franklin and marshall college - franklin & marshall · disability services 71.00 3/6/17 5/15/17...

4
Activity Name Duration (Days) Start Date Finish Date Project Manager 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 May 17 Jun 17 Jul 17 Aug 17 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 Residence Halls 108.00 5/8/17 8/23/17 Residence Halls Close 11AM 0.00 5/8/17 5/8/17 Ben Franklin South 48.00 6/19/17 8/5/17 CTY Staff 48.00 6/19/17 8/5/17 6/19/17 8/5/17 CTY session 1 students 21.00 6/25/17 7/15/17 6/25/17 7/15/17 CTY session 2 students 21.00 7/16/17 8/5/17 7/16/17 8/5/17 Ben Franklin North 58.00 6/9/17 8/5/17 Camp / Group 4.00 6/9/17 6/12/17 6/9/17 6/12/17 CTY Staff 48.00 6/19/17 8/5/17 6/19/17 8/5/17 CTY session 1 students 21.00 6/25/17 7/15/17 6/25/17 7/15/17 CTY session 2 students 21.00 7/16/17 8/5/17 7/16/17 8/5/17 Buchanan 90.00 5/8/17 8/5/17 Install new Elevator 82.00 5/8/17 7/28/17 Sheldon Wenger Replace hallway carpet (G,1,2,3) 12.00 5/15/17 5/26/17 Sheldon Wenger Camp / Group 7.00 6/11/17 6/17/17 6/11/17 6/17/17 Camp / Group 4.00 6/22/17 6/25/17 6/22/17 6/25/17 Camp / Group 5.00 6/28/17 7/2/17 6/28/17 7/2/17 Important Dates May 13: Commencement May 27: All Campus Power Shut Down August 14: Early Arrival Begins Camp / Group 3.00 7/10/17 7/12/17 7/10/17 7/12/17 Camp / Group 3.00 7/14/17 7/16/17 7/14/17 7/16/17 Camp / Group 14.00 7/23/17 8/5/17 7/23/17 8/5/17 Dietz 67.00 6/18/17 8/23/17 Sheldon Wenger Wireless Network Upgrade 6.00 8/18/17 8/23/17 Alan Sutter Camp / Group 7.00 6/18/17 6/24/17 6/18/17 6/24/17 Camp / Group 5.00 6/28/17 7/2/17 6/28/17 7/2/17 Camp / Group 28.00 7/9/17 8/5/17 7/9/17 8/5/17 Marshall 82.00 5/8/17 7/28/17 Sheldon Wenger Install new Elevator 82.00 5/8/17 7/28/17 Wireless Network Upgrade 33.00 5/8/17 6/9/17 Alan Sutter Camp / Group 17.88 6/11/17 6/28/17 6/11/17 6/28/17 Camp / Group 27.88 7/1/17 7/28/17 7/1/17 7/28/17 New College House 63.00 6/5/17 8/6/17 Wireless Network Upgrade 5.00 6/5/17 6/9/17 Alan Sutter Camp / Group 8.00 6/11/17 6/18/17 6/11/17 6/18/17 CTY Admin Staff 49.00 6/19/17 8/6/17 6/19/17 8/6/17 CTY Staff 45.00 6/21/17 8/4/17 6/21/17 8/4/17 Phi Kappa Psi 89.00 5/15/17 8/11/17 Roof repairs 60.75 6/1/17 7/31/17 Bill Stark Fire Alarm Upgrade 89.00 5/15/17 8/11/17 Dick Denlinger Porch repairs 61.00 6/1/17 7/31/17 Bill Stark Residence Halls - annual painting 58.00 6/15/17 8/11/17 Bill Stark Schnader 84.00 5/8/17 7/30/17 Sheldon Wenger Create 4 Gender Neutral Bathrooms 46.00 5/8/17 6/22/17 Install new Elevator 82.00 5/8/17 7/28/17 Camp / Group 8.00 6/4/17 6/11/17 6/4/17 6/11/17 Camp / Group 14.00 6/18/17 7/1/17 6/18/17 7/1/17 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Tuesday, April 18, 2017 Page 1 of 4 Franklin and Marshall College Summer 2017 Master Schedule of Project Work and Residence Hall Occupation Jonathan Enos Capital Projects Manager

Upload: others

Post on 16-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Franklin and Marshall College - Franklin & Marshall · Disability Services 71.00 3/6/17 5/15/17 Sheldon Wenger Old Main 96.00 5/15/17 8/18/17 President's Office 96.00 5/15/17 8/18/17

Activity Name Duration (Days) Start Date Finish

Date Project Manager7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27

May 17 Jun 17 Jul 17 Aug 17

7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27

Residence Halls 108.00 5/8/17 8/23/17

Residence Halls Close 11AM 0.00 5/8/17 5/8/17

Ben Franklin South 48.00 6/19/17 8/5/17CTY Staff 48.00 6/19/17 8/5/17 6/19/17 8/5/17

CTY session 1 students 21.00 6/25/17 7/15/17 6/25/17 7/15/17

CTY session 2 students 21.00 7/16/17 8/5/17 7/16/17 8/5/17

Ben Franklin North 58.00 6/9/17 8/5/17Camp / Group 4.00 6/9/17 6/12/17 6/9/17 6/12/17

CTY Staff 48.00 6/19/17 8/5/17 6/19/17 8/5/17

CTY session 1 students 21.00 6/25/17 7/15/17 6/25/17 7/15/17

CTY session 2 students 21.00 7/16/17 8/5/17 7/16/17 8/5/17

Buchanan 90.00 5/8/17 8/5/17Install new Elevator 82.00 5/8/17 7/28/17 Sheldon Wenger

Replace hallway carpet (G,1,2,3) 12.00 5/15/17 5/26/17 Sheldon Wenger

Camp / Group 7.00 6/11/17 6/17/17 6/11/17 6/17/17

Camp / Group 4.00 6/22/17 6/25/17 6/22/17 6/25/17

Camp / Group 5.00 6/28/17 7/2/17 6/28/17 7/2/17Important DatesMay 13: CommencementMay 27: All Campus Power Shut DownAugust 14: Early Arrival Begins

Camp / Group 3.00 7/10/17 7/12/17 7/10/17 7/12/17

Camp / Group 3.00 7/14/17 7/16/17 7/14/17 7/16/17

Camp / Group 14.00 7/23/17 8/5/17 7/23/17 8/5/17

Dietz 67.00 6/18/17 8/23/17 Sheldon Wenger

Wireless Network Upgrade 6.00 8/18/17 8/23/17 Alan Sutter

Camp / Group 7.00 6/18/17 6/24/17 6/18/17 6/24/17

Camp / Group 5.00 6/28/17 7/2/17 6/28/17 7/2/17

Camp / Group 28.00 7/9/17 8/5/17 7/9/17 8/5/17

Marshall 82.00 5/8/17 7/28/17 Sheldon Wenger

Install new Elevator 82.00 5/8/17 7/28/17

Wireless Network Upgrade 33.00 5/8/17 6/9/17 Alan Sutter

Camp / Group 17.88 6/11/17 6/28/17 6/11/17 6/28/17

Camp / Group 27.88 7/1/17 7/28/17 7/1/17 7/28/17

New College House 63.00 6/5/17 8/6/17Wireless Network Upgrade 5.00 6/5/17 6/9/17 Alan Sutter

Camp / Group 8.00 6/11/17 6/18/17 6/11/17 6/18/17

CTY Admin Staff 49.00 6/19/17 8/6/17 6/19/17 8/6/17

CTY Staff 45.00 6/21/17 8/4/17 6/21/17 8/4/17

Phi Kappa Psi 89.00 5/15/17 8/11/17Roof repairs 60.75 6/1/17 7/31/17 Bill Stark

Fire Alarm Upgrade 89.00 5/15/17 8/11/17 Dick Denlinger

Porch repairs 61.00 6/1/17 7/31/17 Bill Stark

Residence Halls - annual painting 58.00 6/15/17 8/11/17 Bill Stark

Schnader 84.00 5/8/17 7/30/17 Sheldon Wenger

Create 4 Gender Neutral Bathrooms 46.00 5/8/17 6/22/17

Install new Elevator 82.00 5/8/17 7/28/17

Camp / Group 8.00 6/4/17 6/11/17 6/4/17 6/11/17

Camp / Group 14.00 6/18/17 7/1/17 6/18/17 7/1/17

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

Tuesday, April 18, 2017Page 1 of 4

Franklin and Marshall CollegeSummer 2017 Master Schedule of Project Work

and Residence Hall Occupation

Jonathan EnosCapital Projects Manager

Page 2: Franklin and Marshall College - Franklin & Marshall · Disability Services 71.00 3/6/17 5/15/17 Sheldon Wenger Old Main 96.00 5/15/17 8/18/17 President's Office 96.00 5/15/17 8/18/17

Activity Name Duration (Days) Start Date Finish

Date Project Manager7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27

May 17 Jun 17 Jul 17 Aug 17

7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27

Camp / Group 2.88 7/16/17 7/18/17 7/16/17 7/18/17

Camp / Group 3.88 7/24/17 7/27/17 7/24/17 7/27/17

Camp / Group 4.00 7/27/17 7/30/17 7/27/17 7/30/17

Thomas 96.00 5/8/17 8/11/17 Jon Enos

complete renovation, including redesigned bathrooms, lounges and HVAC unit and infrastructure replacement

95.75 5/8/17 8/11/17

Fire Alarm Upgrade 96.00 5/8/17 8/11/17 Perry Scheid

Wireless Network Upgrade 50.00 6/12/17 7/31/17 Alan Sutter

Weis 102.00 5/8/17 8/17/17Create 3 Gender Neutral Bathrooms 46.00 5/8/17 6/22/17 Sheldon Wenger

Remove carpet/Install LVT in student rooms 46.00 5/8/17 6/22/17 Sheldon Wenger

Replace Electric cables 46.00 5/8/17 6/22/17 Pat Henry

Replace ceilings in bathrooms 46.00 5/8/17 6/22/17 Bill Stark

Shades for Great Room 18.00 5/15/17 6/1/17 Bill Stark

Wireless Network Upgrade (east) 24.00 5/8/17 5/31/17 Alan Sutter

Wireless Network Upgrade (west) 11.00 8/7/17 8/17/17 Alan Sutter

CTY Staff 48.00 6/19/17 8/5/17 6/19/17 8/5/17

CTY session 1 students 21.00 6/25/17 7/15/17 6/25/17 7/15/17

CTY session 2 students 21.00 7/16/17 8/5/17 7/16/17 8/5/17

Academic Buildings 222.00 1/3/17 8/12/17Barshinger Musical Arts 148.00 2/20/17 7/17/17 Bill Stark

Slate roof repairs 40.00 2/20/17 3/31/17

Paint lower portion of the cupola 64.00 5/15/17 7/17/17 Bill Stark

Barshinger LSP 33.00 5/15/17 6/16/17Selected rooms lighting 33.00 5/15/17 6/16/17 Pat Henry

Paint hallways, replace doorframe (basement, 1st floor)

19.00 5/15/17 6/2/17 Bill Stark

Important DatesMay 13: CommencementMay 27: All Campus Power Shut DownAugust 14: Early Arrival Begins

Hackman 61.00 5/15/17 7/14/17Upgrade classroom 131 and lighting in classroom 111

61.00 5/15/17 7/14/17 Bill Stark, Dick Denliger, Pat Henry

Joseph International Center 122.00 3/15/17 7/14/17Painting 61.00 5/15/17 7/14/17 Sheldon Wenger

Replace house trap 17.00 3/15/17 3/31/17 Don Yohe

Kauffman 54.00 5/15/17 7/7/17Selected rooms lighting, fan coil units 54.00 5/15/17 7/7/17 Don Yohe

Martin Library of the Sciences 54.00 5/15/17 7/7/17PA system 54.00 5/15/17 7/7/17

Shadek-Fackenthal Library 47.00 5/15/17 6/30/17Repair and replace glass on stair tower 19.00 5/15/17 6/2/17 Bill Stark

2nd floor classroom upgrade 46.00 5/16/17 6/30/17 John Coccia

PA system

Stager 153.00 3/13/17 8/12/17Attic Access 5.00 3/13/17 3/17/17 Bill Stark

Electrical Upgrade (new generator) 90.00 5/15/17 8/12/17 Dick Denlinger

Exterior painting 46.00 5/16/17 6/30/17 Sheldon Wenger

Classroom upgrades (215, 216, 217, 219) 46.00 5/16/17 6/30/17 Sheldon Wenger

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

80

81

82

83

84

85

86

87

88

Tuesday, April 18, 2017Page 2 of 4

Franklin and Marshall CollegeSummer 2017 Master Schedule of Project Work

and Residence Hall Occupation

Jonathan EnosCapital Projects Manager

Page 3: Franklin and Marshall College - Franklin & Marshall · Disability Services 71.00 3/6/17 5/15/17 Sheldon Wenger Old Main 96.00 5/15/17 8/18/17 President's Office 96.00 5/15/17 8/18/17

Activity Name Duration (Days) Start Date Finish

Date Project Manager7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27

May 17 Jun 17 Jul 17 Aug 17

7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27

TV Studio conversion (Lightboard Studio) 40.88 3/22/17 5/1/17 Bill Stark

Film Media Service / Classroom

Writer's House 172.00 1/3/17 6/23/17Interior painting - phase 1 25.00 1/3/17 1/27/17 Sheldon Wenger

Interior painting - phase 2 40.00 5/15/17 6/23/17 Sheldon Wenger

Athletics 186.75 2/6/17 8/11/17ASFC 55.88 6/6/17 7/31/17

Tile around pool 55.88 6/6/17 7/31/17 Don Yohe

Mayser 186.75 2/6/17 8/11/17HVAC Roof Unit replacement 40.00 2/6/17 3/17/17 Don Yohe

Replace Roof G 9.00 7/24/17 8/1/17 Bill Stark

Replace Roof H 9.88 7/18/17 7/27/17 Bill Stark

Replace Roof K & L 68.00 5/15/17 7/21/17

Replace exit doors at dance studio 57.75 6/15/17 8/11/17 Bill Stark

Core Campus 852.00 5/3/15 8/31/17Central Services 16.88 5/15/17 6/1/17

Commercial washer & dryer 16.88 5/15/17 6/1/17 Don Yohe

Ben's Dining 47.00 5/15/17 6/30/17 Bill Stark

E-Temp 46.00 5/15/17 6/29/17 Nic Auwaerter Important DatesMay 13: CommencementMay 27: All Campus Power Shut DownAugust 14: Early Arrival Begins

Equipment Upgrades 47.00 5/15/17 6/30/17 Perry Schied

Grease Trap replacement 14.88 5/17/17 5/31/17 Don Yohe

Distler - Zime 772.00 5/3/15 6/12/17

Brick repairs 29.00 5/15/17 6/12/17 Bill Stark

Window repairs 15.00 5/15/17 5/29/17 Bill Stark

Replace Trash enclosure 1.00 5/3/15 5/3/15

Business Office 93.00 5/15/17 8/15/17Replace back doors 93.00 5/15/17 8/15/17 Bill Stark

College Square 224.88 12/5/16 7/17/17Lighting replacement hallways, offices 63.88 5/15/17 7/17/17 Pat Henry

Heat Pump replacement 57.00 5/15/17 7/10/17 Don Yohe

Advancement phase 2 75.00 12/5/16 2/17/17 Sheldon Wenger

Disability Services 71.00 3/6/17 5/15/17 Sheldon Wenger

Old Main 96.00 5/15/17 8/18/17President's Office 96.00 5/15/17 8/18/17 Sheldon Wenger

Steinman College Center 839.00 5/3/15 8/18/17Gender Neutral Bathrooms 96.00 5/15/17 8/18/17 Sheldon Wenger

Mail Room access window 29.00 5/17/17 6/14/17 Bill Stark

Replace floor of freight elevator 1.00 5/3/15 5/3/15 Bill Stark

LED lighting 47.00 6/6/17 7/22/17Campus-wide conversion schedule 47.00 6/6/17 7/22/17 Dick Denlinger

Window Cleaning 151.00 4/3/17 8/31/17across campus 151.00 4/3/17 8/31/17 Bill Stark

Grounds 56.00 6/5/17 7/30/17Trash enclosures 30.00 6/5/17 7/4/17

Distler, TBD 30.00 6/5/17 7/4/17 Bill Stark

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

Tuesday, April 18, 2017Page 3 of 4

Franklin and Marshall CollegeSummer 2017 Master Schedule of Project Work

and Residence Hall Occupation

Jonathan EnosCapital Projects Manager

Page 4: Franklin and Marshall College - Franklin & Marshall · Disability Services 71.00 3/6/17 5/15/17 Sheldon Wenger Old Main 96.00 5/15/17 8/18/17 President's Office 96.00 5/15/17 8/18/17

Activity Name Duration (Days) Start Date Finish

Date Project Manager7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27

May 17 Jun 17 Jul 17 Aug 17

7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27

Parking Lots 30.00 7/1/17 7/30/17TBD lots and sidewalks 30.00 7/1/17 7/30/17 Ted Schmid

Rental Properties 424.88 5/2/16 6/30/17758 Pine St 29.88 6/1/17 6/30/17

Replace boiler 29.88 6/1/17 6/30/17 Don Yohe

College Ave Admin Office 95.88 5/2/16 8/5/16upgrade oil units to gas 95.88 5/2/16 8/5/16 Don Yohe

Other Properties 123.88 4/30/17 8/31/17President's Residence 123.88 4/30/17 8/31/17 Don Yohe

Replace boiler and building-wide AC system 123.88 4/30/17 8/31/17

Provost's Residence 29.88 6/1/17 6/30/17 Don Yohe

Replace boiler and hot water heater 29.88 6/1/17 6/30/17

Harbaugh House 88.88 5/15/17 8/11/17 Dick Denlinger

Replace Fire Alarm system 88.88 5/15/17 8/11/17

134

135

136

137

138

139

140

141

142

143

144

145

146

147

Tuesday, April 18, 2017Page 4 of 4

Franklin and Marshall CollegeSummer 2017 Master Schedule of Project Work

and Residence Hall Occupation

Jonathan EnosCapital Projects Manager