fqi - baseline program

17
Activity ID Activity Name Original Duration Start Finish Quantity Unit Measure Predecessors Successors FALAJ AL QABIL RO FALAJ AL QABIL ROUNDABOUT 608 30-Oct-13 29-Jun-15 741411 PREPARATORY WO PREPARATORY WORKS 608 30-Oct-13 29-Jun-15 0 GENERAL GENERAL 608 30-Oct-13 29-Jun-15 0 CONTRACTUAL & PR CONTRACTUAL & PRELIMINARIES 608 30-Oct-13 29-Jun-15 0 MILESTONE & MO MILESTONE & MOBILIZATION 608 30-Oct-13 29-Jun-15 0 MILESTONES MILESTONES 608 30-Oct-13 29-Jun-15 0 CONTRACTU CONTRACTUAL DATES 608 30-Oct-13 29-Jun-15 0 A0000 Contract Award Date 0 30-Oct-13 0 0 A6230, A6080, A6670, A6630 A6080 Mobilization 60 30-Oct-13 28-Dec-13 0 0 A0000 A6230, A6240, A6255, A6250 A6720 Construction Duration 548 29-Dec-13 29-Jun-15 0 0 A6680 A6100 A6100 Project Completion Date 0 29-Jun-15 0 0 A5640, A6690, A6720, A5 CONSTRUCT CONSTRUCTIONAL DATES 608 30-Oct-13 29-Jun-15 0 A6670 Project Commencement 0 30-Oct-13 0 0 A0000 A6680 A6680 Mobilization Completion 0 28-Dec-13 0 0 A6230, A6240, A6255, A6 A6690, A6720, A1260, A6110 A10580 Resolution of Falaj Location under Bridge 0 09-Feb-14 0 0 A999 A6100 A6700 Commence Traffic Diversions from Existing Roads to Temporary Roads 0 11-Feb-14 0 0 A1010 A6730, A6710 A6800 Resolution of all Expropriations about SR-2 0 25-Feb-14 0 0 A1330, A1340, A1400, A1 A6710 Complete Traffic Diversion from Temporary Roads to Batinah Highway 0 01-Jan-15 0 0 A5490, A6700, A6770, A6 A6690, A9900 A6730 Complete Traffic Diversion from Temporary Roads to Sohar-Buraimi Road 0 03-Mar-15 0 0 A5640, A6700 A6690 A6690 Completion of all works 0 29-Jun-15 0 0 A6680, A6710, A6740, A6 A6100 A6740 Complete Traffic Diversion from Temporary Roads to New Service Roads 0 29-Jun-15 0 0 A5780, A5940, A9640 A6690 MOBILIZATION MOBILIZATION 60 30-Oct-13 28-Dec-13 0 GENERAL GENERAL 60 30-Oct-13 28-Dec-13 0 A6230 Obtain NOC's 60 30-Oct-13 28-Dec-13 0 0 A0000, A6080 A6240, A6260, A6255, A6680 A6240 Setting-up Engineer's Offices 38 09-Nov-13 16-Dec-13 0 0 A6230, A6080 A6250, A6680 A6260 Erection of Laboratory & Store 45 14-Nov-13 28-Dec-13 0 0 A6230, A6080 A6680 A6250 Setting-up Contractor's Offices 38 16-Nov-13 23-Dec-13 0 0 A6240, A6080 A6680 A6255 Setting-up of Contractor's Camp 35 24-Nov-13 28-Dec-13 0 0 A6230, A6080 A6680 TRAFFIC MANA TRAFFIC MANAGEMENT 53 06-Nov-13 28-Dec-13 0 GENERAL GENERAL 53 06-Nov-13 28-Dec-13 0 A6630 Submit Traffic Mangement Plans 15 06-Nov-13 20-Nov-13 0 0 A0000 A6640 A6640 Approve Traffic Mnagement Plans 15 17-Nov-13 01-Dec-13 0 0 A6630 A6650 A6650 Obtain Traffic NOC's 15 02-Dec-13 16-Dec-13 0 0 A6640 A6660 A6660 Obtain Approval from RO P Police 12 17-Dec-13 28-Dec-13 0 0 A6650, A6230 A1260, A1070 SHOP DRAWING SHOP DRAWINGS 535 29-Dec-13 16-Jun-15 0 GENERAL GENERAL 535 29-Dec-13 16-Jun-15 0 A10620 Prepare & Submit Shop Drawings 520 29-Dec-13 01-Jun-15 A6680 A10630 A10630 Approval of Shop Drawings 520 13-Jan-14 16-Jun-15 A10620 PROCUREMENT PROCUREMENT 578 29-Nov-13 29-Jun-15 0 MATERIAL MATERIAL 561 16-Dec-13 29-Jun-15 0 PRECAST MS PRECAST MSE WALL PANELS 75 16-Dec-13 28-Feb-14 0 A6300 Submit Material for Appr oval 15 16-Dec-13 30-Dec-13 0 0 A0000 A6310 A6310 Obtain Material Approval 20 31-Dec-13 19-Jan-14 0 0 A6300 A6320 A6320 Delivery to Site 40 20-Jan-14 28-Feb-14 0 0 A6310 A5020 POT BEARIN POT BEARINGS 170 03-Jan-14 21-Jun-14 0 A6450 Submit Material for Appr oval 20 03-Jan-14 22-Jan-14 0 0 A0000 A6460 A6460 Obtain Material Approval 30 23-Jan-14 21-Feb-14 0 0 A6450 A6470 A6470 Delivery to Site 120 22-Feb-14 21-Jun-14 0 0 A6460 A1640, A3500, A3850, A4310 EXPANSION J EXPANSION JOINT 170 11-Jan-15 29-Jun-15 0 A10590 Submit Material for Appr oval 20 11-Jan-15 30-Jan-15 0 0 A10600 A10600 Obtain Material Approval 30 31-Jan-15 01-Mar-15 0 0 A10590 A10610 A10610 Delivery to Site 120 02-Mar-15 29-Jun-15 0 0 A10600 LIGHTING PO LIGHTING POLES & LUMINARIES 140 03-Mar-14 20-Jul-14 0 A6330 Submit Material for Appr oval 20 03-Mar-14 22-Mar-14 0 0 A0000 A6340 J J J J J J J J J 2014 2015 2016 29-Jun-15, FALAJ AL QABI 29-Jun-15, PREPARATORY 29-Jun-15, GENERAL 29-Jun-15, CONTRACTUA 29-Jun-15, MILESTONE & 29-Jun-15, MILESTONES 29-Jun-15, CONTRACTUA Contract Award Date Mobilization Construction Duration Project Completion Date 29-Jun-15, CONSTRUCTIO Project Commencement Mobilization Completion Resolution of Falaj Location under Bridge Commence Traffic Diversions from Existing Roads to T Resolution of all Expropriations about SR-2 Complete Traffic Diversion from Temp Complete Traffic Diversion from Te Completion of all works Complete Traffic Diversion f 28-Dec-13, MOBILIZATION 28-Dec-13, GENERAL Obtain NOC's Setting-up Engineer's Offices Erection of Laboratory & Store Setting-up Contractor's Offices Setting-up of Contractor's Camp 28-Dec-13, TRAFFIC MANAGEMENT 28-Dec-13, GENERAL Submit Traffic Mangement Plans Approve Tr affic Mnagement Plans Obtain Traffic NOC's Obtain Appr oval from RO P Police 16-Jun-15, SHOP DRAWING 16-Jun-15, GENERAL Prepare & Submit Shop Draw Approval of Shop Drawings 29-Jun-15, PROCUREMEN 29-Jun-15, MATERIAL 28-Feb-14, PRECAST MSE WALL PANELS Submit Material for Appr oval Obtain Material Approval Delivery to Site 21-Jun-14, POT BEARINGS Submit Material for Appr oval Obtain Material Approval Delivery to Site 29-Jun-15, EXPANSION JO Submit Material for Appr oval Obtain Material Approval Delivery to Site 20-Jul-14, LIGHTING POLES & LUMINARIES Submit Material for Appr oval CCC OMAN LLC Primary Baseline Actual Work Remaining Work Critical Remaining Work Milestone Summary UPGRADING OF FALAJ AL QABAIL ROUNDABOUT Page 1 of 17 Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM Date Revision Checked Approved 13-Apr-14 FQI - REV2 18 September 2014 12-Oct-14 FQI - REV3 02-Feb-15 FQI - REV3 A

Upload: muneerpmh

Post on 22-Dec-2015

27 views

Category:

Documents


0 download

DESCRIPTION

Falaj al Qabail Interchange project is for the upgrading of existing Falaj al Qabail roundabout including sixlanes flyover and approaches.

TRANSCRIPT

Page 1: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

FALAJ AL QABIL ROUNDABOUTFALAJ AL QABIL ROUNDABOUT 608 30-Oct-13 29-Jun-15 741411

PREPARATORY WORKSPREPARATORY WORKS 608 30-Oct-13 29-Jun-15 0

GENERALGENERAL 608 30-Oct-13 29-Jun-15 0

CONTRACTUAL & PRELIMINARIESCONTRACTUAL & PRELIMINARIES 608 30-Oct-13 29-Jun-15 0

MILESTONE & MOBILIZATIONMILESTONE & MOBILIZATION 608 30-Oct-13 29-Jun-15 0

MILESTONESMILESTONES 608 30-Oct-13 29-Jun-15 0

CONTRACTUAL DATESCONTRACTUAL DATES 608 30-Oct-13 29-Jun-15 0

A0000 Contract Award Date 0 30-Oct-13 0 0 A6230, A6080, A6670, A6630,

A6080 Mobilization 60 30-Oct-13 28-Dec-13 0 0 A0000 A6230, A6240, A6255, A6250, A6260, A6680

A6720 Construction Duration 548 29-Dec-13 29-Jun-15 0 0 A6680 A6100

A6100 Project Completion Date 0 29-Jun-15 0 0 A5640, A6690, A6720, A57

CONSTRUCTIONAL DATESCONSTRUCTIONAL DATES 608 30-Oct-13 29-Jun-15 0

A6670 Project Commencement 0 30-Oct-13 0 0 A0000 A6680

A6680 Mobilization Completion 0 28-Dec-13 0 0 A6230, A6240, A6255, A6250, A6260, A6080, A6670A6690, A6720, A1260, A6110, A10620

A10580 Resolution of Falaj Location under Bridge 0 09-Feb-14 0 0 A999 A6100

A6700 Commence Traffic Diversions from Existing Roads to Temporary Roads 0 11-Feb-14 0 0 A1010 A6730, A6710

A6800 Resolution of all Expropriations about SR-2 0 25-Feb-14 0 0 A1330, A1340, A1400, A1410

A6710 Complete Traffic Diversion from Temporary Roads to Batinah Highway 0 01-Jan-15 0 0 A5490, A6700, A6770, A6790, A3940A6690, A9900

A6730 Complete Traffic Diversion from Temporary Roads to Sohar-Buraimi Road 0 03-Mar-15 0 0 A5640, A6700 A6690

A6690 Completion of all works 0 29-Jun-15 0 0 A6680, A6710, A6740, A6730A6100

A6740 Complete Traffic Diversion from Temporary Roads to New Service Roads 0 29-Jun-15 0 0 A5780, A5940, A9640 A6690

MOBILIZATIONMOBILIZATION 60 30-Oct-13 28-Dec-13 0

GENERALGENERAL 60 30-Oct-13 28-Dec-13 0

A6230 Obtain NOC's 60 30-Oct-13 28-Dec-13 0 0 A0000, A6080 A6240, A6260, A6255, A6680, A6660

A6240 Setting-up Engineer's Offices 38 09-Nov-13 16-Dec-13 0 0 A6230, A6080 A6250, A6680

A6260 Erection of Laboratory & Store 45 14-Nov-13 28-Dec-13 0 0 A6230, A6080 A6680

A6250 Setting-up Contractor's Offices 38 16-Nov-13 23-Dec-13 0 0 A6240, A6080 A6680

A6255 Setting-up of Contractor's Camp 35 24-Nov-13 28-Dec-13 0 0 A6230, A6080 A6680

TRAFFIC MANAGEMENTTRAFFIC MANAGEMENT 53 06-Nov-13 28-Dec-13 0

GENERALGENERAL 53 06-Nov-13 28-Dec-13 0

A6630 Submit Traffic Mangement Plans 15 06-Nov-13 20-Nov-13 0 0 A0000 A6640

A6640 Approve Traffic Mnagement Plans 15 17-Nov-13 01-Dec-13 0 0 A6630 A6650

A6650 Obtain Traffic NOC's 15 02-Dec-13 16-Dec-13 0 0 A6640 A6660

A6660 Obtain Approval from ROP Police 12 17-Dec-13 28-Dec-13 0 0 A6650, A6230 A1260, A1070

SHOP DRAWINGSSHOP DRAWINGS 535 29-Dec-13 16-Jun-15 0

GENERALGENERAL 535 29-Dec-13 16-Jun-15 0

A10620 Prepare & Submit Shop Drawings 520 29-Dec-13 01-Jun-15 A6680 A10630

A10630 Approval of Shop Drawings 520 13-Jan-14 16-Jun-15 A10620

PROCUREMENTPROCUREMENT 578 29-Nov-13 29-Jun-15 0

MATERIALMATERIAL 561 16-Dec-13 29-Jun-15 0

PRECAST MSE WALL PANELSPRECAST MSE WALL PANELS 75 16-Dec-13 28-Feb-14 0

A6300 Submit Material for Approval 15 16-Dec-13 30-Dec-13 0 0 A0000 A6310

A6310 Obtain Material Approval 20 31-Dec-13 19-Jan-14 0 0 A6300 A6320

A6320 Delivery to Site 40 20-Jan-14 28-Feb-14 0 0 A6310 A5020

POT BEARINGSPOT BEARINGS 170 03-Jan-14 21-Jun-14 0

A6450 Submit Material for Approval 20 03-Jan-14 22-Jan-14 0 0 A0000 A6460

A6460 Obtain Material Approval 30 23-Jan-14 21-Feb-14 0 0 A6450 A6470

A6470 Delivery to Site 120 22-Feb-14 21-Jun-14 0 0 A6460 A1640, A3500, A3850, A4310

EXPANSION JOINTEXPANSION JOINT 170 11-Jan-15 29-Jun-15 0

A10590 Submit Material for Approval 20 11-Jan-15 30-Jan-15 0 0 A10600

A10600 Obtain Material Approval 30 31-Jan-15 01-Mar-15 0 0 A10590 A10610

A10610 Delivery to Site 120 02-Mar-15 29-Jun-15 0 0 A10600

LIGHTING POLES & LUMINARIESLIGHTING POLES & LUMINARIES 140 03-Mar-14 20-Jul-14 0

A6330 Submit Material for Approval 20 03-Mar-14 22-Mar-14 0 0 A0000 A6340

J J J J J J J J J

2014 2015 2016

29-Jun-15, FALAJ AL QABIL

29-Jun-15, PREPARATORY WORKS

29-Jun-15, GENERAL

29-Jun-15, CONTRACTUAL

29-Jun-15, MILESTONE & M

29-Jun-15, MILESTONES

29-Jun-15, CONTRACTUAL DATES

Contract Award Date

Mobilization

Construction Duration

Project Completion Date

29-Jun-15, CONSTRUCTIONAL DATES

Project Commencement

Mobilization Completion

Resolution of Falaj Location under Bridge

Commence Traffic Diversions from Existing Roads to T

Resolution of all Expropriations about SR-2

Complete Traffic Diversion from Temp

Complete Traffic Diversion from Te

Completion of all works

Complete Traffic Diversion fr

28-Dec-13, MOBILIZATION

28-Dec-13, GENERAL

Obtain NOC's

Setting-up Engineer's Offices

Erection of Laboratory & Store

Setting-up Contractor's Offices

Setting-up of Contractor's Camp28-Dec-13, TRAFFIC MANAGEMENT

28-Dec-13, GENERAL

Submit Traffic Mangement Plans

Approve Traffic Mnagement Plans

Obtain Traffic NOC's

Obtain Approval from ROP Police16-Jun-15, SHOP DRAWINGS

16-Jun-15, GENERAL

Prepare & Submit Shop Drawings

Approval of Shop Drawings29-Jun-15, PROCUREMENT

29-Jun-15, MATERIAL

28-Feb-14, PRECAST MSE WALL PANELS

Submit Material for Approval

Obtain Material Approval

Delivery to Site21-Jun-14, POT BEARINGS

Submit Material for Approval

Obtain Material Approval

Delivery to Site29-Jun-15, EXPANSION JOINT

Submit Material for Approval

Obtain Material Approval

Delivery to Site20-Jul-14, LIGHTING POLES & LUMINARIES

Submit Material for Approval

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 1 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 2: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A6340 Obtain Material Approval 20 23-Mar-14 11-Apr-14 0 0 A6330 A6350

A6350 Delivery to Site 100 12-Apr-14 20-Jul-14 0 0 A6340 A4670, A5990, A5010

PRECAST CONC. BARRIER MOLDSPRECAST CONC. BARRIER MOLDS 75 06-May-14 19-Jul-14 0

A6270 Submit Material for Approval 15 06-May-14 20-May-14 0 0 A0000 A6280

A6280 Obtain Material Approval 20 21-May-14 09-Jun-14 0 0 A6270 A6290

A6290 Delivery to Site 40 10-Jun-14 19-Jul-14 0 0 A6280 A4550, A3920, A5400

RC STORM SEWERRC STORM SEWER 50 28-Dec-13 15-Feb-14 0

A6360 Submit Material for Approval 15 28-Dec-13 11-Jan-14 0 0 A0000 A6370

A6370 Obtain Material Approval 15 12-Jan-14 26-Jan-14 0 0 A6360 A6380

A6380 Delivery to Site 20 27-Jan-14 15-Feb-14 0 0 A6370 A5100, A5140

GUARDRAILGUARDRAIL 100 09-Aug-14 16-Nov-14 0

A6420 Submit Material for Approval 20 09-Aug-14 28-Aug-14 0 0 A0000 A6430

A6430 Obtain Material Approval 20 29-Aug-14 17-Sep-14 0 0 A6420 A6440

A6440 Delivery to Site 60 18-Sep-14 16-Nov-14 0 0 A6430 A5460

ROAD SIGNSROAD SIGNS 60 18-Sep-14 16-Nov-14 0

A6390 Submit Material for Approval 20 18-Sep-14 07-Oct-14 0 0 A0000 A6400

A6400 Obtain Material Approval 20 08-Oct-14 27-Oct-14 0 0 A6390 A6410

A6410 Delivery to Site 20 28-Oct-14 16-Nov-14 0 0 A6400 A5470, A5930, A5620, A5760

S/CS/C 233 29-Nov-13 19-Jul-14 0

ELECTRICAL S/CELECTRICAL S/C 75 15-Dec-13 27-Feb-14 0

A6510 Select S/C 15 15-Dec-13 29-Dec-13 0 0 A0000 A6520

A6520 Approve S/C 15 30-Dec-13 13-Jan-14 0 0 A6510 A6530

A6530 Mobilization to Site 45 14-Jan-14 27-Feb-14 0 0 A6520 A1360, A1100, A4800, A4910

WATER S/CWATER S/C 75 20-Dec-13 04-Mar-14 0

A6540 Select S/C 15 20-Dec-13 03-Jan-14 0 0 A0000 A6550

A6550 Approve S/C 15 04-Jan-14 18-Jan-14 0 0 A6540 A6560

A6560 Mobilization to Site 45 19-Jan-14 04-Mar-14 0 0 A6550 A1280, A1020

TELEPHONE S/CTELEPHONE S/C 75 15-Dec-13 27-Feb-14 0

A6570 Select S/C 15 15-Dec-13 29-Dec-13 0 0 A0000 A6580

A6580 Approve S/C 15 30-Dec-13 13-Jan-14 0 0 A6570 A6590

A6590 Mobilization to Site 45 14-Jan-14 27-Feb-14 0 0 A6580 A1450, A1890, A1210

PILING S/CPILING S/C 75 29-Nov-13 11-Feb-14 0

A6480 Select S/C 15 29-Nov-13 13-Dec-13 0 0 A0000 A6490

A6490 Approve S/C 15 14-Dec-13 28-Dec-13 0 0 A6480 A6500

A6500 Mobilization to Site 45 29-Dec-13 11-Feb-14 0 0 A6490 A1540, A3160

POST TENSIONING S/CPOST TENSIONING S/C 75 06-May-14 19-Jul-14 0

A6600 Select S/C 15 06-May-14 20-May-14 0 0 A0000 A6610

A6610 Approve S/C 15 21-May-14 04-Jun-14 0 0 A6600 A6620

A6620 Mobilization to Site 45 05-Jun-14 19-Jul-14 0 0 A6610 A1670

BATINAH HIGHWAYBATINAH HIGHWAY 548 29-Dec-13 29-Jun-15 609312

HIGHWAY & SLIP ROADSHIGHWAY & SLIP ROADS 530 29-Dec-13 11-Jun-15 571511

SOL1, SOL5, SOL6SOL1, SOL5, SOL6 407 29-Dec-13 08-Feb-15 480323

TEMPORARY DIVERSION FOR EXISTING NORTHERN SERVICE ROADTEMPORARY DIVERSION FOR EXISTING NORTHERN SERVICE ROAD 21 29-Dec-13 18-Jan-14 327

SR1 (CH 0+000 to CH 0+797)SR1 (CH 0+000 to CH 0+797) 21 29-Dec-13 18-Jan-14 327

GENERALGENERAL 21 29-Dec-13 18-Jan-14 327

A1260 Laying of Asphalt of Temp. Road over SR-1 15 29-Dec-13 12-Jan-14 327 M3 A6660, A6680 A10330

A10330 Placing Plastic Barriers 5 14-Jan-14 18-Jan-14 0 0 A1260 A1270

A1270 Shift Traffic from Existing Northern Service Road to Temp. SR-1 0 18-Jan-14 0 0 A10330 A9940, A1330, A1340, A1400, A1410, A10490

TEMPORARY DIVERSION FOR EXISTING HIGHWAY - NORTH BOUNDTEMPORARY DIVERSION FOR EXISTING HIGHWAY - NORTH BOUND 45 29-Dec-13 11-Feb-14 655

SOL1-NORTH (CH 21+100 to CH 25+300)SOL1-NORTH (CH 21+100 to CH 25+300) 45 29-Dec-13 11-Feb-14 655

GENERALGENERAL 45 29-Dec-13 11-Feb-14 655

A1070 Protection of services 15 29-Dec-13 12-Jan-14 0 0 A6660 A1000, A999

A1000 Laying of Asphalt on Temp. new Road Adjacent to SOL1-NB 30 13-Jan-14 11-Feb-14 655 M3 A1070, A999 A1005, A9910

A1005 Placing of Plastic Barriers 8 04-Feb-14 11-Feb-14 0 0 A1000 A1010

A999 Resolution of Falaj Relocation Under Temp. Diversion 0 09-Feb-14 A1070 A1000, A10580

J J J J J J J J J

2014 2015 2016

Obtain Material Approval

Delivery to Site19-Jul-14, PRECAST CONC. BARRIER MOLDS

Submit Material for Approval

Obtain Material Approval

Delivery to Site15-Feb-14, RC STORM SEWER

Submit Material for Approval

Obtain Material Approval

Delivery to Site16-Nov-14, GUARDRAIL

Submit Material for Approval

Obtain Material Approval

Delivery to Site16-Nov-14, ROAD SIGNS

Submit Material for Approval

Obtain Material Approval

Delivery to Site19-Jul-14, S/C

27-Feb-14, ELECTRICAL S/C

Select S/C

Approve S/C

Mobilization to Site04-Mar-14, WATER S/C

Select S/C

Approve S/C

Mobilization to Site27-Feb-14, TELEPHONE S/C

Select S/C

Approve S/C

Mobilization to Site11-Feb-14, PILING S/C

Select S/C

Approve S/C

Mobilization to Site19-Jul-14, POST TENSIONING S/C

Select S/C

Approve S/C

Mobilization to Site29-Jun-15, BATINAH HIGHWAY

11-Jun-15, HIGHWAY & SLIP ROADS

08-Feb-15, SOL1, SOL5, SOL6

18-Jan-14, TEMPORARY DIVERSION FOR EXISTING

18-Jan-14, SR1 (CH 0+000 to CH 0+797)

18-Jan-14, GENERAL

Laying of Asphalt of Temp. Road over SR-1

Placing Plastic BarriersShift Traffic from Existing Northern Service Road to Temp. SR-1

11-Feb-14, TEMPORARY DIVERSION FOR EXISTING

11-Feb-14, SOL1-NORTH (CH 21+100 to CH 25+300)

11-Feb-14, GENERAL

Protection of services

Laying of Asphalt on Temp. new Road Adjacent to SOL1-NB

Placing of Plastic BarriersResolution of Falaj Relocation Under Temp. Diversion

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 2 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 3: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A1010 Shift Traffic from Existing Main Road NB to Temp. diversion 0 11-Feb-14 0 0 A1005 A6700, A2940, A2800, A5090, A1540, A2660, A3160, A5310

TEMPORARY DIVERSION FOR EXISTING SOUTHERN SERVICE ROADTEMPORARY DIVERSION FOR EXISTING SOUTHERN SERVICE ROAD 48 19-Jan-14 07-Mar-14 655

SR2 (CH 0+000 to CH 1+450)SR2 (CH 0+000 to CH 1+450) 48 19-Jan-14 07-Mar-14 655

GENERALGENERAL 48 19-Jan-14 07-Mar-14 655

A10490 Protection of services 15 19-Jan-14 02-Feb-14 0 0 A1270 A9940, A10500

A9940 Laying of Asphalt Adjacent to SR-2 30 03-Feb-14 04-Mar-14 655 M3 A1270, A10490, A1330, A1340, A1400, A1410A9950

A1330 Resolution of expropriation of Fuel Station (SR-2 CH 1+140) 0 25-Feb-14 0 0 A1270 A6800, A9940

A1340 Resolution of expropriation of Graveyard (SR-2 CH 0+900) 0 25-Feb-14 0 0 A1270 A6800, A9940

A1400 Resolution of expropriation of Al-Falaj Shopping (SR-2 CH 0+380) 0 25-Feb-14 0 0 A1270 A6800, A9940

A1410 Resolution of expropriation of Shopping Buildings (SR-2 CH 0+300) 0 25-Feb-14 0 0 A1270 A6800, A9940

A9950 Placing Plastic Barriers 3 05-Mar-14 07-Mar-14 0 0 A9940 A10340

A10340 Shift Traffic from Existing Southern Service Road Temp. SR-2 0 07-Mar-14 0 0 A9950 A9910

TEMPORARY DIVERSION FOR EXISTING HIGHWAY - SOUTH BOUNDTEMPORARY DIVERSION FOR EXISTING HIGHWAY - SOUTH BOUND 57 25-Jan-14 22-Mar-14 764

SOL1-SOUTH (CH 25+300 to CH 21+100)SOL1-SOUTH (CH 25+300 to CH 21+100) 57 25-Jan-14 22-Mar-14 764

GENERALGENERAL 57 25-Jan-14 22-Mar-14 764

A10500 Protection of services 15 25-Jan-14 08-Feb-14 0 0 A10490 A9910

A9910 Laying of Asphalt on Temp. Road Adjacent to SOL-1 SB over SOLs 4&7 35 09-Feb-14 15-Mar-14 764 M3 A1000, A10340, A10500 A9920

A9920 Placing Plastic Barriers 7 16-Mar-14 22-Mar-14 0 0 A9910 A9930

A9930 Shift Traffic from Existing Main Road SB to Temp. diversion 0 22-Mar-14 0 0 A9920 A2940, A2800, A10350, A2660, A4000, A1360

INVESTIGATIONINVESTIGATION 33 29-Dec-13 30-Jan-14 0

GEOTECHNICAL INVESTIGATIONGEOTECHNICAL INVESTIGATION 33 29-Dec-13 30-Jan-14 0

GENERALGENERAL 33 29-Dec-13 30-Jan-14 0

A6110 Site Survey 10 29-Dec-13 07-Jan-14 0 0 A6680 A6120

A6120 Setting up Drilling Rigs 7 08-Jan-14 14-Jan-14 0 0 A6110 A6130, A1540, A3160, A6140

A6130 Execution of Trial Pits 7 15-Jan-14 21-Jan-14 0 0 A6120 A6140

A6140 Execution of Trial Boreholes 7 15-Jan-14 21-Jan-14 0 0 A6130, A6120 A6150

A6150 (SPT) Test 5 22-Jan-14 26-Jan-14 0 0 A6140 A6160

A6160 Laboratory Testing Report 4 27-Jan-14 30-Jan-14 0 0 A6150 A6170

GENERAL CIVIL WORKSGENERAL CIVIL WORKS 114 12-Feb-14 05-Jun-14 11743

CLEARING & EXCAVATIONCLEARING & EXCAVATION 114 12-Feb-14 05-Jun-14 11743

GENERALGENERAL 114 12-Feb-14 05-Jun-14 11743

A5310 Clearing & Grubbing 30 12-Feb-14 13-Mar-14 4259 M2 A1010 A5320

A5320 Removal of Structures & Obstructures 60 26-Feb-14 26-Apr-14 1 LS A5310 A5330

A5330 Utilities Trench Ear thworks 60 26-Feb-14 26-Apr-14 1641 M3 A5320 A5340, A1450

A5340 Structural & Road Way Excavation 100 26-Feb-14 05-Jun-14 5842 M3 A5330 A4580

UTILITIESUTILITIES 56 28-Feb-14 24-Apr-14 14200

GENERALGENERAL 56 28-Feb-14 24-Apr-14 14200

TELEPHONETELEPHONE 30 28-Feb-14 29-Mar-14 2200

A1450 Installation of New (GTO) Omantal Line 12 28-Feb-14 11-Mar-14 1100 0 A5330, A6590 A1455, A1890, A1360, A1990

A1455 Obtain Shutdown & Connect to Existing 15 12-Mar-14 26-Mar-14 0 0 A1450 A1457

A1457 Remove & Dispose Existing (GTO) Omantal Line 3 27-Mar-14 29-Mar-14 1100 0 A1455 A5030

ELECTRICAL (11 KV)ELECTRICAL (11 KV) 56 28-Feb-14 24-Apr-14 6400

A1360 Installation of New 11 Kv Overhead Lines 30 28-Feb-14 29-Mar-14 3000 0 A1450, A6530, A9930 A1365, A1970, A1280, A1376

A1365 Obtain Shutdown & Connect to Existing 15 30-Mar-14 13-Apr-14 0 0 A1360 A1367

A1367 Remove & Dispose Existing 11 Kv Overhead Lines 7 14-Apr-14 20-Apr-14 400 0 A1365 A1376, A1315

A1376 Remove & Dispose Existing 11 Kv Under Ground Lines 4 21-Apr-14 24-Apr-14 3000 0 A1367, A1360 A5020

ELECTRICAL (33 KV)ELECTRICAL (33 KV) 10 07-Apr-14 16-Apr-14 400

A1335 Obtain Shutdown & Connect to Existing 7 07-Apr-14 13-Apr-14 0 0 A0000 A1315

A1315 Remove & Dispose Existing 33 Kv Ovehead Lines 3 14-Apr-14 16-Apr-14 400 0 A1367, A1335 A1300

WATERLINESWATERLINES 47 05-Mar-14 20-Apr-14 5200

A1280 Installation of New Irrigation Pipes 25 05-Mar-14 29-Mar-14 2600 0 A1360, A6560 A1290, A1850

A1290 Obtain Shutdown & Connect to Existing 15 30-Mar-14 13-Apr-14 0 0 A1280 A1300, A2950

A1300 Remove & Dispose Existing Irrigation Pipes 7 14-Apr-14 20-Apr-14 2600 0 A1290, A1315 A2800, A2660, A2940

UTILITIES (P.S.)UTILITIES (P.S.) 54 05-Mar-14 27-Apr-14 0

GENERALGENERAL 54 05-Mar-14 27-Apr-14 0

J J J J J J J J J

2014 2015 2016

Shift Traffic from Existing Main Road NB to Temp. diversion

07-Mar-14, TEMPORARY DIVERSION FOR EXISTIN

07-Mar-14, SR2 (CH 0+000 to CH 1+450)

07-Mar-14, GENERAL

Protection of services

Laying of Asphalt Adjacent to SR-2Resolution of expropriation of Fuel Station (SR-2 CH 1+140)

Resolution of expropriation of Graveyard (SR-2 CH 0+900)

Resolution of expropriation of Al-Falaj Shopping (SR-2 CH 0+380)

Resolution of expropriation of Shopping Buildings (SR-2 CH 0+300)

Placing Plastic BarriersShift Traffic from Existing Southern Service Road Temp. SR-2

22-Mar-14, TEMPORARY DIVERSION FOR EXISTIN

22-Mar-14, SOL1-SOUTH (CH 25+300 to CH 21+100)

22-Mar-14, GENERAL

Protection of services

Laying of Asphalt on Temp. Road Adjacent to SOL-1 S

Placing Plastic BarriersShift Traffic from Existing Main Road SB to Temp. diversion

30-Jan-14, INVESTIGATION

30-Jan-14, GEOTECHNICAL INVESTIGATION

30-Jan-14, GENERAL

Site Survey

Setting up Drilling Rigs

Execution of Trial Pits

Execution of Trial Boreholes

(SPT) Test

Laboratory Testing Report05-Jun-14, GENERAL CIVIL WORKS

05-Jun-14, CLEARING & EXCAVATION

05-Jun-14, GENERAL

Clearing & Grubbing

Removal of Structures & Obstructures

Utilities Trench Ear thworks

Structural & Road Way Excavation24-Apr-14, UTILITIES

24-Apr-14, GENERAL

29-Mar-14, TELEPHONE

Installation of New (GTO) Omantal Line

Obtain Shutdown & Connect to Existing

Remove & Dispose Existing (GTO) Omantal Line24-Apr-14, ELECTRICAL (11 KV)

Installation of New 11 Kv Overhead Lines

Obtain Shutdown & Connect to Existing

Remove & Dispose Existing 11 Kv Overhead Lines

Remove & Dispose Existing 11 Kv Under Ground Lines16-Apr-14, ELECTRICAL (33 KV)

Obtain Shutdown & Connect to Existing

Remove & Dispose Existing 33 Kv Ovehead Lines20-Apr-14, WATERLINES

Installation of New Irrigation Pipes

Obtain Shutdown & Connect to Existing

Remove & Dispose Existing Irrigation Pipes27-Apr-14, UTILITIES (P.S.)

27-Apr-14, GENERAL

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 3 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 4: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

TELEPHONETELEPHONE 30 05-Mar-14 03-Apr-14 0

A1890 Provide & Install New Utilities 12 05-Mar-14 16-Mar-14 0 0 A1450, A6590 A1900, A1920

A1920 Remove & Relocate of Existing Utilities 22 05-Mar-14 26-Mar-14 0 0 A1890 A1910

A1900 Obtain Shutdown & Connect to Existing 15 17-Mar-14 31-Mar-14 0 0 A1890 A1910

A1910 Remove & Dispose of Existing Utilities 3 01-Apr-14 03-Apr-14 0 0 A1900, A1920 A1990

ELECTRICALELECTRICAL 54 05-Mar-14 27-Apr-14 0

A1970 Provide & Install New Utilities 30 05-Mar-14 03-Apr-14 0 0 A1360 A1980, A2000

A2000 Remove & Relocate of Existing Utilities 47 05-Mar-14 20-Apr-14 0 0 A1970 A1990

A1980 Obtain Shutdown & Connect to Existing 15 04-Apr-14 18-Apr-14 0 0 A1970 A1990

A1990 Remove & Dispose of Existing Utilities 7 21-Apr-14 27-Apr-14 0 0 A1980, A2000, A1910, A1450A1870

WATERLINESWATERLINES 49 10-Mar-14 27-Apr-14 0

A1850 Provide & Install New Utilities 25 10-Mar-14 03-Apr-14 0 0 A1280 A1860, A1880

A1880 Remove & Relocate of Existing Utilities 42 10-Mar-14 20-Apr-14 0 0 A1850 A1870

A1860 Obtain Shutdown & Connect to Existing 15 04-Apr-14 18-Apr-14 0 0 A1850 A1870

A1870 Remove & Dispose of Existing Utilities 7 21-Apr-14 27-Apr-14 0 0 A1860, A1880, A1990 A6100

BOX CULVERTS - STAGE 1BOX CULVERTS - STAGE 1 208 02-Apr-14 26-Oct-14 27584

GENERALGENERAL 208 02-Apr-14 26-Oct-14 27584

52 CELLS BOX CULVERT AT CH 21+98552 CELLS BOX CULVERT AT CH 21+985 149 02-Apr-14 28-Aug-14 10543

A2940 Structural Excavation 19 02-Apr-14 20-Apr-14 1110 M3 A1010, A9930, A1300 A2950, A1795

A2950 Blinding of Concrete 17 11-Apr-14 27-Apr-14 194 M3 A2940, A1290 A2960

A2960 Casting of Base Slab 93 13-Apr-14 14-Jul-14 820 M3 A2950 A2970

A2970 Casting of Walls 90 01-May-14 29-Jul-14 793 M3 A2960 A2980, A3000

A2980 Casting of Top Slab 92 17-May-14 16-Aug-14 811 M3 A2970 A2990, A2890

A3000 Casting of Apron Slab & W ing Walls 60 19-Jun-14 17-Aug-14 529 M3 A2970 A2990

A2990 Backfilling 11 18-Aug-14 28-Aug-14 6286 M3 A2980, A3000 A5350

9 CELLS BOX CULVERT AT CH 22+6509 CELLS BOX CULVERT AT CH 22+650 68 15-Apr-14 21-Jun-14 3477

A2800 Structural Excavation 6 15-Apr-14 20-Apr-14 351 M3 A1010, A9930, A1300 A2810

A2810 Blinding of Concrete 4 19-Apr-14 22-Apr-14 46 M3 A2800 A2820

A2820 Casting of Base Slab 18 21-Apr-14 08-May-14 159 M3 A2810 A2830

A2830 Casting of Walls 32 05-May-14 05-Jun-14 282 M3 A2820 A2840, A2860

A2860 Casting of Apron Slab & W ing Walls 22 31-May-14 21-Jun-14 194 M3 A2830 A2850, A10400

A2840 Casting of Top Slab 18 02-Jun-14 19-Jun-14 159 M3 A2830 A2850, A10370

A2850 Backfilling 4 18-Jun-14 21-Jun-14 2286 M3 A2840, A2860 A5350

1 CELL BOX CULVERT AT CH 23+0001 CELL BOX CULVERT AT CH 23+000 20 17-Jun-14 06-Jul-14 875

A10350 Structural Excavation 2 17-Jun-14 18-Jun-14 117 M3 A9930 A10360

A10360 Blinding of Concrete 1 19-Jun-14 19-Jun-14 11 M3 A10350 A10370

A10370 Casting of Base Slab 4 20-Jun-14 23-Jun-14 35 M3 A10360, A2840 A10380

A10380 Casting of Walls 8 24-Jun-14 01-Jul-14 71 M3 A10370 A10390, A10400

A10390 Casting of Top Slab 4 02-Jul-14 05-Jul-14 35 M3 A10380 A10410

A10400 Casting of Apron Slab & W ing Walls 4 03-Jul-14 06-Jul-14 35 M3 A10380, A2860 A10410, A2650, A2590

A10410 Backfilling 1 06-Jul-14 06-Jul-14 571 M3 A10390, A10400 A5350

1 CELLS BOX CULVERT AT CH 23+7601 CELLS BOX CULVERT AT CH 23+760 20 03-Jul-14 22-Jul-14 964

A2590 Structural Excavation 2 03-Jul-14 04-Jul-14 117 M3 A10400 A2600

A2600 Blinding of Concrete 1 05-Jul-14 05-Jul-14 11 M3 A2590 A2610

A2610 Casting of Base Slab 4 06-Jul-14 09-Jul-14 53 M3 A2600 A2620

A2620 Casting of Walls 8 10-Jul-14 17-Jul-14 88 M3 A2610 A2630, A2650

A2630 Casting of Top Slab 4 18-Jul-14 21-Jul-14 53 M3 A2620 A2330

A2650 Casting of Apron Slab & W ing Walls 4 19-Jul-14 22-Jul-14 71 M3 A2620, A10400 A2640, A2370, A2310

A2640 Backfilling 1 22-Jul-14 22-Jul-14 571 M3 A2650 A5350

2 CELL BOX CULVERT AT CH 23+2002 CELL BOX CULVERT AT CH 23+200 28 19-Jul-14 15-Aug-14 875

A2310 Structural Excavation 2 19-Jul-14 20-Jul-14 117 M3 A2650 A2320

A2320 Blinding of Concrete 1 21-Jul-14 21-Jul-14 11 M3 A2310 A2330

A2330 Casting of Base Slab 6 22-Jul-14 27-Jul-14 35 M3 A2320, A2630 A2340

A2340 Casting of Walls 10 28-Jul-14 06-Aug-14 71 M3 A2330 A2350, A2370

J J J J J J J J J

2014 2015 2016

03-Apr-14, TELEPHONE

Provide & Install New Utilities

Remove & Relocate of Existing Utilities

Obtain Shutdown & Connect to Existing

Remove & Dispose of Existing Utilities27-Apr-14, ELECTRICAL

Provide & Install New Utilities

Remove & Relocate of Existing Utilities

Obtain Shutdown & Connect to Existing

Remove & Dispose of Existing Utilities27-Apr-14, WATERLINES

Provide & Install New Utilities

Remove & Relocate of Existing Utilities

Obtain Shutdown & Connect to Existing

Remove & Dispose of Existing Utilities26-Oct-14, BOX CULVERTS - STAGE 1

26-Oct-14, GENERAL

28-Aug-14, 52 CELLS BOX CULVERT AT CH 21+985

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling21-Jun-14, 9 CELLS BOX CULVERT AT CH 22+650

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Apron Slab & W ing Walls

Casting of Top Slab

Backfilling06-Jul-14, 1 CELL BOX CULVERT AT CH 23+000

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling22-Jul-14, 1 CELLS BOX CULVERT AT CH 23+760

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling15-Aug-14, 2 CELL BOX CULVERT AT CH 23+200

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 4 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 5: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A2350 Casting of Top Slab 8 07-Aug-14 14-Aug-14 35 M3 A2340 A2360, A2400

A2370 Casting of Apron Slab & W ing Walls 6 08-Aug-14 13-Aug-14 35 M3 A2340, A2650 A2360, A2440, A2380

A2360 Backfilling 1 15-Aug-14 15-Aug-14 571 M3 A2350, A2370 A5350

1 CELL BOX CULVERT AT CH 23+9971 CELL BOX CULVERT AT CH 23+997 20 12-Aug-14 31-Aug-14 875

A2380 Structural Excavation 2 12-Aug-14 13-Aug-14 117 M3 A2370 A2390

A2390 Blinding of Concrete 1 14-Aug-14 14-Aug-14 11 M3 A2380 A2400

A2400 Casting of Base Slab 4 15-Aug-14 18-Aug-14 35 M3 A2390, A2350 A2410

A2410 Casting of Walls 8 19-Aug-14 26-Aug-14 71 M3 A2400 A2420, A2440

A2420 Casting of Top Slab 4 27-Aug-14 30-Aug-14 35 M3 A2410

A2440 Casting of Apron Slab & W ing Walls 4 28-Aug-14 31-Aug-14 35 M3 A2410, A2370 A2430

A2430 Backfilling 1 31-Aug-14 31-Aug-14 571 M3 A2440 A5350

5 CELLS BOX CULVERT AT CH 23+5005 CELLS BOX CULVERT AT CH 23+500 38 16-Apr-14 23-May-14 1834

A2660 Structural Excavation 5 16-Apr-14 20-Apr-14 292 M3 A9930, A1010, A1300 A2670

A2670 Blinding of Concrete 1 21-Apr-14 21-Apr-14 11 M3 A2660 A2680

A2680 Casting of Base Slab 8 22-Apr-14 29-Apr-14 71 M3 A2670 A2690

A2690 Casting of Walls 14 30-Apr-14 13-May-14 123 M3 A2680 A2700, A2720

A2720 Casting of Apron Slab & W ing Walls 14 10-May-14 23-May-14 123 M3 A2690 A2710, A2230

A2700 Casting of Top Slab 8 14-May-14 21-May-14 71 M3 A2690 A2710, A2190, A2170

A2710 Backfilling 2 22-May-14 23-May-14 1143 M3 A2700, A2720 A5350

3 CELLS BOX CULVERT AT CH 21+2603 CELLS BOX CULVERT AT CH 21+260 30 18-May-14 16-Jun-14 1057

A2170 Structural Excavation 3 18-May-14 20-May-14 175 M3 A2700 A2180

A2180 Blinding of Concrete 1 21-May-14 21-May-14 11 M3 A2170 A2190

A2190 Casting of Base Slab 6 22-May-14 27-May-14 53 M3 A2180, A2700 A2200

A2200 Casting of Walls 12 28-May-14 08-Jun-14 106 M3 A2190 A2210, A2230

A2230 Casting of Apron Slab & W ing Walls 10 07-Jun-14 16-Jun-14 88 M3 A2200, A2720 A2220, A2300

A2210 Casting of Top Slab 6 09-Jun-14 14-Jun-14 53 M3 A2200 A2220, A2260, A2240

A2220 Backfilling 1 16-Jun-14 16-Jun-14 571 M3 A2210, A2230 A5350

1 CELL BOX CULVERT AT CH 21+4851 CELL BOX CULVERT AT CH 21+485 20 12-Jun-14 01-Jul-14 875

A2240 Structural Excavation 2 12-Jun-14 13-Jun-14 117 M3 A2210 A2250

A2250 Blinding of Concrete 1 14-Jun-14 14-Jun-14 11 M3 A2240 A2260

A2260 Casting of Base Slab 4 15-Jun-14 18-Jun-14 35 M3 A2250, A2210 A2270

A2270 Casting of Walls 8 19-Jun-14 26-Jun-14 71 M3 A2260 A2280, A2300

A2280 Casting of Top Slab 4 27-Jun-14 30-Jun-14 35 M3 A2270 A2290, A2750, A2540

A2300 Casting of Apron Slab & W ing Walls 4 28-Jun-14 01-Jul-14 35 M3 A2270, A2230 A2290, A2790, A2730

A2290 Backfilling 1 01-Jul-14 01-Jul-14 571 M3 A2280, A2300 A5350

2 CELLS BOX CULVERT AT CH 22+2002 CELLS BOX CULVERT AT CH 22+200 26 28-Jun-14 23-Jul-14 964

A2730 Structural Excavation 2 28-Jun-14 29-Jun-14 117 M3 A2300 A2740

A2740 Blinding of Concrete 1 30-Jun-14 30-Jun-14 11 M3 A2730 A2750

A2750 Casting of Base Slab 6 01-Jul-14 06-Jul-14 53 M3 A2740, A2280 A2760

A2760 Casting of Walls 10 07-Jul-14 16-Jul-14 88 M3 A2750 A2770, A2790

A2790 Casting of Apron Slab & W ing Walls 8 16-Jul-14 23-Jul-14 71 M3 A2760, A2300 A2780, A2510

A2770 Casting of Top Slab 6 17-Jul-14 22-Jul-14 53 M3 A2760 A2780, A2470, A2450

A2780 Backfilling 1 23-Jul-14 23-Jul-14 571 M3 A2770, A2790 A5350

1 CELL BOX CULVERT AT CH 24+2351 CELL BOX CULVERT AT CH 24+235 20 20-Jul-14 08-Aug-14 875

A2450 Structural Excavation 2 20-Jul-14 21-Jul-14 117 M3 A2770 A2460

A2460 Blinding of Concrete 1 22-Jul-14 22-Jul-14 11 M3 A2450 A2470

A2470 Casting of Base Slab 4 23-Jul-14 26-Jul-14 35 M3 A2460, A2770 A2480

A2480 Casting of Walls 8 27-Jul-14 03-Aug-14 71 M3 A2470 A2490, A2510

A2490 Casting of Top Slab 4 04-Aug-14 07-Aug-14 35 M3 A2480 A2500, A2890, A2540

A2510 Casting of Apron Slab & W ing Walls 4 05-Aug-14 08-Aug-14 35 M3 A2480, A2790 A2500, A2520

A2500 Backfilling 1 08-Aug-14 08-Aug-14 571 M3 A2490, A2510 A5350

1 CELL BOX CULVERT AT CH 24+5701 CELL BOX CULVERT AT CH 24+570 22 05-Aug-14 26-Aug-14 893

A2520 Structural Excavation 2 05-Aug-14 06-Aug-14 117 M3 A2510 A2530

A2530 Blinding of Concrete 1 07-Aug-14 07-Aug-14 11 M3 A2520 A2540

J J J J J J J J J

2014 2015 2016

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling31-Aug-14, 1 CELL BOX CULVERT AT CH 23+997

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling23-May-14, 5 CELLS BOX CULVERT AT CH 23+500

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Apron Slab & W ing Walls

Casting of Top Slab

Backfilling16-Jun-14, 3 CELLS BOX CULVERT AT CH 21+260

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Apron Slab & W ing Walls

Casting of Top Slab

Backfilling01-Jul-14, 1 CELL BOX CULVERT AT CH 21+485

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling23-Jul-14, 2 CELLS BOX CULVERT AT CH 22+200

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Apron Slab & W ing Walls

Casting of Top Slab

Backfilling08-Aug-14, 1 CELL BOX CULVERT AT CH 24+235

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling26-Aug-14, 1 CELL BOX CULVERT AT CH 24+570

Structural Excavation

Blinding of Concrete

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 5 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 6: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A2540 Casting of Base Slab 5 08-Aug-14 12-Aug-14 44 M3 A2530, A2280, A2490 A2550

A2550 Casting of Walls 8 13-Aug-14 20-Aug-14 71 M3 A2540 A2560, A2580

A2560 Casting of Top Slab 5 21-Aug-14 25-Aug-14 44 M3 A2550 A2570, A2890, A2870

A2580 Casting of Apron Slab & W ing Walls 4 23-Aug-14 26-Aug-14 35 M3 A2550 A2570, A5170

A2570 Backfilling 1 26-Aug-14 26-Aug-14 571 M3 A2560, A2580 A5350

8 CELLS BOX CULVERT AT CH 21+8388 CELLS BOX CULVERT AT CH 21+838 68 20-Aug-14 26-Oct-14 3477

A2870 Structural Excavation 6 20-Aug-14 25-Aug-14 351 M3 A2560 A2880

A2880 Blinding of Concrete 4 24-Aug-14 27-Aug-14 46 M3 A2870 A2890

A2890 Casting of Base Slab 18 26-Aug-14 12-Sep-14 159 M3 A2880, A2980, A2490, A2560A2900

A2900 Casting of Walls 32 09-Sep-14 10-Oct-14 282 M3 A2890 A2910, A2930

A2930 Casting of Apron Slab & W ing Walls 22 05-Oct-14 26-Oct-14 194 M3 A2900 A2920, A5170

A2910 Casting of Top Slab 18 07-Oct-14 24-Oct-14 159 M3 A2900 A2920

A2920 Backfilling 4 23-Oct-14 26-Oct-14 2286 M3 A2910, A2930 A5350

PEDESTRIAN UNDERPASS 2 (SOL1 CH 23+300) - STAGE 1PEDESTRIAN UNDERPASS 2 (SOL1 CH 23+300) - STAGE 1 201 11-Apr-14 28-Oct-14 6329

GENERALGENERAL 201 11-Apr-14 28-Oct-14 6329

UNDERPASS STRUCTUREUNDERPASS STRUCTURE 130 11-Apr-14 18-Aug-14 5517

A1795 Structural Excavation 10 11-Apr-14 20-Apr-14 584 M3 A2940 A1800

A1800 Blinding of Concrete 12 14-Apr-14 25-Apr-14 137 M3 A1795 A1810

A1810 Casting of Base Slab 35 23-Apr-14 27-May-14 309 M3 A1800 A1820, A3070

A1820 Casting of Walls 70 14-May-14 22-Jul-14 617 M3 A1810 A1830, A3055

A1830 Casting of Top Slab 50 24-Jun-14 12-Aug-14 441 M3 A1820 A3010, A8300, A10290

A3010 Backfilling 6 13-Aug-14 18-Aug-14 3429 M3 A1830 A5350

ENTRANCE & EXISTENTRANCE & EXIST 77 13-Aug-14 28-Oct-14 812

A10290 Casting of Floor Slab 22 13-Aug-14 03-Sep-14 194 M3 A1830 A10300

A10300 Casting of Walls 35 04-Sep-14 08-Oct-14 309 M3 A10290 A10310, A10320

A10320 Casting of Landing Slabs & Stair Case 35 24-Sep-14 28-Oct-14 309 M3 A10300 A10310

A10310 Casing of Beams & Roof Slab 20 09-Oct-14 28-Oct-14 0 0 A10300, A10320 A6100

PEDESTRIAN UNDERPASS 1 (SOL1 CH 22+800) - STAGE 1PEDESTRIAN UNDERPASS 1 (SOL1 CH 22+800) - STAGE 1 199 18-May-14 02-Dec-14 6329

GENERALGENERAL 199 18-May-14 02-Dec-14 6329

UNDERPASS STRUCTUREUNDERPASS STRUCTURE 128 18-May-14 22-Sep-14 5517

A3055 Structural Excavation 10 18-May-14 27-May-14 584 M3 A1820 A3060

A3060 Blinding of Concrete 12 21-May-14 01-Jun-14 137 M3 A3055 A3070

A3070 Casting of Base Slab 35 28-May-14 01-Jul-14 309 M3 A3060, A1810 A3080

A3080 Casting of Walls 70 18-Jun-14 26-Aug-14 617 M3 A3070 A3090

A3090 Casting of Top Slab 50 29-Jul-14 16-Sep-14 441 M3 A3080 A3120, A10250

A3120 Backfilling 6 17-Sep-14 22-Sep-14 3429 M3 A3090 A8400, A5350

ENTRANCE & EXISTENTRANCE & EXIST 77 17-Sep-14 02-Dec-14 812

A10250 Casting of Floor Slab 22 17-Sep-14 08-Oct-14 194 M3 A3090 A10260

A10260 Casting of Walls 35 09-Oct-14 12-Nov-14 309 M3 A10250 A10270, A10280

A10280 Casting of Landing Slabs & Stair Case 35 29-Oct-14 02-Dec-14 309 M3 A10260 A10270

A10270 Casing of Beams & Roof Slab 20 13-Nov-14 02-Dec-14 0 0 A10260, A10280 A6100

FLYOVER AT FALAJ AL QABIL (NORTH BOUND)FLYOVER AT FALAJ AL QABIL (NORTH BOUND) 243 12-Feb-14 12-Oct-14 73649

SUBSTRUCTURESSUBSTRUCTURES 123 12-Feb-14 14-Jun-14 69375

PIER P3PIER P3 63 12-Feb-14 15-Apr-14 1903

A1540 Boring & Casting of Piles 14 12-Feb-14 25-Feb-14 269 LM A6500, A1010, A6120 A1550, A5020, A1590

A1550 Blinding for Pier Pile Cap 3 26-Feb-14 28-Feb-14 34 M3 A1540 A1560

A1560 Casting of Pier Pile Cap 15 01-Mar-14 15-Mar-14 132 M3 A1550 A1570

A1570 Bituminous Paint 3 16-Mar-14 18-Mar-14 1221 M2 A1560 A1580

A1580 Casting of Pier & Pier Cap 28 19-Mar-14 15-Apr-14 247 M3 A1570 A1640, A3500

ABUTMENT AB1ABUTMENT AB1 76 26-Feb-14 12-May-14 29968

A1590 Boring & Casting of Piles 20 26-Feb-14 17-Mar-14 384 LM A1540 A1600, A3310

A1600 Blinding for Abutment Pile Cap 7 18-Mar-14 24-Mar-14 80 M3 A1590 A1610, A3030

A3030 Fixing of MSE Wall 46 18-Mar-14 02-May-14 0 M2 A1600 A3110

A1610 Casting of Abutment Pile Cap 42 25-Mar-14 05-May-14 370 M3 A1600 A1620, A1640

J J J J J J J J J

2014 2015 2016

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling26-Oct-14, 8 CELLS BOX CULVERT AT CH 21+838

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Apron Slab & W ing Walls

Casting of Top Slab

Backfilling28-Oct-14, PEDESTRIAN UNDERPASS 2

28-Oct-14, GENERAL

18-Aug-14, UNDERPASS STRUCTURE

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Backfilling28-Oct-14, ENTRANCE & EXIST

Casting of Floor Slab

Casting of Walls

Casting of Landing Slabs & Stair Case

Casing of Beams & Roof Slab02-Dec-14, PEDESTRIAN UNDERPAS

02-Dec-14, GENERAL

22-Sep-14, UNDERPASS STRUCTURE

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Backfilling02-Dec-14, ENTRANCE & EXIST

Casting of Floor Slab

Casting of Walls

Casting of Landing Slabs & Stair Case

Casing of Beams & Roof Slab12-Oct-14, FLYOVER AT FALAJ AL QABIL

14-Jun-14, SUBSTRUCTURES

15-Apr-14, PIER P3

Boring & Casting of Piles

Blinding for Pier Pile Cap

Casting of Pier Pile Cap

Bituminous Paint

Casting of Pier & Pier Cap12-May-14, ABUTMENT AB1

Boring & Casting of Piles

Blinding for Abutment Pile Cap

Fixing of MSE Wall

Casting of Abutment Pile Cap

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 6 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 7: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A3110 Backfilling 46 28-Mar-14 12-May-14 26286 M3 A3030 A5350

A1620 Bituminous Paint 7 06-May-14 12-May-14 2848 M2 A1610 A5170

PIER P4PIER P4 62 18-Mar-14 18-May-14 1884

A3310 Boring & Casting of Piles 13 18-Mar-14 30-Mar-14 250 LM A1590 A3320, A3360

A3320 Blinding for Pier Pile Cap 3 31-Mar-14 02-Apr-14 34 M3 A3310 A3330

A3330 Casting of Pier Pile Cap 15 03-Apr-14 17-Apr-14 132 M3 A3320 A3340

A3340 Bituminous Paint 3 18-Apr-14 20-Apr-14 1221 M2 A3330 A3350

A3350 Casting of Pier & Pier Cap 28 21-Apr-14 18-May-14 247 M3 A3340 A3500

ABUTMENT AB2ABUTMENT AB2 76 31-Mar-14 14-Jun-14 29968

A3360 Boring & Casting of Piles 20 31-Mar-14 19-Apr-14 384 LM A3310 A3370, A4000

A3370 Blinding for Abutment Pile Cap 7 20-Apr-14 26-Apr-14 80 M3 A3360 A3380, A3410

A3410 Fixing of MSE Wall 46 20-Apr-14 04-Jun-14 0 M2 A3370 A3420

A3380 Casting of Abutment Pile Cap 42 27-Apr-14 07-Jun-14 370 M3 A3370 A3390, A3500

A3420 Backfilling 46 30-Apr-14 14-Jun-14 26286 M3 A3410 A5350

A3390 Bituminous Paint 7 02-Jun-14 09-Jun-14 2848 M2 A3380 A5170

PIER P2PIER P2 62 12-Feb-14 14-Apr-14 1884

A3160 Boring & Casting of Piles 13 12-Feb-14 24-Feb-14 250 LM A6500, A6120, A1010 A3170, A3210

A3170 Blinding for Pier Pile Cap 3 25-Feb-14 27-Feb-14 34 M3 A3160 A3180

A3180 Casting of Pier Pile Cap 15 28-Feb-14 14-Mar-14 132 M3 A3170 A3190

A3190 Bituminous Paint 3 15-Mar-14 17-Mar-14 1221 M2 A3180 A3200

A3200 Casting of Pier & Pier Cap 28 18-Mar-14 14-Apr-14 247 M3 A3190 A1640

PIER P1PIER P1 62 25-Feb-14 27-Apr-14 1884

A3210 Boring & Casting of Piles 13 25-Feb-14 09-Mar-14 250 LM A3160 A3220, A3260

A3220 Blinding for Pier Pile Cap 3 10-Mar-14 12-Mar-14 34 M3 A3210 A3230

A3230 Casting of Pier Pile Cap 15 13-Mar-14 27-Mar-14 132 M3 A3220 A3240

A3240 Bituminous Paint 3 28-Mar-14 30-Mar-14 1221 M2 A3230 A3250

A3250 Casting of Pier & Pier Cap 28 31-Mar-14 27-Apr-14 247 M3 A3240 A1640

PIER P5PIER P5 62 10-Mar-14 10-May-14 1884

A3260 Boring & Casting of Piles 13 10-Mar-14 22-Mar-14 250 LM A3210 A3270, A4100

A3270 Blinding for Pier Pile Cap 3 23-Mar-14 25-Mar-14 34 M3 A3260 A3280

A3280 Casting of Pier Pile Cap 15 26-Mar-14 09-Apr-14 132 M3 A3270 A3290

A3290 Bituminous Paint 3 10-Apr-14 12-Apr-14 1221 M2 A3280 A3300

A3300 Casting of Pier & Pier Cap 28 13-Apr-14 10-May-14 247 M3 A3290 A3500

SUPERSTRUCTURESUPERSTRUCTURE 135 28-Apr-14 09-Sep-14 3660

SPAN BETWEEN AB1 & P3SPAN BETWEEN AB1 & P3 114 28-Apr-14 19-Aug-14 1830

A1640 Erection of Scaffold & Shutter 55 28-Apr-14 21-Jun-14 0 0 A3250, A1580, A1610, A3200, A6470A1650

A1650 Fixing of Pot Bearings 7 22-Jun-14 28-Jun-14 12 NO. A1640 A1660

A1660 Casting of Box Girder 21 29-Jun-14 19-Jul-14 1818 M3 A1650 A1670

A1670 Prestressing Operation 10 20-Jul-14 29-Jul-14 0 0 A1660, A6620 A6760, A6790, A4550

A6760 Deshuttering of Scaffold 21 30-Jul-14 19-Aug-14 0 0 A1670 A3850

SPAN BETWEEN AB2 & P3SPAN BETWEEN AB2 & P3 114 19-May-14 09-Sep-14 1830

A3500 Erection of Scaffold & Shutter 55 19-May-14 12-Jul-14 0 0 A1580, A3300, A3380, A3350, A6470A3510

A3510 Fixing of Pot Bearings 7 13-Jul-14 19-Jul-14 12 NO. A3500 A3520

A3520 Casting of Box Girder 21 20-Jul-14 09-Aug-14 1818 M3 A3510 A3530

A3530 Prestressing Operation 10 10-Aug-14 19-Aug-14 0 0 A3520 A3570, A4550

A3570 Deshuttering of Scaffold 21 20-Aug-14 09-Sep-14 0 0 A3530 A4310

FINISHING WORKSFINISHING WORKS 29 14-Sep-14 12-Oct-14 614

GENERALGENERAL 29 14-Sep-14 12-Oct-14 614

A4550 Concrete Bridge Parapet (N.J Barrier) 22 14-Sep-14 05-Oct-14 555 M A6290, A3530, A1670, A5080A4560

A4560 Laying of Bituminous Wearing Course 6 30-Sep-14 05-Oct-14 0 0 A4550 A4570, A5450, A5430

A4570 Fixing of Expansion Joints 7 06-Oct-14 12-Oct-14 59 M A4560 A3940

FLYOVER AT FALAJ AL QABIL (SOUTH BOUND)FLYOVER AT FALAJ AL QABIL (SOUTH BOUND) 285 23-Mar-14 01-Jan-15 73914

SUBSTRUCTURESSUBSTRUCTURES 123 23-Mar-14 23-Jul-14 69410

PIER P2PIER P2 62 20-Apr-14 20-Jun-14 1884

J J J J J J J J J

2014 2015 2016

Backfilling

Bituminous Paint18-May-14, PIER P4

Boring & Casting of Piles

Blinding for Pier Pile Cap

Casting of Pier Pile Cap

Bituminous Paint

Casting of Pier & Pier Cap14-Jun-14, ABUTMENT AB2

Boring & Casting of Piles

Blinding for Abutment Pile Cap

Fixing of MSE Wall

Casting of Abutment Pile Cap

Backfilling

Bituminous Paint14-Apr-14, PIER P2

Boring & Casting of Piles

Blinding for Pier Pile Cap

Casting of Pier Pile Cap

Bituminous Paint

Casting of Pier & Pier Cap27-Apr-14, PIER P1

Boring & Casting of Piles

Blinding for Pier Pile Cap

Casting of Pier Pile Cap

Bituminous Paint

Casting of Pier & Pier Cap10-May-14, PIER P5

Boring & Casting of Piles

Blinding for Pier Pile Cap

Casting of Pier Pile Cap

Bituminous Paint

Casting of Pier & Pier Cap09-Sep-14, SUPERSTRUCTURE

19-Aug-14, SPAN BETWEEN AB1 & P3

Erection of Scaffold & Shutter

Fixing of Pot Bearings

Casting of Box Girder

Prestressing Operation

Deshuttering of Scaffold09-Sep-14, SPAN BETWEEN AB2 & P3

Erection of Scaffold & Shutter

Fixing of Pot Bearings

Casting of Box Girder

Prestressing Operation

Deshuttering of Scaffold12-Oct-14, FINISHING WORKS

12-Oct-14, GENERAL

Concrete Bridge Parapet (N.J Barrier)

Laying of Bituminous Wearing Course

Fixing of Expansion Joints01-Jan-15, FLYOVER AT FALAJ AL Q

23-Jul-14, SUBSTRUCTURES

20-Jun-14, PIER P2

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 7 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 8: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A4000 Boring & Casting of Piles 13 20-Apr-14 02-May-14 250 LM A3360, A9930 A4010, A3800

A4010 Blinding for Pier Pile Cap 3 03-May-14 05-May-14 34 M3 A4000 A4020

A4020 Casting of Pier Pile Cap 15 06-May-14 20-May-14 132 M3 A4010 A4030

A4030 Bituminous Paint 3 21-May-14 23-May-14 1221 M2 A4020 A4040

A4040 Casting of Pier & Pier Cap 28 24-May-14 20-Jun-14 247 M3 A4030 A4310

ABUTMENT AB1ABUTMENT AB1 79 03-May-14 20-Jul-14 29995

A3800 Boring & Casting of Piles 20 03-May-14 22-May-14 384 LM A4000 A3810, A3950

A3810 Blinding for Abutment Pile Cap 7 23-May-14 29-May-14 80 M3 A3800 A3820, A4150

A4150 Fixing of MSE Wall 46 23-May-14 07-Jul-14 0 M2 A3810 A4160

A3820 Casting of Abutment Pile Cap 45 30-May-14 13-Jul-14 397 M3 A3810 A3830, A4310

A4160 Backfilling 46 04-Jun-14 20-Jul-14 26286 M3 A4150 A5350

A3830 Bituminous Paint 7 14-Jul-14 20-Jul-14 2848 M2 A3820 A5170

PIER P5PIER P5 62 23-May-14 23-Jul-14 1884

A3950 Boring & Casting of Piles 13 23-May-14 04-Jun-14 250 LM A3800 A3960

A3960 Blinding for Pier Pile Cap 3 05-Jun-14 07-Jun-14 34 M3 A3950 A3970

A3970 Casting of Pier Pile Cap 15 08-Jun-14 22-Jun-14 132 M3 A3960 A3980

A3980 Bituminous Paint 3 23-Jun-14 25-Jun-14 1221 M2 A3970 A3990

A3990 Casting of Pier & Pier Cap 28 26-Jun-14 23-Jul-14 247 M3 A3980 A3850

PIER P3PIER P3 62 23-Mar-14 23-May-14 1884

A4100 Boring & Casting of Piles 13 23-Mar-14 04-Apr-14 250 LM A3260 A4110, A3750

A4110 Blinding for Pier Pile Cap 3 05-Apr-14 07-Apr-14 34 M3 A4100 A4120

A4120 Casting of Pier Pile Cap 15 08-Apr-14 22-Apr-14 132 M3 A4110 A4130

A4130 Bituminous Paint 3 23-Apr-14 25-Apr-14 1221 M2 A4120 A4140

A4140 Casting of Pier & Pier Cap 28 26-Apr-14 23-May-14 247 M3 A4130 A3850, A4310

PIER P1PIER P1 62 05-Apr-14 05-Jun-14 1884

A3750 Boring & Casting of Piles 13 05-Apr-14 17-Apr-14 250 LM A4100 A3760, A4050

A3760 Blinding for Pier Pile Cap 3 18-Apr-14 20-Apr-14 34 M3 A3750 A3770

A3770 Casting of Pier Pile Cap 15 21-Apr-14 05-May-14 132 M3 A3760 A3780

A3780 Bituminous Paint 3 06-May-14 08-May-14 1221 M2 A3770 A3790

A3790 Casting of Pier & Pier Cap 28 09-May-14 05-Jun-14 247 M3 A3780 A4310

PIER P4PIER P4 62 18-Apr-14 18-Jun-14 1884

A4050 Boring & Casting of Piles 13 18-Apr-14 30-Apr-14 250 LM A3750 A4060, A4170

A4060 Blinding for Pier Pile Cap 3 01-May-14 03-May-14 34 M3 A4050 A4070

A4070 Casting of Pier Pile Cap 15 04-May-14 18-May-14 132 M3 A4060 A4080

A4080 Bituminous Paint 3 19-May-14 21-May-14 1221 M2 A4070 A4090

A4090 Casting of Pier & Pier Cap 28 22-May-14 18-Jun-14 247 M3 A4080 A3850

ABUTMENT AB2ABUTMENT AB2 79 01-May-14 18-Jul-14 29995

A4170 Boring & Casting of Piles 20 01-May-14 20-May-14 384 LM A4050 A4180

A4180 Blinding for Abutment Pile Cap 7 21-May-14 27-May-14 80 M3 A4170 A4190, A4220

A4220 Fixing of MSE Wall 46 21-May-14 05-Jul-14 0 M2 A4180 A4230

A4190 Casting of Abutment Pile Cap 45 28-May-14 11-Jul-14 397 M3 A4180 A4200, A3850

A4230 Backfilling 46 31-May-14 15-Jul-14 26286 M3 A4220 A5350

A4200 Bituminous Paint 7 12-Jul-14 18-Jul-14 2848 M2 A4190 A5170

SUPERSTRUCTURESUPERSTRUCTURE 135 20-Aug-14 01-Jan-15 3660

SPAN BETWEEN AB2 & P3SPAN BETWEEN AB2 & P3 114 20-Aug-14 11-Dec-14 1830

A3850 Erection of Scaffold & Shutter 55 20-Aug-14 13-Oct-14 0 0 A4140, A4090, A6760, A4190, A3990, A6470A3860

A3860 Fixing of Pot Bearings 7 14-Oct-14 20-Oct-14 12 NO. A3850 A3870

A3870 Casting of Box Girder 21 21-Oct-14 10-Nov-14 1818 M3 A3860 A3880

A3880 Prestressing Operation 10 11-Nov-14 20-Nov-14 0 0 A3870 A6770, A3920

A6770 Deshuttering of Scaffold 21 20-Nov-14 11-Dec-14 0 0 A3880 A6710

SPAN BETWEEN AB1 & P3SPAN BETWEEN AB1 & P3 114 10-Sep-14 01-Jan-15 1830

A4310 Erection of Scaffold & Shutter 55 10-Sep-14 03-Nov-14 0 0 A4040, A3570, A4140, A3790, A3820, A6470A4320

A4320 Fixing of Pot Bearings 7 04-Nov-14 10-Nov-14 12 NO. A4310 A4330

A4330 Casting of Box Girder 21 11-Nov-14 01-Dec-14 1818 M3 A4320 A4340

J J J J J J J J J

2014 2015 2016

Boring & Casting of Piles

Blinding for Pier Pile Cap

Casting of Pier Pile Cap

Bituminous Paint

Casting of Pier & Pier Cap20-Jul-14, ABUTMENT AB1

Boring & Casting of Piles

Blinding for Abutment Pile Cap

Fixing of MSE Wall

Casting of Abutment Pile Cap

Backfilling

Bituminous Paint23-Jul-14, PIER P5

Boring & Casting of Piles

Blinding for Pier Pile Cap

Casting of Pier Pile Cap

Bituminous Paint

Casting of Pier & Pier Cap23-May-14, PIER P3

Boring & Casting of Piles

Blinding for Pier Pile Cap

Casting of Pier Pile Cap

Bituminous Paint

Casting of Pier & Pier Cap05-Jun-14, PIER P1

Boring & Casting of Piles

Blinding for Pier Pile Cap

Casting of Pier Pile Cap

Bituminous Paint

Casting of Pier & Pier Cap18-Jun-14, PIER P4

Boring & Casting of Piles

Blinding for Pier Pile Cap

Casting of Pier Pile Cap

Bituminous Paint

Casting of Pier & Pier Cap18-Jul-14, ABUTMENT AB2

Boring & Casting of Piles

Blinding for Abutment Pile Cap

Fixing of MSE Wall

Casting of Abutment Pile Cap

Backfilling

Bituminous Paint01-Jan-15, SUPERSTRUCTURE

11-Dec-14, SPAN BETWEEN AB2 & P3

Erection of Scaffold & Shutter

Fixing of Pot Bearings

Casting of Box Girder

Prestressing Operation

Deshuttering of Scaffold01-Jan-15, SPAN BETWEEN AB1 & P3

Erection of Scaffold & Shutter

Fixing of Pot Bearings

Casting of Box Girder

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 8 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 9: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A4340 Prestressing Operation 10 02-Dec-14 11-Dec-14 0 0 A4330 A6790, A3920

A6790 Deshuttering of Scaffold 21 12-Dec-14 01-Jan-15 0 0 A4340, A1670 A6710

FINISHING WORKSFINISHING WORKS 28 02-Dec-14 29-Dec-14 844

GENERALGENERAL 28 02-Dec-14 29-Dec-14 844

A3920 Concrete Bridge Parapet (N.J Barrier) 22 02-Dec-14 23-Dec-14 793 M A6290, A3880, A4340 A3930

A3930 Laying of Bituminous Wearing Course 6 18-Dec-14 23-Dec-14 0 0 A3920 A3940, A5490

A3940 Fixing of Expansion Joints 6 24-Dec-14 29-Dec-14 51 M A3930, A4570 A6710

MSE WALL (RAMPS OF FLYOVER)MSE WALL (RAMPS OF FLYOVER) 197 01-Mar-14 13-Sep-14 10167

MSE RWs & RAMPS OF FLYOVERMSE RWs & RAMPS OF FLYOVER 197 01-Mar-14 13-Sep-14 10167

GENERALGENERAL 197 01-Mar-14 13-Sep-14 10167

A5020 Excavation to Reduce Level 55 01-Mar-14 24-Apr-14 0 0 A1540, A1376, A6320 A5030

A5030 Preparation of Foundations 100 09-Mar-14 16-Jun-14 0 0 A5020, A1457 A5040

A5040 Installing & Bracing of MSE Wall Panels 155 16-Mar-14 17-Aug-14 8800 M2 A5030 A5050

A5050 Place & Compact Selected Fill up 155 20-Mar-14 21-Aug-14 0 0 A5040 A5060

A5060 Connect & Tighten Soil Reinforcement 155 25-Mar-14 26-Aug-14 0 0 A5050 A5070

A5070 Place & Compact Random Backfill 155 04-Apr-14 05-Sep-14 0 0 A5060 A5080, A4580

A5080 Casting of Coping Beam 155 12-Apr-14 13-Sep-14 1367 M3 A5070 A4550

ROAD LIGHTING & ELECTRICAL INSTALLATIONROAD LIGHTING & ELECTRICAL INSTALLATION 312 03-Apr-14 08-Feb-15 9331

GENERALGENERAL 312 03-Apr-14 08-Feb-15 9331

CIVIL WORKS & CABLINGCIVIL WORKS & CABLING 189 03-Apr-14 08-Oct-14 9331

A4580 Trench for Low Voltage Cables 160 03-Apr-14 09-Sep-14 7097 M A5340, A5070 A4590

A4590 Laying of Ducts 160 10-Apr-14 16-Sep-14 2054 M A4580 A4600

A4600 Laying of Cables 160 17-Apr-14 23-Sep-14 0 0 A4590 A4610

A4620 High Masts Concrete Foundations 90 11-Jul-14 08-Oct-14 0 0 A4610 A4630, A4670

A4610 Lighting Columns Concrete Foundations 90 11-Jul-14 08-Oct-14 180 NO. A4600 A4620, A5350

A4630 Concrete Foundations for Transformer Stations & Feeder Pillars 60 10-Aug-14 08-Oct-14 0 0 A4620 A4640

COLUMNS, HIGH MASTSCOLUMNS, HIGH MASTS 90 21-Jul-14 18-Oct-14 0

A4670 Fixing of High Masts 90 21-Jul-14 18-Oct-14 0 0 A4620, A6350 A4680

A4680 Fixing of Lighting Poles 90 21-Jul-14 18-Oct-14 0 0 A4670 A5010, A5990

TRANSFORMERS & FEEDER PILLARSTRANSFORMERS & FEEDER PILLARS 173 20-Aug-14 08-Feb-15 0

A4650 Installation of Feeder Pillar 60 20-Aug-14 18-Oct-14 0 0 A4640 A4660

A4640 33 KV & 11 KV Pad Mounted & Pole Mounted Transformers Substations 60 20-Aug-14 18-Oct-14 0 0 A4630 A4650

A4660 Power Supply Connections to Feeder Pillar 60 11-Dec-14 08-Feb-15 0 0 A4650 A9460

SLOPE PROTECTION & STABILIZATIONSLOPE PROTECTION & STABILIZATION 100 08-Aug-14 15-Nov-14 19093

RIPRAP, GABIONRIPRAP, GABION 100 08-Aug-14 15-Nov-14 19093

GENERALGENERAL 100 08-Aug-14 15-Nov-14 19093

A5170 Laying of Filter Membrane Fabric for Protection Works 80 08-Aug-14 26-Oct-14 5133 M2 A2580, A2930, A1620, A3390, A3830, A4200A5180

A5180 Fixing of Gabion Cages 90 13-Aug-14 10-Nov-14 2487 M3 A5170 A5190

A5190 Installation of Mortared Stone Riprap 90 13-Aug-14 10-Nov-14 3473 M3 A5180 A5200

A5200 Grouted Stone Ditch Lining 60 17-Sep-14 15-Nov-14 8000 M2 A5190 A6100

DRAINAGE WORKSDRAINAGE WORKS 80 12-Feb-14 02-May-14 35947

RC PIPESRC PIPES 80 12-Feb-14 02-May-14 35947

GENERALGENERAL 80 12-Feb-14 02-May-14 35947

A5090 Trench Excavation Work 60 12-Feb-14 12-Apr-14 1641 M3 A1010 A5100

A5100 Laying of Drainage Pipes (RCC) 60 16-Feb-14 16-Apr-14 0 0 A5090, A6380 A5110

A5110 Construction of Manholes 60 22-Feb-14 22-Apr-14 20 0 A5100 A5120

A5120 Backfilling 60 04-Mar-14 02-May-14 34286 M3 A5110 A5350

ROAD FINISHING WORKSROAD FINISHING WORKS 167 19-Jul-14 01-Jan-15 189636

GENERALGENERAL 167 19-Jul-14 01-Jan-15 189636

EMBANKMENT, SUBBASE & AGGREGATE BASEEMBANKMENT, SUBBASE & AGGREGATE BASE 144 19-Jul-14 09-Dec-14 128077

A5350 Backfilling to Embankment 120 19-Jul-14 15-Nov-14 68571 M3 A4610, A3010, A3120, A29 A5370

A5370 Preparation of Granular Subbase 110 04-Aug-14 21-Nov-14 18355 M3 A5350 A5380

A5380 Preparation of Aggregate Base Course 120 12-Aug-14 09-Dec-14 41151 M3 A5370 A5390, A5430

MEDIAN & SIDEWALK PAVINGMEDIAN & SIDEWALK PAVING 157 20-Jul-14 23-Dec-14 42833

A5390 Installation of Precast Concrete Curbs 150 20-Jul-14 16-Dec-14 15393 M A5380 A5400

J J J J J J J J J

2014 2015 2016

Prestressing Operation

Deshuttering of Scaffold29-Dec-14, FINISHING WORKS

29-Dec-14, GENERAL

Concrete Bridge Parapet (N.J Barrier)

Laying of Bituminous Wearing Course

Fixing of Expansion Joints13-Sep-14, MSE WALL (RAMPS OF FLYOVER)

13-Sep-14, MSE RWs & RAMPS OF FLYOVER

13-Sep-14, GENERAL

Excavation to Reduce Level

Preparation of Foundations

Installing & Bracing of MSE Wall Panels

Place & Compact Selected Fill up

Connect & Tighten Soil Reinforcement

Place & Compact Random Backfill

Casting of Coping Beam08-Feb-15, ROAD LIGHTING & ELE

08-Feb-15, GENERAL

08-Oct-14, CIVIL WORKS & CABLING

Trench for Low Voltage Cables

Laying of Ducts

Laying of Cables

High Masts Concrete Foundations

Lighting Columns Concrete Foundations

Concrete Foundations for Transformer Sta18-Oct-14, COLUMNS, HIGH MASTS

Fixing of High Masts

Fixing of Lighting Poles08-Feb-15, TRANSFORMERS & FE

Installation of Feeder Pillar

33 KV & 11 KV Pad Mounted & Pole Moun

Power Supply Connections to Feeder Pillar15-Nov-14, SLOPE PROTECTION & STABILIZATION

15-Nov-14, RIPRAP, GABION

15-Nov-14, GENERAL

Laying of Filter Membrane Fabric for Protection Works

Fixing of Gabion Cages

Installation of Mortared Stone Riprap

Grouted Stone Ditch Lining02-May-14, DRAINAGE WORKS

02-May-14, RC PIPES

02-May-14, GENERAL

Trench Excavation Work

Laying of Drainage Pipes (RCC)

Construction of Manholes

Backfilling01-Jan-15, ROAD FINISHING WORKS

01-Jan-15, GENERAL

09-Dec-14, EMBANKMENT, SUBBASE

Backfilling to Embankment

Preparation of Granular Subbase

Preparation of Aggregate Base Course23-Dec-14, MEDIAN & SIDEWALK PAVING

Installation of Precast Concrete Curbs

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 9 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 10: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A5400 Installation of Concrete Barriers 150 20-Jul-14 16-Dec-14 6600 M A5390, A6290 A5410

A5410 Installation of Interlocking Tiles 150 27-Jul-14 23-Dec-14 20840 M2 A5400 A6100

NEW BITUMINOUS LAYERSNEW BITUMINOUS LAYERS 82 06-Oct-14 26-Dec-14 17242

A5430 Bituminous Base Course 75 06-Oct-14 19-Dec-14 12483 M3 A5380, A4560 A5450

A5450 Bituminous Wearing Course 38 19-Nov-14 26-Dec-14 4759 M3 A5430, A4560 A5460, A5490

GUARDRAILS, HIGHWAY SIGNS & ROAD MARKINGGUARDRAILS, HIGHWAY SIGNS & ROAD MARKING 46 17-Nov-14 01-Jan-15 1484

A5460 Fixing of Guardrails 45 17-Nov-14 31-Dec-14 1415 M A5450, A6440 A5470

A5470 Fixing of Highway Signs Single & Multiple Poles 45 17-Nov-14 31-Dec-14 65 NO. A5460, A6410 A5480

A5480 Fixing of Overhead & Gantry Signs 30 02-Dec-14 31-Dec-14 4 NO. A5470 A6100

A5490 Traffic Lines & Road Studs 30 03-Dec-14 01-Jan-15 0 0 A3930, A5450 A6710, A6100

SOL2, SOL4, SOL7SOL2, SOL4, SOL7 161 02-Jan-15 11-Jun-15 91188

SHIFT TRAFFIC TO SOL1- SB & TEMP SERVICE ROAD SR-2SHIFT TRAFFIC TO SOL1- SB & TEMP SERVICE ROAD SR-2 7 02-Jan-15 08-Jan-15 0

Start (CH 25+300) & End (CH 21+100)Start (CH 25+300) & End (CH 21+100) 7 02-Jan-15 08-Jan-15 0

GENERALGENERAL 7 02-Jan-15 08-Jan-15 0

A9900 Placing of Plastic Barriers 7 02-Jan-15 08-Jan-15 0 0 A6710 A6810

A6810 Shift Traffic from Southern & Northeren Temp. Diversions back to new Main Road 0 08-Jan-15 0 0 A9900 A9650, A8400, A8300, A8090, A7600, A7880

GENERAL CIVIL WORKSGENERAL CIVIL WORKS 99 12-Jan-15 20-Apr-15 11159

CLEARING & EXCAVATIONCLEARING & EXCAVATION 99 12-Jan-15 20-Apr-15 11159

GENERALGENERAL 99 12-Jan-15 20-Apr-15 11159

A9650 Clearing & Grubbing 30 12-Jan-15 10-Feb-15 4259 M2 A6810 A9660

A9660 Removal of Structures & Obstructures 60 14-Jan-15 15-Mar-15 1 LS A9650 A9670

A9670 Utilities Trench Ear thworks 60 17-Jan-15 17-Mar-15 1641 M3 A9660 A9680, A7010

A9680 Structural & Road Way Excavation 90 21-Jan-15 20-Apr-15 5258 M3 A9670 A9390

UTILITIESUTILITIES 52 21-Jan-15 13-Mar-15 14200

GENERALGENERAL 52 21-Jan-15 13-Mar-15 14200

TELEPHONETELEPHONE 32 21-Jan-15 21-Feb-15 2200

A7010 Installation of New (GTO) Omantal Line 12 21-Jan-15 01-Feb-15 1100 0 A9670 A7030, A7340, A6920, A6960, A7440

A7030 Obtain Shutdown & Connect to Existing 15 02-Feb-15 16-Feb-15 0 0 A7010 A7040

A7040 Remove & Dispose Existing (GTO) Omantal Line 5 17-Feb-15 21-Feb-15 1100 0 A7030 A6960

ELECTRICAL (11 KV)ELECTRICAL (11 KV) 52 21-Jan-15 13-Mar-15 6400

A6920 Installation of New 11 Kv Overhead Lines 30 21-Jan-15 19-Feb-15 3000 0 A7010 A6890, A7420, A6840, A6960, A6900

A6890 Obtain Shutdown & Connect to Existing 15 20-Feb-15 06-Mar-15 0 0 A6920 A6970

A6970 Remove & Dispose Existing 11 Kv Overhead Lines 7 07-Mar-15 13-Mar-15 400 0 A6890 A6960

A6960 Remove & Dispose Existing 11 Kv Under Ground Lines 5 09-Mar-15 13-Mar-15 3000 0 A6970, A6920, A7040, A7010A6100

ELECTRICAL (33 KV)ELECTRICAL (33 KV) 10 13-Feb-15 22-Feb-15 400

A7290 Obtain Shutdown & Connect to Existing 7 13-Feb-15 19-Feb-15 0 0 A0000 A6900

A6900 Remove & Dispose Existing 33 Kv Ovehead Lines 3 20-Feb-15 22-Feb-15 400 0 A6920, A7290 A6100

WATERLINESWATERLINES 37 26-Jan-15 03-Mar-15 5200

A6840 Installation of New Irrigation Pipes 25 26-Jan-15 19-Feb-15 2600 0 A6920 A6850, A7300

A6850 Obtain Shutdown & Connect to Existing 15 10-Feb-15 24-Feb-15 0 0 A6840 A6860

A6860 Remove & Dispose Existing Irrigation Pipes 7 25-Feb-15 03-Mar-15 2600 0 A6850 A8090, A7600, A7880

UTILITIES (P.S.)UTILITIES (P.S.) 54 26-Jan-15 20-Mar-15 0

GENERALGENERAL 54 26-Jan-15 20-Mar-15 0

TELEPHONETELEPHONE 30 26-Jan-15 24-Feb-15 0

A7340 Provide & Install New Utilities 12 26-Jan-15 06-Feb-15 0 0 A7010 A7350, A7370

A7370 Remove & Relocate of Existing Utilities 22 26-Jan-15 16-Feb-15 0 0 A7340 A7360

A7350 Obtain Shutdown & Connect to Existing 15 07-Feb-15 21-Feb-15 0 0 A7340 A7360

A7360 Remove & Dispose of Existing Utilities 3 22-Feb-15 24-Feb-15 0 0 A7350, A7370 A7440

ELECTRICALELECTRICAL 54 26-Jan-15 20-Mar-15 0

A7420 Provide & Install New Utilities 30 26-Jan-15 24-Feb-15 0 0 A6920 A7430, A7450

A7450 Remove & Relocate of Existing Utilities 47 26-Jan-15 13-Mar-15 0 0 A7420 A7440

A7430 Obtain Shutdown & Connect to Existing 15 25-Feb-15 11-Mar-15 0 0 A7420 A7440

A7440 Remove & Dispose of Existing Utilities 7 14-Mar-15 20-Mar-15 0 0 A7430, A7450, A7360, A7010A7320

WATERLINESWATERLINES 49 31-Jan-15 20-Mar-15 0

A7300 Provide & Install New Utilities 25 31-Jan-15 24-Feb-15 0 0 A6840 A7310, A7330

J J J J J J J J J

2014 2015 2016

Installation of Concrete Barriers

Installation of Interlocking Tiles26-Dec-14, NEW BITUMINOUS LAYERS

Bituminous Base Course

Bituminous Wearing Course01-Jan-15, GUARDRAILS, HIGHWAY

Fixing of Guardrails

Fixing of Highway Signs Single & Multiple Poles

Fixing of Overhead & Gantry Signs

Traffic Lines & Road Studs11-Jun-15, SOL2, SOL4, SOL7

08-Jan-15, SHIFT TRAFFIC TO SOL

08-Jan-15, Start (CH 25+300) & End (CH 21+100)

08-Jan-15, GENERAL

Placing of Plastic BarriersShift Traffic from Southern & Northere

20-Apr-15, GENERAL CIVIL WORKS

20-Apr-15, CLEARING & EXCAVATION

20-Apr-15, GENERAL

Clearing & Grubbing

Removal of Structures & Obstructures

Utilities Trench Ear thworks

Structural & Road Way Excavation13-Mar-15, UTILITIES

13-Mar-15, GENERAL

21-Feb-15, TELEPHONE

Installation of New (GTO) Omantal Line

Obtain Shutdown & Connect to Existing

Remove & Dispose Existing (GTO)13-Mar-15, ELECTRICAL (11 KV)

Installation of New 11 Kv Overhead Lines

Obtain Shutdown & Connect to Existing

Remove & Dispose Existing 11 Kv

Remove & Dispose Existing 11 Kv22-Feb-15, ELECTRICAL (33 KV)

Obtain Shutdown & Connect to Existing

Remove & Dispose Existing 33 Kv 03-Mar-15, WATERLINES

Installation of New Irrigation Pipes

Obtain Shutdown & Connect to Existing

Remove & Dispose Existing Irrigation Pipes20-Mar-15, UTILITIES (P.S.)

20-Mar-15, GENERAL

24-Feb-15, TELEPHONE

Provide & Install New Utilities

Remove & Relocate of Existing Utilities

Obtain Shutdown & Connect to Existing

Remove & Dispose of Existing Utilities20-Mar-15, ELECTRICAL

Provide & Install New Utilities

Remove & Relocate of Existing Utilities

Obtain Shutdown & Connect to Existing

Remove & Dispose of Existing Utilities20-Mar-15, WATERLINES

Provide & Install New Utilities

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 10 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 11: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A7330 Remove & Relocate of Existing Utilities 42 31-Jan-15 13-Mar-15 0 0 A7300 A7320

A7310 Obtain Shutdown & Connect to Existing 15 25-Feb-15 11-Mar-15 0 0 A7300 A7320

A7320 Remove & Dispose of Existing Utilities 7 14-Mar-15 20-Mar-15 0 0 A7310, A7330, A7440 A6100

BOX CULVERTS - STAGE 2BOX CULVERTS - STAGE 2 26 04-Mar-15 29-Mar-15 6201

GENERALGENERAL 26 04-Mar-15 29-Mar-15 6201

9 CELLS BOX CULVERT AT CH 22+6509 CELLS BOX CULVERT AT CH 22+650 23 04-Mar-15 26-Mar-15 1517

A8090 Structural Excavation 3 04-Mar-15 06-Mar-15 175 M3 A6810, A6860 A8100

A8100 Blinding of Concrete 2 07-Mar-15 08-Mar-15 23 M3 A8090 A8110

A8110 Casting of Base Slab 4 09-Mar-15 12-Mar-15 35 M3 A8100 A8120, A10440

A8120 Casting of Walls 7 13-Mar-15 19-Mar-15 62 M3 A8110 A8130, A8140

A8130 Casting of Top Slab 5 20-Mar-15 24-Mar-15 44 M3 A8120 A8150, A10440, A10420

A8140 Casting of Apron Slab & W ing Walls 4 20-Mar-15 23-Mar-15 35 M3 A8120 A9610

A8150 Backfilling 2 25-Mar-15 26-Mar-15 1143 M3 A8130 A9690

1 CELL BOX CULVERT AT CH 23+0001 CELL BOX CULVERT AT CH 23+000 10 20-Mar-15 29-Mar-15 752

A10420 Structural Excavation 2 20-Mar-15 21-Mar-15 117 M3 A8130 A10430

A10430 Blinding of Concrete 1 22-Mar-15 22-Mar-15 11 M3 A10420 A10440

A10440 Casting of Base Slab 2 23-Mar-15 24-Mar-15 18 M3 A10430, A8110, A8130 A10450

A10450 Casting of Walls 3 25-Mar-15 27-Mar-15 26 M3 A10440 A10460, A9610

A10460 Casting of Top Slab 1 28-Mar-15 28-Mar-15 9 M3 A10450 A10480

A10480 Backfilling 1 29-Mar-15 29-Mar-15 571 M3 A10460 A9690

2 CELLS BOX CULVERT AT CH 23+2002 CELLS BOX CULVERT AT CH 23+200 26 04-Mar-15 29-Mar-15 893

A7880 Structural Excavation 2 04-Mar-15 05-Mar-15 117 M3 A6810, A6860 A7890

A7890 Blinding of Concrete 1 06-Mar-15 06-Mar-15 11 M3 A7880 A7900

A7900 Casting of Base Slab 6 07-Mar-15 12-Mar-15 53 M3 A7890 A7910

A7910 Casting of Walls 10 13-Mar-15 22-Mar-15 88 M3 A7900 A7920, A9610

A7920 Casting of Top Slab 6 23-Mar-15 28-Mar-15 53 M3 A7910 A7940

A7940 Backfilling 1 29-Mar-15 29-Mar-15 571 M3 A7920 A9690

1 CELL BOX CULVERT AT CH 23+7601 CELL BOX CULVERT AT CH 23+760 12 04-Mar-15 15-Mar-15 787

A7600 Structural Excavation 2 04-Mar-15 05-Mar-15 117 M3 A6810, A6860 A7610

A7610 Blinding of Concrete 1 06-Mar-15 06-Mar-15 11 M3 A7600 A7620

A7620 Casting of Base Slab 2 07-Mar-15 08-Mar-15 18 M3 A7610 A7630, A7970

A7630 Casting of Walls 3 09-Mar-15 11-Mar-15 26 M3 A7620 A7640, A7650, A7670

A7640 Casting of Top Slab 1 12-Mar-15 12-Mar-15 9 M3 A7630 A7660, A7690

A7650 Casting of Apron Slab & W ing Walls 4 12-Mar-15 15-Mar-15 35 M3 A7630 A7720

A7660 Backfilling 1 13-Mar-15 13-Mar-15 571 M3 A7640 A9690

1 CELL BOX CULVERT AT CH 23+9971 CELL BOX CULVERT AT CH 23+997 12 10-Mar-15 21-Mar-15 787

A7670 Structural Excavation 2 10-Mar-15 11-Mar-15 117 M3 A7630 A7680, A7950

A7680 Blinding of Concrete 1 12-Mar-15 12-Mar-15 11 M3 A7670 A7690

A7690 Casting of Base Slab 2 13-Mar-15 14-Mar-15 18 M3 A7680, A7640 A7700, A7970

A7700 Casting of Walls 3 15-Mar-15 17-Mar-15 26 M3 A7690 A7710, A7720

A7710 Casting of Top Slab 1 18-Mar-15 18-Mar-15 9 M3 A7700 A7730

A7720 Casting of Apron Slab & W ing Walls 4 18-Mar-15 21-Mar-15 35 M3 A7700, A7650 A8000

A7730 Backfilling 1 19-Mar-15 19-Mar-15 571 M3 A7710 A9690

5 CELLS BOX CULVERT AT CH 23+5005 CELLS BOX CULVERT AT CH 23+500 20 10-Mar-15 29-Mar-15 1465

A7950 Structural Excavation 2 10-Mar-15 11-Mar-15 117 M3 A7670 A7960

A7960 Blinding of Concrete 1 12-Mar-15 12-Mar-15 11 M3 A7950 A7970

A7970 Casting of Base Slab 4 13-Mar-15 16-Mar-15 35 M3 A7960, A7620, A7690 A7980

A7980 Casting of Walls 7 17-Mar-15 23-Mar-15 62 M3 A7970 A7990, A8000

A8000 Casting of Apron Slab & W ing Walls 7 22-Mar-15 28-Mar-15 62 M3 A7980, A7720 A9610

A7990 Casting of Top Slab 4 24-Mar-15 27-Mar-15 35 M3 A7980 A8010

A8010 Backfilling 2 28-Mar-15 29-Mar-15 1143 M3 A7990 A9690

PEDESTRIAN UNDERPASS 2 (SOL4 CH 00+935) - STAGE 2PEDESTRIAN UNDERPASS 2 (SOL4 CH 00+935) - STAGE 2 80 09-Jan-15 29-Mar-15 2990

GENERALGENERAL 80 09-Jan-15 29-Mar-15 2990

UNDERPASS STRUCTUREUNDERPASS STRUCTURE 80 09-Jan-15 29-Mar-15 2990

J J J J J J J J J

2014 2015 2016

Remove & Relocate of Existing Utilities

Obtain Shutdown & Connect to Existing

Remove & Dispose of Existing Utilities29-Mar-15, BOX CULVERTS - STAGE 2

29-Mar-15, GENERAL

26-Mar-15, 9 CELLS BOX CULVE

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling29-Mar-15, 1 CELL BOX CULVER

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Backfilling29-Mar-15, 2 CELLS BOX CULVE

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Backfilling15-Mar-15, 1 CELL BOX CULVER

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling21-Mar-15, 1 CELL BOX CULVER

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling29-Mar-15, 5 CELLS BOX CULVE

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Apron Slab & W ing Walls

Casting of Top Slab

Backfilling29-Mar-15, PEDESTRIAN UNDE

29-Mar-15, GENERAL

29-Mar-15, UNDERPASS STRUCTURE

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 11 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 12: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A8300 Structural Excavation 10 09-Jan-15 18-Jan-15 584 M3 A6810, A1830 A7220, A1510

A7220 Blinding of Concrete 12 12-Jan-15 23-Jan-15 137 M3 A8300 A7230

A7230 Casting of Base Slab 21 23-Jan-15 12-Feb-15 185 M3 A7220 A7240

A7240 Casting of Walls 21 13-Feb-15 05-Mar-15 185 M3 A7230 A7250

A7250 Casting of Top Slab 21 06-Mar-15 26-Mar-15 185 M3 A7240 A8310, A10030

A8310 Backfilling 3 27-Mar-15 29-Mar-15 1714 M3 A7250 A9690

PEDESTRIAN UNDERPASS 1 (SOL4 CH 00+435) - STAGE 2PEDESTRIAN UNDERPASS 1 (SOL4 CH 00+435) - STAGE 2 80 09-Jan-15 29-Mar-15 2990

GENERALGENERAL 80 09-Jan-15 29-Mar-15 2990

UNDERPASS STRUCTUREUNDERPASS STRUCTURE 80 09-Jan-15 29-Mar-15 2990

A8400 Structural Excavation 10 09-Jan-15 18-Jan-15 584 M3 A6810, A3120 A8350

A8350 Blinding of Concrete 12 12-Jan-15 23-Jan-15 137 M3 A8400 A8360

A8360 Casting of Base Slab 21 23-Jan-15 12-Feb-15 185 M3 A8350 A8370

A8370 Casting of Walls 21 13-Feb-15 05-Mar-15 185 M3 A8360 A8380

A8380 Casting of Top Slab 21 06-Mar-15 26-Mar-15 185 M3 A8370 A8410

A8410 Backfilling 3 27-Mar-15 29-Mar-15 1714 M3 A8380 A9690

ROAD LIGHTING & ELECTRICAL INSTALLATIONROAD LIGHTING & ELECTRICAL INSTALLATION 56 05-Feb-15 01-Apr-15 1168

GENERALGENERAL 56 05-Feb-15 01-Apr-15 1168

CIVIL WORKS & CABLINGCIVIL WORKS & CABLING 41 05-Feb-15 17-Mar-15 1168

A9390 Trench for Low Voltage Cables 20 05-Feb-15 24-Feb-15 887 M A9680 A9400

A9400 Laying of Ducts 20 12-Feb-15 03-Mar-15 257 M A9390 A9410

A9420 Concrete Foundations for Transformer Stations & Feeder Pillars 30 16-Feb-15 17-Mar-15 0 0 A9430 A9470

A9410 Laying of Cables 20 19-Feb-15 10-Mar-15 0 0 A9400 A9440

A9430 High Masts Concrete Foundations 25 21-Feb-15 17-Mar-15 0 0 A9440 A9420, A9480

A9440 Lighting Columns Concrete Foundations 12 06-Mar-15 17-Mar-15 24 NO. A9410 A9430, A9690

COLUMNS, HIGH MASTSCOLUMNS, HIGH MASTS 30 03-Mar-15 01-Apr-15 0

A9480 Fixing of High Masts 30 03-Mar-15 01-Apr-15 0 0 A9430 A9490

A9490 Fixing of Lighting Poles 30 03-Mar-15 01-Apr-15 0 0 A9480 A9730

TRANSFORMERS & FEEDER PILLARSTRANSFORMERS & FEEDER PILLARS 30 26-Feb-15 27-Mar-15 0

A9450 Installation of Feeder Pillar 30 26-Feb-15 27-Mar-15 0 0 A9470 A9460

A9460 Power Supply Connections to Feeder Pillar 30 26-Feb-15 27-Mar-15 0 0 A9450, A4660 A6100

A9470 33 KV & 11 KV Pad Mounted & Pole Mounted Transformers Substations 30 26-Feb-15 27-Mar-15 0 0 A9420 A9450

SLOPE PROTECTION & STABILIZATIONSLOPE PROTECTION & STABILIZATION 55 18-Apr-15 11-Jun-15 9547

RIPRAP, GABIONRIPRAP, GABION 55 18-Apr-15 11-Jun-15 9547

GENERALGENERAL 55 18-Apr-15 11-Jun-15 9547

A9610 Laying of Filter Membrane Fabric for Protection Works 40 18-Apr-15 27-May-15 2567 M2 A8000, A7910, A10450, A8140A9620

A9620 Fixing of Gabion Cages 45 23-Apr-15 06-Jun-15 1243 M3 A9610 A9630

A9630 Installation of Mortared Stone Riprap 45 23-Apr-15 06-Jun-15 1737 M3 A9620 A9640

A9640 Grouted Stone Ditch Lining 30 13-May-15 11-Jun-15 4000 M2 A9630 A6740

ROAD FINISHING WORKSROAD FINISHING WORKS 83 26-Feb-15 19-May-15 42933

GENERALGENERAL 83 26-Feb-15 19-May-15 42933

EMBANKMENT, SUBBASE & AGGREGATE BASEEMBANKMENT, SUBBASE & AGGREGATE BASE 44 26-Feb-15 10-Apr-15 27648

A9690 Backfilling to Embankment 32 26-Feb-15 29-Mar-15 18286 M3 A9440, A8410, A8310, A8150, A10480, A7940, A7660, A7730, A8010A9710

A9710 Preparation of Granular Subbase 15 20-Mar-15 03-Apr-15 2503 M3 A9690 A9720

A9720 Preparation of Aggregate Base Course 20 22-Mar-15 10-Apr-15 6859 M3 A9710 A9730, A9770

MEDIAN & SIDEWALK PAVINGMEDIAN & SIDEWALK PAVING 52 29-Mar-15 19-May-15 11383

A9730 Installation of Precast Concrete Curbs 50 29-Mar-15 17-May-15 5131 M A9720, A9490 A9750

A9750 Installation of Interlocking Tiles 45 05-Apr-15 19-May-15 6252 M2 A9730 A6100

NEW BITUMINOUS LAYERSNEW BITUMINOUS LAYERS 17 02-Apr-15 18-Apr-15 3833

A9770 Bituminous Base Course 14 02-Apr-15 15-Apr-15 2330 M3 A9720 A9790

A9790 Bituminous Wearing Course 12 07-Apr-15 18-Apr-15 1503 M3 A9770 A9800, A9830

GUARDRAILS, HIGHWAY SIGNS & ROAD MARKINGGUARDRAILS, HIGHWAY SIGNS & ROAD MARKING 45 10-Mar-15 23-Apr-15 69

A9800 Fixing of Guardrails 45 10-Mar-15 23-Apr-15 0 M A9790 A9810

A9810 Fixing of Highway Signs Single & Multiple Poles 45 10-Mar-15 23-Apr-15 65 NO. A9800 A9820

A9830 Traffic Lines & Road Studs 30 23-Mar-15 21-Apr-15 0 0 A9790 A6100, A1500

A9820 Fixing of Overhead & Gantry Signs 30 25-Mar-15 23-Apr-15 4 NO. A9810 A6100

J J J J J J J J J

2014 2015 2016

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Backfilling29-Mar-15, PEDESTRIAN UNDE

29-Mar-15, GENERAL

29-Mar-15, UNDERPASS STRUCTURE

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Backfilling01-Apr-15, ROAD LIGHTING & E

01-Apr-15, GENERAL

17-Mar-15, CIVIL WORKS & CABLING

Trench for Low Voltage Cables

Laying of Ducts

Concrete Foundations for Transfo

Laying of Cables

High Masts Concrete Foundations

Lighting Columns Concrete Foundations01-Apr-15, COLUMNS, HIGH MASTS

Fixing of High Masts

Fixing of Lighting Poles27-Mar-15, TRANSFORMERS &

Installation of Feeder Pillar

Power Supply Connections to Feeder Pillar

33 KV & 11 KV Pad Mounted & Po11-Jun-15, SLOPE PROTEC

11-Jun-15, RIPRAP, GABION

11-Jun-15, GENERAL

Laying of Filter Membrane Fab

Fixing of Gabion Cages

Installation of Mortared Stone Riprap

Grouted Stone Ditch Lining19-May-15, ROAD FINISHING WORKS

19-May-15, GENERAL

10-Apr-15, EMBANKMENT, SUB

Backfilling to Embankment

Preparation of Granular Subbase

Preparation of Aggregate Base Course19-May-15, MEDIAN & SIDEWALK PAVING

Installation of Precast Concrete Curbs

Installation of Interlocking Tiles18-Apr-15, NEW BITUMINOUS LAYERS

Bituminous Base Course

Bituminous Wearing Course23-Apr-15, GUARDRAILS, HIGH

Fixing of Guardrails

Fixing of Highway Signs Single &

Traffic Lines & Road Studs

Fixing of Overhead & Gantry Signs

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 12 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 13: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

SERVICE ROADSSERVICE ROADS 73 18-Apr-15 29-Jun-15 37801

SR1, SR2 & SR3SR1, SR2 & SR3 73 18-Apr-15 29-Jun-15 37801

SHIFT TRAFFIC FROM SERVICE ROADS TO NEW SLIP ROADS (SOL 4/5/6/7)SHIFT TRAFFIC FROM SERVICE ROADS TO NEW SLIP ROADS (SOL 4/5/6/7) 4 18-Apr-15 21-Apr-15 0

SR2 - (CH0+0 TO CH1+300) & SR-1(CH0+0 TO CH0+797)SR2 - (CH0+0 TO CH1+300) & SR-1(CH0+0 TO CH0+797) 4 18-Apr-15 21-Apr-15 0

GENERALGENERAL 4 18-Apr-15 21-Apr-15 0

A1500 Placing of Plastic Barriers & Temporary Signs 4 18-Apr-15 21-Apr-15 0 0 A9830 A1510

A1510 Shift Traffic from Existing Southern & Northeren Service Roads to New Main Road 0 21-Apr-15 0 0 A1500, A8300 A6000, A10090, A10030, A1840, A3100

GENERAL CIVIL WORKSGENERAL CIVIL WORKS 17 22-Apr-15 08-May-15 1421

CLEARING & EXCAVATIONCLEARING & EXCAVATION 17 22-Apr-15 08-May-15 1421

GENERALGENERAL 17 22-Apr-15 08-May-15 1421

A6000 Clearing & Grubbing 10 22-Apr-15 01-May-15 1420 M2 A1510 A6010

A6010 Removal of Structures & Obstructures 15 24-Apr-15 08-May-15 1 LS A6000 A6020

A6020 Road Way Excavation 10 26-Apr-15 05-May-15 0 0 A6010 A5950, A9960, A10510

BOX CULERTS - STAGE 3BOX CULERTS - STAGE 3 24 06-May-15 29-May-15 1822

GENERALGENERAL 24 06-May-15 29-May-15 1822

1 CELL BOX CULVERT AT CH 23+0001 CELL BOX CULVERT AT CH 23+000 20 06-May-15 25-May-15 875

A10510 Structural Excavation 2 06-May-15 07-May-15 117 M3 A6020 A10520

A10520 Blinding of Concrete 1 08-May-15 08-May-15 11 M3 A10510 A10530

A10530 Casting of Base Slab 4 09-May-15 12-May-15 35 M3 A10520 A10540

A10540 Casting of Walls 8 13-May-15 20-May-15 71 M3 A10530 A10550, A10560

A10550 Casting of Top Slab 4 21-May-15 24-May-15 35 M3 A10540 A10570

A10560 Casting of Apron Slab & W ing Walls 4 22-May-15 25-May-15 35 M3 A10540 A6100

A10570 Backfilling 1 25-May-15 25-May-15 571 M3 A10550 A5830

2 CELLS BOX CULVERT AT CH 23+2002 CELLS BOX CULVERT AT CH 23+200 24 06-May-15 29-May-15 947

A9960 Structural Excavation 2 06-May-15 07-May-15 117 M3 A6020 A9970

A9970 Blinding of Concrete 1 08-May-15 08-May-15 11 M3 A9960 A9980

A9980 Casting of Base Slab 6 09-May-15 14-May-15 53 M3 A9970 A9990

A9990 Casting of Walls 8 15-May-15 22-May-15 71 M3 A9980 A10010, A10000

A10000 Casting of Apron Slab & W ing Walls 8 20-May-15 27-May-15 71 M3 A9990

A10010 Casting of Top Slab 6 23-May-15 28-May-15 53 M3 A9990 A10020

A10020 Backfilling 1 29-May-15 29-May-15 571 M3 A10010 A5830

PEDESTRIAN UNDERPASS 1 (SR2 CH 00+725) - STAGE 3PEDESTRIAN UNDERPASS 1 (SR2 CH 00+725) - STAGE 3 67 22-Apr-15 27-Jun-15 2997

GENERALGENERAL 67 22-Apr-15 27-Jun-15 2997

UNDERPASS STRUCTUREUNDERPASS STRUCTURE 44 22-Apr-15 04-Jun-15 2363

A10090 Structural Excavation 5 22-Apr-15 26-Apr-15 292 M3 A1510 A10100, A3100

A10100 Blinding of Concrete 5 24-Apr-15 28-Apr-15 57 M3 A10090 A10110

A10110 Casting of Base Slab 12 29-Apr-15 10-May-15 106 M3 A10100 A10120

A10120 Casting of Walls 10 11-May-15 20-May-15 88 M3 A10110 A10130

A10130 Casting of Top Slab 12 21-May-15 01-Jun-15 106 M3 A10120 A10140

A10140 Backfilling 3 02-Jun-15 04-Jun-15 1714 M3 A10130 A5830

ENTRANCE & EXITENTRANCE & EXIT 67 22-Apr-15 27-Jun-15 634

A3100 Casting of Floor Slab 22 22-Apr-15 13-May-15 194 M3 A10090, A1510 A3130

A3130 Casting of Walls 25 14-May-15 07-Jun-15 220 M3 A3100 A3140, A3150

A3150 Casting of Landing Slabs & Stair Case 25 29-May-15 22-Jun-15 220 M3 A3130 A3140

A3140 Casing of Beams & Roof Slab 20 08-Jun-15 27-Jun-15 0 0 A3130, A3150 A6100

PEDESTRIAN UNDERPASS 2 (SR2 CH 01+210) - STAGE 3PEDESTRIAN UNDERPASS 2 (SR2 CH 01+210) - STAGE 3 67 22-Apr-15 27-Jun-15 2997

GENERALGENERAL 67 22-Apr-15 27-Jun-15 2997

UNDERPASS STRUCTUREUNDERPASS STRUCTURE 44 22-Apr-15 04-Jun-15 2363

A10030 Structural Excavation 5 22-Apr-15 26-Apr-15 292 M3 A1510, A7250 A10040, A1840

A10040 Blinding of Concrete 5 24-Apr-15 28-Apr-15 57 M3 A10030 A10050

A10050 Casting of Base Slab 12 29-Apr-15 10-May-15 106 M3 A10040 A10060

A10060 Casting of Walls 10 11-May-15 20-May-15 88 M3 A10050 A10070

A10070 Casting of Top Slab 12 21-May-15 01-Jun-15 106 M3 A10060 A10080

A10080 Backfilling 3 02-Jun-15 04-Jun-15 1714 M3 A10070 A5830

ENTRANCE & EXITENTRANCE & EXIT 67 22-Apr-15 27-Jun-15 634

J J J J J J J J J

2014 2015 2016

29-Jun-15, SERVICE ROADS

29-Jun-15, SR1, SR2 & SR3

21-Apr-15, SHIFT TRAFFIC FR

21-Apr-15, SR2 - (CH0+0 TO C

21-Apr-15, GENERAL

Placing of Plastic Barriers & Temporary SignsShift Traffic from Existing Southe

08-May-15, GENERAL CIVIL WORKS

08-May-15, CLEARING & EXCAVATION

08-May-15, GENERAL

Clearing & Grubbing

Removal of Structures & Obstructures

Road Way Excavation29-May-15, BOX CULERTS - STAGE 3

29-May-15, GENERAL

25-May-15, 1 CELL BOX CUL

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Casting of Apron Slab & W ing Walls

Backfilling29-May-15, 2 CELLS BOX CU

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Apron Slab & W ing Walls

Casting of Top Slab

Backfilling27-Jun-15, PEDESTRIAN U

27-Jun-15, GENERAL

04-Jun-15, UNDERPASS STRUCTURE

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Backfilling27-Jun-15, ENTRANCE & EXIT

Casting of Floor Slab

Casting of Walls

Casting of Landing Slabs & Stair Case

Casing of Beams & Roof Slab27-Jun-15, PEDESTRIAN U

27-Jun-15, GENERAL

04-Jun-15, UNDERPASS STRUCTURE

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Backfilling27-Jun-15, ENTRANCE & EXIT

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 13 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 14: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A1840 Casting of Floor Slab 22 22-Apr-15 13-May-15 194 M3 A1510, A10030 A3020

A3020 Casting of Walls 25 14-May-15 07-Jun-15 220 M3 A1840 A3040, A3050

A3050 Casting of Landing Slabs & Stair Case 25 03-Jun-15 27-Jun-15 220 M3 A3020 A3040

A3040 Casing of Beams & Roof Slab 20 08-Jun-15 27-Jun-15 0 0 A3020, A3050 A6100

ROAD LIGHTING & ELECTRICAL INSTALLATIONROAD LIGHTING & ELECTRICAL INSTALLATION 45 26-Apr-15 09-Jun-15 888

GENERALGENERAL 45 26-Apr-15 09-Jun-15 888

CIVIL WORKS & CABLINGCIVIL WORKS & CABLING 30 26-Apr-15 25-May-15 888

A5950 Trench for Low Voltage Cables 15 26-Apr-15 10-May-15 665 M A6020 A5960

A5960 Laying of Ducts 15 01-May-15 15-May-15 193 M A5950 A5970

A5970 Laying of Cables 15 06-May-15 20-May-15 0 0 A5960 A5980

A5980 Lighting Columns Concrete Foundations 19 07-May-15 25-May-15 30 NO. A5970 A5990, A5830

COLUMNS, HIGH MASTSCOLUMNS, HIGH MASTS 25 16-May-15 09-Jun-15 0

A5990 Fixing of Lighting Poles 25 16-May-15 09-Jun-15 0 0 A5980, A4680, A6350 A5870

ROAD FINISHING WORKSROAD FINISHING WORKS 48 13-May-15 29-Jun-15 27676

GENERALGENERAL 48 13-May-15 29-Jun-15 27676

EMBANKMENT, SUBBASE & AGGREGATE BASEEMBANKMENT, SUBBASE & AGGREGATE BASE 35 13-May-15 16-Jun-15 19316

A5830 Backfilling to Embankment 23 13-May-15 04-Jun-15 13143 M3 A5980, A10080, A10140, A10020, A10570A5860

A5860 Preparation of Aggregate Base Course 18 30-May-15 16-Jun-15 6173 M3 A5830 A5870, A5900

MEDIAN & SIDEWALK PAVINGMEDIAN & SIDEWALK PAVING 23 02-Jun-15 24-Jun-15 4831

A5870 Installation of Precast Concrete Curbs 20 02-Jun-15 21-Jun-15 2052 M A5860, A5990 A5880

A5880 Installation of Interlocking Tiles 20 05-Jun-15 24-Jun-15 2779 M2 A5870 A6100

NEW BITUMINOUS LAYERSNEW BITUMINOUS LAYERS 18 10-Jun-15 27-Jun-15 3500

A5900 Bituminous Base Course 12 10-Jun-15 21-Jun-15 1997 M3 A5860 A5920

A5920 Bituminous Wearing Course 12 16-Jun-15 27-Jun-15 1503 M3 A5900 A5930, A5940

HIGHWAY SIGNS & ROAD MARKINGHIGHWAY SIGNS & ROAD MARKING 21 09-Jun-15 29-Jun-15 29

A5930 Fixing of Highway Signs Single & Multiple Poles 20 09-Jun-15 28-Jun-15 29 NO. A5920, A6410 A6100

A5940 Traffic Lines & Road Studs 15 15-Jun-15 29-Jun-15 0 0 A5920 A6740, A6100

SOHAR-BURAIMI ROADSOHAR-BURAIMI ROAD 475 12-Mar-14 29-Jun-15 132099

MAIN ROADMAIN ROAD 357 12-Mar-14 03-Mar-15 110776

SOL3 (CH 0+0 to 1+200)SOL3 (CH 0+0 to 1+200) 357 12-Mar-14 03-Mar-15 110776

INVESTIGATIONINVESTIGATION 24 12-Mar-14 04-Apr-14 0

GEOTECHNICAL INVESTIGATIONGEOTECHNICAL INVESTIGATION 24 12-Mar-14 04-Apr-14 0

GENERALGENERAL 24 12-Mar-14 04-Apr-14 0

A6170 Site Survey 4 12-Mar-14 15-Mar-14 0 0 A6160 A6180

A6180 Setting up Drilling Rigs 5 16-Mar-14 20-Mar-14 0 0 A6170 A6190

A6190 Execution of Boreholes 5 21-Mar-14 25-Mar-14 0 0 A6180 A6200

A6200 Execution of Trial Pits 4 26-Mar-14 29-Mar-14 0 0 A6190 A6210

A6210 (SPT) Test 3 30-Mar-14 01-Apr-14 0 0 A6200 A6220

A6220 Laboratory Testing Report 3 02-Apr-14 04-Apr-14 0 0 A6210 A6030

GENERAL CIVIL WORKSGENERAL CIVIL WORKS 114 05-Apr-14 27-Jul-14 5736

CLEARING & EXCAVATIONCLEARING & EXCAVATION 114 05-Apr-14 27-Jul-14 5736

GENERALGENERAL 114 05-Apr-14 27-Jul-14 5736

A6030 Clearing & Grubbing 8 05-Apr-14 12-Apr-14 1136 M2 A6220 A6040

A6040 Removal of Structures & Obstructures 15 12-Apr-14 26-Apr-14 1 LS A6030 A6050

A6050 Utilities Trench Excavation & Backfilling 40 19-Apr-14 28-May-14 1094 M3 A6040 A6060, A1210

A6060 Structural & Road Way Excavation 60 29-May-14 27-Jul-14 3505 M3 A6050 A4800, A5130

UTILITIESUTILITIES 30 29-May-14 27-Jun-14 3000

GENERALGENERAL 30 29-May-14 27-Jun-14 3000

TELEPHONETELEPHONE 30 29-May-14 27-Jun-14 800

A1210 Installation of New (GTO) Omantal Line 10 29-May-14 07-Jun-14 400 0 A6050, A6590 A1215, A1100, A2050, A1105, A2150

A1215 Obtain Shutdown & Connect to Existing 15 08-Jun-14 22-Jun-14 0 0 A1210 A1218

A1218 Remove & Dispose Existing (GTO) Omantal Line 5 23-Jun-14 27-Jun-14 400 0 A1215 A1105

ELECTRICAL (11 KV)ELECTRICAL (11 KV) 30 29-May-14 27-Jun-14 1100

A1100 Installation of New 11 Kv Overhead Lines 10 29-May-14 07-Jun-14 500 0 A1210, A6530 A1102, A1020, A2130

A1102 Obtain Shutdown & Connect to Existing 15 08-Jun-14 22-Jun-14 0 0 A1100 A1105, A1170, A1058

J J J J J J J J J

2014 2015 2016

Casting of Floor Slab

Casting of Walls

Casting of Landing Slabs & Stair Case

Casing of Beams & Roof Slab09-Jun-15, ROAD LIGHTING

09-Jun-15, GENERAL

25-May-15, CIVIL WORKS & CABLING

Trench for Low Voltage Cables

Laying of Ducts

Laying of Cables

Lighting Columns Concrete Foundations09-Jun-15, COLUMNS, HIGH MASTS

Fixing of Lighting Poles29-Jun-15, ROAD FINISHING WORKS

29-Jun-15, GENERAL

16-Jun-15, EMBANKMENT, S

Backfilling to Embankment

Preparation of Aggregate Base Course24-Jun-15, MEDIAN & SIDEW

Installation of Precast Concrete Curbs

Installation of Interlocking Tiles27-Jun-15, NEW BITUMINOUS LAYERS

Bituminous Base Course

Bituminous Wearing Course29-Jun-15, HIGHWAY SIGN

Fixing of Highway Signs Sing

Traffic Lines & Road Studs29-Jun-15, SOHAR-BURAIMI ROAD

03-Mar-15, MAIN ROAD

03-Mar-15, SOL3 (CH 0+0 to 1+200)

04-Apr-14, INVESTIGATION

04-Apr-14, GEOTECHNICAL INVESTIGATION

04-Apr-14, GENERAL

Site Survey

Setting up Drilling Rigs

Execution of Boreholes

Execution of Trial Pits

(SPT) Test

Laboratory Testing Report27-Jul-14, GENERAL CIVIL WORKS

27-Jul-14, CLEARING & EXCAVATION

27-Jul-14, GENERAL

Clearing & Grubbing

Removal of Structures & Obstructures

Utilities Trench Excavation & Backfilling

Structural & Road Way Excavation27-Jun-14, UTILITIES

27-Jun-14, GENERAL

27-Jun-14, TELEPHONE

Installation of New (GTO) Omantal Line

Obtain Shutdown & Connect to Existing

Remove & Dispose Existing (GTO) Omantal Line27-Jun-14, ELECTRICAL (11 KV)

Installation of New 11 Kv Overhead Lines

Obtain Shutdown & Connect to Existing

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 14 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 15: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A1105 Remove & Dispose Existing 11 Kv Overhead Lines 5 23-Jun-14 27-Jun-14 100 0 A1102, A1218, A1210 A1170

A1170 Remove & Dispose Existing 11 Kv Under Ground Lines 2 26-Jun-14 27-Jun-14 500 0 A1105, A1102 A1058

ELECTRICAL (33 KV)ELECTRICAL (33 KV) 9 19-Jun-14 27-Jun-14 100

A1065 Obtain Shutdown & Connect to Existing 7 19-Jun-14 25-Jun-14 0 0 A0000 A1058

A1058 Remove & Dispose Existing 33 Kv Ovehead Lines 2 26-Jun-14 27-Jun-14 100 0 A1170, A1102, A1065 A5650

WATERLINESWATERLINES 30 29-May-14 27-Jun-14 1000

A1020 Installation of New Irrigation Pipes 10 29-May-14 07-Jun-14 500 0 A1100, A6560 A1030, A2010

A1030 Obtain Shutdown & Connect to Existing 15 08-Jun-14 22-Jun-14 0 0 A1020 A1040

A1040 Remove & Dispose Existing Irrigation Pipes 5 23-Jun-14 27-Jun-14 500 0 A1030 A5210

UTILITIES (P.S.)UTILITIES (P.S.) 45 03-Jun-14 17-Jul-14 0

GENERALGENERAL 45 03-Jun-14 17-Jul-14 0

TELEPHONETELEPHONE 30 03-Jun-14 02-Jul-14 0

A2050 Provide & Install New Utilities 10 03-Jun-14 12-Jun-14 0 0 A1210 A2060, A2080

A2080 Remove & Relocate of Existing Utilities 25 03-Jun-14 27-Jun-14 0 0 A2050 A2070

A2060 Obtain Shutdown & Connect to Existing 15 13-Jun-14 27-Jun-14 0 0 A2050 A2070

A2070 Remove & Dispose of Existing Utilities 5 28-Jun-14 02-Jul-14 0 0 A2060, A2080 A2150

ELECTRICALELECTRICAL 40 03-Jun-14 12-Jul-14 0

A2130 Provide & Install New Utilities 10 03-Jun-14 12-Jun-14 0 0 A1100 A2140, A2160

A2140 Obtain Shutdown & Connect to Existing 15 13-Jun-14 27-Jun-14 0 0 A2130 A2150

A2160 Remove & Relocate of Existing Utilities 25 13-Jun-14 07-Jul-14 0 0 A2130 A2150

A2150 Remove & Dispose of Existing Utilities 5 08-Jul-14 12-Jul-14 0 0 A2140, A2160, A2070, A1210A2030

WATERLINESWATERLINES 45 03-Jun-14 17-Jul-14 0

A2010 Provide & Install New Utilities 10 03-Jun-14 12-Jun-14 0 0 A1020 A2020, A2040

A2020 Obtain Shutdown & Connect to Existing 15 13-Jun-14 27-Jun-14 0 0 A2010 A2030

A2040 Remove & Relocate of Existing Utilities 25 13-Jun-14 07-Jul-14 0 0 A2010 A2030

A2030 Remove & Dispose of Existing Utilities 5 13-Jul-14 17-Jul-14 0 0 A2020, A2040, A2150 A5260

PEDESTRIAN UNDERPASS 3 (SOL3 CH 00+050) - STAGE 1PEDESTRIAN UNDERPASS 3 (SOL3 CH 00+050) - STAGE 1 199 03-Jul-14 17-Jan-15 6329

GENERALGENERAL 199 03-Jul-14 17-Jan-15 6329

UNDERPASS STRUCTUREUNDERPASS STRUCTURE 128 03-Jul-14 07-Nov-14 5517

A5210 Structural Excavation 10 03-Jul-14 12-Jul-14 584 M3 A1040 A5220

A5220 Blinding of Concrete 12 06-Jul-14 17-Jul-14 137 M3 A5210 A5230

A5230 Casting of Base Slab 35 13-Jul-14 16-Aug-14 309 M3 A5220 A5240

A5240 Casting of Walls 70 03-Aug-14 11-Oct-14 617 M3 A5230 A5250

A5250 Casting of Top Slab 50 13-Sep-14 01-Nov-14 441 M3 A5240 A5260, A4800, A5270

A5260 Backfilling 6 02-Nov-14 07-Nov-14 3429 M3 A5250, A2030 A5500

ENTRANCE & EXISTENTRANCE & EXIST 77 02-Nov-14 17-Jan-15 812

A5270 Casting of Floor Slab 22 02-Nov-14 23-Nov-14 194 M3 A5250 A5280

A5280 Casting of Walls 35 24-Nov-14 28-Dec-14 309 M3 A5270 A5290, A5300

A5300 Casting of Landing Slabs & Stair Case 35 14-Dec-14 17-Jan-15 309 M3 A5280 A5290

A5290 Casing of Beams & Roof Slab 20 29-Dec-14 17-Jan-15 0 0 A5280, A5300 A6100

ROAD LIGHTING & ELECTRICAL INSTALLATIONROAD LIGHTING & ELECTRICAL INSTALLATION 89 13-Sep-14 10-Dec-14 2920

GENERALGENERAL 89 13-Sep-14 10-Dec-14 2920

CIVIL WORKS & CABLINGCIVIL WORKS & CABLING 79 13-Sep-14 30-Nov-14 2920

A4800 Trench for Low Voltage Cables 50 13-Sep-14 01-Nov-14 2218 M A5250, A6060, A6530 A4810

A4810 Laying of Ducts 50 20-Sep-14 08-Nov-14 642 M A4800 A4820

A4820 Laying of Cables 50 27-Sep-14 15-Nov-14 0 0 A4810 A4850

A4850 Lighting Columns Concrete Foundations 30 01-Nov-14 30-Nov-14 60 NO. A4820 A4852

A4852 High Masts Concrete Foundations 30 01-Nov-14 30-Nov-14 0 0 A4850 A4855, A5500

A4855 Concrete Foundations for Transformer Stations & Feeder Pillars 20 11-Nov-14 30-Nov-14 0 0 A4852 A4857, A4890

COLUMNS, HIGH MASTSCOLUMNS, HIGH MASTS 30 11-Nov-14 10-Dec-14 0

A4890 Fixing of High Masts 30 11-Nov-14 10-Dec-14 0 0 A4855 A4900

A4900 Fixing of Lighting Poles 30 11-Nov-14 10-Dec-14 0 0 A4890 A4860

TRANSFORMERS & FEEDER PILLARSTRANSFORMERS & FEEDER PILLARS 20 21-Nov-14 10-Dec-14 0

A4860 Installation of Feeder Pillar 20 21-Nov-14 10-Dec-14 0 0 A4900 A4870

J J J J J J J J J

2014 2015 2016

Remove & Dispose Existing 11 Kv Overhead Lines

Remove & Dispose Existing 11 Kv Under Ground Lines27-Jun-14, ELECTRICAL (33 KV)

Obtain Shutdown & Connect to Existing

Remove & Dispose Existing 33 Kv Ovehead Lines27-Jun-14, WATERLINES

Installation of New Irrigation Pipes

Obtain Shutdown & Connect to Existing

Remove & Dispose Existing Irrigation Pipes17-Jul-14, UTILITIES (P.S.)

17-Jul-14, GENERAL

02-Jul-14, TELEPHONE

Provide & Install New Utilities

Remove & Relocate of Existing Utilities

Obtain Shutdown & Connect to Existing

Remove & Dispose of Existing Utilities12-Jul-14, ELECTRICAL

Provide & Install New Utilities

Obtain Shutdown & Connect to Existing

Remove & Relocate of Existing Utilities

Remove & Dispose of Existing Utilities17-Jul-14, WATERLINES

Provide & Install New Utilities

Obtain Shutdown & Connect to Existing

Remove & Relocate of Existing Utilities

Remove & Dispose of Existing Utilities17-Jan-15, PEDESTRIAN UNDERPA

17-Jan-15, GENERAL

07-Nov-14, UNDERPASS STRUCTURE

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Backfilling17-Jan-15, ENTRANCE & EXIST

Casting of Floor Slab

Casting of Walls

Casting of Landing Slabs & Stair Case

Casing of Beams & Roof Slab10-Dec-14, ROAD LIGHTING & ELEC

10-Dec-14, GENERAL

30-Nov-14, CIVIL WORKS & CABLING

Trench for Low Voltage Cables

Laying of Ducts

Laying of Cables

Lighting Columns Concrete Foundations

High Masts Concrete Foundations

Concrete Foundations for Transformer 10-Dec-14, COLUMNS, HIGH MASTS

Fixing of High Masts

Fixing of Lighting Poles10-Dec-14, TRANSFORMERS & FEEDER PILLARS

Installation of Feeder Pillar

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 15 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 16: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

A4870 Power Supply Connections to Feeder Pillar 20 21-Nov-14 10-Dec-14 0 0 A4860

A4857 33 KV & 11 KV Pad Mounted & Pole Mounted Transformers Substations 20 21-Nov-14 10-Dec-14 0 0 A4855

DRAINAGE WORKSDRAINAGE WORKS 40 29-May-14 07-Jul-14 11996

RC PIPESRC PIPES 40 29-May-14 07-Jul-14 11996

GENERALGENERAL 40 29-May-14 07-Jul-14 11996

A5130 Trench Excavation Work 20 29-May-14 17-Jun-14 547 M3 A6060 A5140

A5140 Laying of Drainage Pipes (RCC) 20 03-Jun-14 22-Jun-14 0 0 A5130, A6380 A5150

A5150 Construction of Manholes 20 10-Jun-14 29-Jun-14 20 0 A5140 A5160

A5160 Backfilling 20 18-Jun-14 07-Jul-14 11429 M3 A5150 A5500

ROAD FINISHING WORKSROAD FINISHING WORKS 133 22-Oct-14 03-Mar-15 80795

GENERALGENERAL 133 22-Oct-14 03-Mar-15 80795

EMBANKMENT, SUBBASE & AGGREGATE BASEEMBANKMENT, SUBBASE & AGGREGATE BASE 74 22-Oct-14 03-Jan-15 60026

A5500 Backfilling to Embankment 50 22-Oct-14 10-Dec-14 28571 M3 A4852, A5260, A5160 A5510

A5510 Subgrade Preparation 40 11-Nov-14 20-Dec-14 11064 M2 A5500 A5520

A5520 Preparation of Granular Subbase 40 18-Nov-14 27-Dec-14 6674 M3 A5510 A5530

A5530 Preparation of Aggregate Base Course 40 25-Nov-14 03-Jan-15 13717 M3 A5520 A5540

MEDIAN & SIDEWALK PAVINGMEDIAN & SIDEWALK PAVING 47 11-Dec-14 26-Jan-15 9662

A5540 Installation of Precast Concrete Curbs 40 11-Dec-14 19-Jan-15 4105 M A5530 A5560

A5560 Installation of Interlocking Tiles 40 18-Dec-14 26-Jan-15 5557 M2 A5540 A5570

NEW BITUMINOUS LAYERSNEW BITUMINOUS LAYERS 59 25-Dec-14 21-Feb-15 11084

A5570 Bituminous Prime Coat 38 25-Dec-14 31-Jan-15 0 0 A5560 A5580

A5580 Bituminous Base Course 38 01-Jan-15 07-Feb-15 6325 M3 A5570 A5590

A5590 Bituminous Tack Coat 38 08-Jan-15 14-Feb-15 0 0 A5580 A5600

A5600 Bituminous Wearing Course 38 15-Jan-15 21-Feb-15 4759 M3 A5590 A5620

HIGHWAY SIGNS & ROAD MARKINGHIGHWAY SIGNS & ROAD MARKING 20 12-Feb-15 03-Mar-15 23

A5620 Fixing of Highway Signs Single & Multiple Poles 15 12-Feb-15 26-Feb-15 22 NO. A5600, A6410 A5630

A5630 Fixing of Overhead & Gantry Signs 15 12-Feb-15 26-Feb-15 1 NO. A5620 A5640

A5640 Traffic Lines & Road Studs 10 22-Feb-15 03-Mar-15 0 0 A5630 A1520, A6100, A6730

SURVICE ROADSSURVICE ROADS 118 04-Mar-15 29-Jun-15 21323

SR2 (CH 1+200 to 1+477.488)SR2 (CH 1+200 to 1+477.488) 118 04-Mar-15 29-Jun-15 21323

TRAFFIC SHIFTINGTRAFFIC SHIFTING 4 04-Mar-15 07-Mar-15 0

TO NEW MAIN ROADTO NEW MAIN ROAD 4 04-Mar-15 07-Mar-15 0

GENERALGENERAL 4 04-Mar-15 07-Mar-15 0

A1520 Placing of Plastic Barriers & Temporary Signs 4 04-Mar-15 07-Mar-15 0 0 A5640 A1530

A1530 Shift Traffic from Existing Southern & Northeren Service Roads to New Main Road 0 07-Mar-15 0 0 A1520 A5790

GENERAL CIVIL WORKSGENERAL CIVIL WORKS 16 08-Mar-15 23-Mar-15 711

CLEARING & EXCAVATIONCLEARING & EXCAVATION 16 08-Mar-15 23-Mar-15 711

GENERALGENERAL 16 08-Mar-15 23-Mar-15 711

A5790 Clearing & Grubbing 5 08-Mar-15 12-Mar-15 710 M2 A1530 A5800, A10190

A5800 Removal of Structures & Obstructures 5 10-Mar-15 14-Mar-15 1 LS A5790 A5820

A5820 Road Way Excavation 12 12-Mar-15 23-Mar-15 0 0 A5800 A4910

PEDESTRIAN UNDERPASS 3 (SR2 CH 01+320) - STAGE 2PEDESTRIAN UNDERPASS 3 (SR2 CH 01+320) - STAGE 2 108 08-Mar-15 23-Jun-15 3802

GENERALGENERAL 108 08-Mar-15 23-Jun-15 3802

UNDERPASS STRUCTUREUNDERPASS STRUCTURE 76 08-Mar-15 22-May-15 2990

A10190 Structural Excavation 10 08-Mar-15 17-Mar-15 584 M3 A5790 A10150

A10150 Blinding of Concrete 12 11-Mar-15 22-Mar-15 137 M3 A10190 A10160

A10160 Casting of Base Slab 21 18-Mar-15 07-Apr-15 185 M3 A10150 A10170, A10210

A10170 Casting of Walls 21 08-Apr-15 28-Apr-15 185 M3 A10160 A10180

A10180 Casting of Top Slab 21 29-Apr-15 19-May-15 185 M3 A10170 A10200

A10200 Backfilling 3 20-May-15 22-May-15 1714 M3 A10180 A5650

ENTRANCE & EXISTENTRANCE & EXIST 77 08-Apr-15 23-Jun-15 812

A10210 Casting of Floor Slab 22 08-Apr-15 29-Apr-15 194 M3 A10160 A10220

A10220 Casting of Walls 35 30-Apr-15 03-Jun-15 309 M3 A10210 A10230, A10240

A10240 Casting of Landing Slabs & Stair Case 35 20-May-15 23-Jun-15 309 M3 A10220 A10230

A10230 Casing of Beams & Roof Slab 20 04-Jun-15 23-Jun-15 0 0 A10220, A10240 A6100

J J J J J J J J J

2014 2015 2016

Power Supply Connections to Feeder Pillar

33 KV & 11 KV Pad Mounted & Pole Mo

07-Jul-14, DRAINAGE WORKS

07-Jul-14, RC PIPES

07-Jul-14, GENERAL

Trench Excavation Work

Laying of Drainage Pipes (RCC)

Construction of Manholes

Backfilling03-Mar-15, ROAD FINISHING WORKS

03-Mar-15, GENERAL

03-Jan-15, EMBANKMENT, SUBBASE

Backfilling to Embankment

Subgrade Preparation

Preparation of Granular Subbase

Preparation of Aggregate Base Course26-Jan-15, MEDIAN & SIDEWALK PAVING

Installation of Precast Concrete Curbs

Installation of Interlocking Tiles21-Feb-15, NEW BITUMINOUS LAYERS

Bituminous Prime Coat

Bituminous Base Course

Bituminous Tack Coat

Bituminous Wearing Course03-Mar-15, HIGHWAY SIGNS & R

Fixing of Highway Signs Single & Multiple Poles

Fixing of Overhead & Gantry Signs

Traffic Lines & Road Studs29-Jun-15, SURVICE ROADS

29-Jun-15, SR2 (CH 1+200

07-Mar-15, TRAFFIC SHIFTING

07-Mar-15, TO NEW MAIN ROAD

07-Mar-15, GENERAL

Placing of Plastic Barriers & Temporary SignsShift Traffic from Existing Southern

23-Mar-15, GENERAL CIVIL WORKS

23-Mar-15, CLEARING & EXCAVATION

23-Mar-15, GENERAL

Clearing & Grubbing

Removal of Structures & Obstructures

Road Way Excavation23-Jun-15, PEDESTRIAN UN

23-Jun-15, GENERAL

22-May-15, UNDERPASS STRUCTURE

Structural Excavation

Blinding of Concrete

Casting of Base Slab

Casting of Walls

Casting of Top Slab

Backfilling23-Jun-15, ENTRANCE & EXIST

Casting of Floor Slab

Casting of Walls

Casting of Landing Slabs & Stair Case

Casing of Beams & Roof Slab

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 16 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A

Page 17: FQI - Baseline Program

Activity ID Activity Name OriginalDuration

Start Finish Quantity UnitMeasure

Predecessors Successors

ROAD LIGHTING & ELECTRICAL INSTALLATIONROAD LIGHTING & ELECTRICAL INSTALLATION 32 12-Mar-15 12-Apr-15 706

GENERALGENERAL 32 12-Mar-15 12-Apr-15 706

CIVIL WORKS & CABLINGCIVIL WORKS & CABLING 27 12-Mar-15 07-Apr-15 706

A4910 Trench for Low Voltage Cables 12 12-Mar-15 23-Mar-15 532 M A5820, A6530 A4920

A4920 Laying of Ducts 12 17-Mar-15 28-Mar-15 154 M A4910 A4930

A4930 Laying of Cables 12 22-Mar-15 02-Apr-15 0 0 A4920 A4960

A4960 Lighting Columns Concrete Foundations 10 29-Mar-15 07-Apr-15 20 NO. A4930 A5010, A5650

COLUMNS, HIGH MASTSCOLUMNS, HIGH MASTS 10 03-Apr-15 12-Apr-15 0

A5010 Fixing of Lighting Poles 10 03-Apr-15 12-Apr-15 0 0 A4960, A4680, A6350 A5690

ROAD FINISHING WORKSROAD FINISHING WORKS 50 11-May-15 29-Jun-15 16104

GENERALGENERAL 50 11-May-15 29-Jun-15 16104

EMBANKMENT, SUBBASE & AGGREGATE BASEEMBANKMENT, SUBBASE & AGGREGATE BASE 24 11-May-15 03-Jun-15 12361

A5650 Backfilling to Embankment 12 11-May-15 22-May-15 6857 M3 A4960, A10200, A1058 A5660

A5660 Subgrade Preparation 7 18-May-15 24-May-15 1936 M2 A5650 A5670

A5670 Preparation of Granular Subbase 7 23-May-15 29-May-15 1168 M3 A5660 A5680

A5680 Preparation of Aggregate Base Course 7 28-May-15 03-Jun-15 2400 M3 A5670 A5690

MEDIAN & SIDEWALK PAVINGMEDIAN & SIDEWALK PAVING 10 31-May-15 09-Jun-15 1691

A5690 Installation of Precast Concrete Curbs 7 31-May-15 06-Jun-15 718 M A5680, A5010 A5710

A5710 Installation of Interlocking Tiles 7 03-Jun-15 09-Jun-15 973 M2 A5690 A5720

NEW BITUMINOUS LAYERSNEW BITUMINOUS LAYERS 22 06-Jun-15 27-Jun-15 2042

A5720 Bituminous Prime Coat 7 06-Jun-15 12-Jun-15 0 0 A5710 A5730

A5730 Bituminous Base Course 7 11-Jun-15 17-Jun-15 1165 M3 A5720 A5740

A5740 Bituminous Tack Coat 7 16-Jun-15 22-Jun-15 0 0 A5730 A5750

A5750 Bituminous Wearing Course 7 21-Jun-15 27-Jun-15 877 M3 A5740 A5760

HIGHWAY SIGNS & ROAD MARKINGHIGHWAY SIGNS & ROAD MARKING 7 23-Jun-15 29-Jun-15 10

A5760 Fixing of Highway Signs Single & Multiple Poles 7 23-Jun-15 29-Jun-15 10 NO. A5750, A6410 A5780

A5780 Traffic Lines & Road Studs 5 25-Jun-15 29-Jun-15 0 0 A5760 A6100, A6740

J J J J J J J J J

2014 2015 2016

12-Apr-15, ROAD LIGHTING &

12-Apr-15, GENERAL

07-Apr-15, CIVIL WORKS & CABLING

Trench for Low Voltage Cables

Laying of Ducts

Laying of Cables

Lighting Columns Concrete Foundations12-Apr-15, COLUMNS, HIGH MASTS

Fixing of Lighting Poles29-Jun-15, ROAD FINISHING WORKS

29-Jun-15, GENERAL

03-Jun-15, EMBANKMENT, S

Backfilling to Embankment

Subgrade Preparation

Preparation of Granular Subbase

Preparation of Aggregate Base Course09-Jun-15, MEDIAN & SIDEWALK PAVING

Installation of Precast Concrete Curbs

Installation of Interlocking Tiles27-Jun-15, NEW BITUMINOUS LAYERS

Bituminous Prime Coat

Bituminous Base Course

Bituminous Tack Coat

Bituminous Wearing Course29-Jun-15, HIGHWAY SIGN

Fixing of Highway Signs Sing

Traffic Lines & Road Studs

CCC OMAN LLC

Primary Baseline

Actual Work

Remaining Work

Critical Remaining Work

Milestone

Summary

UPGRADING OF FALAJ AL QABAIL ROUNDABOUT

Page 17 of 17

Data Date: 30-Oct-13 UPDATES TO CLAUSE 14 PROGRAM

Date Revision Checked Approved

13-Apr-14 FQI - REV2 18 September 2014

12-Oct-14 FQI - REV3

02-Feb-15 FQI - REV3 A