framework guide - lhc this framework is relevant for the installation of pvc–u window and door...

25
TRUSTED PROCUREMENT FOR BETTER BUILDING AND HOMES LHC Royal House 4th Floor 2-4 Vine Street Uxbridge UB8 1QE T 07818 045869 E [email protected] WWW.LHC.GOV.UK/SW Framework guide

Upload: dinhhanh

Post on 14-May-2018

217 views

Category:

Documents


2 download

TRANSCRIPT

TRUSTED PROCUREMENT FOR BETTER BUILDING

AND HOMES

LHC Royal House

4th Floor 2-4 Vine Street

Uxbridge UB8 1QE

T 07818 045869 E [email protected]

WWW.LHC.GOV.UK/SW

Framework guide

LHC FRAMEWORK GUIDE 1

Contents

Introduction 2

Why work with LHC? 3

The frameworks in action 5

PVC-U Window and Door Products (U9) 6

Offsite Construction of New Homes (NH1) 8

Schools and Community Buildings (SCB1) 10

Energy Efficiency and Refurbishment (N7) 12

Kitchen and Bathroom Replacements (KB3) 14

Pitched Roofing (PR3) 16

Entrance Doorsets and Associated Services (C7) 18

Aluminium Window and Door Products (A6) 20

Timber Window and Door Products (TW3) 22

Asbestos Works and Services (AS1) 24

Vacant Property Security and Associated Services (V6) 26

Supply of Kitchen Cabinets and Worktops (K5) 28

Flat Roofing (FR2) 30

Modular Buildings (MB1) 32

Communal Entrance Doorsets (CED1) 34

Heating Services (HS1) 36

Upcoming frameworks 38

Membership form

Why work with LHC South West?Introduction

LHC FRAMEWORK GUIDE 32 LHC FRAMEWORK GUIDE

These are the key reasons to work with LHC whether you’re a public sector organisation looking for procurement solutions or a supplier with products or services to provide.

Knowledge and experience of procurement Our organisation began half a century ago and over five decades we’ve developed and shaped our service to meet the evolving needs of our clients.

Recognised technical expertise Our technical expertise is built on continuous research by our team of technical specialists who consult with clients on the outcomes they need and suppliers on the range of available solutions.

Commitment to better buildings and homes Our ultimate goal is helping our clients deliver better environments for the communities they serve, a goal we support through our frameworks, that address every aspect of quality, and our selection of the most appropriate suppliers.

Fast and efficient procurement Once LHC appointed companies are established for a framework, the process of calling off projects and commissioning work is very efficient. Terms and rates have been agreed and even when a mini competition is required, the majority of contractual arrangements have already been finalised, project work can start quickly.

Financial gains Working with LHC frameworks gives suppliers access to construction, refurbishment and maintenance projects of over £250,000,000 each financial year. Clients who spend more than £250,000 on two or more frameworks in a year will benefit from a share in the LHC operating surplus we return to members.

WWW.LHC.GOV.UK/ABOUT-US/JOIN

LHC South West is a leading provider of free-to-use framework agreements used by local authorities, social landlords and other public sector bodies to procure works, products and services for the construction, refurbishment and maintenance of social housing and public buildings.

We’ve been perfecting what we do for five decades, strengthening our technical knowledge, investigating innovations in products and services, supporting suppliers who are committed to being LHC appointed companies, and helping our clients and members with professional procurement that delivers better communities and homes.

LHC FRAMEWORK 5LHC FRAMEWORK 44 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 5

Quick and efficient procurement

Mini–competition and direct award available to enable the final selection of a supplier or supplier(s) for a project

High quality standards

Standards of quality maintained throughout project through monitoring in accordance with ISO 9001 Quality Management System

Quick project starts

Enabled by pre–tendered procurement that reduces the cost and time input by public sector organisations and speeds up their access to companies

Specification and production standards

High level specifications and approval to latest British and European standards

Instant access to project data

Continuous access to information throughout the procurement process through the suppliers’ on–line portal

Service levels guarantee

Guaranteed service levels from inquiry to supply providing peace of mind that services and works will be conducted effectively

Advice on design and regulatory compliance

Guidance on interpretation and conformity to statutory regulations

Delivery periods guarantee

Guaranteed delivery periods that ensure services and works are delivered to meet work schedules

Frameworks in action

As well as providing compliance, quality and best value to clients, our frameworks will support a streamlined process from the award of a contract (‘call–off’) to completion of a project.

NIGEL WILLIAMS Chief Commercial Officer

‘‘

‘‘

LHC FRAMEWORK 7LHC FRAMEWORK 6

PVC–U Window and Door Products (U9)

Produced by the Chair of the BSI Committee B/538/1/7, this framework is relevant for the installation of PVC–U window and door products for use in domestic residential, care homes, schools and other public buildings.

This OJEU compliant framework offers:

-- Easy access to PVC–U window and door products with compliant and consistent quality standards. All products and services also conform to the latest UK and European standards

-- High energy efficiency ratings and enhanced security features available

-- Products CE marked to BS EN 14351–1

-- Ten year product and installation guarantee

-- Design advice and support available including full survey and installation services (programming and residents liaison)

-- Installation works and management undertaken to the guidance set out in BS 8213–4

Valid until: 31st July 2018. Download the full procurement guide from www.lhc.gov.uk/u9

6 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 7

-- Astraseal

-- Anglian

-- Plastal

-- Sovereign

-- Solar

25%Essential requirements

25%Qualitative assessments

50%Pricing

Appointed companies

Award weighting criteria

LHC FRAMEWORK 9LHC FRAMEWORK 8

Offsite Construction of New Homes (NH1)

This framework offers a full turnkey solution for offsite construction of new homes that includes construction, design, manufacture, supply and installation of volumetric and panelised building systems. Alternatively, our members can also access a supply only solution.

This OJEU compliant framework offers:

-- Easy access to offsite manufactured building systems for new build projects

-- Our clients with standard house types houses that comply with Building Regulations, the Housing Quality Index (HQI) and funding authority requirements

-- Panelised systems that come factory fitted with insulation to meet national Building Regulations

-- Volumetric systems that are fully finished internally with the option of external wall and roof cladding systems that can be factory fitted

-- The opportunity to choose your own window and cladding suppliers or select from a range of suppliers provided by the manufacture

Integrated services valid until: 30th November 2019. Supply only valid until: 31st October 2018.Download the full procurement guide from www.lhc.gov.uk/nh1

8 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 9

10%Scenario questions

10%Evaluation of project specific responses

25%Pricing20%

Technical requirements

15%Production qualitative assessment

10%Project management

10%Company evaluation

-- Accord t/a LoCal

-- Caledonian Modular

-- CCG Scotland

-- F1 Modular

-- Galliford Try

-- Hill Partnership

-- Keepmoat Regeneration

-- Mi–Space (UK)

-- Rollalong

-- Stewart Milne Group

Appointed companies

Award weighting criteria

LHC FRAMEWORK 11LHC FRAMEWORK 10

Schools and Community Buildings (SCB2)

This framework for schools and community buildings is available to all local authorities, housing associations and other public sector bodies in England, Wales and Scotland.

This OJEU compliant framework offers:

-- The provision of new build projects, extensions, refurbishment and associated works with a design service for school and community buildings projects.

-- Education buildings

-- Healthcare buildings

-- Emergency Services buildings

-- Community buildings

Download the full procurement guide from www.lhc.gov.uk/scb2

10 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 11

30%Pricing

70%Quality

Award weighting criteria

£0-2M New

-- Shaylor Group

£0-2M Refurb

-- M&J Group

-- Novus Property Solutions

-- Shaylor Group

£2-4M

-- Lakehouse Contracts

-- Shaylor Group

-- Speller Metcalfe

Appointed companies

£4-10M

-- Farrans t/a Northstone

-- Kier Construction

-- Lakehouse Constracts

-- Willmott Dixon

£10M+

-- Farrans t/a Northstone

-- Galliford Try

-- Kier Construction

-- Morgan Sindall

-- Willmott Dixon

LHC FRAMEWORK 13

Energy Efficiency and Refurbishment (N7)

This framework is relevant for the supply and installation of energy efficiency and refurbishment measures delivered through three individual Workstreams.

This OJEU compliant framework offers:

-- Supply and installation companies that are specialist, competent contractors (PAS 2030 and MCS or equivalent certified installers)

-- Companies that supply and install energy saving measures that are compliant with all relevant funding streams (e.g. ECO Funding, Renewable Heat Incentive, Feed in Tariff and Devolved Administration funding)

-- Workstream 1: Energy Consultants and Project Management services including, but not limited to: Building energy policy and strategy development, energy audits and surveys, chartered surveyors reports and Green Deal Advice Reports (GDAR), project management services, building energy certificates, as well as principle design duties

-- Workstream 2: The opportunity to appoint local SMEs through Individual Energy Efficiency and Renewable Measures including, but not limited to: External, cavity and internal wall insulation, traditional and individual biomass heating boiler systems, photovoltaic systems, air source heat pump systems (air to water), as well as district heating (heat interface units)

-- Workstream 3: The opportunity to appoint large main contractors for all Energy Measures and Refurbishment Works including, but not limited to: Minor building works, kitchens and bathrooms, windows and doors, flooring, plumbing and waste, electrical rewires, power and lighting, internal and external finishes and decoration, walls and fences, roof repairs, footpaths, as well as landscaping

Workstream 1 and 3 valid until: 29th February 2020.Workstream 2 valid until: 31st May 2020.Download the full procurement guide from www.lhc.gov.uk/n7

LHC FRAMEWORK GUIDE 13

40%Quality

50%Pricing

10%Sustainability

12 LHC FRAMEWORK GUIDE

Workstream 1

-- Currie & Brown

Workstream 2

-- AC Whyte

-- BG (ECL)

-- BG (PH Jones)

-- Campbell & Kennedy

-- EON Energy Solutions Ltd

-- Everwarm

-- Insta Group

-- K&T Heating

-- Mears

Workstream 3

-- Keepmoat Regeneration

-- Lakehouse Contracts

-- Herbert T Forrest

-- Fortem (Wilmott Dixon Group)

-- SBS (Sustainable Business Services)

-- Mi-Space UK

-- Lawtech Group

Appointed companies

Award weighting criteria

LHC FRAMEWORK 15LHC FRAMEWORK 14

Kitchen and Bathroom Replacements (KB3)

This framework is relevant to the installation of all kitchen and bathroom furniture and associated services.

This OJEU compliant framework offers:

-- Access to SMEs. Sixty percent of our nationwide framework suppliers are SMEs, of which 31 are appointed to engage with the client directly as the principal contractor

-- Provision of advice to ensure conformity programming and assistance with resident liaison

-- Kitchen and bathroom measurement and design services, supply of white goods, replacement of floor, wall and ceiling finishes, replacement or new installation of electrical and plumbing services, as well as minor structural alterations and decoration works

-- Three different value bands ensuring SMEs and national contractors are not competing for the same contracts. This helps to improve inclusivity of all company sizes and helps meet increasing member demands to use local companies where possible

Valid until: 31st August 2019.Download the full procurement guide from www.lhc.gov.uk/kb3

14 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 15

15%Management systems

15%Quality of submission

20%Service capability

50%Pricing

Workstream 2

-- Ian Williams

-- MD Bldg Services

-- CLC Contractors

-- NKS Contracts

-- DW Contractors

Workstream 3

-- Lakehouse Contracts

-- Fortem (Wilmott Dixon Group)

-- Mi-Space UK

-- Wates Living Space

-- Mears

-- Mitie Pty Services

-- Keepmoat Regeneration

Appointed companies

Award weighting criteria

LHC FRAMEWORK 17LHC FRAMEWORK 16

-- Acclaim

-- Avonside

-- M&J

-- Mi–Space UK

-- Superior

Pitched Roofing (PR3)

16 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 17

This framework provides the supply and installation of pitched roof coverings by specialist roofing contractors, including roof repairs, structural repairs and other pitchedroofing works with a supported design service.

This OJEU compliant framework offers:

-- The removal of existing roof covering, survey and design with chosen installers and the option to select any manufacturer that complies with the framework requirements

-- Supply and installation of pitched roof covering systems and associated components supplied and supported by chosen installers and the option to select any manufacturer that complies with the framework requirements

-- Roof covering systems including concrete, clay roof tiles, slates and underlay (including battens) and profiled sheet roof covering

-- General scaffolding design and erection as per the building type

-- Optional works including flat to pitch conversions and associated building works. Associated roofing works including rainwater goods, soffits and fascia boards, timber repairs, PVC–U cover trims and boarding, loft insulation, renewable energy technologies and liquid parapet guttering systems

-- Two value bands: Value Band 1; £3,000–£250,000 and Value Band 2; Above £250,000

Valid until: 1st July 2020. Download the full procurement guide from www.lhc.gov.uk/pr3

50%Quality

Appointed companies

Award weighting criteria

50%Pricing

LHC FRAMEWORK 19LHC FRAMEWORK 18

Entrance Doorsets and Associated Services (C7)

This framework is relevant to the installation of all entrance doorsets and associated services.

This OJEU compliant framework offers:

-- Composite door leaves

-- Timber engineered door leaves

-- PVC-U, ECO and hardwood door frames

-- Screens and fanlights

-- FD30 and FD60 fire door assemblies

-- Enhanced security

-- Impaired mobility solutions

The specialist manufacturers appointed to this framework also offer the following product benefits:

-- A supply and installation or supply only service

-- An extensive range of door patterns, colours and finishes

-- A choice of hardware options including specialist applications for egress and enhanced security

-- Hardware and design options to meet DDA requirements and conformity to BS 8300

-- Doorsets compliant with BS8529, BS644, PAS 24 and BS EN 14351–1 ensuring quality standards of manufacture and performance

Valid until: 29th February 2020. Download the full procurement guide from www.lhc.gov.uk/c7

18 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 19

-- Astraseal

-- IG Doors

-- Masterdor

-- Solar

-- Sovereign

20%Essential requirements

50%Pricing

10%Sustainability

20%Quality

Appointed companies

Award weighting criteria

LHC FRAMEWORK 21LHC FRAMEWORK 20

Aluminium Window and Door Products (A6)

Valid until: 30th September 2019.Download the full procurement guide from www.lhc.gov.uk/a6

This framework is relevant to the installation of aluminium window and door products, suitable for low, medium and high rise housing schemes, schools and other types of public sector buildings.

This OJEU compliant framework offers:

-- Good quality, best value aluminium windows and doors with a range of options providing customer choice

-- Windows and doors compliant to BS 4873, BS EN 14351–1 and PAS 24 ensuring quality standards are adhered to

-- Enhanced security options conforming to PAS 24 and Secured by Design

20 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 21

25%Essential requirements

25%Qualitative assessments

50%Pricing

-- 3D TVAG

-- AWS Turner Fain

-- Hazelmere

-- Sovereign

Appointed companies

Award weighting criteria

LHC FRAMEWORK 23LHC FRAMEWORK 22

Timber Window and Door Products (TW3)

This framework is relevant to the installation of timber window and door products for use in refurbishment or new–build projects.

This OJEU compliant framework offers:

-- Compliant and consistent product quality and services conforming to the latest UK and European standards

-- Assurance that timber is legally sourced from sustainably managed forests, compliance with EU Timber Regulation No. 995/2010:2013 EUTR

-- High energy efficiency ratings and enhanced security features available

-- All products CE marked to BS EN 14351–1

-- Ten year product and installation guarantee

Valid until: 30th November 2017. Download the full procurement guide from www.lhc.gov.uk/tw3

22 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 23

25%Essential requirements

25%Qualitative assessments

50%Pricing

Workstream 1

-- Arden Windows

-- Heron Bros

-- Janex

-- West Port

Workstream 2

-- Arden Windows

-- Heron Bros

-- Sidey

-- Sovereign

Appointed companies

Award weighting criteria

LHC FRAMEWORK 25LHC FRAMEWORK 24

Asbestos Works and Services (AS1)

This framework is split into three workstreams, two of which address management and monitoring services and the third covers works associated with the removal of asbestos.

This OJEU compliant framework offers:

-- Access to approved consultants and specialist asbestos contractors

-- Asbestos solutions for all housing and properties including common blocks of housing properties, public and communal buildings, NHS and educational establishments, and all types and classifications of buildings used by public sector authorities

-- Asbestos management services that include, but not limited to: Management and supervision of asbestos removal/remediation, undertaking and preparing third party gap analysis, preparation of surveys and risk assessments including annual reviews, as well as, providing professional and concise asbestos reports in accordance with HSG264

-- Licensed works include, but not limited to: Removal and disposal of asbestos containing materials using appropriate control measures and under appropriately controlled conditions, removal of asbestos containing appliances, dismantling boilers and removal, arrange for and have undertaken all air testing by a UKAS accredited laboratory, as well as, encapsulation works

-- Approved suppliers that will advise on design and regulatory compliance while also maintaining high quality standards, in accordance with ISO9001 Quality Management System

-- Non–Licensed works including: Removal of asbestos and undertaking associated works in accordance with HSG 210 task sheets and preparing risk assessments as required by HSG 210

24 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 25

Appointed companies

Workstream 1

-- Allium Environmental

-- Environtec

-- Hazard t/a Thames Labs

-- REC Asbestos

Workstream 2

-- Environtec

-- Hazard t/a Thames Labs

-- REC Asbestos

Workstream 3

40%Pricing

60%Services

Workstream 1 and 2

70%Services

30%Pricing

Valid until: 31st May 2018. Download the full procurement guide from www.lhc.gov.uk/as1

Award weighting criteria

Workstream 3

-- Aspect Contracts

-- European Asbestos Services

-- Shield Environmental

-- Woods Building Services

LHC FRAMEWORK 27LHC FRAMEWORK 26

Vacant Property Security and Associated Services (V6)

This framework is relevant to vacant property security and associated services.

This OJEU compliant framework offers:

-- Continuous protection of a vacant property while maintaining standards and desirability

-- A core set of security systems including, but not limited to: Vacant building inspection service, electronically managed access key system, boarding up services, temporary intruder alarm systems, vacant alarm monitoring and call–out wardens

-- A core set of associated services including, but not limited to: Vacant property clearance, sharps and clinical waste clearance, pre–let cleaning services, concrete barriers, graffiti removal and UK call handling facilities for repair and maintenance 24/7

Valid until: 31st May 2018. Download the full procurement guide from www.lhc.gov.uk/v6

26 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 27

-- SitexOrbis

-- VPS UK

30%Project management, quality control and project delivery

40%Pricing structure and contract scenarios

12%Qualitative assessments

18%Essential requirements

Appointed companies

Award weighting criteria

LHC FRAMEWORK 29LHC FRAMEWORK 28

Supply of Kitchen Cabinets and Worktops (K5)

This framework is relevant to the manufacture, supply and delivery of kitchen cabinets, worktops and associated products.

This OJEU compliant framework offers:

-- Consistent product quality and services conforming to the latest UK and European standards

-- Accredited products to the current British and European standards for quality, production and performance, including Furniture Industry Association (FIRA) GOLD AWARD certification

-- Timber products that are sourced from sustainable, fully certified sources that comply with EU Timber Regulations

-- A choice of glue and dowel or cam and dowel manufacture

-- Specialist height adjustable kitchen furniture designed for use by persons with special needs

-- The supply of ‘A+++’ rated appliances

-- A 20 year product guarantee

-- Advice to ensure conformity programming and assistance with resident liaison

Valid until: 31st May 2018. Download the full procurement guide from www.lhc.gov.uk/k5

28 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 29

30%Project management, quality control and project delivery

40%Pricing structure and contract scenarios

12%Qualitative assessments

18%Essential requirements

-- Moores Furniture Group

-- Premiere

-- Richmond

-- Rixonway

-- Symphony

Appointed companies

Award weighting criteria

LHC FRAMEWORK 31LHC FRAMEWORK 30

Flat Roofing (FR2)

Valid until: March 2021. Download the full procurement guide from www.lhc.gov.uk/fr2

30 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 31

35%Pricing

25%Community

40%Quality

System Supplier: Langley

-- Acclaim Contracts

-- Allard Construction

-- Amber Construction Services

-- Everlast Waterproofing

-- Hodgson Sayers

-- Mac Roofing &

Contracting

-- Topek Southern

Appointed companies

Award weighting criteria

This free to use framework offers design, supply and installation of flat roofing and associated works.

This OJEU compliant framework offers:

-- Design, survey, technical support and advice

-- Supply and installation of various flat roof covering systems and associated components

-- General scaffolding design and erection as per the building type

-- Optional works include roofing systems and associated flat roof works

-- Access to approved framework suppliers with local and nationwide specialist roofing contractors to install a high level specification roofing system that is supplied by high quality manufacturer/system suppliers within a consortium led bid

System Supplier: IKO

-- Hodgson Sayers

-- Ifield & Barrett Roofing

-- Mac Roofing & Contracting

-- Maguire Brothers

-- Mitie Tilley Roofing

-- M&J Group (Construction &

Roofing)

-- P&M Group trading as ISD Solutions

System Supplier: Alumasc

-- Amber Construction Services

-- Central Roofing & Building Services

-- DFR Roofing

-- M&J Group (Construction & Roofing)

-- Nautilus Roofing & Exteriors

-- Rateavon

LHC FRAMEWORK 33LHC FRAMEWORK 32

Modular Buildings (MB1)

Valid until: May 2021. Download the full procurement guide from www.lhc.gov.uk/mb1

32 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 33

25%Pricing

75%Quality

Award weighting criteria

The LHC Framework Agreement for Modular Buildings (design, manufacture, supply and erection) is available to public sector organisations in England, Scotland and Wales and forms one of the LHC Construction, Extension and Refurbishment portfolio.

Fully OJEU compliant, the Modular Buildings framework provides public sector organisations with easy access to modular systems for the use in non-residential buildings including:

Education buildings including:

-- Nurseries-- Primary schools-- Secondary schools-- Further education buildings-- Universities

Healthcare buildings including:

-- Doctor’s surgeries-- Hospital wards-- Operating theatres

Emergency Services buildings including:

-- Fire and rescue-- Police-- Ambulance

Community buildings including:

-- Community halls-- Sports facilities

Workstream 1a - Education

-- Module-AR

-- Portakabin

-- The McAvoy Group

-- Wernick Buildings

-- Western Building Systems

Workstream 1b - Healthcare

-- Extraspace Solutions UK

-- MTX Contracts

-- Portakabin

-- Wernick Buildings

-- Western Building Systems

Appointed companies

Workstream 2 - All buildings

-- Extraspace Solutions UK

-- Portakabin

-- The McAvoy Group

-- Wernick Buildings

-- Western Building Systems

Workstream 3 - Temp

-- Extraspace Solutions UK

-- MTX Contracts

-- Portakabin

-- Wernick Buildings

LHC FRAMEWORK 35LHC FRAMEWORK 34

Communal Entrance Doorsets (CED1)

Valid until: May 2021. Download the full procurement guide from www.lhc.gov.uk/ced1

34 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 35

30%Pricing

70%Quality

Workstream 1 - Aluminium

-- Bamford

-- CCSS

Workstream 2 - Mild Steele

-- NEOS Project

Workstream 3- Stainless Steel

-- Warrior Doors

Appointed companies

Award weighting criteria

The free to use framework for Communal Entrance Doorsets and Associated Products has been developed in conjunction with Secured by Design and is available to all Local Authorities, Housing Associations and other public sector bodies funded by public finance throughout the UK.

This OJEU compliant framework offers specialist design, manufacture, supply and installation of communal entrance systems from specialist manufacturers with a choice of doorset materials depending on individual requirements including:

-- Aluminium

-- Mild steel

-- Stainless steel doorsets

-- Screens and fanlights in materials as above

-- Fire resistant door assemblies

-- Door/access control systems

-- All products are to enhanced security standards PAS 24, STS 202 Burglary Rating 2 or LPS 1175 Security Rating 2

-- Impaired mobility solutions

-- Cyclical service/maintenance package associated to installation

-- Emergency repair/maintenance of associated installation

-- All doorsets manufactured under this framework are CE Marked as required in law under the European Construction Products Regulations (CPR)

LHC FRAMEWORK 37LHC FRAMEWORK 36

Heating Services (HS1)

Valid until: April 2021. Download the full procurement guide from www.lhc.gov.uk/hs1

36 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 37

40%Pricing

60%Quality

Award weighting criteria

The free to use framework for Heating Services is available to all local authorities, housing associations and other public sector bodies throughout the UK.

This OJEU compliant framework offers:

-- Technically capable heating and maintenance contractors who can provide landlords with annual safety records and both general and emergency 24/7, 365 day response for servicing and repairs to domestic heating and small commercial systems

-- OJEU compliant framework solution valid from May 2017 – April 2021

-- Clients with gas safety compliance

-- Clients with the choice of SMEs for smaller local projects and main contractors for larger opportunities

-- Services for all heating appliance (gas, oil, solid fuel and renewable) and connected systems managed or replaced

-- Two workstreams: (1) Third-party gas auditors and consultants, and, (2) Heating Services and repairs

Workstream 1

-- CORGI Technical Services

-- Gas Contract Services

Workstream 2

-- British Gas T/A PH Jones

-- Hewer FM

Appointed companies

LHC FRAMEWORK 39LHC FRAMEWORK 38

Legionella Control & Water Management (WM1)

This framework agreement for legionella control & water management is available to all public-sector bodies funded by public finance throughout the UK.

This OJEU compliant framework offers:

-- Maintenance and testing of control measures for domestic hot and cold water systems

-- Management and control of building hot and cold water services

-- Management and control in leisure, display, therapy and other non-industrial water systems

-- Optional - management and control of evaporative cooling and other high-risk industrial water

Download the full procurement guide from www.lhc.gov.uk/wm1

38 LHC FRAMEWORK GUIDE LHC FRAMEWORK GUIDE 39

60%Quality

40%Pricing

Workstream 1

-- Clearwater Technology Ltd

-- Graham Asset Management Ltd T/A Graham Environmental Services

-- Integrated Water Services Ltd

-- SMS Environmental Limited

-- Soil Mechanics T/A Environmental Scientifics Group Limited

Workstream 2

-- Graham Asset Management Ltd T/A Graham Environmental Services

-- HSL Compliance Ltd

-- Integrated Water Services Ltd

-- SMS Environmental Limited

Appointed companies

Award weighting criteria

LHC FRAMEWORK 40

-- OrganisationName:

-- OrganisationAddress:

-- ContactName: -- Email:

-- ContactPosition: -- TelephoneNo:

CommunicationsandPRContact

-- ContactName: -- Email:

IwishtodeclaremyinterestandjoinLHCasaConstituentMember(requiresBoardapproval)

IwishtoapplyforAssociateLHCMembership

-- Signed: -- Date:

-- PrintName: -- Position:

ThisdocumentshouldbesignedforbyaChiefExecutiveoradesignatedseniorofficer

Pleaseprovideyourbankaccountdetailsforthepurposeofanyrebatesthatmaybeduetoyourorganisationinthefuture.

-- AccountName:

-- Bank:

-- BankAddress(infull):

-- SortCode:

-- AccountNumber:

Paymentoftherebateissubjectto:

--LHCgeneratingasurplusinthefinancialyear(April–March)

--Twoframeworkarrangementsbeingusedduringtheabove

period(AssociateMembersonly)

--ApprovalofpaymentbytheLHCJointCommittee

LHC RoyalHouse4thFloor2-4VineStreetUxbridgeUB81QE

T 07818045869E [email protected]/sw

Annual Rebaterate RebaterateTransaction (%oftransaction (%oftransactionValue value),5%levy value),allother frameworks levyframeworks

£0-£250k Nil Nil

Above£250k - £1.3m 0.50% 0.25%

Above£1.3m - £1.8m 1.00% 0.50%

Above£1.8m - £2.3m 1.50% 0.75%

Above£2.3m 2.00% 1.00%

Application for Membership

Me

mb

ers

hip

fo

rm e

nclo

sed