination of risksignificance of event

8

Page 10: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

* Appendix A to Part 100-Paragraph V(a)(2) states, "Ifvibratory ground motion exceeding that of the OperatingBasis Earthquake occurs, shutdown of the nuclear powerplant will be required.

Prior to resuming operations, the licensee will be required todemonstrate to the Commission that no functional damageoccurred to those features necessary for continued operationwithout undue risk to the health and safety of the public.5 "

* Staff will utilize RG and EPRI guidance to assess whether.Appendix A to Part 100 criteria are met.

9

Page 11: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

* Staff will utilize appropriate regulatory actions toensure that the licensee takes adequate actionsto ensure that the regulatory requirements inAppendix A of Part 100 are met." Confirmatory Order

" Order/Adequate Protection

10

Page 12: From: Khanna, Meena Sent: Tuesday, August 30, 2011 9:56 …Subject: FW: North Anna Earthquake Issue Commissioner Briefing final with talking points Date: Tuesday, August 30, 2011 4:29:00

m The list below provides the plants and theassociated distance from the Epicenter:m North Anna is 18 km from the Epicenter

m Surry is 139 km from the Epicenter

m Calvert Cliffs is 141 km from the Epicenter

* NRR will confirm that the OBE was not exceededat Surry and Calvert Cliffs.

11