formato sena ingles 2013 (1)

5
Dirección General Dirección de Formación Profesional NATIONAL SERVICE OF LEARNING FORM FORMATION`S PROJECT Name: _____________Bantracord_______________________ Grade: ___9A_____ Direction Web: ____________________________ Tel: ______________ 1.1 EducationalInstitution: Industrial technicaleducationalinstitution 1.2 MUNICIPALITY: Marinilla 1.2 Name of the project: Bantracord 1.3 Training Program that responds to 1.4 Estimated time of execution of the project (months): 5 month 1.5Companies or institutions that take part in his formulation or financing : (if exist) 1.7 Key words of search Transport-production-mobility

Upload: santiagotheguitar

Post on 11-Jul-2015

25 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: Formato sena ingles 2013 (1)

Dirección General Dirección de Formación Profesional

NATIONAL SERVICE OF LEARNING

FORM FORMATION`S PROJECT

Name: _____________Bantracord_______________________ Grade: ___9A_____

Direction Web: ____________________________ Tel: ______________

1.1 EducationalInstitution:

Industrial

technicaleducationalinstitution

1.2 MUNICIPALITY: Marinilla

1.2 Name of the project:

Bantracord

1.3 Training Program that responds to

1.4 Estimated time of execution of the

project (months):

5 month

1.5Companies or institutions that take part

in his formulation or financing : (if exist)

1.7 Key words of search Transport-production-mobility

Page 2: Formato sena ingles 2013 (1)

2. Structure of the Project 2.1 Approaching the Problem

How make a black line follower robot carrying cotton to the company JGB and improve transportation and production?

2.2 Justification of theProject

This project done in order to show the performance of the robot followed lines and its application in everyday life for the implementation in the transport and the reduction of costs in the factories

2.3 General objetive

Develop a black line follower robot that allows the transport of better performance and economy.

2.4 Specific objetive:

. improve the quality of life of people through the creation of artifacts that optimize production and quality of the products of the company.

2.Buscar los materiales que sean amigables con el ambiente y que mejoren la economía.

2.5 scope

2.5.1 Beneficiaries of theproject

employees of largefactoriesto seeka better solution

2.5.2 Impact presents improvements to the production companies would be a good thing.

Social helpwithpractical benefits

Economic increased productionin the industry

Environmental recyclable materialfact

Technological transport problems andincreased production.

2.5.3 Restrictions or associated risks:none

2.5.4. Products or results of the projectimprove transportationof goodswithin largefactories andoptimizeproduct qualityand reducehigh costs

Page 3: Formato sena ingles 2013 (1)

2.6:Innovation/ Technologicalmanagement

The project addresses a need of the productive sector

yes/no

NO

The project improves the process / product / service exists?.

yes/no

YES

The project involves the use of new techniques and process technologies

yes/no

YES

The end products are susceptible to industrial protection and / or copyright

yes/no

NO

The products obtained in the project can be positioned in the market?.

yes/no

YES

2.7 Productiveassessment

With the development of the project can meet the need for a potential customer.

yes/no

YES

Feasibility of project business plan

yes/no

YES

3. Planning

Page 4: Formato sena ingles 2013 (1)

3.1 PROCESS STAGES

3.2

ACTIVITIES OF THE

PROJECT

3.3. RESULTS OF LEARNING(a partirof the program of formation)

3.4 ASSOCIATE COMPETITION

DESCRIPTION OF THE ACTIVITY TEACHERSTHAT TAKE PART

HOURS EVIDENCES

Fase 1: Fundamentación

PHASE 2:formulación

PHASE 3:DIAGNOSTIC

4 PHASE:ANALYSIS AND CONSTRUCTION OF THE

PROPOSAL

5 PHASE:

Page 5: Formato sena ingles 2013 (1)