Page 1: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

FPSO LIFE EXTENSION TOTAL APPROACH

Mireille FRANCO DEV/TEC/STR

Page 2: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

FPSO LIFE EXTENSION: OUTLINE

2

INTRODUCTION

TOTAL WOLDWIDE FPSO FLEET

LIFE EXTENSION

CONCLUSIONS

FPSO LIFE EXTENSION- MCEDD Madrid 2014

Page 3: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

INTRODUCTION

Page 4: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

INTRODUCTION

• Life extension

– Support and its systems – Production – Export systems

•This presentation will focus in FPSO HULL

FPSO LIFE EXTENSION- MCEDD Madrid 2014 4

Page 5: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

INTRODUCTION

Life Extension

Integrity Management

System

Design & Construction

Condition Assessment (Analysis & Inspection)

IMMR plan

5 FPSO LIFE EXTENSION- MCEDD Madrid 2014

Life extension relies on: - Integrity Management System involved from Design to Decommisioning - Design based in proved standards and good quality construction

- Condition assessment : analysis and regular inspection - IMMR plan in place

Page 6: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

TOTAL FLEET

Page 7: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

FLOATING UNITS AROUND THE WORLD

FPSO LIFE EXTENSION- MCEDD Madrid 2014

World fleet: 150 FPSOs (not considering the unconventional as SEVAN)

IN OPERATION

YEAR 2010s

YEAR 2000s

YEAR 1990s

YEAR 1980s 99

33

6 12

60% Approx. are converted hulls

Page 8: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

8

FLOATING UNITS:

NKP FPU

GIRASSOL FPSO

AKPO FPSO

DALIA FPSO

NKP (concrete FPU, 1996) Farwah (FPSO, 2003) NKS II (FGSO, 1996) Dalia (FPSO, 2006) Girassol (FPSO, 2001) Akpo (FPSO, 2009) Unity (FSO, 2002) Serepca 1 (1984-2009) Alima (FPU, 2008) replaced by Kingsway Pazflor (FPSO, 2011) Usan (FPSO, 2012) CLOV (FPSO, 2014)

SOME NEW UNITS COMING SOON:

EGINA (FPSO, 2017) MOHO NORD (FPU+TLP, 2016)

PAZFLOR FPSO

MOST OF THEM SITUATED IN THE GULF OF GUINEA, MILD ENVIRONMENTAL CONDITIONS

FPSO LIFE EXTENSION- MCEDD Madrid 2014

FLOATING UNITS: TOTAL’S FLEET

Page 9: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

LIFE EXTENSION

Page 10: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

10

Design life TIME

PE

RFO

RM

AN

CE

DESIGN LEVEL

LIFE EXTENSION

Acceptable loss of performance

Unacceptable loss of performance

ACCEPTABLE

The EXTENSION OF LIFE keys are: 1. To know the acceptable level of performance for the FPSO 2. To know about the condition of the FPSO 3. To know about how the FPSO is aging.

FPSO LIFE EXTENSION- MCEDD Madrid 2014

LIFE EXTENSION

Page 11: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

Drivers for Life Extension are mostly commercial and taken in a case by case basis.

Some particularities:

Specifications highly dependent on past life of the unit International Reference Standards not specific for FPSO

extension of life Project to be executed with ongoing operations Relevance of the time varying factors: Previous repairs “survival” Coating degradation / integrity Fatigue Others: Metocean reassessment New technologies New standards / Rules

11

LIFE EXTENSION

FPSO LIFE EXTENSION- MCEDD Madrid 2014

Page 12: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

12

MAIN OBJECTIVE: KEEP INTEGRITY OF THE UNIT

Extension of life is also an IN SERVICE philosophy

- Keeping integrity and fitness today for avoiding big scopes in the future

FPSO LIFE EXTENSION- MCEDD Madrid 2014

LIFE EXTENSION

Page 13: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

13

MAIN OBJECTIVE: KEEP INTEGRITY OF THE UNIT

Extension of life is also an IN SERVICE philosophy

3rd-p. Comp . (control by GSF)

Subsidiary Subsidiary

Subsidiary

Subsidiary GSF, 3rd Party Assist. Cy, Subsidiary

Inspection Plan

Inspection Plan Update

Inspection Plan Execution

Inspection Reporting and Updating of the database

Models Update & re-Analysis

Annual Review Meeting of FU Condition

LIFE EXTENSION

FPSO LIFE EXTENSION- MCEDD Madrid 2014

Page 14: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

14

MAIN OBJECTIVE: KEEP INTEGRITY OF THE UNIT

Extension of life is also an IN SERVICE philosophy

FATIGUE MONITORING

FPSO LIFE EXTENSION- MCEDD Madrid 2014

LIFE EXTENSION

Page 15: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

ENGINEERING

Page 16: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

16

ENGINEERING

1. PAST 1. Good data (Design, Installation, Operation)

2. PRESENT 1. Assessment « As it is »: understanding the degradation processes

and the response of the unit 2. Rules and standards in force 3. New tools

3. FUTURE

1. Requirements for future operation 2. IMMR plan

FPSO LIFE EXTENSION- MCEDD Madrid 2014

Page 17: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

17

ENGINEERING

1. HISTORY : docs review 1. Inspection reports: class and owner 2. Maintenance records 3. Repairs records 4. Design dossier: site conditions, corrosion allowances, Class rules 5. Operational conditions 6. Definition of Inspection plan for structure and critical equipment

2. INSPECTION 1. Hot spot driven inspection 2. Critical equipment 3. Close visual inspections of hull (cleaning): coating status/corrosion 4. Equipment inspections/surveys 5. UTM measurements 6. Underwater inspections 7. Mooring-if intended to be kept

FPSO LIFE EXTENSION- MCEDD Madrid 2014

Page 18: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

18

ENGINEERING

FPSO LIFE EXTENSION- MCEDD Madrid 2014

Be aware of initial INCERTAINTIES which may be carried over future life AND ALSO of new project uncertainties: - Unavailable drawings, reports, feedback - Loads: metocean, operation loads - New failures types to be considered: pitting? Vibrations? - Quality of original construction: coating application? - Computerized models simplifications

Page 19: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

19

ENGINEERING

3. Preliminary Analysis/ studies 1. Gap between old Codes and Rules/Codes in force: IMPACT 2. Site conditions –gap with previous metocean-IMPACT 3. New Production conditions if any- topsides/equipment 4. 2D evaluation of actual scantlings 5. Corrosion forecast-evaluation 6. Rough Estimation of steel renewal 7. Equipment to be kept/refurbished/replace: spares availability 8. Preservation 9. 2D fatigue screening 10. 3D fatigue- deterministic? 11. Mooring

4. Analysis/studies 1. Full 3D FEM strength and fatigue analysis 2. Steel renewal: thickness diminution and pitting 3. Steel repairs/ steel modifications 4. Equipment compatibilities 5. Class requirements 6. Mooring

FPSO LIFE EXTENSION- MCEDD Madrid 2014

Page 20: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

20

ENGINEERING TOTAL General Specifications / Company Standards • From design to decommissioning

• Enhanced Ship Technology for Offshore Industry needs:

- additional corrosion margins

- adapted fatigue safety factors

- fabrication and construction enhanced focusing in critical areas

- Yielding, Buckling and Fatigue addressed through latest finite elements

calculations methodologies

- Permanent means of access

- IMMR plan and conditions included in design.

- Mooring design as critical system

• Continious improvent & room for new Knowledge and technology, FEED

BACK from Industry and new methods. -:

FPSO LIFE EXTENSION- MCEDD Madrid 2014

Page 21: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

WORKS EXECUTION &

LESSONS LEARNT

Page 22: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

22

LIFE EXTENSION

DRY DOCK

ON SITE

FPSO LIFE EXTENSION- MCEDD Madrid 2014

Engineering results: scope Important Steel bottom to be renewed Important equipment to be installed/un-installed Shipyard // offshore units opportunities

Engineering results: scope No Steel bottom to be renewed No topsides modification Pure extension of life (no relocation)

Schedule and economics

Page 23: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

CONCLUSIONS

Page 24: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

FIRST CONCLUSIONS:

24

• The number of Life Extesion projects is expected to increase with the aging of the existing units

• Aging and life extension is to be faced from day one: • By designing for a long and ‘healthy” life • By having in place a commited ASSET INTEGRITY MANAGEMENT

FPSO LIFE EXTENSION- MCEDD Madrid 2014

TO BE ENCOURAGED -PRIORITY TO INSPECTIONS FOR ESTIMATION OF SCOPE OF WORK -ANALYSIS COVERING BOTH PREVIOUS OPERATIONAL LIFES AND FUTURE CONDITIONS -PRIORITY TO GOOD CLEANING FOR CLOSE VISUAL INSPECTIONS -REPAIRS/RENEWAL: FORECAST OF FUTURE DEGRADATIONS -DO NOT UNDERESTIMATE THE DIFFICULTIES OF EXECUTION IN CONFINED SPACES -USE QUALIFIED AND RELIABLE VENDORS

Page 25: FPSO LIFE EXTENSION TOTAL APPROACH - MCEDDmcedd.com/wp-content/uploads/Mireille Franco - Total.pdf · •Life extension – Support and its systems – Production – Export systems

25

ANY QUESTION??

THANK YOU!! [email protected]

FPSO LIFE EXTENSION- MCEDD Madrid 2014