FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

Upload: sharlene-gardner

Post on 24-Dec-2015

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

FRGP/UPoP/BiSON

1

Marla Meehl

Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON

CENIC Meeting – 3/11/13

Page 2: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

2

Acronym soup• University Corporation for

Atmospheric Research (UCAR) – 501 (c) 3 not for profit– National Center for Atmospheric Research

(NCAR)– Front Range GigaPoP (FRGP)– UCAR Point of Presence (UPoP)– Bi-State Optical Network (BiSON)

Page 3: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

3

Front Range GigaPoP (FRGP)• http://www.frgp.net

• 12 years of operation by UCAR NETS• 12 members• Covers Colorado and Wyoming• All major public and private universities

and federal research organizations• Formal management and technical

committees, but not formal board• Partner in Western Regional Network

(WRN) with CENIC, UNM, PNWGP, UH, LEARN

Page 4: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

FRGP – Cont’d• Cost based with minimal overhead• 3 dedicated engineers• Management, accounting, legal,

contracts covered out of overhead currently but being revisited

• Member of the Quilt• Support Colorado SEGP – shared funding• Shared commodity, I2, and NLR with

WRN• Only serve non-profits

4

Page 5: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

5

FRGP members• Colorado School of Mines• Colorado State University System• National Oceanic and Atmospheric Administration

(NOAA-Boulder)• State of Colorado• University Corporation for Atmospheric Research• University NAVSTAR Consortium (UNAVCO)• University of Colorado Boulder• University of Colorado Colorado Springs• University of Colorado Denver• University of Denver• University of Northern Colorado• University of Wyoming

Page 6: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

FRGP

4

• Upgraded all routing hardware to Juniper MX480s – support 10, 40, 100Gbps

• Colocation updates– 1850 Pearl– 1200 Larimer– 910 15th (moved colocation from 10th to 6th floor)

• peering– 10G Google peering active at 910– Comcast - decreasing in importance– TR/CPS – largest single FRGP/UPoP usage– Akamai – Netflix – in progress with the help of CENIC

Page 7: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

FRGP - DYNES

4

• DYNES• UCB – pending scientific application

activation• CSU awaiting hardware and config• http://www.internet2.edu/ion/dynes.h

tml

Page 8: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

8

UCAR Point of Presence (UPoP)

• 5 years of operation by UCAR NETS• 21 members• K-12s, smaller colleges, community

colleges, small not for profits• No direct voice in governance• http://upop.ucar.edu

Page 9: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

9

UPoP members• ARTstor• Auraria Higher Education Center• Colorado Association of Research Libraries• City of Boulder• City and County of Denver• Colorado Community College System• Colorado Telehealth Network• Community College of Denver• Colorado Department of Higher Education• Colorado Mountain College• Denver Health and Hospital Authority• EAGLE-Net

Page 10: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

10

UPoP members• Fort Lewis College• Front Range Internet, Inc. (two school districts)• Metropolitan State University of Denver• Open Media Foundation• St. Mary's Academy• Science and Technology in Atmospheric

Research (STAR) Institute• United States Antarctic Program (USAP)• University of Colorado Hospital• University Information Systems (UIS)

Page 11: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

National Ecological Observatory Network (NEON)

4

• Boulder HQ connection• national build out /project• FRGP/UPoP involvement pending

fiber path• http://www.neoninc.org/

Page 12: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

National Renewable Energy Laboratory (NREL)

4

• Golden, CO headquarters• Interactions with the University of

Colorado• FRGP/UPoP involvement pending

fiber path• http://www.neoninc.org/

Page 13: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

Bi-State Optical Network (BiSON)

4

• Covers northern Colorado, UW, and NWSC• Had to expand to integrate NWSC• Expanding to include Colorado School of Mines

• Fiber segments owned by multiple entities

• end of service replacement in 3-5 years• building equipment fund for replacement by 2017

• Major fiber move on BiSON-owned Mcleod fiber 10/13• Looking at move and replacement options• Operate this span of fiber

Page 14: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

14

Page 15: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13
Page 16: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

Yellowstone fully operational as of 11/12- 1.5 petaflops supercomputer- (1.5 quadrillion operations per second)

Page 17: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13
Page 18: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

Have had issues with infinband cabling and firmware levels, but performing well now

Page 19: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

NWSC

4

• NCAR Wyoming Supercomputing Center– http://nwsc.ucar.edu/

• http://www2.cisl.ucar.edu/resources/yellowstone

• http://www2.cisl.ucar.edu/resources/yellowstone/hardware

Page 20: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

NOAA N-Wave

4

• 10G / MPLS backbone – 100G upgrade path

• Internet2 and NLR DWDM for backbone circuits

• waves on various RENs for access• http://noc.nwave.noaa.gov/

Page 21: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

CTN

4

• CTN– http://www.cotelehealth.com/

• meetings pending on future options– sustainability, services, locations– RFP open for network operator– FRGP/UPoP connectivity

Page 22: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

BTOP

4

• EAGLE-Net – awarded BTOP for Colorado

• In progress however on hold for environmental assessments

• $100M• Connect 178 school districts• Complete by 8/13• Will provide most of CAI growth to

FRGP/UPoP

Page 23: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

Futures/Challenges

• New agreements and new algorithms in 2014

• BiSON growth, upgrade, funding• Supporting/funding services –

NET+, etc.• Statewide coordination – leadership

at state level in Colorado• Replacing expiring fiber IRUs• Supporting/funding 40/100Gbps 18

Page 24: FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13

Discussion