frankfurt (germany), 6-9 june 2011 kostiainen– fi – s3– 0622 paper 0622 towards self-healing...
TRANSCRIPT
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Paper 0622TOWARDS SELF-HEALING POWER DISTRIBUTION BY MEANS OF THE ZONE CONCEPT
Antti Kostiainen, ABB Oy, Finland, Presenter Pekka Manner, Fortum Oyj, Finland Kari Koivuranta, Fortum Oyj, Finland Göran Wiklund, ABB Oy, Finland
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Principles of the Zone Concept
Network control center
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Self-healing network
IEC 61850
Network topology
Communication
Fault location
Remote controllable devices
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Power reliability indices of the pilot case
Power reliability indices of the two pilot feeders in 2010
MAIFI 10,78 pcs /customer SAIDI 7,2 h /customer SAIFI 18,85 pcs /customer
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Feasibility of the pilot (ph.1) investment
Total investment of the pilot case is 134 000 €
* Customer Interruption Costs
Years Total CIC* savings in €
Profitability in €
1 28 000 - 106 000
2 55 000 - 80 000
3 79 000 - 56 000
4 101 000 - 33 000
5 122 000 - 12 000
6 142 000 7 000
7 159 000 25 000
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Case: System operation during a fault
Masala area has 20 remote controlled disconnector zones (red areas)
Masala area has two remote controlled re-closer protected zones (blue areas)
110 kV
20 kV
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
[0 s] A fault occurs
Case: Fault occurs110 kV
20 kV
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Case: Re-closer tries to clear out the fault
[0 s] A fault occurs [1 s] remote re-closer
operates
110 kV
20 kV
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Case: The system locates the fault
[0 s] A fault occurs [1 s] remote re-closer
operates [10 s] The system analyses
and localizes the fault
110 kV
20 kV
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Case: The fault is isolated in 1 min
[0 s] A fault occurs [1 s] remote re-closer
operates [10 s] The system analyses
and localizes the fault [1 min] remote controlled
disconnectors isolate the end of the feeder
110 kV
20 kV
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Case: Back-up restoration in 2 min
[0 s] A fault occurs [1 s] remote re-closer
operates [10 s] The system analyses
and localizes the fault [1 min] remote controlled
disconnectors isolate the end of the feeder
[2 min] remote controlled disconnector restores the power from another feeder
110 kV
20 kV
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Case: The service crew fixes the fault
[0 s] A fault occurs [1 s] remote re-closer
operates [10 s] The system analyses
and localizes the fault [1 min] remote controlled
disconnectors isolate the end of the feeder
[2 min] remote controlled disconnectors restore the power from another feeder
[~100 min] the service crew fixes the fault
110 kV
20 kV
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Case: Results
3 zones suffered an outage of <2min
1 zone suffered an outage of ~100 min
Without the advanced system, the fault would have been located with time consuming trial & error method total outage ~200 min
~1 min
~2 min
~100 min
0 min
110 kV 20 kV
~1 min
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Accurate fault location, including also earth faults, is crucial for fast fault isolation
Fast fault isolation enables fast power restoration SAIDI improvement
Local automation confines the impact of a network fault to the limited area SAIFI improvement
Utilize all ”senses” and use them to support each other.
Conclusive statements
Frankfurt (Germany), 6-9 June 2011
KOSTIAINEN– FI – S3– 0622
Thank You for your attention