fraunhofer visit | may 2013

13
Fraunhofer visit | May 2013 nan FIP project Eva Gousiou BE/CO-HT FieldDrive Validation

Upload: felice

Post on 13-Feb-2016

34 views

Category:

Documents


1 download

DESCRIPTION

Fraunhofer visit | May 2013. nan FIP project. FieldDrive Validation. Eva Gousiou BE/CO-HT. WorldFIP & the FielDrive. WorldFIP FIELDBUS. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Fraunhofer  visit | May 2013

Fraunhofer visit | May 2013

nan FIP project

Eva GousiouBE/CO-HT

FieldDrive Validation

Page 2: Fraunhofer  visit | May 2013

WorldFIP & the FielDrive

2

WorldFIP FIELDBUS

WorldFIPMaster

WFIPagent

sensor

FIEDRIVE

WFIPagent

sensor

FIEDRIVE

WFIPagent

sensor

FIEDRIVE

Page 3: Fraunhofer  visit | May 2013

WorldFIP & the FielDrive

3

WorldFIP FIELDBUS

WorldFIPMaster

WFIPagent

sensor

FIEDRIVE

WFIPagent

sensor

FIEDRIVE

WFIPagent

sensor

FIEDRIVE

o 4’000 purchased devices

o No information yet on the number of different batches

o Analog and digital part

o Used always in companion with WFIP agent with TID lifetime 400

Gy

o No dedicated tests, but there is some confidence

o Several groups tested at CNGS, LHC

o Parasitically 2 devices at PSI; up to 400 Gy and up to 700 Gy

Page 4: Fraunhofer  visit | May 2013

Preliminary Test PlanCo60 Passive Tests

4

Passive Tests

o Steps at 200 | 400 | 600 | 800 Gy

o For each step 5 devices per batch

o Devices delivered at CERN for validation on NFTC board

o Components and NFTC validation board available in ~ 1 month

Page 5: Fraunhofer  visit | May 2013

Preliminary Test PlanCo60 Active Tests

5

Active Tests

o Irradiation of FIPdiag boards

o Boards should be failing at WFIP agent lifetime 400 Gy

o 10 boards available

Page 6: Fraunhofer  visit | May 2013

Preliminary Test PlanCo60 Active Tests Setup

6

Control Room

Master

FIELDBUS

Page 7: Fraunhofer  visit | May 2013

Preliminary Test PlanCo60 Active Tests Setup

7

Control Room

Master

FIELDBUS

Page 8: Fraunhofer  visit | May 2013

Preliminary Test PlanCo60 Active Tests Setup

8

Control Room

Master

FIELDBUS

Page 9: Fraunhofer  visit | May 2013

Control Room

Preliminary Test PlanCo60 Active Tests Setup

9

Control Room

Master

FIELDBUS

9V50m

USB50m

Page 10: Fraunhofer  visit | May 2013

Extras

Page 11: Fraunhofer  visit | May 2013

FielDrive FieldTR tests

11

o Study of failures of the digital parts

o PSI targeted beam

o ~5 nanoFIP test boards

o Study of failures of the analog parts

o Fraunhofer; irradiation of complete boards

o ~5 nanoFIPdiag boards

Page 12: Fraunhofer  visit | May 2013

WorldFIP, microFIP & nanoFIP (I)

o WorldFIP is a real-time fieldbus used at CERN's LHC for a variety of control systems: Cryogenics, Power Converters, Quench Protection, Beam Instrumentation, Radiation Monitoring, Survey

o More than 10000 WorldFIP client nodes (agents) and 200 WorldFIP master nodes installed in the LHC

o WorldFIP was selected because of the good performance of its agents under radiation

12

FIELDBUS

…WFIPagent

WorldFIPMaster

Userlogic

WorldFIP Architecture

sensor

WFIPagent

Userlogic

actuator

FIELDRIVEFIELDTR

WFIPagent

Userlogic

sensor

FIELDRIVEFIELDTR

FIEDRIVEFIELDTR

FIELDRIVEFIELDTR

Page 13: Fraunhofer  visit | May 2013

WorldFIP, microFIP & nanoFIP (I)

o WorldFIP is a real-time fieldbus used at CERN's LHC for a variety of control systems: Cryogenics, Power Converters, Quench Protection, Beam Instrumentation, Radiation Monitoring, Survey

o More than 10000 WorldFIP client nodes (agents) and 200 WorldFIP master nodes installed in the LHC

o WorldFIP was selected because of the good performance of its agents under radiation

13

FIELDBUS

WFIPagent

WorldFIPMaster

WorldFIP Architecture

sensor

FIEDRIVE FIELDRIVEFIELDTR

WFIPagent

sensor

FIEDRIVE

WFIPagent

sensor

FIEDRIVE