FRATT ELEMENTARY SCHOOL Three-Pronged Approach for Improving Student Achievement Our long-range plan uses a three-pronged approach for improving student achievement: Strong Academics Resources Aligned to our Vision Excellent Learning Environments If passed, the referendum would provide the funding needed to make the following improvements at Fratt: SAFETY & SECURITY: Create new secure entrance and office for improved parent access Replace fire alarm, clock, video and PA systems LEARNING SPACES: Reconfigure existing office into Classroom Repurpose existing gym for Music and STEM lab Replace coat hooks with cubbies BUILDING ADDITIONS: Build new gymnasium and student support offices Add new playground, offices and receiving area INFRASTRUCTURE: Refresh building interiors (LED lighting, flooring, ceilings, casework, paint walls) Address building maintenance (doors, roofing, HVAC updates, exterior masonry and concrete, retro-commissioning)

Upload: others

Post on 14-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FRATT ELEMENTARY SCHOOL · (Schulte) New Elementary School (Red Apple) Close Giese ES Hammes Field Improvements Misc. Life Safety, ADA and Deferred Maintenance RUSD Long Step 2 New

FRATT ELEMENTARY SCHOOL

Three-Pronged Approach for Improving Student Achievement Our long-range plan uses a three-pronged approach for improving student achievement:

• Strong Academics • Resources Aligned to our Vision • Excellent Learning Environments

If passed, the referendum would provide the funding needed to make the following improvements at Fratt: SAFETY & SECURITY:

• Create new secure entrance and office for improved parent access • Replace fire alarm, clock, video and PA systems

LEARNING SPACES:

• Reconfigure existing office into Classroom • Repurpose existing gym for Music and STEM lab • Replace coat hooks with cubbies

BUILDING ADDITIONS:

• Build new gymnasium and student support offices • Add new playground, offices and receiving area

INFRASTRUCTURE:

• Refresh building interiors (LED lighting, flooring, ceilings, casework, paint walls)

• Address building maintenance (doors, roofing, HVAC updates, exterior masonry and concrete, retro-commissioning)