Frank F. Hejazi Architect. Façade Improvements. Existing Conditions 1st Floor Facing South. Left Wing. Right Wing. Metal Sun Screens. Metal Sun Screen. Fabric Sun Screen. View from inside out through Fabric Screens. 3. Mechanical Air Louvers used overhead. 1. 2. Canopy. 4. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Frank F. Hejazi Architect

Frank F. Hejazi Architect

Façade Improvements

Page 2: Frank F. Hejazi Architect

Existing Conditions 1st Floor Facing South

Page 3: Frank F. Hejazi Architect

Left Wing

Page 4: Frank F. Hejazi Architect

Right Wing

Page 5: Frank F. Hejazi Architect

Metal Sun Screens

Page 6: Frank F. Hejazi Architect

Metal Sun Screen Fabric Sun Screen

Page 7: Frank F. Hejazi Architect

View from inside out through Fabric Screens

Page 8: Frank F. Hejazi Architect

ArchitecturalTools / Ideas

for improvements

1 2

3

4

5

6

7

Exterior Blinds

Canopy

Mechanical Air Louvers used overhead

Landscape Elements

Page 9: Frank F. Hejazi Architect

3. Look at a Series of AvailableSun Protection Parts and Products

2. Identify Levels of Improvements Desired

4. Consider Costs of each Level / Option

1. Identify Existing Issues / Problems

To Make Façade Improvements:

Page 10: Frank F. Hejazi Architect

1. Identify Existing Issues / Problems( Verify in Field (VIF))12 Large Column Bays 4 Small Column Bays

18’-1”19’-0”19’-8”

19’-11”20’-5”20’-6”

18’-2”19’-1”19’-9”

19’-10”20’-4”20’-5”

Lft. Wing Rt. Wing

12’-8”13’-9”

Lft. Wing Rt. Wing

12’-9”13’-11”

1/3 Size Similar to 1/2 Size 1/2 Size Similar to 1/3 Size

Page 11: Frank F. Hejazi Architect

Existing Conditions – Design Study

Not Okay

Okay

2. Identify Levels of Improvements Desired

The Bays seams to work fine architecturally. Where is the problem?

Can an arbitrary line define where the problems stop or start?

Line is not Arbitrary but the lowest horizontal member above headroom

Page 12: Frank F. Hejazi Architect

3

6Exterior Moving Shade

Architectural Tools / Ideas

3. Look at a Series of AvailableSun Protection Parts and Products

2

Canopy

Page 13: Frank F. Hejazi Architect

Exterior Blinds

Page 14: Frank F. Hejazi Architect

Canopy

Page 15: Frank F. Hejazi Architect

Fixed Sun Louvers

Page 16: Frank F. Hejazi Architect

Fixed Sun Louvers

Page 17: Frank F. Hejazi Architect

Movable Louvers

Page 18: Frank F. Hejazi Architect

Detached MotorizedSun Louvers - 24” Offset

Page 19: Frank F. Hejazi Architect

Concept Study w/ Available Products

w/ or w/o Canopy as Add Alternate

With Existing orNew Storefront

w/ or w/o Optional ExteriorBlind / Shadewith Concealed Housing

Louvers Over Existing Conditions as cover up or demo existing substrate-panels and rebuild new.

3. Look at a Series of Available Sun Protection Parts and Products2. Identify Levels of Improvements Desired1. Identify Existing Issues / Problems

Page 20: Frank F. Hejazi Architect

Existing Location of Existing Storefront

Look for Effects and Causes

Scan and review both new designs and

existing conditions for cause and effect

With a Magnifying lens when necessary!

Ask Questions like: What if the overhead louvers moved forward, but the doors and windows did not?

Page 21: Frank F. Hejazi Architect

N

S

W E

Existing

02AIM Architecture PC

1ST Floor Partition locations not shown on existing as builts. Needs to be site verified before additional design study.

1 2 3 4 5 6 7 8 161514131211109

Who Owns Bay No. 9?

Page 22: Frank F. Hejazi Architect

01

02

03

04

Mechanical Air Lovers used as Bookend Design.

Mechanical Air Lovers used at top only.

Mechanical Air Lovers used to create Large Glass Bays.

Mechanical Air Lovers used to create Small Glass Bays.

Rt. Wing Design Studies

Page 23: Frank F. Hejazi Architect

OFFICE SIGNAGE

Doctor's OfficeSuite C-7

Stephen D. BloodD.O., FACOFP, FAAO, FCA

Mechanical Air Lovers in Levels 2 & 3

Canopy either in Level 2 or 3

Exterior Blinds in Level 2 or 3Existing Storefront in Level 2 or

new Storefront in Level 3

Overlapping Design Features

Page 24: Frank F. Hejazi Architect

Optional Levels of Improvements

• Level 1 $20,000 - $40,000– Basic

• Level 2 $100,000 – $200,000– Mid Level

• Level 3 $250,000– Ultimate

Page 25: Frank F. Hejazi Architect

• Level 1 $20,000 - $40,000– Crew of 4 to 6– Duration: 1 Month - Both Sides

• Level 2 $100,000 – $200,000– Crew of 4 to 8– Duration: 1 Month - Both Side

• Level 3 $250,000– Crew of 6 to 10– Duration: 1 Month - Per Sides

4 Consider Costs of each Level or Option

Page 26: Frank F. Hejazi Architect

• Remove Metal/Fabric Screens, Fasteners• Repair surface damage and holes

• Sand Blast Frames / Clear Coat / Paint• Clean window exterior and interior• Remove/Replace Reflective Film, Add Alt.• Blackout Film for Privacy & Decal Signage• Repairs at Floor and Ceiling• Recycling• Management and supervision

Additional items not yet included

• Level 1 $20,000 - $40,000– Crew of 4 to 6– Duration: 1 Month - Both Sides

$895.35

$2.5 K

$10 K

$1.5 K

$20 K

$1.0 K

$1.0 K

$1.0 K

$2.0 K

_____

$40 K

Page 27: Frank F. Hejazi Architect

$895.35

$2.5 K

$10 K

$1.5 K

$20 K

$1.0 K

$1.0 K

$1.0 K

$2.0 K

_____

$40 K

$895.35

$12 K

$50 K

$20 K

$100K

$1.0 K

$3.0 K

$3.0 K

$10 K

____

$100 K

• Level 2 $100,000 – $200,000– Crew of 4 to 8– Duration: 1 Month - Both Side

• Remove Metal/Fabric Screens, Fasteners and Accessories

• Louvers Above Doors Cost• Canopy Cost• Pickup/Delivery/Installation• Exterior motorized Blinds, Add Alt.• Blackout Film for Privacy & Decal Signage• Repairs at Floor and Ceiling• Recycling• Management and supervision

Additional items not yet included

Page 28: Frank F. Hejazi Architect

$895.35

$2.5 K

$10 K

$1.5 K

$20 K

$1.0 K

$1.0 K

$1.0 K

$2.0 K

_____

$40 K

$895.35

$12 K

$50 K

$20 K

$100K

$1.0 K

$3.0 K

$3.0 K

$10 K

____

$100 K

$895.35

$12 K

$50 K

$20 K

$140K

$1.0 K

$5.0 K

$5.0 K

$20 K

_____

$250 K

• Level 3 $250,000– Crew of 6 to 10– Duration: 1 Month - Per Sides

• Remove Metal/Fabric Screens, Fasteners and Accessories

• Louvers Above Doors Cost• Canopy Cost• Pickup/Delivery/Installation• Storefront Systems w/ Insul. Glazing• Blackout Film for Privacy & Decal Signage• Repairs at Floor and Ceiling• Recycling• Management and supervision

Additional items not yet included

Page 29: Frank F. Hejazi Architect

3 Look at a Series of AvailableSun Protection Parts and Products

2 Identify Levels of Improvements Desired

4 Consider Costs of each Level / Option

1 Identify Existing Issues / Problems

What’s Next? Action Items.Define Project CharterDefine Scope of Work Statement

Form Workgroups and Talk to Your Architect.

Page 30: Frank F. Hejazi Architect

To make Progress,

Set your Next Meeting Date,

Today!

Page 31: Frank F. Hejazi Architect

Reference Material: Solar Film Spec

Canopy Spec

Storefront Specs

The End

Page 32: Frank F. Hejazi Architect

Thank you for your time and interest …

Sincerely,

Frank F. Hejazi, Architect