foundation equipment
TRANSCRIPT
F O U N D AT I O N E Q U I P M E N T
Offshore Foundation SolutionsVibratory Hammers
THIS IS DIESEKO GROUPINTRODUCTION
▪ Dieseko is the global player
in the foundation technology
market based in the
Netherlands
▪ Products marketed under
brands ICE, PVE and
Woltman
▪ Shareholder of
▪ Clear focus on foundation
equipment
▪ World leader in vibratory
equipment
Netherlands ChinaUSA BrasilPoland Australia
1974 1977 1978 1983 1989 1995 2004 2008 2009 2010 2012 2013 2014 2015 2016 2017
INTRODUCTIONOVER 40 YEARS HISTORY
1974
PVE
▪ 1974 Founding Dieseko – Bolnes
1974 1977 1978 1983 1989 1995 2004 2008 2009 2010 2012 2013 2014 2015 2016 2017
INTRODUCTIONOVER 40 YEARS HISTORY
1977
ICE
▪ 1977 Founding ICE – Amsterdam as animporter of American vibratoryhammers
1974 1977 1978 1983 1989 1995 2004 2008 2009 2010 2012 2013 2014 2015 2016 2017
INTRODUCTIONOVER 40 YEARS HISTORY
2008
▪ 2008 Founding of DIESEKO GROUP
PVE and ICE merge and they join forces in a single strong company with a comprehensiveproduct portfolio and global service netwerk.
Dieseko Group starts as a house of brands.
1974 1977 1978 1983 1989 1995 2004 2008 2009 2010 2012 2013 2014 2015 2016 2017
INTRODUCTIONOVER 40 YEARS HISTORY
2009
▪ 2009 The new emerging market: offshore
▪ Developing the 200M ‘twin’ for theconstructions of wind farms.
▪ The PVE 200M active in Bard1 offshore project
1974 1977 1978 1983 1989 1995 2004 2008 2009 2010 2012 2013 2014 2015 2016 2017
INTRODUCTIONOVER 40 YEARS HISTORY
2010
▪ 2010
▪ PVE 300M, Dieseko Group once againintroduces the biggest vibratory hammerin the World
▪ With the establishment of ICE China in Shanghai a fully owned rental fleet comesavailable.
▪ With the Vibroflot, a new product is addedto the range
▪ 2011
▪ A rental fleet is established in Brazil
1974 1977 1978 1983 1989 1995 2004 2008 2009 2010 2012 2013 2014 2015 2016 2017
INTRODUCTIONOVER 40 YEARS HISTORY
2012
▪ 2012
▪ The award for ”Best Managed Companies” is won again
▪ Dieseko Group provides two sets of thePVE 300 MU upending vibratory hammer, to the prestigious Global Tech wind farm in Germany
1974 1977 1978 1983 1989 1995 2004 2008 2009 2010 2012 2013 2014 2015 2016 2017
INTRODUCTIONOVER 40 YEARS HISTORY
▪ 2014
▪ Dieseko Group celebrates 40th anniversary.
▪ Introduction of PVE 500M, the world’sbiggest mono bloc vibro hammer
2014
DIESEKO GROUPORGANIZATION
▪ Branches and dealers
▪ Certification / Quality
▪ Employees
▪ Safety
▪ Awards
▪ Partners and suppliers
ISO 9001
CE DEMANDS
DNV-CERTIFICATION
DIESEKO GROUPORGANIZATION
▪ Branches and dealers
▪ Certification / Quality
▪ Employees
▪ Safety
▪ Awards
▪ Partners and suppliers
DIESEKO GROUPORGANIZATION
▪ Branches and dealers
▪ Certification / Quality
▪ Employees
▪ Safety
▪ Awards
▪ Partners and suppliers
Employeesworldwide200
NVAF
DFI, PDCA
DIESEKO GROUPORGANIZATION
▪ Branches and dealers
▪ Certification / Quality
▪ Employees
▪ Safety
▪ Awards
▪ Partners and suppliers
DIESEKO GROUPORGANIZATION
Best ManagedCompany (2010, 2012)
Gazellen Award(2007, 2009, 2013)
#1
▪ Branches and dealers
▪ Certification / Quality
▪ Employees
▪ Safety
▪ Awards
▪ Partners and suppliers
PARTNERS AND SUPPLIERSORGANIZATION
▪ Branches and dealers
▪ Certification / Quality
▪ Employees
▪ Safety
▪ Awards
▪ Partners and suppliers
PARTSBUSINESS
DRIVEABILITY STUDIES
• Allnamics + GeoDrive
• Minimising risk
• Selecting most suitable hammer
• Advise for customers
OWF Noordoostpolder - Pile 5000x45-30mm - PVE-400
Remaining Driving force and Toe Resistance
Ftoe : Remaining Driving Force at Toe
SRVtoe: Vibratory Toe Resistance
Force [MN]
109876543210
Penetr
atio
n [m
] -
NA
P
30
28
26
24
22
20
18
16
14
12
10
8
6
4
2
0
Dieseko group
CONSULTANCY
DRIVEABILITY STUDIES
WHY DIESEKO ?
• More than 45 years experience in Vibro Equipment
• Sustainable and durable quality of our products
• Global dealer network (service 24/7)
• Co-engineering together with our clients
Benefits PVE Vibratory Hammer
Balanced equipment;
▪ Better kN – kgm – amplitude weight ratio
Hydraulic power (kW) vs centrifugal force (kN);
▪ (m3/sec * pressure) vs kN
High torque;
▪ Max force even in tough conditions
Forced lubrication;
▪ Better cooling – less wear and tear
Additional gearbox cooling;
▪ Longer life-time, no overheating
Benefits PVE Vibratory Hammer
▪ Forced lubrication + additional cooling
▪ High performance
▪ Increased life-time
▪ Bearings
▪ Oil
▪ Gears
LESS MAINTENANCE
Benefits of Power packs
▪ High reliability
▪ Better cooling
▪ Additional cooling system
▪ Variable pumps
▪ Easy troubleshooting iQan
▪ Sound proof
▪ Multi purpose hydraulic power packs
Vibratory Hammers vs. Conventional Methods
1. Installation Speed Significant time saving 2. Noise reduction (< 140 dB)3. Accurate positioning
• Option to extract piles
• Less fatigue • Cost efficient pile design• Longer life-time of structure
1
32
Installation speed
▪ Handling time (less than 1 hour)
▪ Driving time 1 meter per 1 minute (rule of thumb)
Noise Reduction
Noise Reduction
Between 6 and 11 October 2016, 4 monopiles (3200-3700mm dia) where retracted from the seabed at “Windpark Lely” with our PVE 500M vibratory hammer. During the work extensive underwater sound measurements were performed, resulting in positive indications of noise levels compared to “German requirements”.
BARD Offshore 1 OWF
300M The Netherlands
300M Singapore
300MU North Sea
China PVE 200M
PVE 500M
2000M GIANT
UPENDING
UPENDING
INNOVATIONSUPENDING PROFILES
▪ Also available as (aftermarket) add-on
PATENDEDPVE 110MU Upending
PVE 82MU Upending
F O U N D AT I O N E Q U I P M E N T