Fort George G. Meade Face of Change. Cyber. Transformation. EUL. BRAC. Critical Analysis, Research, and Project Development. Transportation. Joint Land Use. Transportation Demand Management (TDM). Relocation Timeline. As of: 22 Apr 2011. Personnel Totals. - PowerPoint PPT PresentationTRANSCRIPT
Fort George G. MeadeFace of Change
Transformation
Critical Analysis,Research, andProject
Development
BRACEUL
Cyber
Joint Land UseTransportation
Transportation Demand Management
(TDM)
Agency/Time
Dec 2011Jan
Feb Mar Apr May Jun Jul Aug
DISA 600 600 600 600 600 600 400 272
DMA 103 204 204 152
Adjudication
50 150 150 150 200 67
Total 600 600 650 750 853 954 804 491As of: 22 Apr 2011
Personnel Totals
Total Military Civilian ContractorDISA 4272 339 2348 1585Adjudication 767 56 603 108DMA * 663** 217 314 132*DMA building occupancy date was delayed, therefore migration of positions shifted from Spring to Summer** A number of recently hired personnel are from Maryland and or have begun to relocate to Maryland
Relocation Timeline
Roadway Projects
RED
= Intersection= Gate= Road= Unfunded / Critical= Unfunded / Moderate= Funded
YELLOW
GREEN
Funded Road Projects
Access Control PointRockenbach ACP ($9.7M) (through state)
Road wideningCooper Ave Improvements (BRAC)
IntersectionsReece at Ernie Pyle ($1.75M)Rockenbach at Cooper $1.4MMapes at Cooper ($1.9M)
Unfunded Road Projects
Mapes Rd East ACP ($6.2M)Mapes Rd West ACP ($8.3M)Reece Rd ACP ($10.6M)Llewellyn ACP ($8.8M)
Access Control Points
Road wideningMapes Rd East ($1.95M)Mapes Rd West ($3.4M)Reece Rd ($3.25M)
IntersectionsMapes at Ernie Pyle ($1.8M) Mapes at O’Brien ($1.85M)Rockenbach at O’Brien ($1.75M)
Projects
Projects
Defense Information Systems Agency
Defense Media Activity
Adjudication Activities
Building 902
DINFOS Expansion
CYBER
Rockenbach ACP
Rockenbach/Cooper Rd Intersection Mapes/Cooper Rd Intersection
CYS – Sports Complex
Golf Course
Elements of TDM
• Telework
• Carpools
• Vanpools
• Buses – subscription, ICC, shuttle
• MARC Train
• Metro Rail
• Light Rail
• Walk/Bike
Transportation Demand Management (TDM)
Situation: (peak period – 0700 to 0800 hours) Current gate lane capacity 360/hr: 2 lanes/gate X 5 gates X 360 vehicles = 3,600
Number of vehicles now arriving during peak period ~ 3,900 (300 vehicles over capacity)
No improvements of gates and roadways in near future for lack of funding
Llewellyn Gate was a multi-occupancy vehicle (MOV) gate on a trial basis – was re-evaluated – now one lane at Rockenbach is devoted to MOV traffic – two lanes will be open to all other traffic
Status:Current wait time at some gates ~ 5 to15 minutes
With growth and no TDM this time will only increase
Way Ahead:Implement TDM programs now
Carpool, Vanpool, Buses, MARC Train, Metro, Light Rail, Bicycles, walkCompressed work schedule, Flex schedule, TeleworkUse gate for inbound traffic only from 0600 to 0900
Identify new ways to reduce single occupancy vehicle (SOV) usage
Transportation Demand Management (TDM)
Programs of Interest • Mass Transportation Benefits Program (MTBP):
Currently up to $230 per month for use with vanpools, mass transit optionsMust register – http://asafm.army.mil/offices/asa/masstrans.aspx?OfficeCode=1000 Complete form – then take to Bldg 219 for processing (Mr. Riley, 301 677-5813)Some agencies provide for their own employees
• Guaranteed Ride Home Program (GRHP):For those who commute at least two days per week (walking & carpools)Can use up to four times per year, for real emergenciesOptions include taxi, rental car, or free mass transitRegister online: http://www.mwcog.org/commuter2/commuter/grh/index.html
OR http://www.cmrtransit.org
• Odenton MARC Train and Internal Shuttle:For schedules visit: www.ftmeade.army.mil
• Intercounty Connector (ICC) – Gaithersberg to FGGM & Return: For schedule visit: http://www.mtaiccbus.com/
• Other resource websites: www.mta.maryland.gov, www.meaderide.com, &www.mdtrip.org
Transportation Demand Management (TDM)