frame setup & installation instructions - art...

53
ART MORRISON ENTERPRISES, INC 5301 8 TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847 Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

Upload: vuongminh

Post on 30-Jun-2018

244 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Frame Setup & Installation Instructions

1947-53 Chevrolet 3100

Page 2: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

2

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Table of Contents Introduction .................................................................................................................... 3

Body Mounting ............................................................................................................... 3

Engine Fitment ................................................................................................................ 4

Transmission Fitment ..................................................................................................... 4

Steering Column & Linkage ............................................................................................. 4

Brake Pedals & Lines ....................................................................................................... 5

Wheels & Tires ................................................................................................................ 5

Axle Housings .................................................................................................................. 5

Frame Fit and OEM Tolerances....................................................................................... 5

Frame & Component Installation & Setup ..................................................................... 6

Alignment Specifications ................................................................................................ 7

Post-Drive Checklist ........................................................................................................ 7

Sport IFS 47-53 Chevy Truck Wheel Size and Offset Specs ............................................ 8

Deluxe IFS 47-53 Chevy Truck Wheel Size and Offset Specs .......................................... 9

225mm Front/225mm Rear High Height Tire Example ................................................ 10

275mm Front/275mm Rear Low Height Tire Example ................................................. 11

Important: Lifting a Vehicle with Two-Post Lifts ......................................................... 12

Steering Rack Technical Information ............................................................................ 13

DSE/Mustang Rack Steering Stop Information ............................................................. 15

Rear Coilover Installation .............................................................................................. 16

Rear Sway Bar Installation ............................................................................................ 17

Deluxe IFS Front Sway Bar Installation ......................................................................... 18

Sport IFS Front Sway Bar Installation............................................................................ 19

Deluxe Front Upper Control Arm Installation ............................................................... 20

Deluxe Front Lower Control Arm Installation ............................................................... 21

Sport Front Lower Control Arm Installation ................................................................. 22

Front Upper Control Arm Installation ........................................................................... 23

Ball Joint Cap Installation .............................................................................................. 24

Optional Equipment: Stainless Brake Line Kit (High Height Models) .......................... 25

Optional Equipment: Stainless Brake Line Kit (Low Height Models) ........................... 31

Optional Equipment: Brake Proportioning Valve Mount Kit ....................................... 37

Optional Equipment: Brake/Clutch Pedal Assembly Instructions ............................... 38

Optional Equipment: LS Polyurethane Motor Mount Kit ............................................ 46

Optional Equipment: LS Rubber Motor Mount Kit ...................................................... 48

Optional Equipment: Axle Housing Vent Kit ................................................................ 50

Fastener Information & Torque Specifications ............................................................ 51

Page 3: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

3

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Introduction

Congratulations on the purchase of your Art Morrison Enterprises GT Sport chassis. This frame is the result of

many years of chassis and suspension design experience. In an effort to make your project progress smoothly,

we have compiled this booklet containing instructions, notes and tips on removal of your current frame as well

as assembly and installation of your new GT Sport chassis.

Art Morrison Enterprises’ Engineering department has

developed an entirely exclusive design that provides

superior geometry with the Wilwood Pro Spindle.

Countless hours were spent utilizing computer modeling

and analysis to ensure the suspension provided on this

frame provides excellent performance yet fits the

packaging necessary Ford pickups.

The GT Sport frames follow the Art Morrison design

philosophy that combines simplicity and elegance. We

believe stiffening material and bracing should only be added as necessary because too much only leads to

additional weight. High stiffness can be obtained by geometric design and strategic placement rather than

adding material.

The Chevrolet 3100 GT Sport chassis uses a fully boxed 2x6 mid-rail section with strategically placed bracing

further increases torsional stiffness. Connected to the 2x6 mid-rail is mandrel-bent 0.180” wall 2”x4” material

made specifically for Art Morrison Enterprises.

Body Mounting

The Art Morrison GT Sport chassis is a bolt-on frame, meaning it bolts to the body as the original frame did.

Please refer to a factory assembly manual for removal and assembly instructions.

Typical body mount kits are made of rubber and are widely available for 3100’s and any kit produced for a stock

chassis will work on a GT Sport frame. Body mounts can vary by material, from soft materials such as rubber to

harder materials such as aluminum.

All material options have their merits. Rubber body mounts can isolate vibrations and offer a quiet cabin, similar

to modern cars. These mounts however, act as a secondary spring between the suspension and body and add

body flex. People looking for a quiet, vibration free cabin should look into using rubber mounts. Those who are

looking for performance or running tight fender gaps should use harder materials.

Polyurethane and aluminum mounts can be grouped into the same category as their compressed stiffness is

fairly similar. Polyurethane mounts will isolate high frequency vibrations (which cause high pitched rattles)

Page 4: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

4

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

slightly better than aluminum. However, aluminum mounts have the advantage of being highly accurate and are

ideal for high performance vehicles or those with tight fender gaps. Because of the zero compressibility of

aluminum mounts, consider running medium strength thread locker on the body bolts.

The Chevrolet 3100 GT Sport chassis is available in both low and high ride height configurations. Low ride height

trucks will use 2” front drop spindles and require the bed floor to be raised 2”, along with small inner fender

modifications to fit the upper control arm bracket area. High ride height trucks will use standard height front

spindles and require no bed or inner fender modifications.

While the 1954 3100 models are very similar to the 1947-53 models, the bed mounts to the frame in a different

manner. Most builders will find it easier to replace the 1954 bed to a 1947-53 style.

Engine Fitment Your new GT Sport frame will accept small block and LS-series Chevrolet engines. For proper fitment LS engines

require the use of adapter plates available only from Art Morrison Enterprises; the utilization of adapter plates

from other manufacturers may generate clearance issues. LS F-Body engine accessories (including A/C

compressors) will typically fit within the frame rails. Corvette, GTO, CTS and truck accessory configurations will

also fit. When shopping for an aftermarket drive system, pay particular attention to the area left of the engine

oil pan as this is where the steering rack will reside.

The engine oil pan design is critical for proper performance as well as trouble-free installation. Due to the

steering rack location, oil pans typically will need to have a minimum front depth. For small blocks, traditional

front pan depths (similar to stock) will be adequate. For LS engines, choose a pan that is similar to a 98-02 F-

Body or LS2/LS3 oil pan. For reference, front pan depths should be around 1-7/8”.

Transmission Fitment The GT Sport frame is designed to support modern manual and automatic transmissions. Manual transmissions

will require the use of a hydraulic throwout bearing which is made easy by an available hydraulic clutch pedal kit

from Art Morrison Enterprises.

Due to the size of modern transmissions, there is a possibility of requiring the transmission tunnel to be

modified. Most often the pinchweld above the bellhousing will require trimming.

Steering Column & Linkage

The stock 3100 steering column is directly connected to the steering box therefor it is good practice to use an

aftermarket column. An aftermarket steering column should be utilized for several reasons. First, the column

can be ordered in any length for maximum flexibility. Second, the welcome addition of a tilt feature and all new

components as well as zero steering shaft radial play makes these columns a convenient choice. Third, they

feature a 1” double-D end for easy linkage hook-up. A steering linkage kit that provides you with all the

Page 5: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

5

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

necessary parts to connect an aftermarket column to the steering rack is available from Art Morrison

Enterprises.

Brake Pedals & Lines Art Morrison Enterprises offers a brake pedal assembly and pre-bent stainless brake lines.

The available Chevrolet 3100 brake pedal assemblies accommodate builds with automatic or manual

transmissions. Those using manual transmissions will utilize a Wilwood Compact Remote master cylinder (3/4”

bore typical) with a 6:1 ratio. Brake hydraulics are accomplished with a 6:1 pedal ratio and the optional use of a

7” or 8” power booster.

Art Morrison Enterprises’ stainless steel brake line kits connect directly to the proportioning valve included with

the pedal assembly to make plumbing easy. The brake lines are made from 304 stainless and utilize -03AN

stainless fittings.

Wheels & Tires While the GT Sport’s hub track is similar to stock, there are other considerations to examine before using wheels

for a stock chassis. First, the brakes used on a GT Sport chassis requires close attention regarding overall

diameter and caliper offset. Second, the chassis will lower the car much more than stock and typically will

require slightly more positive offset. While Art Morrison Enterprises has gone to great lengths to ensure proper

wheel and tire fitment, variations can occur from vehicle assembly or modifications/repairs over the years that

affect fitment. Backspacing and proper fitment should be double checked before ordering wheels!

The rear inner fenders limit the truck’s ability to accept wide tires. Without fabricated wheel tubs, only a

225mm tire will fit, but the bed must be precisely square to the frame. Up to a 305mm tire will fit with a 4”

widened wheel tub. In front, 285mm front tires will require steering stops or tire rubbing may occur.

Axle Housings

When ordering a GT Sport frame, several axle housing options are available. To make selection simple the

housing width can be specified to replicate stock (about 60” wheel mount width), 2” narrow, or a custom width.

All axle housings are a modern rendition of a Ford 9” design. These housings include a brand new stamped

center section (Fab 9 is optional), 3” diameter 3/16” wall axle tubes and forged tube ends. All housings are built

on a precise fixture that ensures proper wheel alignment.

Frame Fit and OEM Tolerances Art Morrison Enterprises has done extensive testing to ensure the frame matches OEM specifications while

maintaining much tighter tolerances than Ford’s specifications as produced over 60 years ago.

Over the years, these vehicles have been subjected to high miles, accidents, racing and lastly, time. Many of

these vehicles have been in accidents but the damage from which is no longer readily evident, however these

incidents may have severely distorted the location of body mounts. Even low mileage, pristine “survivor cars”

Page 6: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

6

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

can suffer from body sag due to uneven spring settling. Due to these factors, the body mounts located on the

frame may be slightly different than those on the body shell. This is considered normal, and is often not an issue

thanks to a large amount of adjustability. When fitting the frame to the body, shimming the body mounts is

recommended if a precise fit is desired.

Frame & Component Installation & Setup Frame removal and installation follow identical procedures between the stock frame and GT Sport frame. Refer

to the factory shop manuals for procedures and torque settings.

Prior to assembling the frame to body, all brake lines, fuel lines, parking brake cables, etc. should be attached.

To prevent interference later, it is imperative to be mindful of where the engine and headers will sit.

Prior to finishing, the frame should be disassembled. As the frame is assembled at Art Morrison Enterprises the

front and rear suspension is pre-set to initial alignment specifications as a quality check. To maintain these

settings, prior to getting the car aligned, be sure to take measurements of upper control arm shims and tie rod

lengths.

Ideally, all welding and drilling should be completed prior to powdercoating or painting. Please note that all

welds must not be ground smooth as this will weaken the frame’s structural integrity. If you wish to have the

welds smoothed use body filler instead.

After the finishing operation has been completed the frame can now be assembled. Set the frame on a level

surface in a well-lit area. Next, use a rat-tail file to clean all holes which bolts pass through and make sure all

threaded bosses are clear of powder or paint. To finish the preparation process, collect all fasteners and have

the torque specifications sheet handy.

To begin assembling, install the upper control arm/knuckle/lower control arm assembly by first fastening the

lower control arm bolts to the frame. Next, bolt the upper control arm to the frame ensuring that the alignment

bushings lay between the two. Hand-tighten all fasteners for now and repeat the process on the opposite side.

Now, install the steering rack with the fasteners, hand-tighten and attach the tie rod end to the knuckle. To

install the sway bar, first attach the end linkage to the bar using the drawing as a guide. Then attach the linkage

to the control arm and rotate the bar toward the bottom of the frame for attachment. To mount the coilovers,

attach the lower mount to the control arm with the provided fasteners and then attach the upper mount to the

chassis. As a starting point, set the coil spring adjuster to 1” above the lowest adjustment point.

When plumbing the steering rack, note the fitting closest to the radiator is the pressure line and the other is the

return. To start the bleeding process, first fill the reservoir full of power steering fluid. With the reservoir cap

removed and the wheels off the ground, turn the steering wheel lock-to-lock twenty times while monitoring the

fluid level. When complete, the engine can be started and checked for leaks. Before driving for the first time,

rotate the steering wheel another four times. See the Steering Rack Technical Guide later in this manual for

other important information.

Page 7: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

7

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

To complete the assembly process attach any brake lines, brackets, transmission crossmember and other

necessary components. Check every fastener for proper torque and mark with a paint pen as a visual

indicator.

If you purchased the optional Wilwood brake kit it is imperative the break-in procedure be followed very

carefully. Failure to follow these directions will lead to glazed pads and poor braking performance. If these

directions are missing from your brake kit, visit www.wilwood.com to download their instructions.

Alignment Specifications

Street Settings:

Toe: 1/32” to 1/16” total (in)

Camber: ½ to ¾ degree negative

Caster: 6 degrees positive

Autocross Settings:

Toe: 0 to 1/16” total (out)

Camber: 1-3/4 degree (Consult tire manufacturer)

Caster: 6 degrees positive

Road Course Settings:

Toe: 0 to 1/32” total (in)

Camber: 1-1/2 degree negative (Consult tire manufacturer)

Caster: 6 to 7 degrees positive

Post-Drive Checklist After the first 100 miles, please check these items:

1. All fasteners (including wheel lugs) 2. Brake fluid (Fluid level and check fittings for leaks) 3. Power steering fluid (Fluid level and check fittings for leaks) 4. Coolant (Fluid level and check fittings for leaks)) 5. Transmission fluid (if applicable) 6. Fuel lines (Check fittings for leaks) 7. Brake Lines (Check fittings for leaks) 8. Battery cables 9. Exhaust system

The coil springs should also be checked and readjusted if necessary. New springs will typically settle once after

several miles and usually do not need a second adjustment.

Page 8: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

8

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Sport IFS 47-53 Chevy Truck Wheel Size and Offset Specs Rear Wheel Dimensions With a bare housing width of 52-5/8", the rim width and backspace dimensions that will work with a widened wheel well are listed below: Max rim width: 9.5" Max section width: 11-1/4" Backspace: 5" Other sizes: 9" wide rim with 4-1/2" backspace 8" wide rim with 3-1/2" backspace 7" wide rim with 3" backspace Front Wheel Dimensions Caution! Front rim backspace will depend on brake choice. Please finalize your brake choice before purchasing wheels! Wilwood 11", 12.19", and AME Brake Kit: 9.5" wide rim with 5.5" backspace 8" wide rim with 4" backspace 7" wide rim with 3" backspace Wilwood 13" and 14" Brake Kits: 9.5" wide rim with 6" backspace 8" wide rim with 4-1/2" backspace 7" wide rim with 3-1/2" backspace

Page 9: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Deluxe IFS 47-53 Chevy Truck Wheel Size and Offset Specs Rear Wheel Dimensions With a bare housing width of 52-5/8" or 53-1/8”, the rim width and backspace dimensions that will work with an unaltered wheel well are listed below: Max rim width: 7" Max section width: 9-3/4" Backspace: 3" (52-5/8” housing) or 3-1/4” (53-1/8” housing) Other sizes: 9" wide rim with 5" backspace (52-5/8” housing) or 5-1/4” (53-1/8” housing) 8" wide rim with 4" backspace (52-5/8” housing) or 4-1/4” (53-1/8” housing) Front Wheel Dimensions Caution! Front rim backspace will depend on brake choice. Please finalize your brake choice before purchasing wheels! Wilwood 11", 12.19", and AME Brake Kit: 9.5" wide rim with 5" backspace 8" wide rim with 3-1/2" backspace 7" wide rim with 3" backspace Wilwood 13" and 14" Brake Kits: 9.5" wide rim with 5-1/2" backspace 8" wide rim with 4" backspace 7" wide rim with 3" backspace

Page 10: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

225mm Front/225mm Rear High Height Tire Example

Page 11: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

11

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

275mm Front/275mm Rear Low Height Tire Example

Page 12: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Important: Lifting a Vehicle with Two-Post Lifts The debate of choosing a four or two post lift is something that many can have strong opinions about.

While driving the vehicle onto a four post lift is convenient, it comes at a cost of requiring another

lifting assembly to raise the vehicle off of the ramps in order to remove the wheels and perform any

brake or suspension work.

Two post lifts solve this problem by lifting the vehicle by the frame or reinforced unibody structures.

However, the problem will arise with a two-post in which the vehicle is lifted unnaturally, meaning

loads are placed in areas that will cause some beaming flex. This type of flex is a function of frame

stiffness and body stiffness, with the frame stiffness is typically 30-40% of the total beaming stiffness.

Vehicles with heavy drivetrains will increase flex, as the majority of this weight (engines and axle

housings) are far away from the lifting points.

It should be noted that this flex is completely normal. Dealerships and OEMs use two posts lift which

should be a testament to their safety. However, this issue can become a problem with vehicles with

precision door gaps that are tighter than typical OEM specifications or body panels that have been

modified or removed for larger engines, aesthetics, etc. Panels and doors should always be fitted with

the vehicle on the ground or the frame properly supported in some way. Convertibles will always see

much more flex than coupes and sedans, to the point that doors may not open or shut. In most cases,

the older the vehicle, the higher probability for flex as body stiffness increased with newer vehicle

designs with more stringent safety standards.

While beaming flex may be alarming to some people, this does not mean the vehicle won’t drive

correctly. As mentioned before, it’s simply loading the vehicle in an unnatural way. Vehicles are

meant to be driven with the normal road force applied to the vehicle’s suspension, not applied to the

area below the rocker panels. Loading the vehicle properly allows the forces to be efficiently

transmitted through bracing and body panels with the upper areas in compression, whereas loading at

the rocker loads these areas in tension with the drivetrain and suspension acting as ballast which

encourages flex.

In summary, beaming flex is a normal occurrence when using two post lifts. Vehicles of all types, new

or old, full frame or unibody, coupes/sedans and convertibles, will flex. The magnitude of this flex

depends on vehicle age, condition, construction, design, drivetrain weight, and lastly the lifting point

spread – all of which is to be expected.

Page 13: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

13

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Steering Rack Technical Information

Hoses

For those using -06AN hoses, AME can supply the proper fittings. Be aware that some aftermarket

fittings do not use the correct threads and can damage the casting. Before installing, coat the O-ring

with power steering fluid and torque the fitting to 20 lb-ft.

The return hose can be any type of low-pressure hydraulic hose. The pressure hose can exhibit

pressures above 1500PSI and requires a high pressure hose. We do not recommend the use of any

stainless steel braided/Teflon lined hose for its inability to dampen hydraulic “chatter”, thus creating a

growl sound when turning the steering wheel. To keep this noise to a minimum, use a hose with a

rubber length of 15” or more.

The pressure fitting on the rack casting is the fitting closest to the front of the vehicle (lower fitting),

and the return fitting is the closest to the firewall (upper fitting).

Rack Centering

It is easier to center the steering rack before mounting the unit to the chassis. To center the rack, turn

the pinion to full lock and measure between any point on the rack body to the end of the tie rod in the

extended direction. Divide this distance by two, and rotate the pinion in the opposite direction until

this distance is reached. The rack is now centered. Using a paint pen, mark the pinion’s location on

the seal or housing so the rack can be re-centered if moved later.

Mounting

All Mustang-type steering racks mount using 5/8”-NF x 3.5” bolts when using an Art Morrison chassis.

Be sure to liberally coat the threads with anti-seize before installing. Torque bolts to 50 lb-ft. When

using rebuilt steering racks, end boots may be loosened and rotated to move the 3/16” equalizer tube

to a different location if more clearance is needed.

Tuning

Both steering racks respond well to fluid flow rates between 2 to 3 gallons per minute. Less flow tends

to increase steering effort, but too little may lead to pump “catch” where power steering assist

momentarily stops until the pump can “catch up” to the required fluid flow. Too much flow may lead

to a steering feel that is too light and possibly twitchy. Some power steering pumps have adjustable

flow rates, while most OEM type pumps do not. If you feel the fluid flow rate may be too high, contact

Art Morrison Enterprises for a valve that will allow approximately 2 gallons per minute of fluid flow.

Page 14: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

14

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Keep in mind that pumps originally used for steering boxes typically have higher pressure and flow

rates than what is required for steering racks.

If your pump provides too much pressure, fluid may escape past seals in the steering rack and cause a

failure, particularly with rebuilt steering racks. Art Morrison Enterprises has a pressure reducing kit to

correct these situations.

For cars using wide tires, Art Morrison Enterprises can supply steering stops that snap on to the rack

shaft with the boots removed. This provides a simple way to limit steering travel for cars with

interference issues.

Bleeding Procedure (Important! Do not skip this procedure!)

1. Place the front end of the vehicle on jack stands and remove drive belt. 2. Fill reservoir with high quality power steering fluid and rotate the pump pulley by hand for

about thirty seconds. 3. Have a second person rotate the steering wheel from lock to lock, about thirty times, while

continuing to rotate the power steering pump pulley by hand. Watch the fluid reservoir to make sure it does not run dry.

4. Install the drive belt and start the engine. Continue to rotate the steering wheel from lock to lock about fifteen times while the engine idles. Watch the fluid reservoir to make sure it does not run out of fluid, or appear foamy. If foam does appear, shut off the engine and restart the bleeding process.

5. When fluid appears free of foam, top off the reservoir and check for leaks.

This lengthy bleeding process will ensure the majority of the air is removed before initial startup to

prevent pump damage and provide trouble-free steering.

Steering Rack Specifications

Rebuilt 1979-93 DSE Standard Width DSE Narrow Width

Inner Ball Width 24.5” 24.5” 21.5”

Rack Travel (approx.) 5.5” 5.5” 4.5”

Turns lock-to-lock 3 3 2.5

Tie Rod Thread Size 9/16”-18

Input Shaft Spline ¾”-36

Fluid Flow Rate 2.0-3.0GPM 2.0GPM 2.0GPM

Peak Pressure 1200PSI 1800PSI 1800PSI

Pressure Fitting 9/16”-18

Return Fitting 5/8”-18

Page 15: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

15

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

DSE/Mustang Rack Steering Stop Information

Steering Limiter

Size (in)

Maximum

Steering Angle*

0 31.5

1/16 30.8

1/8 30.1

3/16 29.4

¼ 28.7

5/16 28

3/8 27.4

7/16 26.7

This guide is specific for a C6 suspension using the new steering arm, which is most likely to have wide

tires and wheels installed. However, for Pro Spindle based suspensions, the results are similar. To

install the limiter, roll the rubber boot away from the rack body and snap the plastic clip into place.

*Note: This angle represents the outside wheel when in a turn. The forward edge of the inside wheel

moves away from the frame and suspension, which negates any contact problem. When Ackerman is

considered, the actual maximum steering angle is 33 degrees.

Page 16: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

16

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Rear Coilover Installation

Page 17: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

17

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Rear Sway Bar Installation

Page 18: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

18

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Deluxe IFS Front Sway Bar Installation

Page 19: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

19

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Sport IFS Front Sway Bar Installation

Page 20: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

20

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Deluxe Front Upper Control Arm Installation

Page 21: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

21

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Deluxe Front Lower Control Arm Installation

Page 22: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

22

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Sport Front Lower Control Arm Installation

Page 23: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

23

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Front Upper Control Arm Installation

Page 24: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

24

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Ball Joint Cap Installation

Page 25: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

25

Rev0 MJ 05/13/2016 25

Optional Equipment: Stainless Brake Line Kit (High Height Models)

Page 26: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

26

Rev0 MJ 05/13/2016 26

Page 27: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

27

Rev0 MJ 05/13/2016 27

Page 28: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

28

Rev0 MJ 05/13/2016 28

Page 29: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

29

Rev0 MJ 05/13/2016 29

Page 30: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

30

Rev0 MJ 05/13/2016 30

Page 31: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

31

Rev0 MJ 05/13/2016 31

Optional Equipment: Stainless Brake Line Kit (Low Height Models)

Page 32: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

32

Rev0 MJ 05/13/2016 32

Page 33: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

33

Rev0 MJ 05/13/2016 33

Page 34: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

34

Rev0 MJ 05/13/2016 34

Page 35: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

35

Rev0 MJ 05/13/2016 35

Page 36: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

36

Rev0 MJ 05/13/2016 36

Page 37: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

37

Rev0 MJ 05/13/2016 37

Optional Equipment: Brake Proportioning Valve Mount Kit

Page 38: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

38

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Optional Equipment: Brake/Clutch Pedal Assembly Instructions

Brake/Clutch Pedal Assembly Instructions

PN 47530098 (Automatic Trans.) / 47530099 (Manual Trans.)

The Art Morrison Enterprises brake & clutch pedal assembly for 1947-54 Chevrolet pickups is an all new design utilizing permanently lubricated precision bushings and preload springs to reduce pedal vibration. This innovative design allows the use of a Wilwood Compact Remote master cylinder (3/4” bore recommended) for hydraulic clutch applications. Automatic transmission applications will simply use a spacer in place of the clutch pedal assembly which can be removed at a later time.

The brake master cylinder mounting plate is a dual pattern design that allows for Mopar or GM type master cylinders, as well as the common Bendix power booster stud pattern. Due to space limitations, only 7” or 8” power boosters may be used.

This pedal assembly can be used with AME’s GT Sport chassis or to the stock chassis with an optional bracket, PN 47530035.

It is assumed the pedal assembly will be disassembled for paint or powdercoat. While the assembly is simply the reversal of removal, the purpose of this manual is to help the end user reassemble the unit

Page 39: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

39

Rev0 MJ 05/13/2016 39

with minimal frustration. Please DO NOT powdercoat the pedal bushings. For this reason it is recommended the pedal arms be painted.

Assembly Procedures

1. Insert one assembly-to-frame bolt into hole nearest the clutch pedal and loosely secure with masking tape. This bolt cannot be installed when clutch pedal is installed.

2. Slide the center shaft support bracket near the middle of the pedal shaft. 3. Slide the wave springs over the pedal shaft on both sides of the center support bracket 4. Slide the brake pedal assembly over the left side of the pedal shaft. 5. Slide the clutch pedal (or spacer for automatic applications) over the right side of the pedal

shaft. Note that the clutch delete spacer does not use a wave spring. 6. Insert the pedal/shaft assembly into the welded bracket assembly. Make sure the rectangular

notch in the end of the center support bracket slides inside the rectangular hole in the master cylinder mounting plate.

7. Attach the pedal/shaft assembly to the welded bracket using the two countersunk screws. Torque to 25 lb-ft.

8. Attach the assembled unit to the frame using four 3/8” bolts. 9. Attach the power booster or master cylinder to the bracket assembly. Torque fasteners to 25

lb-ft. 10. Screw the brake pedal pushrod clevis to the master cylinder. 11. Attach brake clevis to pedal. Adjust the pushrod until a slight clearance is felt between the

pedal pushrod and master cylinder piston. 12. For manual transmission applications, attach the clutch master cylinder to the bracket

assembly. Torque fasteners to 18 lb-ft. Attach rod end to clutch master cylinder pushrod and attach to clutch pedal with a 5/16”-NF thin Nyloc nut. Adjust the pushrod until a slight clearance is felt between the pedal pushrod and master cylinder piston.

13. Insert remaining three frame mount bolts into bracket holes and fasten to frame, tightening to 25 lb-ft.

14. After pedal assembly is installed in the vehicle and pedal arms are through the firewall, slide pedal pads over pad bracket. Attach brackets to pedal arms using the supplied #10 countersunk screws.

Please note: Due to variances in height between the chassis and cab, some may need to enlarge the opening of the pedal pass-through holes.

Page 40: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

40

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Page 41: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

41

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Page 42: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

42

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

ITEM NO. PART NUMBER DESCRIPTION QTY.

1 47530029 47-53 PEDAL M/C MAIN MNT ASSY 1

2 47530040 47-53 BRAKE PEDAL SHAFT 1

3 47530041 47-53 PEDAL SHAFT BUSHING 4

4 47530033 47-53 PEDAL ASSY CENTER SUPPORT 1

5 70305270 3/8" x 1" NF FH SOC C/S 2

6 72714010 3/4" BORE WAVE SPRING 2

7 89891215 5/16" Femal Rod End w/ Stud 1

8 47530090 47-53 PEDAL BRAKE ASSM 1

9 47530091 47-53 PEDAL CLUTCH ASSM 1

10 47530095 47-53 PEDAL PAD W/ TABS 2

11 47530025 47-53 PEDAL RUBBER PAD 2

12 70100750 #10-32 X 0.750 CSK 4

13 47530026 PEDAL CLEVIS & PIN KIT 1

14 71311200 5/16" NF NYL THIN 1

15 72411000 3/8" SAE F/W PLTD 8

16 70405255 3/8" x 1-1/2" NC GR5 PLTD 4

17 71413700 3/8" NC NYL NUT 4

Page 43: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

43

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Page 44: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

44

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Page 45: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

45

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

ITEM NO. PART NUMBER DESCRIPTION QTY.

1 47530029 47-53 PEDAL M/C MAIN MNT ASSY 1

2 47530040 47-53 BRAKE PEDAL SHAFT 1

3 47530041 47-53 PEDAL SHAFT BUSHING 2

4 47530033 47-53 PEDAL ASSY CENTER SUPPORT 1

5 70305270 3/8" x 1" NF FH SOC C/S 2

6 72714010 3/4" BORE WAVE SPRING 1

7 47530090 47-53 PEDAL BRAKE ASSM 1

8 47530028 47-53 PEDAL PAD RUBBER AUTO 1

9 70100750 #10-32 X 0.750 CSK 2

10 47530026 PEDAL CLEVIS & PIN KIT 1

11 47530096 47-53 PEDAL PAD W/ TABS AUTO 1

12 72411000 3/8" SAE F/W PLTD 8

13 70405255 3/8" x 1-1/2" NC GR5 PLTD 4

14 71413700 3/8" NC NYL NUT 4

15 47530097 47-53 CLUTCH DELETE SPACER 1

Figure 1 - Pedal Assembly BOM (Auto Trans.)

Page 46: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

46

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Optional Equipment: LS Polyurethane Motor Mount Kit

Page 47: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

47

Rev0 MJ 05/13/2016 47

Optional Equipment: Coyote Rubber Motor Mount Kit

Page 48: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

48

Rev0 MJ 05/13/2016 48

Optional Equipment: LS Rubber Motor Mount Kit

Page 49: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

49

Rev0 MJ 05/13/2016 49

Optional equipment: 289/302/351W Rubber Motor Mount Kit

Page 50: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

50

Rev0 MJ 05/13/2016 50

Optional Equipment: Axle Housing Vent Kit

Page 51: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

51

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Fastener Information & Torque Specifications

AME is now offering an upgraded line of fasteners to

come standard with every AME chassis to provide

you with OEM quality grade fasteners for your street

machine or race car. AME’s chassis fasteners utilize a

Magni Coating for increased corrosion resistance,

flanged nuts and bolts for a greater load distribution,

and distorted thread locking nuts for a larger

resistance to loosening forces.

Advantages:

Resists corrosion up to 13x’s longer than typical Zinc

plated fasteners

Magni coating meets several OEM manufacturer

specifications including GM, Ford, and Chrysler

Flanged fasteners provide a larger load distribution on

the mating surface typically eliminating washers

Distorted thread lock nuts provide the increased

resistance to loosing forces from vibration and movement

Identification:

Magni coated fasteners consist of a Zinc base coat with an Aluminum top coat which results

in a gray-silver finish

Distorted Thread locking nuts with flanges have a distinctive tapered top edge and the

locking nuts without flanged contain a hexagon impression on the side.

Instructions:

All AME chassis are assembled with the Magni coated flanged bolts, but use Zinc plated jam

nuts for ease of assembly and mock-up during the building process

The matching lock nuts are provided loose in a bag with the chassis components

Upon final assembly only replace the jam nuts with the Magni Distorted Thread Lock Nuts

Installation of these nuts requires a significant increase in effort compared to other lock nuts.

They will generate some amount of heat during installation due to the interference fit.

Avoid reinstallation as much as possible. Like nylon-lock nuts, the locking capability wears

slightly every use, therefore if the tightening effort dramatically decreases, replace the nut

Reference AME torque specifications for final torque values

Contact AME for any replacement pieces of hardware or to retro-fit your previously

purchased chassis with the upgraded fasteners

Page 52: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

52

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847

Page 53: Frame Setup & Installation Instructions - Art Morrisonartmorrison.com/instructions/47-53-Chev3100-Installation... · Frame Setup & Installation Instructions 1947-53 Chevrolet 3100

53

ART MORRISON ENTERPRISES, INC 5301 8TH STREET EAST FIFE, WASHINGTON, 98424 (800) 929-7188 www.artmorrison.com (253) 922-7188 FAX (253) 922-8847